Loading...
HomeMy WebLinkAboutResolution No. 2011-089 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2011- 110'-'' 'j A RESOLUTION OF THE CITY OF THE COLONY, TEXAS, AWARDING A BID AND APPROVING THE TERMS AND CONDITIONS OF A CONSTRUCTION SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND RKM UTILITY SERVICES, INC., FOR RECONSTRUCTION OF THE PHASE IV RESIDENTIAL STREETS; AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT; PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council has determined that it is in the best interest of the citizens to award a bid to RKM Utility Services, Inc., and execute a construction contract for reconstruction of the Phase IV Residential Streets; and WHEREAS, the City of The Colony agrees to pay the sum of $2,377,539 for such work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THAT: Section 1. The City Council of the City of The Colony, Texas hereby awards a bid to RKM Utility Services, Inc., for reconstruction of the Phase IV Residential Streets for a total amount of $2,377,539 for said work. Section 2. The City Manager is authorized to execute a Construction Services Contract for said work. Section 3. This resolution shall take effect immediately from and after its passage. PASSED AND APPROVED by the City Council of the City of The Colony, Texas, this 6"' day of December, 2011. Aoity e McCo y, Mayor ATTEST: of The Colony, Texas { Christie Wilson, City Secretary' APPROVED AS TO FORM: Jeff Moore, City Attorney Phase IV Sheet Recpnstmctlon RKM Jet The Fain Camino SYS Jim Bowm CPS JRJ TISEO The Colony, Texas Utility Services Inc. Underground Utility Group, inc. Construction Constmctron Co., Inc. Construction Cc., LP Civil, LLC Paving Paving Co. BID OPENS: 2:00 P.M., TUESDAY, November 22, 2011 N0. DESCRIPTION QUANTITY UNIT UNIT $ TOTAL SECTION I - CLOVER VALLEY DRIVE $ UNIT $ TOTAL $ UNIT $ TOTAL $ UNITS TOTALS UNIT S TOTAL E UNIT $ TOIL $ UNITS TOTAL S UNIT $ TOTAL E UNITS TOTAL $ SUB-SECTION IA -PAVING AND DRAINGE IMPROVEMENTS I =COnstmch- Staking work fully performed 1 LS 52,30000 $2,300.00 $15,000.001 $15000.00 $8000,00 $8,000.00 $6000.00 58000000 $9,000.00 $9,000.00 f90,0OO.DG 590.000.00 $10,000.00 $10,000.!10 $14,43].]1 514,631.71 $18,00000 $18000.00 Barricades, Warring and Detour Signs, and Fences, designer) and 2 implemented for temporary traffic cpntrol during construction, work fully 1 LS performed, cpmplete in place $5,000.00 $5,000.00 $3500.00 $9500.00 $10,000.00 $10,000.00 $3007.00 $3,007.00 $10,000.00 $10,000.00 $8,700.00 $8,]00.00 $6,000.00 $6,000.00 $8,080.70 $8,080.70 512.500.00 5125011.00 Joint "tort' Water Pollution Prevention Plan, impleme-c! and maintained, 3 ncluding preparation of Notice of Intent and Notice of Termination, work 1 LS fully pertormetl, complete in place $2.000.00 $2,000.00 51,400.00 $1,400.00 $1.400.00 $1,400.00 $1.000.00 $1,000.00 $2.200.00 $2,200.00 5950.00 595000 $1 000_00 $1,000.00 $1,500.68 $1,500168 51,600.00 51,600.00 Inlet Prote10on, famish antl install work (ally performetl complete'' place 10 EA $100000 $1,00000 $75.00 $7513.00 $100.00 $1,000.00 $125.00 $1,250.00 $110.00 $1,100.00 575.00 5]50.00 $169.00 $1,690.00 $63.00 $630.00 $75.00 $750.00 5 Sohd Sod, fum~sh antl mstall including topsoil and fertilizer, work fully performed, complet¢ in place 5.000 SY $3.50 $1],500.00 $5.25 526,250.00 52.50 $12,500.00 $4.00 $20,0013.00 55.35 $26,]50.00 $3.05 $15,250.00 $5.00 525,000.00 $7.62 $38,100.00 $4.95 $24,750.00 6 General Site Prc n"lon. kf II rt d I " 20 STA _$1,200.00 $24,000.00 $1,000.00 $20,000,00 $1,000.00 520,000.00 $663.0' 516,860.00 54560.00 $91,200.00 $700.00 $14,000.00 $2.000.00 $68000.00 $3,606.80 $72136.00 $2,875.00 $5],500,00 7 Sawcut antl Remove Existing Concrete Pavement antl Flahvork, work fully 85.]2] SF pertortnetl, complete in place $0.70 $60,008.90 $1.10 $94,299.70 $1.00 $85,727.00 $0.8D 568,581.60 $0.55 $4],149.85 $0.51 $43,]20.7] $0.80 $68,581.60 $0.6] $571437.09 $0.70 $S0,OG8.9o S Remove Exishng Storm Drain Pipe (various sizes). work fully performed, mpletc in place 1.30] LF $2.25 $2,940.75 $6,50 $8,405.50 $12.OD $15,684.00 58.00 $10456.00 $10.00 $13,070.00 $25.00 $32,675.00_ $5.00 $6,535.00 $10.50 $13723.50 $11.30 $14,]69.10 A Zicmove Existing Curb Inlet (various sizes), work lolly pertormetl, complete in place 8 EA $200.00 $1,600.00_ $600.00 $4,800.00 5300." S2,4D0.00 $360.00 $2880.00 $400.00 $3,200.00 _ $600.00 gd,800.00 540000 53200.DO $525.00 $4,200.00 5565.00 $4,520.00 10 Remove Existing Tree work fully performed, complete in place _ 3 EA _$4013.00 ^x12.400.00 8200.00 $6.200.00 5200.00 $6,200.00 5550.00 517,05000 $850.00 528350.00 5245.00 57,595.00 $600.00 $18,6G0.00 $414075 512,857,25 $400.00 $12,400.013 11 Unclassifetl Street Excavation, work fully per/omptl complete in place 1,766 CY _ $7.00 $12,362.00 512.50 $22,075.00 $17.00 $30,022.00 $10.00 1 $17,660.00 $12.00 $21,192.0. _ St2.55 $22,163.30 515.00 $26,490.00 $16.69 $29,474,56 Et4.00 $24,]24.00 12 6inch Thick Lime Treatment, work fully perfortnetl, complete in place 8,298 cy $2.60 _-$18596.00 _ $2.25 $18,6]13.50 $2.00 $16,596.00 $1.80 $14,936.40 $2.50 $20,745.00 $2,50 $20,745.00 $3.75 531,117.50 $3.33 527,632.34 $2.65 $21,989.70 13 FumisM1 Lime Material work fully perfortnetl complete ''place 149 TON $100.00 314,900.00 5155.00 $23,095.00 $200.00 $29,800.00 $160.00 $23,840.00 $151.00 $22,499.00 5150.00 $22350.00 $150,00 $22,350.00 $150.70 $22.456.30 $160.00 $23,840.00 6-IncM1 Thick, 6.000 as 14 ;P ortland Lemont Reinforced Concrete Pavement, 8,51)0 SY ark fully pen""""" construct cpmplete in place _ $32.00 $2]2.000.00 $30.00 $255,000.00 542.00 $357000.00 $33.00 $280,500.00 $29.50 $250,750.00 $33,35 $283,475.00 $28.00 $238,000.00 $34.21 $290,785.00 $33.75 $286,8]5,00 1 Pa Thick, 4,000 psi Portland Cement Concrete Alley Approach antl Alley 6 SC0 SF PevemeIL work fully pertormetl construct complete in place $4.46 $28600.00 $3.75 $24,3]5.00 $4.60 $29,900.00 $5.00 532,500.00 $4.25 $27,625.00 54.24 $27,560.00 56.00 $39,000.00 $6.48 $42,120.00 $6.40 $28,600.00 16 6-inch Thick, 4,000 psi POMand Cement Concrete Oriveway Approach and 200 SF Driveway Pavement work fully pertormed construct complete in place 55.00 $1,00000 $3.55 $710.00 $4.16 5820.00 $4.50 $900.00 54.35 $870.00 $3.82 $764.00 $6.00 $1,200.00 $6.26 $1,252.00 54.20 $840.00 17 4-1nch Thick, 4,'00 psi Portland Cement Concrete Barrier-Free Ramp (Type 12), work fully pertorned, construct complete in place 20 EA $85!1.00 $17,000.00 $1,GOG.00 $20,000.00 16 4-i 510000.00 520,000.00 §1,000.00 $20,000.00 $650.00 $13,000.00 $650.00 $13,000.00 $1,000.00 $20,000.00 $865.00 $1],300.00 $700.00 $14,000.00 nch Thick psi Portland Cement Concrete for Sidewalks, work fully p¢rtormetl, c,onstruct4,000 complete in place 15.300 SF $3.50 553,550.00 $3,00 545,900,00 $3.60 555.080.00 53.80 $58,140.00 13.25 149,]25.00 $3.35 551,255.'0 $3.50 $53,550.00 $4.78 $73,134.00 $3.75 $57.375.00 19 Integral Sidewalk Retaining Wull IHeight 11,11 10 11Leas Than 1 Foot), work 500 LF fully pertortnetl, construct complete in place _ S'u'co 520,000.00 $5.]5 $2,875.00 514.00 $7,000.00 58.00 $4,000.00 $8.00 54,000.00 $20,00 510000.00 520.00 $10,000.00 $11.12 $5,560.00 $15.00 $7,500.00 20 ftem"' antl Reinstall Existing Community Mailboxes, including concrete 1 EA fountladon, complete in place $2.500.00 $2,500.00 $450000 5650.00 5600.011 _ $600600 $700.00 $]00.00 $900.00 5800.00 5500.00 $500.00 $2'0.00 $200.00 $800.00 $800.0' 51,000.00 $1,000.00 21 _ Pavestone Tree Well ..,it fully pertomed, cpmplete in place 5 EA $1,500.00 5].500.00 5850.0. $4,250.00 $2,000.00 $10.000.00 $350.00 51,750.00 $1,150.()0 $5,750.00 $2_,625.00 $13,125.00 51,13130.00 $5.000,00 $1,890.00 $9,450,00 $1,300.00 $6,500.00 22 Tree Root barrier work fully pertormed complete in place _ 5C0__ _ LF $15.OG Sc,000.00 _ 512,00 $4,800.00 $7.00 $2,800.00 $2100 $9,200.00 $18.00 $7.200.00 $15.00 $6,000.00 545.00 $18,000.00 §19643 $7,772.00 $19650 S7,8a0.00 23 Pavement Markings and Sinnage famish and install complete in place 1 LS 4,000.00 54,000.00 $4,000.00 §4,000.00 $4,500.00 $6,50(1.00 $4,400.00 $4,400.00 $4,400.00 $4.400.00 $4,200.00 $4,200.00 $1,500.00 $1,500.00 $4189.50 $4,189.50 54,200.00 $4,2(10.00 -4rench SEEM-, afety for Sturm Drain Lines, famish and install -k a requiretl by 24 OSHA Standards that are in effect at the time of bitltling, work fully 1.350 LF pertormed, complete in place ' $,..1 $1,350.00 51.00 $1,350.00 $1.80 $2,430.00 $0.25 $33].50 sloe 51,350.00 $0.50 $675.00 $1.00 $1,350.'0 $1.58 $2,133.00 $1.15 $1,552.50 25' O rain orl'rumian ~n3.- . 'stall including Excavation, Embedment and Backfill, work fully performed, l5 LF $38.00 $2,470.00 $37.00 52,405.00 $33.00 $2,145.00 §44.00 $2,860.00 547.50 $3,087.50 $47.50 $3,087.50 555.00 $3,575.00 $45.68 $2,969.20 560.00 $2,600.00 21-inch Class 111 Reinforced Concrete Stonn Drain (open cut), famish and 26 ''stall including Exca -ti-, Embedment and Backfill, work fully peROnned, 175 1F ompletc im place $43.00 $7,525.00 $40.50 $7,08].50 53800 $6,650.00 549.00 56,575.00 552.50 $9,[87.50 553.00 $9,2]5.00 $60.00 $10,500.00 $49.93 58737.75 $44.25 $7,743.]5 _4-inch Class III Reinforced Concrete Storm Drain (open cut), famish and 27 'stall including Excavation, Embcdmant antl Backfill, work fully pertormed, rG LF ompletc in place _ 550.00 54,500.00 $43.50 $3,91500 $63.00 $3,870.00 $56.0D $5,040.00 $57.00 $5130.0[) ES].35 $5,161.50 $65.00 55650.00 $5],37 $5,163.30 $5!1.00 $4,500.00 ~]-inch C"" m Reinforced Concrete Storm stain (open cut), furnish antl 28 'stall including Excavation, Embedment and Backfill, work lull, pertormed, 100 LF .rhphctein place $59.00 $5,900.00 $47,00 S4,ZD09 DO 549.00 §4,900.00 S6],00 $6,300600 $62.50 $6,250.00 $62670 $6,270.00 $]0.00 $]000.00 563.00 56,300.00 $63.50 56,35!1.00 ~66imch Class III Rei,fom,d Concrete Storm Drain (Inch cull, famish antl 29 install inclutling Excavation, Embetlment and Backfill, work fully pertormed, 340 LF ompletc in place $85.00 $28,900.00 $68.00 $23,120.00 $71.00 $24,140.00 $..00 $28,560.00 $83.50 $28,390.00 $87.25 $29,665.00 $95.00 $32,300.00 586.63 $29454.20 $92.75 $31,535.00 48-inch Class III Reinforced Concrete Storm Drain (open cut), furnish and 30 mstall including Excavation, Embedment antl Backfill, work fully pertorned. 300 LF mpletc in place $120.00 $36.000.00 $102,00 $30,600.00 $110.00 $33,000.00 $130,00 539,000,00 $136.50 $4',950.130 $138.10 541,430.00 $130.00 539,00000 $140.18 542,054.130 5136.50 540,350.00 60-IncM1 Class III Reinforced Concrete Storm Drain (open cut), famish antl 31 in nclutling Excavation, Embetlment antl Backfll, work fully pertormed, 280 1F ompletc in place $180.00 $50,400.00 $1 Sales $42,0'0.00 5170.00 $47,6DO.00 $160.00 $504400.00 $197.00 $55,160.00 $195.30 $54,684.00 $210.00 558,800.00 $183.]5 551450.00 5195.50 $54,740.00 32 4-foot Square Type "B" Junction Box, work fully pertormed, construct ompletc in place EA $3,600.00 53.600.00 $2,600.00 52600.00 53860.00 $3,80G.00 54,100.00 $4,100.00 $3,400.00 $3,400.00 53,570.00 $3,570,00 $2,700.00 $2,700.00 $2,992.50 $2,992.50 $3,110.00 $3,110.00 6-foot Square Type "B" Junction Box, wank fully pertormed, construct 33 omplete in place 1 EA $6.300.00 $61300.00 Simms $3000.00 $7500.D0 $],500.00 54,700.00 $4,700.00 $6,100.00 $6.100.00 $7,140.130 $7.140.00 $4000.00 $4,000.00 54,278.75 $4,278.75 $4,3D0.00 $4,300.00 34 10-foot Standard Curb Inlet, work fully performad. constuct complete in place 6 EA 52,400.00 $14,600.130 $2,800.00 $16,800'0 $2,400.00 $14,400,00 $3100.00 $18600.00 $3,150.00 $18,900.00 53,200.00 $19,200.00 $3,000.00 518,000.00 $2,520.00 $15,120.00 $3,2]].00 $19,662.00 ~0-foot Standartl Curb Inlet, work fully performed, construct complete in 35 place 4 EA 54,500.00 $18,00000 $3,800.00 $15,200.00 $4,300.00 $17,200_00 $5600.00 $22,400.00 $5,]50_00 $23,000.00 551825.00 $23,300.00 $8000.00 $24,000.00 $4,331.25 $17,325.00 54,082.50 316.330.00_ Sub-Total Sub-Section IA $764,102.65 $765,6]3.20 $894,664.00 $806,483.50 $859,480.85 $89],036.0] $054,089.10 $943,004.31 $884814.95 SUB-SECTION IB -WATER AND SANITARY SEWER 1 rent a ety or ate, an annary Shi wer mes, - an lnsta ere _requiretl by OSHA Stantlaftl. that a effect at the time of bidding, 2165 IF 1.00 $21105.00 1.00 52,105.00 1.00 $2,105600 0.25 $526.25 0.10 $210.50 0.50 $1,052.50 1.00 $2,105.00 1.05 $2,210.25 1.15 $2,620.]5 Remove antl Salvage Existing Wlly perfoater Valve (various sizes), including _ 2 Excavation and Backfill, work furmed, complete in place i EA $100.00 $]00.00 _ $200.00 $1,4130.013 5200.00 $1,400.00 $65.00 5455.00 3150.00 $1,050.00 $125.00 587500 $250.00 $1,750.00 $131.25 $918.75 5282.50 $1,9]7.50 3 84111, AtAWA CNO-07 PVC DR 18 (Pressure Cl.- 235), Water Line (open 2 105 LF cut), famish and install, including Excava0on. Embedment, Backfll, F'ntings, Concrete Blocking 8 Clean Up wodc fully performetl complete in place $31.75 $66,833.75 $30.00 $63,150.00 $26_00 554,730.00 534.00 $71,570.00 $29.50 $62,097.50 $27.80 $58519.00 $35.00 $]3,6]5.00 $35.18 $74 053.90 533.90 $]1,359.50 Concrete Encasement for Water Line, famish and install, work fully performed, complete in place 20 LF $20.00 $400.00 $20.00 $400_00 $45.00 $900.00 535.00 $700.00 $30.00 $600.00 $30.00 $60000 54500 $900.00 $34.65 $693.00 $45.50 $910.00 PM1ase IV Street Reconstrucfion RKM Jet The Fain Camino SYB Jim Bowman CPS JRJ TI ED The Colony, Texas Utility Services Inc. Underground Utility Group, inc. Construction Constuction Co., Inc. Construction Co., LP Civil, LLD Paving Paving Co. BID OPENS: 2:00 P.M., TUESDAY, November 22, 2011 NO. DESCRIPTION QUANTITY UNIT UNIT 5 TOTAL $ UNIT $ TOTAL $ UNITE TOTAL $ -UNIT $ TOTAL E UNIT $ TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ 5 B-inch Gate Valve, including on. and lid, fumish and install, work fully 11 FA -performed, complete in place 51,000.00 $11,000;00 $1,1.0.00 $12,100.00 $1,200.00 113,200.00 $1.400.00 $15,400.00 $10]0.00 $11,]]0.00 $t 160.00 $12]60.00 $1,30000 $14,300.00 $1,233.]5 $13,5]1.25 $1,356.00 $14.9%00 6 Pirc Hytlran[ Assembly, Including 6-. leatl line, 6-inch gate valve, and 1 EA barrel extension furnish antl install work fully peffonnetl, <omplete in place $3,000.00 $3,000.00 $3,700.00 $3,]00.00 $3,300.00 $3,300.00 $3,600.00 $3,600,00 52,975.00 $2,975.00 53,735.00 $3,735.00 $3,OD0.00 OOD.O. S3,3137.50 $3,307.51) $3,225.00 $3,225.00 7 Adjust Existing Water Valve I. Grade, work fully performed, complete in place 15 EA %100.110 51,500.00 $150.00 $2,250.00 $200.00 $3,DDO.DD $65.00 $9]5.13. $50.00 $750.DO $150.00 $2,250.00 $150.00 $2.250.OD $4]2.50 $7,08].511 $85,00 $1,275.00 8 Adjust Existing Fire Hydrant Assembly to Grade, work fully p<rtonncd, 5 EA _ omplete in place $SDO.oo $2,500.00 $65000 53,250.00 $700.00 $3,500.00 $100.00 5500.00 $400.00 $2,ooo.0o $1,185.00 $5,925.00 $500.00 $2,500.00 $1.207.50 $6,037.50 $565.00 $2,825.00 9 Connect to Existing 6-inch Water Line, work fully pertormetl, complete in 5 En ,lace $500.00 $21SGDmDG 5700,00 $3,500.00 5450.00 $2,250.00 $4.000 52,UD(loo $9]5.00 $4,8]5.00 $865.00 54,325.00 $1,250.00 $6,250.00 $1102150 $5,512.50 $735.00 $3,6]5.00 Connect to Existing 8-inch Water Line, work fully pertormetl, complete in 10 (place 7 EA $500.00 $3,500.00 $1,100_00 $],]00.00 3530.00 $3,710.00 $465.00 $3,255.00 $975.00 $6825.00 $1165.D0 58,155.00 $1,350.00 $9,450.DO $1,181.25 $6,268.]5 S904.130. $6,328.00, 11 B-inch Tapping Sleeve and Gate Valve, work fully performed, complete in place I EA $3,OGO.0. $3,000.00 $1.600.00 $1,600.00 $3,000.00 $30DOOD $3,200.00 53,200.00 $2,]50.00 $2,]50.00 $3035.00 ;3035.00 $5,000.00 $S,ODDeo $3,622.50 $3,622.50 $3,616.00 $3,616.00 ]/fl inch Water Service Line (short service), Type "M" copper, including 12 saddle, corporation curb stop and fittings, fumish and install, work fully 8 FA pertormed, complete in place WOOD $3,200.00 $900.00 $7,200.00 _ $600.00 $4,800.00 $426.00 §3,4138.00 $410.00 S3,28D.00 5655.0. §5,240.00 $450.00 $3,600.00 $840.00 $6,720.00 $]91.00 $6,326.00 13 314-inch Water Meter Box, furnish and install work fully pertormetl, complete in place 8 EA E10D.Oo $800.00 $95.00 $760.00 $100.00 $800.00 5710.00 $880.00 $25.00 $200.00 5160.00 $1,280.013 $35.00 $280.13D $131.25 $1,1350.00 $113.00 8904,00 Trench Safety for Sanitary Sewer Lines, fumish antl install where required by 14 OSHA Standards that nra in effect of the time of bidding. work fully 1 250 L F performed, complete in place ;1.00 41,250.00 $i.e. $1.25D.00 $2.00 $2,500.00 $0.25 $312.50 $1.00 $1,2%00 $0050 §625.00 $3.00 $3,750.00 $1.05 $1,31150 SIAS $1,437.50 Remove Existing Sanitary Sewer Lines (various sizes), work fully performed. IS omplete in place 1.246 LF 55.00 $6,230.00 $5.50 $6,853.00 $12.00 $14,952.00 52.00 $2,492.00 $1.00 $1,246.00 $6.9o 56,59].40 $6.00 $7,676.00 5].88 59,818.68 5].95 59,905.]0 Remove and Dispose or Existing Sanitary Sewer Manhole, including 16 Excava[ipn and Backfill, work fully pertormetl, complete in place 5 EA $300.00 $1,500.00 52.0.00 $1,000.00 $340.00 $1,]0..00 $300.00 $1,5013.00 $450.00 $2,250.00 $565.00 $2.825.00 $see 00 $3,00.00 $525.OD 52,625,00 $565.00 $2,825.00 Remove and Dispose of Existing Sanitary Sewer Cleanout, including 17 EX<dvatl I and n'i Ba III work fully performed, complete in place I EA $100.G0 $100.00 §100.00 $1D000 $100.00 $100.00 535.00 $35,0. $'One. $100.00 5250.00 $250 00 $150.00 $150.00 $472.50 $472.50 §113.DO $113.00 6i.ch PVC SDR 35 Sanitary Sewer (Open cut), fumish .,it install, including 18 Excavation, Embetlment and Ba<k011, work fully performed, complete in SC 1 1 place $26.00 $1.300.00 $28.00 $1,400..0 $23.00 $1,150.00 $33,00 $1650.130 532.50 51.625.00 §26.60 $1,340.00 $35.00 $1,750.00 $31.7] $1,588.5D $36.25 $1,812.50 e-inch PVC SDR 35 Sanitary Sewer (open cue), fumish and install, including 11 Excavation, Embedment and Backfll, work fully performed, complete in 1.200 LF place _ $30.00 S36,000.0e $38.00 S45SDD.OD $25.00 $30,000.00 $35.00 $42,000.00 534.00 $40,800.00 $28.70 534.640.00 337.00 $",400.00 $31.77 $38,124.00 $39.55 $47,460.00 4-foot Diameter Standard Sanilary Sewer Manhole (0 to 64eet deep), 20 including connection of all intersecting mains, fumistl and install, work fully 5 EA pertormetl, complete in place 52,200.011 §13,200.00 $22600.00 $15,600.00 $2,600.00 $15,600.00 $3,200.130 $19,200.00 $2.700.00 516,200.00 $2,950.00 $1],]00.00 53,000.00 $18,000.00 $3,465.00 $20,]90.00 $3,051.00 $18,3D6.DO -v15-foot Diameter Slandartl Sanitary Sewer Manhole (0 to 6-feet deep), 21 in-din, co of all intersecting mains, fumish and install, work fully I EA pertormed, complete in place $2.]50.00 $2,750.00 $3,200.00 $3,200.00 $3,700.00 $37GODG $4,500.00 $4,500.00 S4.10D.00 $4,100.00 $3,790.00 53,790.00 S4,DOODO 54,000.00 $4,389.00 54389.00 $3,955.0. $3955.00 Extra Dopfh for 4-loot Diameter Standard Sanitary Sewer Manhole, fumish 22 and install, work fully performed, complete in place 5 VF $1130.00 5500.00 §250.00 $1,250.00 $120.00 $600.00 $250.00 $1.250.00 $80.00 5400.00 $12500 $625.00 $100.00 $500.00 5183.]5 $918.]5 $141.25 $706.25 Extra Dupth for 5-foot Diameter Standard Sanitary Sewer Manhole, fumi n 23 and install, work fully performed, complete in place 3 VF $100.00 $300.00 We= $3011.00 $200.00 $600.00 ;300.00 $900.00 $125.00 §3]5.00 S200.OI3 $600.00 $175.00 $525.00 $262.50 $787.50 ;226.00 WOOD 21 Connect to Existing 6-inch Sanitary Sewer Line, work fully pertormetl, FA omplete in place _ $600.00 $600.01) $350.00 5350.00 $400.00 $400.00 $300.DD $300.00 $250.00 5250.00 $495.00 5495.00 $1,300.00 $1,300.Do $5]].50 $577150 5350.00 5350.0. 25 Connect I Existing 8-inch Sanitary Sewer Line, work fully pertormetl, c FA omplete in place $600.00 $1,8DO.00 $650.00 $1,350.00 5500.00 $1,5DO'Do $310.00 $930.00 $250.0. $750.00 $545.00 $1,635.00 $1,35O.D0 $4,050.00 $5]].50 $1,]32.50 $400.00 $1,200.00 28 Connect [o Existing l D-inch Sanitary Sewer Line, work fully pertormed, 1 EA omplete in place ;600.00 $600.00 $750.00 5]50.00 $550.00 $550.00 $320.00 $320.00 $250.00 $250.00 $655.00 $655.00 $1,350.00 $1.350.00 $603.75 5603.]5 $401)..0 $400.00 6-inch Sanitary Sewer Service Line with 4-incM1 Wye (open cut), fumish and 27 .stall, including Excavation, Embedment, Ba<kfrll and two 4-inch Clcanouts, 128 LF work fully pertormed, complete I. place $30.00 $3,840_00 $18.00 $2,304.00 $22_00 $2,816.00 $2].00 $3.456.00 $29100 $3,]12.00 $35.50 54,544.00 $45.00 §5,760.00 541.]4 $5,342.]2 $31.65 $4,051.20 4-inch Sanitary Sewer Scrv a Line (open cut), fumish and install, including 23 Excavation. Embedment, Backfill and 4A11h Cleanout, work fully pertormed, 27 LF omplete in place $30.00 $81000 518.00 $406.00 $19.00 4513.00 $26.00 $702,01) 529.50 $796.50 $26.10 $]04.]0 $35.00 $945.DO $33.60 $90710 $28.25 $762.75 4-inch Sanitary Sc-, Service Line Beyond Right-of-Way (open cut), fumish 29 and install, including Excavation, Embetlment, and BackFll, work fully 100 LF pertormetl, complete in place S3000 $3,00000 _ $24.00 $2,400.00 $19.00 $1,900.00 $24.00 $2,400.OD 525.0. 52,500.00 $2].10 $2,710.00 S20.OD $2,000.00 $31.50 $3150.00 $25.00 $2,500.00 Concrete Encasement for Sanitary Sewer Line, furnish and install, work fully 30 pertormed, complete in place 106 LF §20.00 $2,160.00 §15.00 $1,620.00 $41.00 §47628100 $35.00 $3,760.00 $30.00 $3,240.00 $30.00 43.240.00 545.00 54,660.00 $34.65 $3,742.20 534.013 $3,6]2.01) PrO~COnstruction Television Inspection, including cleaning of lines, work 31 fully pertormetl 1250 LF $,..I $1,250.00 $1.25 51,562.50 $2.50 E3,f 25,00 $1.00 $1,250.00 $1.00 31,250.00 51.00 $1,250.00 $1.50 31,8]5.00 $2.10 $2,625.00 S1.41 $1,]62.50 32 Pos[-Construction Television Inspection work fully performed 125. LF $1.00 $1,250.00 51.25 $1,562.50 51.50 $1,67$.1)1) $1..13 St,250.00 $1.00 $1,250.0. $1.00 51,250.00 $1.50 $1,675.00 52.11, $2,625.00 S1.41 51,762.50 Sub-Total Sub-Section IS $179,478.]5 $198,653.00 $184,104.00 $194,696.75 S181]27.SD $195,02].60 $232,626.00 5235,185.50 $223,419.65 SUB-SECTION IC - STREET LIGHTING Street Light Foundation, fumish and install, work fully pertormetl, complete in place EA 1,500.00 $10,500..0 850.00 $5,950.00 300.00 $2100.00 95D.OO $6650.00 025.00 $5775.00 800.00 55,60000 1,2DO.00 $840000 1,045.00 $7,315.00 100.00 $]00.00 Sub-Total Sub-Section IC $10,500.00 $5.950.00 $2,100.00 $6,650.00 $5,775.00 $5,600.130 $8,400.01) $],315.00 $]00.00 Total Bid Amount Section I 5954,061.40 §9]0,2]6.20 $1 061,468.00 51,007.830.25 $1.046.983.35 $1,097.663.67 $1,095,115.10 $1,165,504.81 51.108,934.60 SECTION II - AVERY LANE SUB-SECTION IIA - PAVING AND DRAINAGE IMPROVEMENTS _ 1 Construction Slaking, work fully pertomretl, complete in place 1 LS 2,600.00 $2.60000 12,000..0 $12,000.00 6,000.00 $8,000.00 6,000.00 $6,D1)1).00 8,000.00 $6,01)0.00 37,295.00 $371295.00 10,000.00 S1D,OOD.OO 14,013.07 $14,013.07 ISD00.00 S18,000.OD Barticatles, Warning and Detour Signs, and Fences, designetl and 2 implemented for lempomry traflc control during construction, work fully 1 LS yertortnetl, complete in place 5,000.00 $5.000.00 9,500.00 $9.500.00 1D.OOeDO $10,00000 3,00].00 53,007.00 3000.00 S3,00000 8,] 01).00 $8,700.00 12,000,00 $12,000.00 ].843.03 $7,843.03 12,5DO.OO $12,500.OD Joint Storm Water Pollution Prevention Plan, implemented and maintained, 3 .cluding prepay of Notice of Intent and Notice If Termination, wIlk 1 LS fully performed, complete in place 4,.00.00 $4,000.0. 1,400.00 $1,400.00 1,400.00 51,400.00 1,000.00 $1,000.00 2,000.00 $2,000.00 950.00 5950.00 1,000.00 $1,000.00 1,5.0.S8 $1,500.68 1,6DO.00 $1,600.00 4 Inlet Pmfec[ion, fumish and install, work fully pertormed, complete in place 2 EA 125.00 $25000 ]5.00 5150.00 I.D.O. $200.00 125.00 $250.130 110.00 $220.00 75.130 $150.00 200.00 $400.00 63.00 $126.00 75.00 $150.00 Solid Sod, lumish antl install including topsoil antl fertilizer, work fully 5 performed, complete I. place 1 .5[`0 SV 3.50 515,]50.00 5.25 $23625.00 2.50 $11,250.00 4.00 S18,OD0.00 5.35 $24,0]5.00 3.05 $13,]25.00 5.00 $22,500..0 7.62 $34,290.00 4.95 522,275.0. Phase IV Street Reconstruction RKM Jut The Fain Camino SYB Jim Bovmran cRs JRJ TISEO Ttie Colpny, Texas Utility Services Inc. Und,rground Utility Group, inc. Construction Construction Co., Inc. Constrv<tipn Co.. LP Civil, LLC Paving Paving Co. BID OPENS: 2:00 P.M.. TUESDAY, November 22, 2011 NO. DESCRIPTION _ QUANTITY UNIT --UNITS -TOTAL UNITE TOTAL $ UNITE TOTAL $ UNIT $ TOTAL S UNIT $ TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ 6 General Site Pre ora11on, work full ertorm,tl com fete in to 15 STA 1,200.00 $19,200.00 _1,000.00 $1G,00D.00 1,000.00 $16,000.00 843.00 $13,488.00 3,840.00 $61,460.00 745.00 $11,920,00 2,000.00 532,011000 4,257.32 $68,117.12 2,875.00 $46.000.00 7 Sawcut antl Remove Ezisting Concrete Pavement and Flahvork, work fully pertorTi d. complete in place 65 5G. SF 0 ]0 545,692.00 9.10 $72.116.00 1.00 565 560.00 0.80 $52,448.00 0.55 536.058.00 0.51 $33,435.60 0.80 $52,608.00 0.68 $41,580.80 0.70 $45,892.00 8 Remove Ex1s11ng Stortn Dram Pipe (variow sizus), work fully purfonnetl. ~comple[e in place 72 LF _ 15.00 $1,060.00 6.50 $468.00 12000 $864.00 12.011 5864.110 1000 $720.OD 25.00 $1,800.00 Soil $360.00 10.50 $756.00 11.30 $813.60 9 Remove Existin Curb Inlet work full ertorm,a, com Icte I. lace 2 _ EA _ 300.00 $600,00 600.00 $1,200.00 300.00 $600.00 360.00 $720.00 400.00 $800.00 600.00 $1,20000 400.00 $800,00 525.00 51,050.00 565.00 51,130.00 10 Remove Existing Trce, work fully pertorm,d, complete I. place 12 EA 450.00 $54110.00 200.00 $2.400.00 200.00 $2600.00 625.00 $7,500.00 850.00 $10.200.00 225.00 $2,700.00 70.,00 $8,400.00 518.09 $6,217.08 000.00 $4,800.011 11 Unclossifietl Street Excavation, work fully p,rtonnud, complete in pill, 1 857 CY 7.00 $12,999.00 12_50 $23,212.50 17.00 $31,569.00 10.00 518,570.00 12.00 $22,284.011 13.00 $24,141.D0 _ 10.00 $184570.00 16169 $30,993.33 14.00 $26 998 OD 12 6-incM1 Thick Lime Treatment, work full ertormcd, ,,pill, in place _ 5965 Sy q.00 523,860.00 2.25 513,421.25 2.00 $11,930.00 1.60 $10,737.00 _ 2.35 §1,,017.75 2.5D $14,912.50 3.00 $17,895.00 3.97 $23,681.05 2.65 $15,807.25 13 Fumish Lime Material, work full ertormca com Iete in place t0] -TON 100.00 _ $10,]00.00 155.00 $16,585.00 200.00 $21,400.00 160.00 511,120.00 151.00 516,157,00 15000 $16,050.00 150.00 Eifi,050.00 150.]0 516,126.90 160.00 517,120.00 14 6-Inch Thick, 4,000 psi Portland Cement Reiinforc,d Concrete Pavement, ll ertormed, __-Et u[[ wmplet, in place 6.750 SY 32.00 $216,000.00 30_0. $202.500.00 42.00 $283,500.00 33.00 $222,750.011 29.25 519],43].50 33.85 $228,487.50 28.00 $189,000.00 34.25 $231,187.50 33.75 $22],612.50 Thick, 4,000 psi Portlantl Cementloi-4-c" Alley Approach antl Alloy ent, work full performed, cons omplete in place t 500 SF - q 40 $6,600.00 3.75 55,62500 4.60 $6,90000 5.00 $7,SOO.D0 4.23 $6,365.00 q.24 56 360.00 6.00 $9,00000 6.93 $10,395.00 4.40 $6,600.00 Thick, 4,000 psi Portland Cement Concrete Driveway Approach antl 1.500 SF a Pavement. work fully pertormed, construct complete in lace 4.00 $6,000.00 3.55 $5,325.00 4.10 $6,150.00 4.75 $7,125.00 3.95 $5,925.00 57 3.82 $5.730.00 6.00 $9,00000 4.96 ,440.00 4.20 56,300.00 Thicklantl Concrete Ramp (Type rk fully pertormetl construct complete im place 6 EA 850.00 $5100.110 1,000.00 $6,000.00 1,000.00 $6,000.00 1,00..00 $6,000.00 650.00 $3,900.00 650.00 $3,900.00 1,250.00 $7 500.00 865.00 $5190.00 ]00.00 54,200.00 18 4-inch Thick. 4000 psi Portland Cement Concrete Barrier-Free Ramp (Type TlP2'~~ A), work full ertortned, constmc, complete in place 1 EA 800.00 $800.00 Soo.00 $800.(10 900.00 $900.00 800.00 $80000 660.00 $460.00 700.00 $700.00 1,000.x0 51,000.00 925.00 8925.00 ]00.00 5]00.00 19 4-inch Thick, 4,000 psi Portlantl Cum,nt Concrete Baniar-Free Ramp (T,DOT Typo ] ,work fully perto-od, construct complete I. place 2 EA 800.00 $1,600.00 1,100.00 52,200..0 900.00 $1,800.00 700.00 $1,400.00 50000 $t,00o.00 850.00 $1,700.0G 850.00 $1,700.00 7.00. $1,4DO.o0 700.00 $1,4.0.. 20 4-in1h Thic1,3,000 psi Portland Cement Concrete 10r 5iduwalks,-1 fully 16200 SF erlortnetl, construct I. lute in lace 3.50 $56,70000 3.00 $48,600.00 3060 558,320.00 3.80 $61,560.00 3.25 $52,65000 3.35 $54,270.00 3.50 $56,7DO.O0 4.79 $77,598.00 3.75 $60,750.00 21 Remove and Reins[nIl Existing Community Mailboxes, including concrete 3 EA fountlatiom,complet, in lace 2,500.00 $7,500,00 450.00 $2,350.00 600.00 $1,800.00 ]00.00 $2,10000 800.00 52,000.00 500.00 51.500.00 200.00 5600.00 800.00 52,400.00 1,000.00 §300000 22 Pavestone Tree Well work fully performed complete in place 3 _ EA 1.750.00 551250.00 850.00 822550.00 2.000.00 $6,000.00 350.00 $1,050.00 1,150.00 _ $3_450.00 2,625.00 $]875.00 650.00 $1,950.001,890.4300 55.6]0.00 1,300.00 _ _$3,900.00 23 Tree Root Barrier work fully pertormetl, complete in place 100 LF 25.00 §2,500.00 12.00 _$1_200.00 TOO $700.00 23,00 $2,300.00 18.00 _$1,600.00 15.00 51,500.00 35.00 53.500.00 19. 51.943.00 19.50 $1,950.00 2d Remove and Reinstall Existing Pavestone Retaining Wall at 5109 Avery Lane, work full pertonned complete in plat, _ LS 1,500.00 $1500.00 1,000.00 $1,000.00 3,000.00 53,000.00 1,200.00 $1,200.00 1,600.00 $1,800.00 2,650400 $2,650.00 3OOD.00 $3,000,00 2,625.00 $2,625.00 4,$0000 $4500.00 25 Pavement Markings and Signage, furnish antl install complete in place 1 LS 2,300.00 $2,300.00 4.DD0_DO $4,000.00 2.600.00 $2,600.011 2,400.00 S24DD.D0 2,400.00 $2,400.00 2,285.00 $2,285.00 1,500.00 $1,500.00 2,283.75 $2,283.75 2,300.00 $2,300.00 wrench Safety for Storm Drain Lines, fumish antl install where requirrd by 25 OSHA Standarmds that are in effect 11 111 time of bidding, work fully 65 LF - pertormed, coplete in place 1.00 $65.00 1.00 $65.00 1.60 $117.00 0.25 $16.25 1.00 SG5.00 0.50 $32.50 500 $325.00 1.58 $102.70 1.15 $74.75 24-incIII Reinforced Concrete Storm Drain (open cull. furnish antl 2] ns[all Ccludilass ng Ezcavati0n, Embedment and BacKI[, work fully perf-od, 35 LF omplIII te in place 67.OD $2,345.00 43.50 $1,522.50 43.011 $1,505.00 56.00 $1,960.00 57.00 51,995.0D 57.35 52,00].25 55.00 $1,925.00 57.23 $2,003.05 50.00 $1,750.00 36-inch Class 111 Reinforced Concrete Storm Drain (open cut), fumish antl 28 i,small iod.dimg Excavation, Embedment antl Bockfill, work fully pertonm,d, 30 LF pletc I. place 95.00 $2,850.00 47.00 $1,41000 71.00 52.13000 84.00 $2,520.00 63.50 $2,505.00 87.25 $2.617.50 85.00 52,55000 86.10 $2,583.00 92.75 $2,782.50 29 15-foot Standard Curt Inlet, work fully pertermed, construct complete in 2 EA - Pl,ce 4,000.00 $8,000.00 3,2DO.Op $6,400.00 3,900.0D STSOGI00 4,400.00 $8,800.00 4,150.00 $8,300.00 4,225.00 $8450.00 4,500.00 $9,000.00 3,360.00 56,72D,OD 4,300.00 $8,600.00 Sub-Total Sub-Section IIA $472,441.0. $482,625.25 $570,39500 §,79,185.25 $491,404.25 $497,043.85 5490,6]3.00 $609,759.06 $54$705.60 SUB-SECTION UB -WATER AND SANITARY SEWER _ Trench Safety for Water Lines, fumish and install where r,q.i,,d by OSHA i Standartls That are in eHect at t1, Hme of bidding, work fully perf0rmed. 1.000 LF omplete in place 1.00 $1,800.00 1.00 $1,800.00 1.00 $1,800.00 0.25 $450.00 0.10 $180.00 050 $900.00 1.00 §1,80000 1.05 $1,890.00 1.15 $2,070.00 2 Remove and Salvage Existing Fir, Hydrant, including Excavation antl Backfll, work fully pertormud, complete in place 2 EA 400.00 5800..0 600.00 $1,200.00 270.00 $540000 260.00 $520.00 150.00 $300.0. 250.00 $5!1000 300.00 $600.00 15].50 5315.00 339.00 $678.00 3 Remove antl Salvage Existing Water Valve (various sizes), inclutling 5 EA Ezcayation and Backfill, work fully pertortnetl, complete in place _ 100.00 $500.00 200.00 $1,000.00 200.00 $1000.00 13D.00 5650.00 150.00 $750.00 _ 125.00 $625.00 200.00 $1,000.OD 131.25 $656.25 282.50 $1,412.50 4 8-inch AW WA C9DD-D7 PVC DR 18 (Pressure Cl- 235), Water Line (open i 000 F ut), fumish and install, including Excavation, Embedment, Backfill, Fittings, _ Concrete Blocking 8 Clean Up, work fully performetl, complete in place 33.00 $59,400.00 30.00 $56,000.00 26.00 $46,800.0D 35.00 $63,000.00 29.00 $52,200.00 27.81) $50,040.00 40.00 §72,00000 40.43 $72,774.00 33.90 $61 02000 flinch Gate Valve, including box and litl, fumish antl install, work fully 5 peAOrmed, complete in place EA 1,100.00 $5,500.00 1,100.00 $5,500.00 1,200,00 $6,000_00 1,300.00 $6,500.00 1,080.00 $5,400.00 1,160.00 $5,800.00 1,30000 $6500_00 1,102.50 $5,542.50 1,356.00 $6,]80.00 6 Fire Hydrant Assembly, inclutling fi inch Ica, 6-inch gate valve, and 3 EA _1 xrrel extension, fumish and install, work fully go do ""u" complete in place _ 3,000.00 _E9,OOD,.O 37700.00 511,100.00 3,300.00 $9,900.00 3,600.00 510,800.00 2,975.00 $8.925.00 34735.00 $11,205.00 3,500.00 $10,500.00 3,307.50 $9,922.50 3,220.50 $9,661.50 7 Connect to Existing 84-Water Line,- fully pertormetl, complete ie -place EA 500.00 $500.00 1,100.110 $1,100,00 530.00 $530.00 465.00 $46500 975.00 $97500 1,165.00 $1,165.00 1,300.00 $1_300_00 1,102.50 $1,102.50 904,00 $906.00 Connect to Existing 6-i..h Water Line, work fully podonled, complete in 8 EA zo 600.00 $1,500.00 700.00 $2,100.00 450.00 $1,350.00 400.00 $1,200.00 975.00 52,925.00 665.OD $21595.00 1,250.00 $3,15000 1,050.00 $3,150.00 734.50 $2,203.50 3Iq-inch Water Service Line (short service), Type "K" copper, Including 9 saddle, corporation curb stop and fittings, furnish and install, work fully 7 EA pIAOrtnetl, complete in place 400.00 $2,800.00 800.00 $5600.00 600.00 $4200.00 600.00 54200.00 _ 425.00 $2,975.00 655.00 $4,585.00 500.00 $3,500.00 813.75 $5,696.25 791.00 $5,537.00 3I4-inch Water Service Line (long service), Type "K" copper, including 10 satltlle, corporation curb stop antl fittings, fumish and install, work fully 2 EA performed, complete in place 525.00 $1_050.00 950.00 $1,900.00 860.00 51,680.00 800.0. $1,600.00 600.00 $1.200.00 890.00 $1,780.00 1,000.00 52,000.00 945.00 51,890.00 1,073.50 52,147.00 -inch Water Service Llne (short service), Typo "K" copper, including s.ddl,, 11 corporation curt stop and fittings, fumish and install, work fully pertonmed. 3 EA omplete in place 735.00 $2,205.00 1,050.00 $3,150..0 770.00 $2,310,00 a.D.aD $2,40000 500.00 $1,500.00 1,020.00 $3,06000 900.00 $2,700.00 945.00 $2,835.00 870.10 $2.610.30 -~1-inch Water Service Line (long se ce). Type" K" copper, including saddle, 12 corporation curb stop antl fittings, furnish and install, work fully p,rf-d. 11 EA omplete in place 875.00 $9,625.00 1,300.00 $14,300.00 11200.00 $13,200.00 1,100.00 $12,100.00 715.00 $7,865.00 1,225.00 513,475.00 1,050.00 $11,550.00 1,260.00 $13,860.00 1,559.40 517,153.40 13 314-inch Water Meter Box, fumish and install work fully Performed, complete .15 FA place _ 450.00 $5,250.00 95.00 $3.325.00 100.00 $3.500.00 110.00 $3,850.00 2500 $87500 160.00 55,600.00 35.011 51225.00 131.25 56,593]5 113.00 $3,955.00 Trench Safety for Sanitary Sewer Lines, fumish and install where required by 14 OSHA Standards that are in effect at the time of bidding, work fully 1.660 LF performed, complete i1 place 1.00 $1,660.00 1.00 $1,660.00 2.OD $3,320.0D 0,25 $415.00 1.00 $1,6600. 0.50 $830.00 3.00 $4,960.00 1.05 $1,743.00 1.15 $1,909.00 Phase IV Street Re.... tructlon RKM Jet The Fain Cami SVB Jim Bowm CPS J" TISEO The Colony, Texas Utility Services Inc. Underground Utility Group, inc. COnstruction construction Co., Inc. Construction Co., LP Civil, LLC Paving Paving Co. BID OPENS: 2:00 P.M„ TUESDAY, November 22, 2011 N0. DESCRIPTION QUANTITY UNIT UNITS TOTAL$ I UNITS -TOTALS UNITS TOTALS UNITE TOTALS UNITS TOTALS UNIT$ TOTALS UNIT$ TOTAL$ UNITS TOTALS UNITE TOTALS 15 Remove Ex~shng Sanitary Sewer Lines (various sizes), work /ally performed. omple[e in place 1,855 LF 500 5927500 550 310,202.50 12.00 $22,260.00 2.00 53,710.00 1.00 $1,855.00 6.90 512,799.50 5.00 $9,2]5.00 8.14 515,099.70 7.91 514,673.05 16 Remove and Dispose of Existing Sanitary Sewer Manhole, mcluding Excavation and Backfi11, work fully performed complete in Place 3 FA 400.00 _$1.200.00 200.00 $600.00 340.00 $1,020.00 30000 $900.00 650.00 $1,350.00 565.00 $1,695.00 500.00 $1,500.00 525.00 51,575.00 565.00 $1,695.00 -inch PVC SDR 35 Sanitary Sewer (open cut), famish and Install, including 17 Excavation, Embetlment and BackFll, work fully performed complete in 115 LF place 26.00 $21990.00 28.00 $3.220.00 23.00 52,645.00 32.00 $3,680.00 34.00 $3,910.00 26.80 $3,082.00 35.00 54025.00 31.50 $3,622.50 36.16 $4,158.401 t0-1ncM1 PVC SDR 35 Sanitary Sewer(open cut), famish and instali, including 18 Excavation. Embedment antl Back611, IN fully performed complete in 1,545 LP place 34.00 $52,530.00 45.00 $69,525.00 27.00 $41,715.00 4200 $64,890.00 38.00 558,710.00 3125 $51,371.25 40.00 $61800.00 34.13 552]30.85 42.95 $66.357.75 -foot Dr-It- Standard Sanitary Sewer Manhole (0 to 6-feat deep), 19 including connection 11 1 intersecting mains, fumisM1 antl install, work fully G FA pertormed com line in lace 2.600.1111 515,600.00 3,200.00 $19,200.00 3,700.110 $22,200.00 4,500.00 $27,000.00 4,100.00 $24,600.00 3,790.00 522,740.00 4,000.00 $24,000.00 4,389.00 $26,334.00 3,955.00 523,730.00 20 Extra DeptM1 for 5-foot Diameter Stantlartl Sanitary Sewer ManM1Ole. furnish 1 antl install, work full 1ormed, complete in place 18 VF 10(1.00 $1 800.00 300.00 55,400.00 200.00 $3,600.00 260.00 $4,680.00 125.00 $2,250.00 200.00 53,600.00 1]5.00 $3,150.00 288.75 $5,197.50 226,00 54,068.00 21 Connect to Existing 6-inch Sanitary Sewer Line, work fully pertormetl, mplete in place 2 EA 500.00 $1,000.00 350.00 $700.00 400.00 $800.00 300.00 $600.00 250.00 $500.00 MOM 1,300.00 52,600.00 945.00 $1.890.00 339.00 $678.00 "'Ch Sanitary Sewer Service line with 4-incM1 Wye (open ut), famish and 22 .stall, =Ill n. Embedment, Backfill and two 4-inch Clea.outs, a[, LF _ wo pertomplete.. P... 30000 _ $10,950.00 18.00 $6,570.00 22.00 $8,030.00 27.00 $9855.00 36.50 $13,322.50 35.50 $12,957.50 50.00 $18,250.00 34.13 $12,457.45 31.65 $11,552.25 41nch Sanitary Sewer Service Line (open utl, furnish and install, including 23 Excavation, Embetlment, Backfill and 4-inch Clearo it, work fully pertormed, 95 LF omplem in place _ 30.00 $2850.00 18.00 $1,710.00 19.00 $1,805.00 26.00 $2,470.00 27.50 52,612.50 26.10 $2,4]9.50 30.0a $2,850.00 30.19 $2,868.05 28.25 $2,683.75 4-inch Sanitary Sewer Service Line Beyond Right-of-Way (open cut), famish 24 and install, including Excavation. Embadment, and Backfill, work fully 100 LF pertormed, complete in place 30.00 $3,000.00 _ 24.00 $2,400.00 19.00 51,900400 24,00 $2,400.00 25.00 S2 500.00 27.10 $2,710.00 20.00 $2,000.00 32.55 $3,255.00 24.86 $2,486.00 2-Concrete Encasement for Sanitary Sewer Line, furnish and install, work fully erfortned com lete in place 43 LF 25.00 $t 0]5.00 15.00 5645.00 41100 $1,763.00 35.00 $1,505.00 32.00 $1,376.00 30.00 $1,290.00 75.00 $3,225.00 34.65 $1,489.95 33.90 $1,457.70 26 Prc-epnstvction Television Inspection, including cleaning of lines, work fullypurtormed 1660 LF 100 $1,660.00 1.25 $2,075.00 2.50 $4,150.00 1.00 $1,660.00 1.00 $1,660.00 1.00 $1,660.00 1.50 $2,490.00 2.10 $3,486.00 1.41 $2,340.60 2 Post-Construction Television Inspection work fully pertornetl _,,680 LF 1.00 51,660.00 1.25 $2,075.00 1050 $2,490.00 _ 1.00 $1,660.00 __1.00 _51 660,00 1.00 $1,660.00 1.50 $2,490.00 2.10 $3,486.00 1.41 $2,360.60 Sub-Total Sub-Section IIB _ $20],160.00 $232,057.50 $210,508.00 $233,160.00 $204036.00 $221,194.75 $261,060.00 $259,432.75 $256,262.30 SUB-SECTION IIC - STREET LIGHTING 1 Street Light Foundation, famish and install, work fully pertorned. complete 3 FA in lace 1500.00 $6,500.00 850.00 $2,550.00 300.00 $900.00 950.00 $2.850.00 825.00 $2,6]5.00 800.00 $2.400.00 1,250.00 $3,750.00 1,045.00 $3,135.00 100.00 $300.00 Sub Total Sub-Section IIC $4,500.00 S2,550.00 $900.00 52,850.00 $2,475.00 52.400.00 $3,750.00 $3135.00 $300.00 Total Bid Amount Section II $-'121.00 $717,232.75 $761,803.00 5715,195.25 569],915.25 $720,638.60 $755,483.00 $8]2.326.81 $805,267.90 SUB-SECTION IIIA - PAVING AND DRAINAGE t Construction Staking, work fully pertormgtl complete in place- LS 2,400.00 $2,400.00 6,250.00 $8,250.00 4,000.00 $4,000.00 6000.00 $6,000.00 8,000,00 53,000.00 37,295.00 $37,295.00 10,000.00 $10,000,00 14,013.07 $14,013.07 9,000.00 $9,000.00 2 Baricatles, Waning antl Detour Signs, and Fences, designed and implemented for temporary traffic <on[rot tlunng cpnstmction, I. fully 1 LS edormed, complete in 111- 5,000.00 $5,000.00 9,500.00 $9,500.00 4,000.00 $4,000.00 4,007.00 $4,007.00 3.500.00 1 $3,500.00 8,700.00 $8,700.00 7,000.00 $7,000.00 7,843.03 $7,843.03 9,000.00 $9,000.00 3 Joint Storm Water Pollution Prevention Plan, implemented antl maintained, inclutling prepamnon of Notice o/Intent and Notice of Termination, work t LS fully crtprmed complete in place 2000.011 $2000,00 1A00.00 $1,400.00 1,400.00 $1,400.00 9,000.00 $1,000.00 1,650.00 $1,650.00 950.00 5950.00 500.00 5500.00 1,500.68 $1,500.68 700.00 $700.00 4 Inlet Protection, famish and install, work fully pertormed complete in place 4 EA 100.00 $400,00 75.00 $300.00 100.00 $400.00 125.00 $500.00 110.00 $440.00 7500 5300.00 150.00 $600.00 63.OD $252.00 75.00 5300.00 5 ~Stabilixed Comstmctiom Entrance (Staging Area), famish ..it install, work rally performed complete in lace 1 FA 2,0011.00 $2,000.00 2,200.00 $2,200.00 2.000.00 $2,000.00 11000.00 $1,000.00 850.00 5850.00 1,500.00 $1,500_00 500.00 $500.00 2,000.00 000.00 1,600.00 51,600.00 fi Solid Sad, famish and install inclutling topsoil antl fertilizer, work fully performed com lete in place 2 850 SY 3.50 $9,975.00 5.25 $16.962.50 2.50 $7,125.00 4.00 $11,400.00 5.35 $15,267.50 3.05 $8,692.50 5.00 $141250.00 7.62 5$2,21,71].00 4.95 516,107.50 1 ] General Site Preparation, work fully pertormed complete I. place 11 STA 1,202.00 $13,200.00 11000.00 $11,000.00 1,000.00 $11,000.00 843.00 S%273.00 5,960.00 $65,560.00 865.00 $9,515.00 2,000.00 $22,000.00 6,720.64 513,927.114 2,875.00 $31,625.00 S -1 antl Remove Existing Concrete Pavement antl Flatwork. work fully 51.428 SF pertormed, complete i a place 0.70 $35,999.60 1.10 $56,570.80 1.00 $51,428.00 0.80 $41,142.40 0.55 $26.285.40 0,51 $26,228.28 0.80 $41,142.40 0.83 542,685.24 0.70 $35,999.60 9 Remove Existing Stomr Drain Pipe (various sizes), work fully Perfomred, mplete in plac t 095 LF 4.00 $4,380.00 6.50 57,117.50 12.00 $13,140.00 12.00 $13,140.00 10.00 $10,950.00 25100 $27,375.00 5.00 $5,475.00 10.50 $11497.50 11.30 $12373.50 10 remove Existing Curb Inlet (venous sires), work fully pertormed, mple in place 1 FA 400.00 5400.00 600.00 $600.00 300.00 5300.00 360.00 $360.00 400.00 $400.00 600.00 $60600 400.00 $400.00 525.00 $525.00 565.00 $565.00 11 Remove Existing Tree work fully pertormed complete in lace 37 EA 400,00 $14800.00 200.00 $7,400.00 200.00 $7,400.00 540.00 579 980.00 850.00 $31,450.00 270.00 $9,990A0 900100 $33,300.00 357.90 $13,242.30 400.00 $14,800.00 'C nclassi£ied gtreet Excavation,work /ally performed compF-in place 1,284 11 CY _ ].00 $8,988.00 12.50 516,050.00 17.00 $21,828.00 10.00 $12,840.00 12,00 $15,408.00 11.00 $14,924.00 10.00 $12,840.00 18.03 523,150.52 14.00 $17,976.00 6-inch Thick Lime Treatment, work fully pertormed, [ompac_ 4'89] SY 2.00 $9,794,00 2.25 511,018.25 2.00 $9,7SA.DD _ 1.80 50,814.60 2.25 511,018.25 2.50 $12 242.50 3.00 $14,691.00 6.83 523,652.51 2.65 $12,9]7.05 14 Famish Lime Material workrtlafully pertormetl complete in pt- Be TON- 100.00 58,800.00 155.00 $13,640.00 200.00 51],600.00 160.00 514,080.00 151.00 $93,288.00 150.00 $13,200.00 150.00 $13,200.00 150.]0 $13,261.60 160.00 $14,080.00 15 6-inch Thick, 4,000 i Pond cement Reinforced Concrete Pavement ork fully performed, psconstruct complete in place 300 -SY 32.00 59,600.00 30.00 $9,000.00 42.00 $12,600.00 33.00 59,900.00 32.00 59,600.00 33.85 $10,15500 28.00 $8,400.00 47.05 $!4,115,00 33.75 510,125.00 1+nch Thick, 4000 psi Portland Cement Reinforced Concrete Pavement, ork fully pertormed, construct complete in place 6.000 S 36.00 $216,000.00 32.50 $195,000.00 4.60 $27,600.00 36.00 $216,000.00 32.50 5195,000.00 37.00 $222,000.00 33.00 $198,000.00 34.84 $209,040.00 34.75 $208,500.00 1] -Inch Thick, 4,000 psi Portland Cement Concrete Alley ApproacM1 antl Al"' Pavement, work fully pertormed, construct complete in place 700 SF 4.45 $3,115.00 3.75 $2,625.00 4.60 $3,220.00 5.00 $3,500.00 4.15 $2,905.00 4.24 $2,968.00 5.00 $3,500.00 7.07 $4,949.00 4.40 $3,080.00 16 4-1nc1 Thick, 4,000 psi Portland Cement Concrete Bartier-Free Ramp (Type Bl, work fully pertormed, construct complete in place EA 820.00 $820.00 1,200.00 31,200.00 900.00 5900.00 800.00 1800.00 610.(10 5410,00 750.00 $750,00 1,000.00 $1,000.00 SSO.OD $550.00 700.00 $700.00 19 4-1111 Thick, 6,000 psi Portlantl Cement Concrete Bari-1- Ramp (Type 12), work fully pertormed, construct complete in plate 4 EA 850.00 53,40600 1.600.00 $5,600.00 900.00 $3,600.00 1,000.00 $4,000.00 650.00 $2.600.00 650.00 $2,600.00 1,250.00 $5,000.00 865.00 53,460.00 700.00 $2,800.00 20 44-1, Thick, 4,000 yi Portland Cement Concrete for Sidewalks, work fully pertormetl, construct complete in place 10500 SF ] 50 $36750.00 3.00 $31,500.00 3.60 $37.800.00 3.80 $39,900.00 3.25 $34.125,00 3.35 8]5,1]5.00 3.50 $36,750.00 4.81 $50,505.00 3.75 $39,375.00 21 „ cre[e Steps, work fully performed, co mplete in place 100 SF 5,OO $500.00 5.00 $500.00 22.00 $2200.00 5.00 $500.00 15.00 $1500.09 6.00 $600.00 20.00 $2.000.00 60.00 56000.00 15.00 $1,500.00 22 Remove antl Reinstall Existing Community Mailboxes, inclutling concrete foundation, work gully pertormetl, complete in place 1 EA _ 2,500.00 52.500.00 450.00 $450.00 600.00 5600.00 700.00 $700.00 800.00 $800.00 500.00 $500.00 200.00 $200.00 600.00 5800.00 1,000.00 $1,000.00 23 _ 1 tell, Tree Well, work fully pertormetl complete in place 5 EA 1,500.00 $7,500.00 050.00 $4250.00 2,000.00 $1000000 350.00 $1,]50.00 1,150.00 55,750.00 2.625.00 513,125.110 _ 1,000.00 $5,000.00 1,890.00 59,450.00 1,300.00 E6 500.00 24 Tree Root Barter, work fully pertormetl complete in place 250 LF 15.00 33,750.00 12.00 53 000.00 7.00 81,750.00 23.00 $5,750.00 16.00 $4,500.00 15.00 $3,750.00 40.00 $10,000.00 19.43 $4,85].50 19.50 54,875.00 25 Pavement Markings antl Sigmage, famish antl install complete il place 1 LS 2,500.00 $2,500.00 1,000.00 $1,000.00 2,900.00 $2,900.00 2700.00 $2,700.00 2,700.00 $23700.00 2,530.00 $2,530.00 1,500.00 51,500,00 2.530.50 $2,530.50 2,600.00 $2,600.00 2rencM1 Safety for Storm.rain Lines, famish and install where required by OSHAStandardsthatare i.nc."ct at the time of bidding, work£ully 1.135 1F pertormed complete ihp, 1.00 $1,135.00 1.00 51,135.00 1.80 $2,043.00 0.25 5283.75 1.00 $1,135.00 0.50 $567.50 4.00 $4540.00 2,3732,689.95 1.15 11,305.25 Phase Street Reconstruction RKM Jet The Fain Camino BYB Jim Bowman CPS JRJ TISEO The CoI ony, Texas Utility BID OPENS: 2:00 P.M., TUESDAY, November 22, 2011 Services Inc. Underground Utility Group, inc. Construction Construcbon Co., Inc. Construction Co., LP Civil, LLC Paving Paving Co. NO. DESCRIPTION pDANTITY 27 UNIT UNIT S TOTAL $ UNIT 5 TOTAL $ UNIT S TOTAL b UNITS TOTAL $ UNIT $ TOTAL $ UNITS TOTAL $ UNIT E TOTAL $ UNIT $ TOTAL $ UNIT $ TOTAL $ 2d-Inch Class III Reinforced Concrete Storm Drain (open curl, famish and nstall including Excavation, Embedment and Backbll, work fully pertormed, 35 LF omplete in place 52.00 $1,820.00 43.50 $1,522.50 4100 51,505.00 56.00 $1,960.00 57.00 $1,995.00 5],35 $2,007.25 65.DD $2,2]5.00 48.83 $1,709.05 49.75 51,]41.25 28 27-inch Class In Reinforced Concrete Storm Dra n (open out). furnish antl nstall including Excavation, Embedment and Ba<kfll, work fully pertpnncd, a~ LP omplete in place 57.00 $2,565.00 47.00 S2,-.OD 49.00 $2,205.00 63.00 $2,835.00 62.50 $2.812.50 62.70 $2,821.50 ]0.00 43,150.00 56.18 $2,528.10 63.50 $2,857.50 29 48-inch Cl- III Reinforced Concrete Storm Drain (open cut), fumish and install inclutling Excava[ion, Embedment and Backgll, work fully pplformetl, 1055 LP _ ompleteinplace 135.00 $142,425.00 102400 _59071610000 110.00 St 16,050.00 130.00 513],150.00 136.50 $144,007050 138.10 $145,695.50 135.00 $142,425.00 142.28 $150,105AG 134.50 $141,89].50 30 5-foot Square Type "B" Junction Box, work fully p.nf.-od, construct ompleteinplace 1 EA 4,]00.00 54700.00 2.]50.00 52,]50.00 4,200.00 $4 zaD.DD 5.300.00 $5.300.00 5,]00.00 55,700.00 5,851100 $5,850.00 4,000.00 $4,000.00 4,410.00 54,410.00 3.729.00 $3,89.00 31 15felt Standard Curb Inlet, work fully pertermetl, construct complete in _place 2 EA 3,500.00 $],600.00 3,200.00 $6,4DD.00 _3,800.00 $7,600.D0 4,400.00 18,800.00 4.150.00 $8,300.00 4225.00 $8,450.00 4,500.00 49,000,00 3,360.00 56,720.00 4,294.00 $8,588.00 Sub-Total Sbb-Section IIIA $564,516.60 _ $535,666.55 $38818800 $585,365.]5 $629,887,15 $630,257.03 $612,638.40 $723,686.99 $516,277.15 SUB-SECTION IIIB - WATER AND SANITARY SEWER _ 1 Trench Safely tot Water and Sanitary Sewer Lines, furnish and install where required by OSHA Standards that ore in effect at the time of bidding, t 185 LP _ ompleteinplace _ 1.00 $1,185.00 1.00 31,185.00 1.00 $1,185.DO 0.25 $296.25 0.10 $118.50 0,50 $592.50 2.00 $2.3]0.00 1.05 $1,244,25 1.15 $1,362.]5 2 Remove and Salvage Existing Fire Hydrant, including Excavation and Backfll work fully pertormed 2 EA 400.00 $800.00 2511.00 4500,00 2]0.00 $540.00 260.00 $520.00 150.00 $300.00 250.00 $5130.00 300.00 $600.00 183.75 $36].50 339.00 $678,00 3 Remove antl Salvage Existing Water Valve (various sizes), including Excavation and Backfill, work fully peRormetl complete in place 3 EA tDD.OD $300.00 200.00 5600.00 200.00 $600.00 130.00 $390.D0 150,00 $450.00 125.00 $3]5.00 200.00 $600.00 131.25 $393.]5 282.50 584].50 4 Sawcut and Remove and Replace Existing Concrete Pavement, work fully 5 performed, complete in place 27 SY 100.00 $2,700.00 10.50 $283.50 5000 $1,350.00 43.00 51,161.00 46.130 $1,242.00 42.00 51134.00 40.00 sl' 0.00 131.25 43,543.]5 79.10 $2,135.]D 8-in<h AMA CSDD47 PVC OR 18 (Pressure Co- 235), Water Line (open 105 LF =i sh and inncluding Excavation, Embetlment, Backfill, Fittings, ing ,,Cl Clean Up, work fully performed complete in place 55.00 $5,]]5.00 30.00 $3,150.00 3].00 $3,885.00 J9.00 54095.00 45.50 54,777.50 27.80 $2,919.00 50.00 35,250.00 68.69 $5,112.45 3390 $3,559.50 6 12-inch AMA C900-07 PVC DR 18 (Pressure Of... 235), Water Line (open 1 080 I F cut), furnish and install, including Excavation, Embedment, Backfill, Fittings, Concrete Blocking 8 Clean Up, work fully performed, complete in place 46.00 54],520.00 45.00 $48,600.00 40.00 $43,200.00 46.00 $49,680.00 48.50 $52,380.00 42.55 $$2.320.00 55.00 $59,400,00 4].67 551,453.60 46.33 $ $2,036.40 7 Binh Gate box and lid. /urnish and install, work fully pertormed, 2 EA 1,075.00 $2,150.00 1,100.00 52.200.00 1,200.00 $2,400.00 1.300.00 52,600.00 1,05D OD $2,100.00 1,150.00 52,320.00 1,200.00 $2,400.00 1,260.00 $2520.00 1,356.00 52.712.00 8 12 inch Gate Valve, including box and lid, furnish antl install, work fully 4 EA pertormed, complete in place 2,000.00 EA,D130.D13 2,100.00 587600.00 2,200600 $8,600.00 2,300.00 59,200600 1,950.00 3],800.00 2,500.00 $10,000.00 2,000.00 §8,000.00 2,152.50 58,610.00 2,486.00 59,944.00 9 Fire Hydrant Assembly, including 6inch lead lino, 6-inch gate valve, and 2 EA barrel pxlunsion fumish and install work fully performed complete in place 3000 OD $6,000.00 3,700.00 _ 57,400.00 3,300.00 $6,600.00 3,600.00 $7,200.00 3.000.00 $6,000.00 3,85.00 $7,470.00 3,500.(10 $7,000.00 3,202.50 $6,405.00 37220.50 $6,441.00 10 Connect to Exi.b.g 6-Inch Water Line, work fully peAOrmed. complete in place 2 EA 600.00 51,200.00 ]130.013 81,400.00 450.00 $900.00 400.00 5800.00 915.00 $5,950.00 865.00 $1,80.00 1,250.00 $2,500.00 1,102.50 $2,205.00 84.50 $1,469.00 11 ..onnect to Existing 12 inch Water Line, work fully pertormed, complete in place 2 EA 850.00 51,]00.00 1,650.00 53,300.00 700.00 $1,400.00 745.00 51,490.00 1,2]5.00 $2,550.00 1,0]0.00 $2.140.00 2.000.00 54,000.00 1,212.]5 $2,625.50 1,243.00 $2,486.00 12 3/44ncM1 Water Service Line (short service). Type "K" copper 'nclucluding satltlle, corporation curt stop antl fittings, fumish and inptall,fully 14 EA ponennetl,completein Dlace 400.00 $5,600.00 900.00 $12,600.00 GOD.00 $8,400.00 600.00 48,400.00 650.00 $6,300.00 655.00 $9,1]0.00 402.00 $5628.00 761.25 $10,65].50 ]91.00 511.0]4.00 13 3/44nch Water Service Line (long service), Type "K" copper, including satltlle, corporation curt stop antl fittings, fuish and install, work fully 2 EA in place pertormed, complete _ 525.00 $1,050.00 950.00 51,900.00 850.00 $1 700.00 800.00 $1,600.00 625.00 $1,250.00 890.00 E1 750.00 1,000.00 $2,000.00 1,023.]5 52,04].511 111]5.00 $2150.00 14 t-inch Water Service Line (long service), Type "K" copper, including sadtllp, corporation curt stop and fittings. fumish antl install, work fully pertormed, 5 EA pmplctpin place _ 0]5.00 $5,250.00 1,275.00 $7,650.00 1100.00 $6.600.00 1100.00 $6600.00 815.00 $6,890.00 1,225.00 57,350.00 2,000.00 $12.000.00 1,260.00 5],560.00 1,559.40 $9,356.60 15 314-inch W.- oter Be., furnish and install work fully pertormed, complete Inplaee 26 EA 150.00 $4,100.00 95.00 $2.660.00 _ 100400 $2,800.00 110.00 $3,080.00 25.00 $]00,00 16000 44,480.00 35.00 $980.00 131,25 S3,675.0D 113.00 $3,164.00 trench Safety for Sanitary Sc- Lines, fumish and install where required by 54,440 S[antlartls[halarc in efect at the time of bidding, work fully 1110 LF peff SHAmed, complete in place 1.00 $1,110.00 1.00 $1,110.00 2.00 $2.220.00 0.25 $217.50 1.00 $1,110.00 S. $555.00 4.00 OSHA .00 1.05 $1,165.50 1.15 $1 ,2]6.50 1] Remove d, comp Sanitary Sewer Lines (various sizes), work lolly pertormed, 1 110 LF pmplate in place _ 5.00 $5,550.00 5.50 $6,105.00 12.00 $13,320.00 2.00 $2,220.00 1.00 $1.110.00 6.90 8],659.00 6.00 $6,660.00 7.35 $6.158.50 7.91 58,]80.10 18 Remove and Dispove of Existing Sanitary Sewer Manhole, including Excavation and Backfill, work fully pertormed complete in place 1 FA 40000 $40D.00 200.00 5200.00 300.00 5300.00 260.00 5260.00 450.00 5450.00 565.00 5565.00 Soo. 00 $500.00 525.00 $525.00 565.00 5565.00 19 8-inch PVG SDR 35 Sanitary Sewer (open curl, fumish antl install, including Excavation, Embedment -d Backbll, work fully performeQ complete in 1,110 LF Voce 31.00 534,41000 38.00 5421180.00 25.00 $27,750- 39.00 $43,290.00 35.]5 539,682.50 28.]0 531,857.00 35.00 $38,850.00 32.55 336,1]0.50 39.55 443,900.50 20 ~v-foot Diameter Standard Sanitary Sewer Manhole I. to 6-feet deep), neluding connection of all intersecting mains, fumish and install, work fully 4 EA pertormed, complete in olace 2,]130.013 $10,800.00 3,200.00 $12,800.00 3,]00.00 $14,500.00 4,200.0D $15,800.00 4,100.00 516,400.00 3,790.00 $15,160.00 4000.00 §16,000.00 6,410.00 820.00 $17640.00 3955.00 $15, 21 Extra Depth for pole Daameter Standard Sanitary Sewer Manhole, furnish 12 VF and install, work fully pertormed, complete in place 300.00 53,600.00 300.00 53.50000 200.00 $2400.00 260.00 $3,120.00 125.00 $1,500.00 200.00 $2,400.00 1]5.00 $210000 288]5 53,465.00 226.00 52,]12.00 22 Connect to Existing Sanitary Sewer Manhole, work fully pertormed, complete 1 EA in place 11000.00 $1,OD0.00 350,DD $35000 750.00 $]511.00 ]OO.OD $700.00 650.00 $650.00 520.00 $620.DO 2,300.00 $2,30000 997.50 $997.5D 510.00 $510.00 23 Connect to Existing 8-inch Sanitary Sewer Line, work fully pertormed, 1 EA ompletc in place 600.00 3400.00 450.00 $450.00 500.00 $500.00 305.00 $305.00 250.00 $250.00 565.00 $545.00 1,300.00 51,300.00 813.]5 4813.]5 339.00 $339.00 24 6-inch Sanitary Sewer Service Lin with 4-inch Wye (open cut), fumish and nstall, including Excavation, Embedment, -B,cluill b Wy and two 4-inch Cleanouts, 550 LF work fully performed, complete in place 30.00 $13800.00 18.013 $8.2A0.00 22.00 $10,120.00 2].00 $12,420.00 27.50 412.650.00 35.50 $16,3]13.00 60.00 $18,400.00 3].54 $1],268.40 ]1.64 $14p554.40 25 4-inch Sanitary Sewer Service Line (open cut), fumish antl install, including Excavation, Embedment, BackL and 4-Inch Cleanout, work fully pertormed, 30 LF omplete in place 30.00 $900.00 10.00 $540.00 19.00 §5]0.00 26.00 $700.00 2].50 $825.00 26.10 5783.00 35.00 $1.050.00 31.50 $945.00 28.25 $847.50 26 binch Sanitary Sewer Service Line Beyond Right-of-Way (open cu[), furnistl and install, including Excavation, Embetlment, antl Back work fully 1DD LF pertormed, complete in place 30.00 _ 53,000.00 24.00 82,400.00 19.00 51,900.1313 24.00 524130.00 25.00 52,500.00 21.10 32,710.00 20.00 $2,000.00 33.60 $3,360.00 25.00 $2.500.00 27 Concrete Encasement 1;I. Sanitary Sewer Line, fumish and install, work fully performed, complete in ce 36 LF 25.00 $900.00 15.00 5540.00 49.00 $1,476.00 35.00 $1,260.00 30.00 81,000.00 30.00 41,080.00 85.00 $3,060.00 34.65 §1.24].40 36.00 $1,224.00 Phone IV Street Reconstruction RKM Jet The Fain Camino SVB Jim Bowman CPS JRJ TISEO The Colony, Tekas Utility Services Inc. Undurgrould Utility Group, Inc. Construction ConsPruction Ce., Inc. Construction Co., LP Civil. LLC Paving Paving Co. BIB OPENS: 2:00 P.M„ TUESDAY, November 22, 2011 NO. DESCRIPTION QUANTITY UNIT UNIT S TOTALS UNITE TOTAL $ UNITE TOTALS UNIT 3 TOTAL $ UNITE TOTAL $ UNIT $ 1 TOTALS UNIT S TOTALS UNIT E TOTAL $ UNIT $ TOTAL $ 28 Pre-Construction Television Inspection, including cleaning of lines, work 1 110 LF full pcrfmrned 1.00 $1,[10.00 1.25 $1,36].50 2.50 $2,]]5.00 1.00 $1,110.00 1.00 51,110.00 1.00 51,110.00 1.50 $1,665.00 2.90 $2,331.00 1.41 $1,565.10 29 Post-Constuction Television lns ec work full orfonned 1,110 I LF 1.00 $1110.00 1.25 $1,38].50 1.50 $1,665.00 1.00 $1110.00 1.00 $1,110.00 1.00 31,110.00 1.50 51665.00 2.10 $2,331.00 1.41 51.565.10 $ub-TOtaI Sub-Section IIIB 59]1,520.00 $183.156.50 $170,906.00 5183.,166.]5 $1]3,235.50 $160,506.50 $213,]9660 $204,629.35 $203575.45 SUB-SECTION IIIC - STREET LIGHTS Street Light Foundation, famish and install, work tally performed, complete !EA 1 n lace 1500.00 $3,000.00 850.00 $1,700.00 300.00 $600.00 950.00 $1,900.00 825.00 $1,650.00 800.00 $1,600.00 1200.00 $2.400.00 1,045.00 $2090.00 100.00 $200.00 $Ub-7OtaI Sub-$QfitlOn IIIC 53,000.00 51,]00.00 $60060 $1,900.00 51,656.00 $1,600.00 $2,400.00 S2,090.00 $200.00 Total Bid Amount Section III $]39,336.66 $720.525.05 $559,694.00 5770,d30.50 $804,]]2.65 5012,]63.53 $828,836.40 5930,406.34 $820,052.60 TOtal Base Bid Amount Sections I II $ III $2,3]],539.00 $2A08,034.00 $2 422,965.00 S2 493,456.00 $2,549,671.25 $2,630,665.80 $2,679,434.50 $2,988.237.96 $2.734,255.10 Atltlentlumo Received L J J J J T Non-eolllusion Hatemenf J J J J J J r J State Reciprocal requirement? J _ y y y Conflict of lntcrest? Bid Affidavit' - - J - y - J J J Bitl Bond J J J _ J J it I