Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Resolution No. 2011-056
CITY OF THE COLONY, TEXAS RESOLUTION NO. 2011- 0,5 tom, A RESOLUTION OF THE CITY OF THE COLONY, TEXAS, AWARDING A BID AND APPROVING THE TERMS AND CONDITIONS OF A CONSTRUCTION SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND F & F CONCRETE, LLC, TO RECONFIGURE AND CONNECT THE ALLEYS BETWEEN CHAPMAN STREET, JENKINS STREET, AND NERVIN STREET, WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT; PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council has determined that it is in the best interest of the citizens to award a bid to F & F Concrete, LLC, and execute a construction contract to reconfigure and connect the alleys between Chapman Street, Jenkins Street, and Nervin Street, which is attached hereto and incorporated herein as Exhibit "A"; and WHEREAS, the City of The Colony agrees to pay the sum of $213,894.92 for such work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THAT: Section 1. The City Council of the City of The Colony, Texas hereby awards a bid to F & F Concrete, LLC, reconfigure and connect the alleys between Chapman Street, Jenkins Street, and Nervin Street for a total amount of $213,894.92. Section 2. The City Manager is authorized to execute a Construction Services Contract for said reconstruction, which is attached hereto and incorporated herein as Exhibit "A". Section 3. This resolution shall take effect immediately from and after its passage. PASSED AND APPROVED by the City Council of the City of The Colony, Texas, this 16"' day of August, 2011. J e McCourr, , Mayor '5~ ATWT: ity of The olony, Texa Christie Wilson, City Secretary APPROVED AS TO FORM: Jeff Moe, , ity Attorney c~ CHAPMAN, JENKINS AND NERVIN lm Bowman P.C. Contractors, ALLEYS BID TABULATION F&F Concrete Constructiion Co., LLC 2LConstruction LLC Item# OTY Unit Description Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 100 1 LS PREPARING SITE $ 5,000.00 $ 5,000.00 $ 1,670.00 $ 1,670.00 $ 9,602.92 $ 9,602.92 $ 5,000.00 $ 5,000.00 101 1 LS MOBILIZATION $ 10,000.00 $ 10,000.00 $ 20,600.00 $ 20,600.00 $ 17,216.52 $ 17,216.52 $ 14,000.00 $ 14,000.00 102 1 LS TRAFFIC CONTROL $ 1,200.00 $ 1,200.00 $ 500.00 $ 500.00 $ 3,744.09 $ 3,744.09 $ 3,500.00 $ 3,500.00 103 1128 SY REMOVING CONCRETE PAVEMENT $ 7.00 $ 7,896.00 $ 8.00 $ 9,024.00 $ 6.16 $ 6,948.48 $ 8.50 $ 9,588.00 104 240 SY REMOVING CONCRETE $ 5.50 $ 1,320.00 $ 9.00 $ 2,160.00 $ 5.61 $ 1,346.40 $ 8.50 $ 2,040.00 SIDEWALKS 105 564 CY UNCLASSIFIED STREET $ 25.00 $ 14,100.00 $ 17.50 $ 9,870.00 $ 14.70 $ 8,290.80 $ 30.00 $ 16,920.00 EXCAVATION 106 10 CY BORROW / FILL MATERIAL $ 37.00 $ 370.00 $ 50.00 $ 500.00 $ 39.92 $ 399.20 $ 30.00 $ 300.00 107 1478 SY BLOCK SODDING $ 5.00 $ 7,390.00 $ 3.50 $ 5,173.00 $ 7.22 $ 10,671.16 $ 5.00 $ 7,390.00 108 3193 SY BROADCAST SEED $ 5.00 $ 15,965.00 $ 0.31 $ 989.83 $ 6.48 $ 20,690.64 $ 1.20 $ 3,831.60 110 1268 SY LIME TREATMENT $ 7.25 $ 9,193.00 $ 12.90 $ 16,357.20 $ 13.04 $ 16,534.72 $ 14.25 $ 18,069.00 111 888 SY CONCRETE PAVEMENT (7") $ 42.75 $ 37,962.00 $ 39.00 $ 34,632.00 $ 44.91 $ 39,880.08 $ 44.30 $ 39,338.40 112 2226 SF SAWCUT, EXISTING ISTING REMOVE, PAVEMENT AND REPLACE $ 6.50 $ 14,469.00 $ 8.00 $ 17,808.00 $ 5.59 $ 12,44134 $ 6.75 $ 15,025.50 113 1238 LF TEMPORARY SILT CONTROL $ 1.25 $ 1,547.50 $ 1.40 $ 1,733.20 $ 1.61 $ 1,993.18 $ 1.30 $ 1,609.40 FENCE 114 242 LF ORGANIC FILTER TUBE $ 2.50 $ 605.00 $ 1.50 $ 363.00 $ 6.62 $ 1,602.04 $ 1.40 $ 338.80 115 834 LF CONCRETE CURB (MONOLITHIC) $ 5.00 $ 4,170.00 $ 2.50 $ 2,085.00 $ 2.94 $ 2,451.96 $ 10.00 $ 8,340.00 116 94 SY CONCRETE DRIVEWAYS $ 40.50 $ 3,807.00 $ 45.00 $ 4,230.00 $ 42.84 $ 4,026.96 $ 48.50 $ 4,559.00 117 35 SY CONCRETE SIDEWALKS $ 33.75 $ 1,181.25 $ 36.00 $ 1,260.00 $ 40.25 $ 1,408.75 $ 100.00 $ 3,500.00 118 1 EA CURB RAMPS $ 150.00 $ 150.00 $ 500.00 $ 500.00 $ 1,200.37 $ 1,200.37 $ 800.00 $ 800.00 119 825 LF 4" FIBER OPTIC CONDUIT $ 9.00 $ 7,425.00 $ 9.75 $ 8,043.75 $ 9.26 $ 7,639.50 $ 16.50 $ 13,612.50 120 2 EA V X 2'X T PULL BOX $ 350.00 $ 700.00 $ 555.00 $ 1,110.00 $ 1,315.76 $ 2,631.52 $ 1,350.00 $ 2,700.00 121 4 EA "TRUCKS" SIGN $ 470.00 $ 1,880.00 $ 75.00 $ 300.00 $ 78.39 $ 313.56 $ 280.00 $ 1,120.00 122 2 EA NO RIGHT TURN (R3-1) SIGN $ 470.00 $ 940.00 $ 150.00 $ 300.00 $ 156.79 $ 313.58 $ 280.00 $ 560.00 123 2 EA NO LEFT TURN (R3-2) SIGN $ 470.00 $ 940.00 $ 150.00 $ 300.00 $ 156.79 $ 313.58 $ 280.00 $ 560.00 124 4 EA METAL SIGN POLE $ 470.00 $ 1,880.00 $ 150.00 $ 600.00 $ 78.39 $ 313.56 $ 280.00 $ 1,120.00 125 1 EA TREE REMOVAL (27") $ 300.00 $ 300.00 $ 550.00 $ 550.00 $ 845.40 $ 845.40 $ 2,500.00 $ 2,500.00 126 906 LF TRENCH SAFETY FOR WATER $ 1.50 $ 1,359.00 $ 1.00 $ 906.00 $ 2.23 $ 2,020.38 $ 4.00 $ 3,624.00 LINES 127 79 LF ABANDON EXISTING WATER LINES $ 3.50 $ 276.50 $ 25.00 $ 1,975.00 $ 15.45 $ 1,220.55 $ 28.00 $ 2,212.00 AND FILL WITH GROUT 128 227 LF REMOVE EXISTING WATER LINES $ 10.00 $ 2,270.00 $ 8.00 $ 1,816.00 $ 8.09 $ 1,836.43 $ 16.00 $ 3,632.00 129 76 LF REMOVE EXISTING SANITARY SEWER LINES $ 12.00 $ 912.00 $ 10.00 $ 760.00 $ 12.91 $ 981.16 $ 22.00 $ 1,672.00 1 of 2 CHAPMAN, JENKINS AND NERVIN Jim Bowman P.C. Contractors, ALLEYS BID TABULATION F&F Concrete Construction Co., LLC 2LConstruction LLC Item# QTY Unit Description Unit Price Total Price Unit Price Total Price Unit Price Total Price Unit Price Total Price 130 2 EA REMOVE AND SALVAGE $ 500.00 $ 1,000.00 $ 550.00 $ 1,100.00 $ 494.45 $ 988.90 $ 800.00 $ 1,600.00 AUTOMATIC FLUSH VALVE 131 3 EA 4-FOOT DIAMETER MANHOLE $ 1,650.00 $ 4,950.00 $ 3,300.00 $ 9,900.00 $ 3,456.91 $ 10,370.73 $ 3,800.00 $ 11,400.00 132 3 EA FIRE HYDRANT ASSEMBLY $ 2,923.33 $ 8,769.99 $ 3,750.00 $ 11,250.00 $ 4,421.09 $ 13,263.27 $ 3,500.00 $ 10,500.00 133 4 EA 8-INCH GATE VALVE $ 1,473.80 $ 5,895.20 $ 1,300.00 $ 5,200.00 $ 1,628.13 $ 6,512.52 $ 1,200.00 $ 4,800.00 134 3 EA CONNECT TO EXISTING 6-INCH $ 500.00 $ 1,500.00 $ 800.00 $ 2,400.00 $ 1,382.99 $ 4,148.97 $ 1,000.00 $ 3,000.00 WATER LINE 135 906 LF (CLASS NCH 150), AWWA WATER C900 PVC LINE DR 18 $ 29.08 $ 26,346.48 $ 40.00 $ 36,240.00 $ 27.88 $ 25,259.28 $ 37.00 $ 33,522.00 136 2 EA 1-INCH WATER SERVICE LINE $ 750.00 $ 1,500.00 $ 1,100.00 $ 2,200.00 $ 1,664.74 $ 3,329.48 $ 1,700.00 $ 3,400.00 137 76 LF UTILITY TELEVISION INSPECTION $ 10.00 $ 760.00 $ 10.00 $ 760.00 $ 8.25 $ 627.00 $ 45.00 $ 3,420.00 138 204 Sy ASPHALT BASE (7) $ 36.00 $ 7,344.00 $ 45.00 $ 9,180.00 $ 57.62 $ 11,754.48 $ 95.00 $ 19,380.00 139 23 SY ASPHALT SIDEWALK (4") $ 27.00 $ 621.00 $ 40.00 $ 920.00 $ 54.51 $ 1,253.73 $ 200.00 $ 4,600.00 TOTAL $213,894.92 $225,265.98 $256,389.19 $283,084.20 2 of 2