HomeMy WebLinkAboutResolution No. 2010-004
CITY OF THE COLONY, TEXAS
RESOLUTION NO.
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, ADOPTING THE AMENDED SPEED CONTROL
HUMP INSTALLATION POLICY, DATED DECEMBER 2009, WHICH IS
ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT
"A"; AND PROVIDING AN EFFECTIVE DATE
WHEREAS, the City Council recognizes that it is in the best interest of all concerned to
establish a Speed Control Hump Installation Policy; and
WHEREAS, the City Council previously adopted a Speed Control Hump Installation
Policy on April 4, 2005; and
WHEREAS, after careful review, the City Council deems it necessary to make certain
amendments to the Speed Control Hump Installation Policy.
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
THE COLONY, TEXAS THAT:
Section 1. The Amended Speed Control Hump Installation Policy, dated December
2009, attached hereto and incorporated herein as Exhibit "A", is hereby approved and adopted.
Section 2. This Resolution shall become effective immediately from and after its
passage.
PASSED, APPROVED and EFFECTIVE this 5th day of January, 2010.
J e McCo y, 6 Mayor
ATTEST: ity of T e Colony, Te s
Christie Wilson, City Secretary,
APPROVE S TO FO t
1E \~i{
j i
Robert E. Hager, Cit Attorney a
1
Speed Control Hump Installation Policy
City of The Colony
Engineering Department
December 2009
Speed Control Hump Policy 1 December 22, 2009
73142
SPEED CONTROL HUMP INSTALLATION POLICY
A. GENERAL
Speed control humps are an effective and appropriate device for safely reducing
vehicle speeds on certain types of streets or alleys when installed in accordance
with the provisions of this policy.
In order for speed control hump installations to be effective, they should be
located selectively in accordance with defined transportation engineering criteria
for the purpose of mitigating documented speeding problems. Proper installation
will also minimize driver frustration and encourage safe driving practices.
This policy promotes reasonable opportunities for residents and property owners
most affected by a proposed speed control humps to participate together in the
process that leads to its installation. It also provides for a sharing of the speed
control humps installation cost between the City and the neighborhood under
certain conditions.
B. DEFINITIONS
The definitions are for the context of this policy only.
SPEED CONTROL HUMP is a geometric design feature of a roadway,
consisting of a raised area in the roadway pavement surface extending
transversely across the travel way, whose primary purpose is to reduce speed of
vehicles traveling along that roadway.
SPEED refers to the 85th percentile speed.
STREET refers to the minimum street length that must be petitioned for the
installation of speed control humps. It is a 500-foot segment generally centered
on the location of the humps, or the length of the block, whichever is greater. If
the 1000-foot segment extends into any part of an adjacent block, it includes the
entire length of the adjacent block, unless separated by an intervening
thoroughfare, traffic signal or offset intersection.
C. ELIGIBILITY REQUIREMENTS
All of the following criteria must be satisfied for a street or alley to be considered
eligible for the installation of speed control humps.
1. Petition
A petition must be submitted which documents that a minimum of three-fourths
(75%) of the residential dwellings on the street support the installation of the
speed control humps. A minimum of one-half (50%) of the residents on the
street must authorize placement of the speed control humps in front of or
adjacent to their property.
Speed Control Hump Policy 2 December 22, 2009
73142
2. Location Of The Street
The adjacent land use along the street where the speed control hump is proposed
must be composed primarily of low-density residential dwellings.
3. Operational Characteristics Of The Street
a. The street must be used to provide access to abutting low-density residential
properties (local residential streets) and/or to collect traffic for such streets
(residential collector).
b. There must be no more than one moving lane of traffic in each direction.
c. Traffic volumes must be more than 500 vehicles per day but less than 5,000
vehicles per day.
d. Vehicle speeds must exceed the Speed Criteria of 30 miles per hour (mph).
e. The street must not be an identified primary route for emergency vehicles;
this refers to a route that is heavily used due to the proximity of the
emergency vehicle facility. These routes are determined by the Police and
Fire Departments.
f. The street must have a speed limit of no more than 30 mph as determined in
accordance with State Law.
4. Geometric Characteristics Of The Street
a. The street must have adequate sight distances to safely accommodate the
hump as determined by the Engineering Department.
b. The street must not have curves or grades that prevent safe placement of
humps. Humps may not be located on streets that have a vertical grade
greater than 5% or on their immediate approaches.
c. The street must be paved and be at least 1000-feet in length. If there are no
curbs, a special design must be used to prevent vehicle run-arounds.
d. The elevation of property adjacent to a hump location must be above the top
of curb to minimize potential flooding due to the presence of the hump in the
roadway.
e. The street must not be scheduled for resurfacing within the next two years.
5. Drainage Considerations
Streets and alleys are an integral part of the City's Storm Drainage System.
Streets and alleys convey storm waters not contained in underground pipes,
channels, swales, etc. Prior to installation of a speed control hump, the City
Engineer shall certify that the speed control hump placement will not be
Speed Control Hump Policy 3 December 22, 2009
73142
detrimental to the conveyance of storm runoff or cause flooding of adjacent
property.
6. Speed Control Humus In Alleys
If there are pedestrian safety concerns, City Staff may present to City
Council for approval at a public hearing the use of Speed Control Humps
in an alley. Residents/property owners using the alley will be notified in
advance of the public hearing. If approved by City Council, cost for such
Speed Control Hump installation will be the sole responsibility of the City.
A COST RESPONSIBILITY
The cost for the Speed Control Hump installation on streets (including signs,
pavement markings and, if necessary, special design features such as curbing or
guard rail) may be shared between the City and residents according to how much
the measured speed on the street exceeds 30 mph. This cost sharing is defined as
follows:
COST SHARING TABLE
85 Percentile Resident's Cost
Speed Share
31 mph 80%
32 mph 60%
33 mph 40%
34 mph 20%
> 34 mph 0%
For a street located in a Community Development Block Grant (CDBG) area, the
cost responsibility of the residents is 0%, regardless of the measured speed above
30 mph. The cost for transportation engineering studies and maintenance of the
speed control hump is the responsibility of the City. The term resident, when
used in cost sharing, does not necessarily refer to the petitioners. It is used to
define the share of the cost that is not the responsibility of the City and could be
paid by one or more of the residents or from other private sources, including tax
deductible donations to the City as described herein. Notwithstanding the
provisions of the foregoing cost sharing table, residents may be able to expedite
hump installation by voluntarily paying the full installation cost or by making tax
deductible donations to the City which collectively satisfy the full installation
cost.
Individual residents of the neighborhood may, in lieu of voluntary payment of the
neighborhood share of the cost of the speed control humps, make donations to the
Speed Control Hump Policy 4 December 22, 2009
73142
City that may be tax deductible by the individual from Federal Income Tax under
certain circumstances. In such event the resident may provide the donation to the
City with the non-binding desire or request that such donation be applied to the
neighborhood share of the cost of the speed control humps. Residents should
consult their financial or tax advisor as to the required forms and the ability to
make tax deductible donations to the City. The Federal Income Tax Code and
the applicable regulations establish rules that determine when an individual may
deduct donations to a political subdivision (the City) from the individual's
Federal Income Tax. Residents of the neighborhood are cautioned, that once the
City receives a tax deductible donation from a resident, as opposed to a voluntary
payment for the neighborhood costs, such donation may not be returned by the
City to the individual donor, nor may the City apply such funds to any other
financial obligation that such individual may have to the City. Residents of the
neighborhood are further advised that the individual's request or desire to apply
the donated fund to the neighborhood costs for the speed control humps is not
binding on the City but should understand that the City will apply the funds to
the program for the individual's neighborhood, or other street improvements in
the event sufficient funding is not received by the City within the stated one year
period. Residents are encouraged, when considering a tax deductible donation to
the City for the program, to determine whether sufficient voluntary payments and
possible donations to the City will be sufficient to cover the neighborhood share
of the costs prior to individual's making donations to the City given that the City
may not return the donations if insufficient funding for the neighborhood share of
the costs are not received by the City.
Tax deductible donations that the City receives from residents of a neighborhood
with the non-binding desire or request that the donation be applied to the
neighborhood costs for the speed control humps shall be applied by the City for
the costs of such program in the neighborhood, or other street improvements in
that neighborhood if sufficient funding for the neighborhood's share of the costs
is not received by the City within the stated one year period.
E. SPEED CONTROL HUMP REMOVAL AND ALTERATION
The process for speed control hump removal or alteration in a street is the same
as the process for installation, except that there is no City participation in cost
sharing. All associated cost for the removal must by borne by the residents
requesting the removal. The process for speed control hump removal or alteration
in an alley is the same as the process for installation and the removal cost will be
the sole responsibility of the City.
F. SPEED CONTROL HUMP LOCATION
A speed control hump will not be located in a street in front of a property if the
occupant objects to its placement or, in the case of a property containing multiple
dwellings, if a majority of the households on the property object to its placement.
Speed Control Hump Policy 5 December 22, 2009
73142
G. DESIGN STANDARDS AND PROCEDURES
The Engineering Department shall prepare and maintain current design standards
and installation procedures for speed control humps in accordance with this
policy.
Speed Control Hump Policy 6 December 22, 2009
73142
PROCEDURES FOR SPEED CONTROL HUMP INSTALLATION
1. The initial request for the installation of speed control humps must originate from
the residents living on the street. A request from a resident or representative
must be directed to:
City of The Colony
Engineering Department
6800 Main Street
The Colony, Texas 75056
(972) 624-3195
2. A preliminary determination of eligibility based on available traffic data will be
made in a timely manner.
A. If the street is determined not to be eligible, the applicant(s) will be notified
giving the reason. This decision may be appealed in writing to the
Engineering Director within 15 days of the notification date. The Director
will review the determination and respond to the applicant(s) within 30-days
of the appeal request.
B. If the street is determined to be eligible for consideration, a meeting will be
arranged between the applicant(s) and staff to define the petition area, the
approximate speed control hump location range and whether the location(s)
would be in a Community Development Block Grant (CDBG) area. The
applicant(s) will be instructed to submit a petition indicating that a minimum
of three-fourths (75%) of the households on the street support the installation
of speed control humps as provided in the Speed Control Hump Policy. Only
petition forms supplied by the Engineering Department or exact duplicate
may be used for this purpose.
3. After verification of the petitions, the Engineering Department will conduct the
necessary transportation engineering studies and solicit comments and
recommendations of other agencies. A determination of the street's eligibility for
speed control hump installation will be made in a timely manner, based on the
Speed Control Hump Policy.
A. If the street is determined not to be eligible for speed control hump
installation, the applicant(s) will be notified giving the reason for denial. The
decision may be appealed in the same manner as in Section 2.
B. If the street is determined to be eligible, the street will be placed on a list of
streets eligible for speed control hump installation.
4. The Engineering Department will make a determination of the total installation
cost and the cost sharing responsibility of the residents, if applicable, according
to the Speed Control Hump Policy.
Speed Control Hump Policy 7 December 22, 2009
73142
5. Once eligible for speed control hump installation, owners of real property lying
within the notification area will be notified of the action by the Engineering
Department. The notification area consists of the area within 200-feet of the
boundary of the street. The measurement of the 200-feet includes streets and
alleys. The notice will include a return form to indicate support or objection to
the proposed installation.
6. If owners of 20 percent or more of the real property within the notification area
object to the installation within 30 days of the notice, then the street will be
removed from the list of streets eligible for speed control hump installation and a
public hearing will be scheduled at the City Council. Notification of the hearing
will include the applicant(s) and owners of real property within the notification
area. In addition, a reasonable effort will be made to notify each residential
household along the street and the area neighborhood associations of the public
hearing.
7. If owners of less than 20 percent of the real property within the notification area
object to the installation or the City Council approves the installation after a
public hearing, then the Engineering Department will place the street on a list of
streets approved for speed control hump installation.
8. Depending on the method used to pay for the cost of the speed control hump
installation, either Section 8A or Section 8B will apply. Section 8A will apply if
there is no City participation in the cost (i.e. the cost will be fully paid with
voluntary private funding). Section 8B will apply if the residents request any
City participation paying for the cost of the speed control hump installation if
that option is available under Section D of the Speed Control Hump Installation
Policy.
A. Once a street is placed on the lists of streets approved for speed control hump
installation, the City will submit a statement to the representative of the
residents for the cost of the speed control hump installation. Upon receipt of
payment of the cost or other private funding, including tax deductible
donations to the City, the humps will be installed as scheduling permits. If
full payment or private funding has not been received with one year from the
statement date, the street will be removed from the list of streets approved for
speed control hump installation and all monies received (other than tax
deductible donations received by the City), if any, returned to the payer.
OR
B. (1) The Public Works Department will submit a report on an annual basis
containing a list of streets approved for speed control hump installation that
require City funding, either in whole or part, in a request for funding to the
City Council. The report will rank the requests in an order of priority
determined by the following calculations.
Speed Control Hump Policy 8 December 22, 2009
73142
# RANKING ITEM VALUE
1 % vehicles exceeding Speed
Criteria x daily traffic volume =
2 number of schools, parks,
churches or institutions on street
(maximum of 2) x 50 =
3 % of petitioning households on
street requesting humps x 15 =
4 number of reported accidents in
previous 12 month period x 100 =
RANKING SUM (1+2+3+4)=
(2) The street yielding the highest numerical value from the above summation
will be considered to have the highest priority. The street with the earliest
application date will have the highest priority among streets with the same
summation value. The report will contain the above ranked list of streets
approved for speed control hump installation, together with the speed, vehicles
per day, ranking sum, whether the location is CDBG area, estimated
installation costs, City's cost share, residents' cost share, application date,
payment due date and cumulative City cost share.
The report will additionally list all speed control hump requests subsequently
denied by the Engineering Director under provisions of Section 2A and 3A, in
addition to pending requests. A street that does not receive road hump
installation funding approval will automatically be considered in the following
years, for a maximum of three additional years. After that time period, a new
request and petition are required.
Representatives of the applicants for all approved road hump installations will
be notified of which requests have been funded for the coming fiscal year.
Installations not included in the group to be funded can be approved if their full
installation cost (including the City's share) is voluntarily paid, as provided in
Section 8A.
(3) If City funds remain after the determination of which installations will be
funded from the budgeted about, or if allocated City funds become available by
non-payment of invoiced amounts under provisions of Section 8, these funds
can be applied towards the highest ranked non-funded installation on the
ranking list. Should be funds be insufficient to cover the City's portion of that
installation, and the applicant(s) do not want to voluntarily pay the difference,
these funds can then be made available towards the second highest ranked non-
funded installation on the ranked list; then the third highest; and so forth.
(4) The City will submit a statement to the representative of the residents for
any cost based on the provisions of the Speed Control Hump Policy. It will list
Speed Control Hump Policy 9 December 22, 2009
73142
the total cost, portion to be paid by residents and the portion to be paid by the
City. Upon funding approval and receipt of payment of the residents' share
through voluntary payments or other private funding, including tax deductible
donations received by the City from the residents, the humps will be installed
as scheduling permits. If payment or funding of the residents' share, if any is
required, has not been received within one year from the statement date, the
street will be removed from the list of streets approved for speed control hump
installation and all monies received (except tax deductible donations received
by the City), if any, returned to the payer.
Speed Control Hump Policy 10 December 22, 2009
73142
SPEED CONTROL HUMP PROGRAM
The City receives many complaints regarding speeding vehicles on residential
streets. Many residents have concerns about the lack of safety for their children
and their neighbors due to this problem. Police enforcement remains the most
effective means of dealing with this problem. However, their limited resources
mean that they cannot cover all the problems at all times. In response to this
problem, the City has developed a Speed Control Hump Policy to minimize
speeding and encourage traffic safety. The policy provides an opportunity for
residents to participate in a process that leads to the installation of speed control
humps. Here are some HIGHLIGHTS from the policy:
WHAT IS A SPEED CONTROL HUMP?
❖ Traffic devise used to safely reduce the vehicle speed.
❖ It is not the typical bump you find in a shopping center parking lot.
❖ It is a pavement overlay placed on the roadway 12-feet in length, about
3-inches high, and extending the full width of the street, usually several
are placed along the street. The ends are tapered to be flushed with the
street at the curb and gutter to allow for drainage.
HOW COULD MY STREET BECOME ELIGIBLE?
❖ A petition supplied by the Engineering Department must be documented
showing that at least three-fourths (75%) of the residents on the street
support the installation.
❖ A minimum of one-half (50%) of the residents on the street must
authorize placement of the speed control humps in front of or adjacent to
their property.
The sponsor of the petition is required to contact every resident of the
abutting properties on the subject street. If a resident is against the speed
control humps, the word "OPPOSED" will be noted on the petition
signature space. If the sponsor is unable to contact a resident, "NO
CONTACT" will be noted on the petition signature space with the days
and times that contact was attempted. It is required that the sponsor
makes at least two attempts on separate days to contact a resident.
❖ The street must not be scheduled for resurfacing during the next two
years.
❖ The street must provide access to residential dwellings with not more
than one moving lane of traffic in each direction.
❖ The street cannot be an identified as a primary route for emergency
vehicles.
Speed Control Hump Policy 11 December 22, 2009
73142
❖ Current vehicle speeds must exceed 30 miles per hour (mph) on the
street.
WHO IS RESPONSIBLE FOR THE COST OF THE SPEED CONTROL
HUMP INSTALLATION?
❖ The cost may be shared between the City and the neighborhood
according to how much of a speeding problem there is on the street.
❖ The non-city share could be paid by one or more of the residents or from
other private sources. Private sources may include tax deductible
donations to the City from the neighborhood residents who desire that
the donation be ear-marked for the program. Residents should consult
their financial or tax advisor as to the required forms and the ability to
make tax deductible donations to the City. The Federal Income Tax
Code and the applicable regulations establish rules that determine when
an individual may deduct donations to a political subdivision (the City).
❖ The City will be responsible for the full cost if the street is located in a
community development grant block area.
HOW DO I GO ABOUT GETTING CONTROL SPEED CONTROL
HUMPS INSTALLED?
❖ Call the Engineering Department at (972) 624-3195.
❖ A meeting will be scheduled with a representative of the neighborhood
and the Engineering Department to provide more details on the program
and to define the petition area.
Speed Control Hump Policy 12 December 22, 2009
73142