HomeMy WebLinkAboutResolution No. 09-086
CITY OF THE COLONY, TEXAS
RESOLUTION NO. 09-OAa
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF A
CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND
DFW COMMUNICATIONS, INC. FOR THE RELOCATION AND
REMOVAL OF RADIO EQUIPMENT AND TOWER LOCATED AT 5151
NORTH COLONY BOULEVARD, WHICH IS ATTACHED HERETO
AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING
THE CITY MANAGER TO EXECUTE THE CONTRACT; AND
PROVIDING AN EFFECTIVE DATE
WHEREAS, the City and Consultant have entered into an agreement such that the
Consultant is to provide the following services: RELOCATION AND REMOVAL OF RADIO
EQUIPMENT AND TOWER LOCATED AT 5151 NORTH COLONY BOULEVARD; and
WHEREAS, the City has determined that it is in the best interest of the City to enter into
the Contract with DFW COMMUNICATIONS, INC., which is attached hereto and incorporated
herein by reference as Exhibit "A," under the terms and conditions provided therein.
WHEREAS, with this Contract the City of The Colony is agreeing to pay the sum not to
exceed $49,025.39 for such work.
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
THE COLONY, TEXAS THAT:
Section 1. The contract, which is attached and incorporated hereto as Exhibit "A", having
been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable
and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved
in the amount of $47,525.39 as the base amount, plus a $1,500.00 contingency amount for a total
not to exceed $49,025.39, and the City Manager is hereby authorized to execute the Contract on
behalf of the City of The Colony, Texas.
Section 2. That this Resolution shall take effect immediately from and after its adoption
and it is so resolved.
PASSED, APPROVED and EFFECTIVE this 17th day of
NOVEMBER. 2009.
c
A TE /6e McCou Mayor
City of T Colony, Texas
Christie Wilson, City Secretary
APPR S.WO FORM:
Robert E. Hager, ty Attorney
63918
j
DFW
COMMUNiCATiONS
DFW Communications Inc. The Colony
Chris Plemons 10-28-2009
The Colony Police Department
Chris,
This document serves as DFW Communications Inc.'s response to the proposal
request for relocation of the dispatch radio equipment required for the Colony Police and
Court building renovation project. This project includes the removal of the 100' tower
located at the east side of the building, the relocation of the console CEB and radio
equipment to a new equipment room, the relocation of the Parks and Rec. repeater and
the relocation of the FD VHF repeater. The project tasks will be performed as described
below in conjunction with the renovation phases.
DFW Communications Inc. Statement of Work
Parks and Recreation Repeater Relocation to Chesapeake Water Tower
Relocation of the Parks and Recreation repeater to Chesapeake Water tower will consist
of the following:
• Tower crew to install new DB224A dipole antenna onto tower support structure
• Tower crew to install 7/8' coaxial cable from antenna location to repeater location
and terminate
• Tower crew to install 7/8' coaxial cable ground kit prior to entry into water tank.
• Remove repeater from PD radio equipment room and transport to Chesapeake
Water Tower.
• Install repeater at customer specified location and ground to single point ground
system.
• Supply and install (1) lightning surge protection device (polyphaser) inside
coaxial cable entrance to building and ground closest ground point.
• Supply and install 1/2 superflex coaxial cable from lightning surge protection
device to repeater and terminate.
• Sweep antenna system prior to putting into service.
• Check forward and reflected power.
Dispatch Radio Equipment Relocation Revl Price Proposal
D /Y
DFW Communications Inc. COMM lNIcAT,®Ns
The Colony
FD VHF Relocation to Chesapeake Water Tower
Relocation of the FD VHF repeater to Chesapeake Water tower will consist of the
following:
• Receive (1) VHF base station.
• Supply and interface (1) CPI TTP2 tone remote adaptor to base station.
• Install base station and shelf in equipment room onto existing rack.
• Supply and install (1) VHF Yagi antenna onto roof.
• Supply and install (1) lightning surge protection device (polyphaser) inside
coaxial cable entrance to building and ground.
• Supply and install 1/4" superflex coaxial cable from antenna to polyphaser and
terminate
• Supply and install 1/4" superflex coaxial cable from lightning surge protection
device to base station and terminate.
• Remove console wire line control from the FD-VHF repeater and interface to base
station tone remote adaptor.
• Remove second weather alert encoder wire line control from the FD-VHF
repeater and interface to base station.
• Chesapeake WT
• Tower crew to install new DB224A dipole antenna onto Chesapeake water tower
support structure.
• Tower crew to install 7/8' coaxial cable from antenna location to repeater location
and terminate
• Tower crew to install 7/8' coaxial cable ground kit prior to entry into water tank.
• Remove the FD-VHF repeater from PD radio equipment room and transport to
Chesapeake Water Tower.
• Install repeater at customer specified location and ground to single point ground
system.
• Supply and install (1) lightning surge protection device (polyphaser) inside
coaxial cable entrance to building and ground closest ground point.
• Supply and install 1/2 superflex coaxial cable from lightning surge protection
device to repeater and terminate.
• Sweep antenna system prior to putting into service.
• Check forward and reflected power.
Tower Removal
Tower removal will be performed to make ready for the Police and Court renovation
project Phase 1
Tower removal will consist of the following:
Dispatch Radio Equipment Relocation Rev1 Price Proposal
-t
DFW
DFW Communications Inc. COMMUNICATIONS
The Colony
• Supply and install (2) antenna support structures (Parapet walls) onto roof close to
tower location
• Supply and install 10 antenna masts onto support structures.
• Relocate 17 antennas from tower and install onto temporary masts utilizing
existing coaxial cable runs. (3) 800 MHz Yagi antennas, (4) 800 omni antennas,
(7) UHF Yagi antennas, (1) VHF Yagi antenna, (2) VHF omni antenna.
• Tower crew to remove any remaining unused antennas an all coaxial cable feed
lines from tower
• Tower crew to remove 100' tower into 20' sections and stack at customer specified
location on site.
• Arrangements to remove tower section can be made but is not part of the
proposal.
Console CEB and Radio Equipment Room Relocation
The physical relocation of the CEB and radio equipment will create down time of the
console radio system. The down time will be kept to a minimum but may be as long as 2
to 4 hours during the relocation process.
Temporary radios for PD and FD can be installed at (2) operator positions for temporary
communications during the equipment relocation.
Relocation of the radio room equipment and antenna systems will consist of the
following:
• Supply and install 10 antenna masts onto customer constructed antenna support
structure.
• Relocate existing ground buss bars to above the ceiling in existing radio room.
➢ Primary lightning protection will remain at the same location. (Within 2' of
entry of building or exit of conduit into building.
• Supply and install up to 50' of 3/8" heliax coaxial cable from each antenna
location at to polyphaser location and terminate
• Supply and install ground kit at each antenna location and terminate to antenna
support structure.
• Supply and install up to 75° of 3/8" superflex coaxial cable from polyphaser
location to new radio equipment room and terminate.
• Install distribution frame (punch block board) for radio console interface at new
equipment room.
• Install radio interface cables from distribution frame to radio rack location and
terminate.
• Install (3) OP cables from new CEB location to console locations.
• Install (3) cat5 cables from new CEB location to console locations and terminate.
Dispatch Radio Equipment Relocation ReA Price Proposal
Dl' ►'Y
DFW Communications Inc. cvnnw,csanvnA®
The Colony
• Remove CEB rack and (2) radio equipment racks and install at customer specified
location in new equipment room
• Connect preinstall RF, op cables and cat5 cables to CEB and radio equipment.
• Ground equipment to R56 specs.
• Perform checks on all relocated antenna systems. Verify operation and power
checks.
Labor
Description Cost
P&R Repeater Installation at Chesapeake Water Tower $ 7,852.86
FD VHF Repeater Installation at Chesapeake Water Tower $ 8,902.16
PD Tower Removal $ 9,423.23
Console CEB and Radio Equipment Room Relocation $ 21,347.14
System installation will be performed in accordance with Motorola R56 FNE Standards.
All ground wire; stainless steel bolts, lugs, and other small grounding hardware will be
supplied by DFW Communications.
Installed equipment will be grounded to customer single point ground system within 50'
of new equipment location
DFW Communications to supply all miscellaneous install hardware such as nuts, bolts,
etc.
Any work that is required to complete this project not described in this statement
of work will be considered above the scope of this proposal and subject to re-quotation. If
you have any questions you can contact me at (817) 314-1472
Thank You,
Steve LePrell
Projects Department
DFW Communications Inc.
Dispatch Radio Equipment Relocation Rev1 Price Proposal