Loading...
HomeMy WebLinkAboutResolution No. 09-082 CITY OF THE COLONY, TEXAS RESOLUTION NO. 09- 09a A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF THE ENGINEERING SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND ALAN PLUMMER ASSOCIATES, INC. FOR PREPARATION OF AN UPDATED WATER MASTER PLAN, WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City and Consultant have entered into a Contract such that the Consultant is to provide the following services: PREPARATION OF AN UPDATED WATER MASTER PLAN; and WHEREAS, the City has determined that it is in the best interest of the City to enter into the Contract with Alan Plummer Associates, Inc., which is attached hereto and incorporated herein by reference as Exhibit "A," under the terms and conditions provided therein; and WHEREAS, with this Contract the City of The Colony is agreeing to pay the sum not to exceed $92,000 for such work. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THAT: Section 1. The Engineering Services Contract, which is attached and incorporated hereto as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved in the base amount of $87,800, plus a contingency amount of $4,200, for a total amount not to exceed $92,000. Section 2. The City Manager is hereby authorized to execute the Contract on behalf of the City of The Colony, Texas. Section 3. This Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED, APPROVED and EFFECTIVE this 20th day of October, 2009. AT S oe McC rry, Mayor G City of The Colony, Texas ristie Wilson, City Secretary APP V ORM: Robert E. Hager, ty Attorney 63918 Exlii bit 4tA3) Scope of Services -and Work Schedule Professlonitl agrees to cOnInlenee services upon written direction from City and to complete project in acoordanee With the attached Alan Plummer Associates scope ofservices, fee schedule and b0got estimate. Budget Requirements The,services will be completed can a time and materials basis for the not to exceed total cost of $87,800.. 0. No w .ork. outside the approved scope of work should be performed by Consultant without, prior written approval and Change Order to the contract. Schedule The services outlined in this proposal mid. final project report should be Qonipleted within nine (0) inontbs after receipt of a written Notice to Proceed yfroni The City of The. Colony. 2009-114-00 City of The Colony ATTACHMENT A SCOPE OF SERVICES Water Distribution System Master Plan The Basic Engineering Services rendered by ENGINEER are to be considered distinguishable from other services and divided into the following categories: A. Water Distribution System Hydraulic Modeling B. General Services In addition to the Basic Services, other services related to the project that may be included by specific authorization are identified herein as "C-SPECIAL SERVICES". These various services are more fully described as follows: A. Water Distribution System Hydraulic Modeling TASK 1 Data Gathering The following information will be provided to the ENGINEER by the CLIENT: 1. Copies of previous reports related to evaluation of pumping and distribution facilities. 2. Information related to any specific fire flow requirements within the City. 3. Electronic files containing water system pipes, valves, fire hydrants, etc. 4. Any available information related to pipe material and age within the system. 5. Electronic files containing all customer metered water usage for 2006-2009. Electronic files should include location (address) of each meter, and monthly metered usage at each location. 6. Electronic files containing city street centerline information and city limits. 7. Operational protocols for the system, which may include pump on/off settings, pressure reducing valve settings, etc. 8. Plans for. piping at all pump stations. 9. Relevant information on available water supply from existing and proposed groundwater wells. 10. Measured flows for the pumps at the pump stations for 2006-2009. 11. Tank level data (hourly) in all storage tanks for 2006-2009. 12. Any records of low-pressure complaints. Map indicating areas of known problems with low or high pressures. 13. Best available electronic elevation data for the CLIENT. 14. Information concerning any projected growth and development within the CLIENT's service area. This could include previous projections, land use zoning, and known plans for projects. 15. Detailed information for all storage tanks, to include inlet and outlet diameter, storage-depth relationship, diameter of bowl, minimum and maximum water levels, presence of interior screening, baffling or other mixing techniques. 16. Emergency connections to any outside water sources (location, sizes, minimum and maximum flow rates, delivery pressure) Page 1 of 4 F:\Busdev\Proposals\Proposals_2009\2009-114-00_Colony_Water_Master_Plan\Colony_water MP_Scope v6.doc 10/2/09 2009-114-00 City of The Colony 17. Location of any special service zones, pressure reducing valves, flow control valves, service to major buildings or geographic areas within the city. TASK 2 Develop Hydraulic Model ENGINEER will update the existing distribution model to accurately represent the existing distribution system and include all pipes within the distribution system. The model will be developed using MWHSoft's INFOWATER software. The following sub-tasks are to be completed as part of this task: 2.1 Initial review of existing information and field testing. ENGINEER will review the information provided by the CLIENT and develop recommendations for sampling to obtain additional data necessary for model setup and calibration. The recommended sampling program will include suggested locations, timing, frequency and duration of pressure and flow measurements throughout the distribution system. All data collection and sampling will be performed by the CLIENT. 2.2 Update water system model. All known existing pipes will be added to the distribution system model. Electronic files showing distribution system pipe size and location will be provided by the CLIENT. 2.3 Develop demand distribution. Metering records provided by the CLIENT will be used to determine demand distributions to each model node under maximum month conditions. Records of hourly pumped flow will then be used to define maximum day flow conditions, identify diurnal flow patterns, and determine additional system demands not captured by the metering records. TASK 3 Hydraulic Model Calibration The objective of this task is to calibrate the hydraulic model so that it provides reliable results for subsequent hydraulic evaluations. The following sub-tasks are to be completed as part of this task: 3.1 Update operational rules into model. ENGINEER will update system operational rules in the model, including pump trigger rules, minimum and maximum tank levels, etc: 3.2 Calibrate steady state model. Model output (flows and system pressures) will be compared to field-measured system data, as provided by Task 2.1. Model physical parameters will be adjusted to calibrate to the field pressure and flow measurements. 3.3 Perform extended period simulation (EPS) model calibration. Modeled flows, pressures and tank levels will be compared to measured data at hourly intervals for a 48-72 hour period under maximum day flow conditions. Adjustment of model. physical parameters and/or refinements to the demand distribution will be used to calibrate for EPS conditions. Page 2 of 4 F:\Busdev\Proposals\Proposals_2009\2009-114-00_Colony_water_Master_Pla n\Colony_water_MP_Scope_v6.d oc 10/2/09 2009-114-00 City of The Colony TASK 4 Hydraulic Model Runs and Identification of Recommended Improvements The objective of this task is to use the calibrated hydraulic model to identify improvements required to meet demands and provide adequate pressures to the system for existing and projected future conditions. The following sub-tasks are to be completed as part of this task: 4.1 Define improvement criteria. In conjunction with City staff, develop criteria for evaluation of improvements. These criteria may include measures such as maximum allowable velocities, maximum allowable head loss, minimum and maximum pressures, fire flow criteria and fiscal constraints. 4.2 Develop demand scenarios. Using information obtained from previous tasks, develop demand scenarios for average day, maximum day, peak hour, and minimum hour steady state conditions. Develop demand scenario for a maximum day EPS condition. 4.3 Perform model runs. Steady state model runs will be made for existing demands and projected year 2019 and buildout (2030) demands under maximum day, peak hour and minimum hour demand conditions. In addition, EPS model runs will be made under maximum day demand conditions in order to evaluate system performance under tank filling and draining conditions. 4.4 Evaluate improvements and provide improvement rationale. The distribution model will be used to evaluate recommended improvements for the 2019 and 2030 systems. Improvements will be identified through consultation with City staff and through analysis of the model results. A description and rationale for each proposed improvement will be provided in tabular form. System maps will be provided that show all distribution piping and facilities,, recommended improvements and pressure contours. 4.5 Provide planning level opinions of probable cost for improvements. Planning level opinions of probable cost for each improvement will be provided. B. General Services TASK 5 Project Meetings The objective of this task is to provide time throughout the project period for meetings with the CLIENT to review and discuss the progress of the study and to provide time for in-house project meetings at the office of the ENGINEER. Project meetings with the CLIENT will include a kickoff meeting and up to 2 additional progress meetings throughout the project. Page 3 of 4 F:\Busdev\Proposals\Proposals_2009\2009-114-00_Colony Water Master_Plan\Colony_water_MP_Scope_v6.doc 10/2/09 2009-114-00 City of The Colony TASK 6 Report The objective of this task is to prepare draft and final reports describing the water distribution system evaluation providing cost projections for improvements and recommending an implementation schedule. Recommendations for piping changes, storage capacity, and pumping capacity will be based on recognized industry standards and State and Federal regulations. Five copies of the draft report will be provided to the CLIENT for review. Upon completion, 5 copies of the final report will be provided to the CLIENT. In addition to the five printed copies of the final report, the report, figures, drawings and data will be provided to the CLIENT in electronic format. C. SPECIAL SERVICES Special Services to be performed by the ENGINEER, if authorized by the OWNER, which are not included in the above-described Basic Services, are described as follows: Special services may include, but are not limited to: a. Additional meetings beyond the number of meetings listed in the basic services; b. Assistance with on-site data collection or field services, not defined in the basic services; c. Conversion of any hard-copy data, specified in the basic services to be provided in electronic format by the CLIENT, to electronic format. e. Additional modeling and analysis to include conditions that are not listed in the basic services, and f. Preliminary or detailed design of recommended improvements listed in the Final Report. Page 4 of 4 F:\Busdev\Proposals\Proposals_2009\2009-114-00_Colony Water Master_Plan\Colony_water MP Scope_v6.doc 10/2/09 ATTACHMENT B ALAN PLUMMER ASSOCIATES, INC. HOURLY PEE SCHEDULE 209 Staff Description od 2009 Rate Code Admin Staff Al-A3 $ .65.00 Senior Admin Staff A4 $ 7x.00 Designer[Technician 01-C2 $ woo Senior Designer/Technician, 03-G4 $ 100.00 Engineer-in-Trairiing!Scientist-in-TrEiiriing ES1-ES3 $ 95.00 Project Engineer/Scientist ES4 $ 110.00 Senior Praject.EngineerlSeien# st ES5 125 0 Project Manager ES-6 $ 150..00 Senior Project M. anager ES7 $190.00 Principal ES8-ES9 $ 224.00 Billing rates may be adjusted by up to 4 percent annually (at the beginning of each calendar year) during the term of this :agreement. A.'rhultipiier of '1,15 will. be applied 6 all direct expenses ,CURRENT City of The. Colony. Water Distrttiutton System Master Platt Water-SystemMaster Ptan 2008~714•Q4 Level 2.(PhaSe) ho. and Desodptlon. PdOclpal. Sr. Prof Mgr No) En_pr" Tezhnlalap Clerical Total Labor Percent of tsvats(TaA)No.andCescnpftin (hrs) {firs) {hrs (lrrs) (hrs) Hours Foe(SU) Totat'Fae Water system Master Plan 26 404 452 86 16 684 $ 136,400 400.6% .A ItlaterSys)ern'}fydXdullF 141etieitng 46 76 586 52 0 539 $ $$,$90 77..S*A .1 Pala attanng _ 20 1a 38 $ 3,900 4:5°k X2.1 InftiatRavreN.ancfFk-ldTasBng 2 24 -f$ 44 $ 4,800 2.2 ttpd feMiDdef ti 40 18 fib S 7,700 $.914 2.3 reve'o PDemandMibution 4 48 52 S 8.300 7.3% 9,1 OpePatiobafQu;es'- _e.».,-...._.__ 2 16 98 .3 2,200 9.2 Ca,orateSteatStaleWoW 1$ 60 7$ S x900 11.5 x.,_... 33 EPS:Cafibraiion 2 1& 60 78 S 111,400_ f2:D"!.• r 4. Y :pefne hfiprovamant Criteria 4 a 12 S. 11740 2.0 4.2 Develop Demaod Scenados 2 16 t5 S w 2,200: zk. 4.3 _ ffodefRtms ....,.w _ . _ 4 40 44 :S 5;400 6.3% ^ 44 EvaNare Improvement Rationale 4 14. 24 $ 50 S 7;000. 8.i% 4.5 Opinion ofProbabte Cost 4 4 32 „ _ _ -00 S 5;3bQ '$_155. B Qaneral Servicea_ Is Is 84 24 1$ 448 $ 48,808 22.7 1 5 AfeEf~rx~s(3} 12 12 24 48 7,700 8.9'0 6- Re~oort 4. 1.8 AO 24 16 100 S 11500. 138. TOTALLABOR_ Total Tabor Flours 26 104 4521. 88 4& 684 Total Labor Amount S 8$j400 . Labor Rates per Hour $220 $190 $115 $90 $75 TotalAmountsbyLabor Cale.9ory $ 3,720 $ 49,7$0 ~y 51,980 $ 7,740_ $ 1,264 $ .86,400 Labor Call, 0 Percent ~of-rotai-Labor 22.3% 80:2% 9.0%. 1.4% 160.81 TOTAL EXOENSES Isee breakd6ni bet"A Total Subconsultants. 5 Total Reimbarsables $ 1,480 Total Expenses $ 1,400 3RAND TOTAL =Water System Master Plan $ 87,800