HomeMy WebLinkAboutResolution No. 07-019
RESOLUTION NO. 07- Olq
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF
THE CONSTRUCTION CONTRACT BY AND BETWEEN THE CITY OF
THE COLONY AND RED RIVER CONSTRUCTION FOR
IMPROVEMENTS AT OFFICE CREEK PUMP STATION AND WELL
SITE NUMBER ONE, WHICH IS ATTACHED HERETO AND
INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE
CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING
AN EFFECTIVE DATE
WHEREAS, the City and Consultant have entered into an agreement such that the
Consultant is to provide the following services: IMPROVEMENTS AT OFFICE CREEK
PUMP STATION AND WELL SITE NUMBER ONE; and
WHEREAS, the City has determined that it is in the best interest of the City to enter into
the Contract with RED RIVER CONSTRUCTION, which is attached hereto and incorporated
herein by reference as Exhibit "A," under the terms and conditions provided therein.
WHEREAS, with this Contract the City of The Colony is agreeing to pay the sum not to
exceed $1,160,000.00 for such work.
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
THE COLONY, TEXAS THAT:
Section 1. The Construction Contract, which is attached and incorporated hereto as Exhibit
"A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be
acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all
things approved in the amount of $1,101,600.00 as the base amount, plus a $58,400.00 contingency
amount for a total not to exceed $1,160,000.00, and the City Manager is hereby authorized to
execute the Contract on behalf ofthe City of The Colony, Texas.
Section 2. That this Resolution shall take effect immediately from and after its adoption
and it is so resolved.
PASSED, APPROVED and EFFECTIVE this 20th day of
FEBRUARY, 2007.
t!J~J W~
Christie Wilson, City Secretary
1 hn Dillard, Mayor
ity of The Colony, Texas
r
~--'<-( OF ",
- v"-............~<';:-
'.' . (')
; !:;:! :' ".0'\-
,~' :"'4.. " . ,"""" <
.1-: 01'- "0'
J : u/-,'Jl( :_f
\, .... ~11~7l
<, l'f::' ..' ./
>/J0/' >( ;:" s <0'
~{)')71JJ:rrrrfl'
63918
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the ~ ''/k day o~~ ~ 0..{/the
year 200fby and between the CITY OF THE COLONY, TEXAS, a municipal rporation
(hereinafter called OWNER) and Red River Construction Co. (hereinafter called)
CONTRACTOR).
OWNER and CONTRACTOR, ill consideration of the mutual covenants hereinafter set forth, agree
as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
Furnishing all labor, tools, materials, and equipment, and performing all work necessary for
the construction of Office Creek Pump Station and Well Site No. 1 Improvements, piping,
valves and accessories as shown on the drawings and specified in the Contract Documents.
The Pr~iect tor which the Work under the Contract Documents may be the whole or only a part is
generally described as foHows:
OFFICE CREEK PUMP STATION
& WELL SITE NO.1 IMPROVEMENTS
City of The Colony
BID #69-07-01-0CPUMP
Article 2. ENGINEER.
'nle Project has been designed by Chiang, Patel & Yerby, Inc., who is to act as Owner's
Representative, assume all duties and responsibilities and have the rights and authority assigned to
the ENGNEER in the Contract Documents in connection with completion of the Work in
accordance with the Contract Documents. The Bidding and Contract Documents have been
established by Chiang, Patel & Yerby, Inc. Contract administration will be provided by the City of
The Colony Engineering Department who is hereinafter called ENGINEER and who is to act as
OWNER's representative, assume all duties.
Contract Documents
2-1
Article 3. CONTRACT TIME.
3.1. The Work will achieve Substantial Completion as specified in Section 01310,
Paragraph 1.03.F.1 thru 1.03.F.5, and will be completed and ready for final payment on or
before March 2, 2008 as specified in Section 01310, Paragraph L03.F.6, in accordan.ce with
Item 1.13 of the General Provisions, and completed and ready for final payment in
accordance with Item 1.51 of the General Provisions.
Article 4. CONTRACT PRICE.
4.1. OWNER shall pay CON1RACTOR for completion of the Work in accordance with the
Contract Documents in current funds subject to additions and deductions by Change Orders
as provided in the contract documents in accordance with the unit prices listed in
Section - Proposal and Bid Schedule. The contact sum shall be the amoWlt of
$1, 101,600.00 The total tangible personal property cost included in the contract sum is
$548,550.00 .
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Item 1.51 of the
General Provisions. Applications for Payment will be processed by ENGINEER as provided in the
General Provisions.
5.1. Progress Payments. OWNER shall make progress payments on account of the Contract
Price on the basis of CONTRACTOR's Applications for Payment as recommended by
ENGINEER, each month during constrnction as provided below. All progress payments
will be on the basis of the progress of th_e Work measured by the schedule of values
established in Item 1.51 of the General Provisions (and in the case of Unit Price Work based
on the number of units completed) or, in the event there is no schedule of values, as
provided in the General Provisions.
5.1.1. Prior to Completion, Progress Payments will be made in an amount equal to the
percentage indicated in Item 1.51.2 of the General Provisions, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGlNEER shall
determine, or OWNER may withhold, in accordance with Item 1.52 of the General
Provisions of the NCTCOG Specifications.
5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with
Item 1.51.4 of the General Provisions, OWNER shall pay the remainder of the Contract
Price as recommended by ENGINEER.
Contract Documents
2-2
,A..,.pftele 6. INTEREST.
No interest shall ever be due OR late payments.
Article 7. CONTRACfOR'S REPRESENTA nONS.
In order to induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:
7. t. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface
conditions and drawings of physical conditions which are identified in the SupplementaJy
Conditions as provided in Item 1.3 of the General Provisions, and accepts the determination
set forth in Item SC-I.20 of the Supplementary Conditions of the extent of the technical
data contained in such reports and drawings upon which CONTRACTOR is entitled to rely.
7.2. CONTRACTOR has obtained and carefully studied (or assumes responsibility for
obtaining and carefully studying) all such examinations, investigations, explorations, tests,
reports, and studies (in addition to or to supplement those referred to in paragraph 7.1
above) which pertain to the subsurface or physical conditions at or contiguous to the site or
otherwise may affect the cost, progress, perfonnance, or furnishing of the Work as
CONTRACTOR considers necessary for the performance or furnishing of the Work at the
Contract Price, within the Contract Time and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provisions of Item 1.3 of
the General Provisions; and no additional examinations, investigations, explorations, testo:;,
reports, studies, or similar information or data are or will be required by CONTRACTOR
for such purposes.
7.3. CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract Documents with respect to existing Underground Facilities at or
contiguous to the site and assumes responsibility for the accurate location of said
Underground Facilities. No additional examinations, investigations, explorations, tests,
reports, studies, or similar information or data in respect of said Underground Facilities are
or will be required by CONI'RACTOR in order to perform and furnish the Work at the
Contract Price, within the Contract time and in accordance with the other terms and
conditions of the Contract Docwnents, including specifically the provisions of Items 1.3,
1.20 and 1.21 of the General Provisions.
Contract Documents
2-3
7.4. CONTRACTOR has correlated the results of all such observations, examinations,
investigations, explorations, tests, reports, and studies with the terms and conditions of the
Contract Documents.
7.5. CONTRACTOR has given ENGINEER written notice of all conflicts, errors or
discrepancies that he has discovered in the Contract Documents and the written resolution
thereof by ENGINEER is acceptable to CONIRACTOR.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1. This Agreement (pages 2-1 through 2-6, inclusive).
8.2. Exhibits to this Agreement (immediately following this Agreement, inclusive).
8.3. Certificate Of Insurance (page 2-7).
8A. Notice of Award.
8.5. Part 1: General Provisions of the Standard Specifications for Public Works
Construction, NCTCOG, 3rd edition.
8.6. Supplementary Conditions to the NCTCOG, Part 1: General Provisions (pages 3-1
through 3-9).
8.7. Specifications bearing the title: "PROJECT MANUAL - Contract Documents for:
OFFICE CREEK PUMP STATION
& WELL SITE NO.1 IMPROVEMENTS
City of The Colony
BID #69-07-01-0CPUMP
8.8. Drawings bearing the title:
OFFICE CREEK PUMP STATION
& WELL SITE NO.1 IMPROVEMENTS
8.9 The following listed and numbered addenda:
Contract Documents
2-4
8.1 o~ CONTRACTOR's Proposal. Bid Schedule, and Bid Summary - Bidding Documents
(page 1~14 through 1-23).
8.1 I. Documentation submitted by CONTRACTOR prior to Notice of Award.
8.12. The following which may be delivered or issued after the Effective Date of the
Agreement and are not attached hereto: All Written Amendments and other
documents amending, modifying, or supplementing the Contract Documents
pursuant to Items 1.37 and ].38 of the General Provisions.
8.13. The docwnents listed in paragraphs 8.2 et seq. above are attached to this Agreement
(ex_cept as expressly noted othervvise above).
8.14 Executed Performance, Payment and Maintenance Bond.
The Contract Documents may only be amended, modified, or supplemented as provided in Items
1.37 and 1.38 of the General Provisions.
Article 9. MISCELLANEOUS.
9.1. Tenns used in this Agreement which are defmed in Item 1.0 of the General Provisions
will have the meanings indicated in the General Provisions.
9.2. No assignment by a party hereto of any rights under or interests in the Contract
Documents will be binding on another party hereto without the written consent of the party
sought to be bound; and specifically but without limitation moneys that may become due
and moneys that are due may not be assigned without such consent (expec..'t to the extent that
the effect of this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or discharge the
assignor from any duty or responsibility under the Contract Documents.
9.3. OWNER and CONTRACTOR each binds itself, its partners, successors, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
representatives in respect of all covenants, agreements and obligations contained in the
Contract Documents.
Contract Documents
2-5
Article 10. OTHER PROVISIONS.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in
triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and
ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER
and CONTRACTOR or by ENGINEER on their behalf.
This Agreement will be effective on
~~rLt it:'f ;?-o
CONTRACTOR:
,20 D7
OWNER: City of The Colony
6800 Main Street
The Colony, TX 75056
BY: 0~ elL
~- ,
TITLE: ~9 J
ATTEST: --Ai. )~""Y'.
Red River Construction Co.
BY: ~-I/
Dean Porter
TITLE: President
AITEST:L.~~ ~b
--=-
Address for giving notices:
Address for giving notices:
2804 Capital Street
Wylie, TX 75098
City of the Colony
6800 Main Street
The Colony, Texas 75056
Attn: Gordon Scruggs, PE
Director of Engineering and Utilities
(If OWNER is a public body, attach
evidence of authority to sign and
resolution or other documents
authorizing execution of Agreement.)
(If CONTRACTOR is a corporation, attach
evidence of authority to sign.)
COlltract Documents
2-6
-, .
RESOLUTION
OF
RED RIVER CONSTRUCTION CO.
I hereby certify that it was RESOLVED by a quorum of the
directors of Red River Construction Co., meeting on the 20th day
of Februarv, 2007, that Dean Porter, President, be, and hereby
is, authorized to act on behalf of Red River Construction Co., as
its representative, in all business transactions conducted in the
State of Texas, and;
That the above resolution was unanimously ratified by the
Board of Directors at said meeting and that the resolution has not
been rescinded or amended and is now in full force and effect, and;
In authentication of the adoption of this resolution, I
subscribe my name and affix the seal of the corporation this 2Qth
day of
Februarv , 2007.
(seal)
(ll~m ~
Meredith Porter; Secretary
Red River Construction Co.
2804 Capital Street
Wylie, TX 75098
State of Incorporation: Texas