HomeMy WebLinkAboutResolution No. 06-045 RESOLUTION NO. 06-~{ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF THE CONSTRUCTION SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND LAYNE CHRISTENSEN COMPANY FOR REPAIRS AT WELL SITE NO.3, WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City and Consultant have entered into an agreement such that the Consultant is to provide the following services: REPAIRS AT WELL SITE NO.3; and WHEREAS, the City has determined that it is in the best interest of the City to enter into the Contract with LAYNE CHRISTENSEN CaMP ANY, which is attached hereto and incorporated herein by reference as Exhibit "A," under the terms and conditions provided therein; and, WHEREAS, the City of The Colony ratifies that the purchase of contractual repairs at Well Site No.3 be exempted from competitive bidding per Section 252.022(a)(2) and (3) of the Local Government Code to preserve public health because of unforeseen damage to public machinery and equipment; and, WHEREAS, with this Contract the City of The Colony is agreeing to pay the sum not to exceed $38,000.00 for such work. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THAT: Section 1. The Engineering Services Contract, which is attached and incorporated hereto as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved in the amount of $31,685.00 as the base amount, plus a $6,315.00 contingency amount for a total not to exceed $38,000.00, and the City Manager is hereby authorized to execute the Contract on behalf of the City of The Colony, Texas. Section 2. That this Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED, APPROVED and EFFECTIVE this 1 day of May, 2006. Dillard, Mayor ty of The Colony, Texas [1: / ~~~ (;J4~ Christie Wilson, City Secretary 63918 CITY OF THE COLONY DENTON COUNTY, TEXAS ENGINEERING AND PUBliC WORKS DEPARTMENTS CONDmON AND REHABILITATION ASSESSMENT 1RINITY WEll. NUMBER 3 CHANGE ORDER FORM DATE: 5/17/06 SHEET I OF 2 Change Order No.1 To The Contract Dated February 24. 2006 between the City of The Colony (Owner) and Layne-Texas. a division of Layne Christensen Comoany for Condition and Rehabilitation Assessment Trinity Well Number 3. Pursuant to the provisions of Section 1.37 and 1.38 of the General Conditions of the Contract. this Supplemental Agreement. when fully executed, shall constitute the authority to change the work of the project as follows, including quantities and total dollars: Add The FoUowme Bid Items: ITEM DESCRIPTION OTY LABOR PRICE MATERIAL TOTAL PRICE PRICE 1 See attached Quotation for Description of Work And quantity $20,606.00 $14,743.00 $35,349.00 Thirty five thousand three hundred fony nine Dollars And !!Q Cents. Total Cost Addition $35,349.00 Total Amount or Change Order No.1 = $35,349.00 Requested Additional No. Of Calendar Days To Be Considered Prior To The Final Payment rao days. Please sign and return this change order to the Engineering Department as soon as possible so future payments may be processed. Thank You. City of The Colony's offer of proposed change: BY: \) ~ ('~ Con_tor. ~U.1 Engineer: ~ 7h~:Z- .J. 9A-a-It- ~f, ; ~ ,l'-J aJ f- 1 e..J.J,r rZII1 c; . Date: c:; I...... -4 0 C Date: ~-"Z.."Z..--z.o~ Date: .5r24--CJ4 Layne Christensen Company Layne - Texas DIvision 5734 American Legion Road - Tyler, Texas 75708-9147 - {903} 592-6177 - Fax: (903) 597-9469 Quotation To: City of The Colony Date: 5116/2006 Quotation No.: 28-073-737-6 Reference: Water Well No. 3 WeD & Pumo Reoairs Scope: Shop inspect bowl assemby, 1/3 of tube & shaft. Install pump. Labor 9 hr Crane truck, operator & 3 helpers to remove tube & shaft from column and 185.00 1,665.00 load on trucks 78 hr Shop labor disassembling, inspecting,c1eaning & assembling 340' tube & 47.00 3.666.00 shaft, and bowl assembly 7 hr Crane truck. operator & 3 helpers to transport and replace tube & shafts into 185.00 1,295.00 column. 56 hr Pump service rig & aew, installing and starting up pump 225.00 12,600.00 6pd Crew per diem 230.00 1 ,380.00 Subtotal 20,606.00 Materials Repairs to 14" - 9stg bowl assembly: replace oil seals and 490.00 490.00 tube adapter bushing 3 10" x 20' column pipe, sch 40, t&c 920.00 2,760.00 2 3-1/2" x 2-7116" bearing 136.00 272.00 6 2-7/16" x 20' shaft, steel, t&c 1080.00 6,480.00 25 10" x 3-1/2 rubber spider 19.00 475.00 1 Repair stretch joint chase threads, fabricate new bronze nut 670.00 670.00 1 Top special tube, shaft & bearing; repairs/replacement, estimated 300.00 300.00 1000 1/4" 5.S. - pvc coated airline 2.05 2,050.00 1 Shop supplies: permatex, varsol, Loctite, etc 223.00 223.00 1 Installation supplies: S.5. bands & buckles,thread lubricant, turbine oil, 1023.00 1,023.00 electrical supplies, gauges, fittings, gaskets, etc. Subtotal 14,743.00 Total Estimate $ 35,349.00 Page 1 at f Layne Christensen Company (CoM1Ir:Iorj ~AN Steve WOOIIe~ \ Layne Christensen Company is an Equal Opportunity Employer