HomeMy WebLinkAboutResolution No. 06-015
RESOLUTION NO. 06- ~/~
ORIGINAL
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF
THE ENGINEERING SERVICES CONTRACT BY AND BETWEEN THE
CITY OF THE COLONY AND HALFF ASSOCIATES FOR SERVICES
ON MEMORIAL DR. AND PAIGE RD., WHICH IS ATTACHED
HERETO AND INCORPORATED HEREIN AS EXHIBIT "A";
AUTHORIZING THE CITY MANAGER TO EXECUTE THE
CONTRACT; AND PROVIDING AN EFFECTIVE DATE
WHEREAS, the City and Consultant have entered into an agreement such that the
Consultant is to provide the following services: Engineering design of Paige Rd. and two
sections of Memorial Dr.; and
WHEREAS, the City has determined that it is in the best interest of the City to enter into
the Contract with Halff Associates, Inc., which is attached hereto and incorporated herein by
reference as Exhibit "A," under the terms and conditions provided therein.
WHEREAS, with this Engineering Services Contract the City of The Colony is agreeing
to pay the sum of $707,480.00 for such work..
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
THE COLONY, TEXAS THAT:
Section 1. The Engineering Services Contract, which is attached and incorporated hereto as
Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found
to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all
things approved, and the City Manager is hereby authorized to execute the Agreement on behalf of
the City of The Colony, Texas.
Section 2. That this Resolution shall take effect immediately from and after its adoption
and it is so resolved.
PASSED, APPROVED and EFFECTIVE this 6th day of February, 2006.
1!~~
, laJ.
MI17T4iEW ~ be. A...J '-t>A.J
Dillard, Mayor
y of The Colony, Texas
63918
AGREEMENT FOR
PROFESSIONAL SERVICES
Q crcP(
THIS AGREEMENT is entered into the 0 day of F€f3 ,2005", by
and between the CITY OF THE COLONY, TEXAS, hereinafter referred to as CITY and
HALFF ASSOCIATES, INC., hereinafter referred to as UNDERSIGNED.
WHEREAS, CITY desires UNDERSIGNED to perform certain work and services
set forth in scope of Services, marked Exhibit "A", and attached hereto and incorporated
herein.
WHEREAS, the UNDERSIGNED has expressed a willingness to perform said
work and services, hereinafter referred to only as "services", specified in said Scope of
Services, and enumerated under Article II of this Agreement.
NOW, THEREFORE, all parties agree as follows:
ARTICLE I
GENERAL
UNDERSIGNED, shall furnish and pay for all labor, tools, materials, equipment,
supplies, transportation and management necessary to perform all services set forth in
Article II hereof for the CITY in accordance with the terms, conditions and provisions of
the Scope of Services, marked Exhibit "A", and attached hereto and incorporated herein
for all purposes. CITY may, at any time, stop any services by the UNDERSIGNED
upon giving UNDERSIGNED written notice. UNDERSIGNED shall be bound to CITY by
the terms, conditions and responsibilities toward the CITY for UNDERSIGNED'S
services set forth in this Agreement.
ARTICLE II
SERVICES
A. The following services, when authorized in writing by a Notice to Proceed,
shall be performed by the UNDERSIGNED in accordance with the CITY'S
requirements:
Professional Engineering Services to prepare Construction Plans,
Specificcitions and Estimates for Major Thoroughfare Roadways as
described in Exhibit "A"
B. UNDERSIGNED shall be responsible for the professional quality, technical
accuracy, and the coordination of all designs, drawings, specifications, plans,
and other services furnished by UNDERSIGNED under this Agreement.
UNDERSIGNED shall, without additional compensation, correct or revise any
errors or deficiencies in the design, drawings, specifications, plans and other
services.
Page 1
C. Neither CITY'S review, approval or acceptance of, nor payment for any of the
services required under this Agreement, shall be construed to operate as a
waiver of any rights under this Agreement, and UNDERSIGNED shall be an
remain liable to the CITY in accordance with applicable law for all damages to
the CITY caused by the UNDERSIGNED'S negligent performance of any of
the services furnished under this Agreement.
D. The rights and remedies of the CITY under this Agreement are as provided by
law.
ARTICLE '"
PAYMENT
A. CITY shall pay UNDERSIGNED for all services authorized in writing and
properly performed by the UNDERSIGNED in the basis herein described,
subject to additions or deletions for changes or extras agreed upon writing.
B. The total amount paid to UNDERSIGNED shall not exceed a lump sum fee of
$615,200 as outlined in Exhibit "B". Partial payment will be made for
completed portions of the work as approved by the CITY and as stipulated in
Exhibit "B" attached hereto and incorporated herein.
C. Upon complete performance of this Agreement by the UNDERSIGNED and
final approval and acceptance of UNDERSIGNED'S service by the CITY,
CITY will make final payment to UNDERSIGNED of the balance due under
this Agreement within thirty (30) days of the following month after final
payment for such services has been billed by the UNDERSIGNED.
D. CITY may deduct from any amounts due or to become due to the
UNDERSIGNED any sum or sums owing by the UNDERSIGNED to the CITY.
In the event of any breach by the UNDERSIGNED of any provision or
obligation of this Agreement, or in the event of the assertion by other parties
of any claim or lien against the CITY, or the CITY'S premises, arising out of
the UNDERSIGNED'S performance of this Agreement, the CITY shall have
the right to retain out of any payments due or to become due to the
UNDERSIGNED an amount sufficient to completely protect the CITY from
any and all loss, damage or expense therefrom, until the breach, claim or lien
has been satisfactorily remedied or adjusted by the UNDERSIGNED.
ARTICLE IV
TIME FOR PERFORMANCE
A. UNDERSIGNED shall perform all services as provided for under this
Agreement in a proper, efficient and professional, manner in accordance with
the CITY'S requirements. Both parties have agreed to the provisions of this
Page 2
Agreement in anticipation of the orderly and continuous progress of the
project through completion of the Scope of Services specified in Exhibit "A",
attached hereto.
B. In the event UNDERSIGNED's performance of this Agreement is delayed or
interfered with by acts of the CITY or others, the UNDERSIGNED may
request an extension of time for the performance of same as hereinafter
provided, but shall not be entitled to any increase in fee or price, or to
damages or additional compensation as a consequence of such delays
unless such delays exceed ninety (90) days.
C. No allowance of any extension of time, for any cause whatever, shall be
claimed or make to the UNDERSIGNED, unless the UNDERSIGNED shall
have made written request upon the CITY for such extension within forty-eight
(48) hours after the cause for such extension occurred, and unless the city
and the UNDERSIGNED have agreed in writing upon the allowance of
additional time to be made.
ARTICLE V
DOCUMENTS
A. All instruments or service (including plans, specifications, drawings, reports,
designs, computations, computer programs, estimated, surveys, other data or
work items, etc.) prepared under this Agreement shall be submitted for
approval of the CITY. All instruments of service shall be professionally sealed
as may be required by law or by the CITY.
B. Such documents of service, together with necessary supporting documents,
shall be delivered to the CITY, and the CITY shall have unlimited rights, for
the benefit of the CITY, in all instruments of service, including the right to use
same on any other work of the CITY without additional cost to the CITY. If, in
the event the CITY uses such instruments of service on any work of the CITY
other than that specified in the Scope of Services, attached as Exhibit "A",
provided the UNDERSIGNED completes this Agreement, under those
circumstances the CITY hereby agrees to protect, defend, indemnify and hold
harmless the UNDERSIGNED, their officers, agents, servants and
employees, form and against suits, actions, claims, losses, liability or damage
of any character, and from and against costs and expenses, including, in part,
attorney fees incidental to the defense of such suits, actions, claims, losses,
damages or liability on account of injury, disease, sickness, including death,
to any person or damage to property including, in part, the loss of use
resulting therefrom, arising from any inaccuracy, such use of such
instruments of service with respect to such other work except where the
UNDERSIGNED participates in such other work.
Page 3
C. The UNDERSIGNED agrees to and does hereby grant to the CITY a royalty-
free license to all such instruments of service, which the UNDERSIGNED
may cover by copyright, and to all designs as to which the UNDERSIGNED
may assert any rights or establish any claim under the design patent or
copyright laws. The UNDERSIGNED, after completion of the project, agrees
to furnish the originals of all such instruments or service to the CITY.
D. All word documents supplied to the CITY as provided herein shall be in
Microsoft Word 98 or higher edition, or in a format compatible with the
aforementioned program. All plan documents shall be exported to an
AutoCAD 14 or higher version format.
ARTICLE VI
TERMINATION
A. The CITY or the UNDERSIGNED may suspend or terminate this Agreement
for cause or without cause at any time by giving written notice to the
UNDERSIGNED. In the event suspension or termination is without cause,
payment to the UNDERSIGNED, in accordance with the terms of this
Agreement, will be made on the basis of services reasonably determined by
the CITY to be satisfactory performed to date of suspension or termination.
Such payment will be due upon delivery of all instruments of service to the
CITY.
B. Should the CITY require a modification of its contract with the
UNDERSIGNED, and in the event the CITY and UNDERSIGNED fail to agree
upon a modification to this Agreement, the CITY and the UNDERSIGNED
shall have the option of termination this Agreement. Payment to the
UNDERSIGNED shall be made by the CITY in accordance with the terms of
this Agreement, for the services mutually agreed upon by the CITY and the
UNDERSIGNED to be properly performed by the UNDERSIGNED prior to
such termination date.
C. Upon termination of this agreement for any reason, the UNDERSIGNED shall
immediately deliver to CITY all plans, drawings, specifications, designs and
other information prepared by or acquired by the UNDERSIGNED relative to
the Major Thoroughfare Roadway project.
ARTICLE VII
INSURANCE
A. UNDERSIGNED shall provide and maintain workers' Compensation with
statutory limits.
B. UNDERSIGNED shall provide and maintain in full force and effect during the
time of this Agreement, auto insurance (including, but not limited to, insurance
Page 4
covering the operations of owned and non-owned automobiles, trucks and
other vehicles) protecting the UNDERSIGNED and the CITY as an additional
insured with limits not less than 250/500/100,000.
C. UNDERSIGNED shall provide general Liability Insurance. Such insurance
covering personal and bodily injuries or death shall be in the sum of not less
than Two Hundred Fifty Thousand ($250,000) Dollars per occurrence and
Five Hundred Thousand ($500,000) Dollars aggregate. Insurance covering
damages to property shall be in the sum of not less than One Hundred
Thousand ($100,000) Dollars. The General Liability Insurance must name
the CITY as an additional Insured.
D. UNDERSIGNED shall provide and maintain Professional Liability Errors and
Omissions insurance coverage to protect the UNDERSIGNED and the CITY
from liability arising out of the performance of professional services, if any,
under this Agreement. Such coverage shall be in the sum of not less than
Three Hundred Thousand ($300,000) Dollars per occurrence and Five
Hundred Thousand ($500,000) Dollars aggregate. Such insurance shall be
kept in effect for four (4) years after the completion of the contract. If the
UNDERSIGNED fails to maintain the insurance covered during that time, the
CITY may pay the premiums to keep the insurance in effect and recover the
cost from the UNDERSIGNED.
E. A signed Certificate of Insurance, satisfactory to the CITY, showing
compliance with the requirements of this Article shall be furnished to the CITY
before any services are performed. Such Certificate shall provide thirty (30)
days written notice to the CITY prior to the cancellation or modification of any
insurance referred to therein and continue to issue such certificate for four (4)
years after completion of the contract.
ARTICLE VIII
INDEMNIFICATION FOR INJURY AND PERFORMANCE
UNDERSIGNED further specifically obligates itself to the CITY in the following,
to-wit:
The UNDERSIGNED hereby agrees to protect, indemnify and hold harmless the
CITY, their officers, agents, servants and employees (hereinafter individually and
collectively referred to as "Indemnitees"), from and against suits, actions, claims, losses,
liability or damage of any character, and from and against costs and expenses,
including, in part, attorney fees incidental to the defense of such suits, actions, claims,
losses, damages or liability on account of injury, disease, sickness, including death, to
any person or damage to property including, in part, the loss of use resulting therefrom
arising from any negligent act, error, or omission of the UNDERSIGNED, its officers,
employees, servants, agents or subcontractors, or anyone else under the
UNDERSIGNED'S direction and control and arising out of, resulting from, or caused by
Page 5
the performance or failure of performance of any work or services called for by this
Agreement, or from conditions created by the performance or non-performance of said
work or services. In the event one or more of the Indemnitees is determined by a court
of law to be jointly or derivatively negligent or liable for such damage or injury, the
UNDERSIGNED shall be obligated to indemnify Indemnitee(s) as provided herein on a
proportionate basis in accordance with the final judgment, after all appeals are
exhausted, determining such joint or derivative negligence or liability.
The UNDERSIGNED is not responsible for the actions of the CITY'S contractor
to perform the construction of the improvements covered under this Agreement.
Acceptance and approval of the final plans by the CITY shall not constitute nor
be deemed a release of this responsibility and liability of the UNDERSIGNED, its
employees, associates, agents and consultants for the accuracy or competency of their
designs, working drawings and specifications, or other documents and work; nor shall
such approval be deemed to be an assumption of such responsibility by the CITY for
any defect in the designs, working drawings and specifications, or other documents
prepared by the UNDERSIGNED, its employees, contractor, agents ad consultants.
ARTICLE IX
INDEMINIFICATION FOR UNEMPLOYMENT COMPENSATION
UNDERSIGNED agrees that it is an independent contractor and not an agent of
the CITY, and that the UNDERSIGNED is subject, as and employer, to all applicable
Unemployment Compensation Statutes, so as to relieve the CITY of any responsibility
or liability from treating the UNDERSIGNED'S employees as employees of the CITY for
the purpose of keeping records, making reports or payments of Unemployment
Compensation taxes or contributions. The UNDERSIGNED further agrees to indemnify
and hold the CITY harmless and reimburse it for any expenses or liability incurred under
said Statues in connection with employees of the UNDERSIGNED.
ARTICLE X
INDEMNIFICATION FOR PERFORMANCE
UNDERSIGNED shall defend and indemnify Indemnitees against and hold the
CITY and the premises harmless from any and all claims, suits or liens based upon or
alleged to be based upon the non-payment of labor, tools, materials, equipment,
supplies, transportation and management costs incurred by the UNDERSIGNED in
performing this Agreement.
ARTICLE XI
ASSIGNMENT
UNDERSIGNED shall not assign or sublet this Agreement or any part thereof,
without the written consent of the CITY. Sale of more than fifty (50%) percent
ownership of the UNDERSIGNED shall be construed as an assignment.
Page 6
ARTICLE XII
APPLICABLE LAWS
UNDERSIGNED shall comply with all Federal, State, County and Municipal laws,
ordinances, regulations, safety orders, resolutions and building codes, including the
Americans With Disabilities Act, relating or applicable to service to be performed under
this Agreement.
This Agreement is performable in the State of Texas and shall be governed by
the laws of the State of Texas. Venue on any suit hereunder shall be in Denton County,
Texas.
ARTICLE XIII
DEFAULT OF UNDERSIGNED
In the event the UNDERSIGNED fails to comply or becomes disable and unable
to comply with the provisions of this Agreement as to the quality or character of the
service or time of performance, and the failure is not corrected within ten (10) days after
written notice by the CITY to the UNDERSIGNED, the CITY may, at its sole discretion
without prejudice to any other right or remedy:
A. Terminate this Agreement and be relieved of the payment of any further
consideration to the UNDERSIGNED except for all work determined by the
CITY to be satisfactorily completed prior to termination. Payment for work
satisfactorily completed shall be for actual costs, including reasonable
salaries and travel expenses of the UNDERSIGNED to and from meetings
called by the CITY at which the UNDERSIGNED is required to attend, but
shall not include any loss of profit of the UNDERSIGNED. In the event of
such termination, the CITY may proceed to complete the services in any
manner deemed proper by the CITY, either by the use of its own forces or by
resubmitting to others. In either event, the UNDERSIGNED shall be liable for
all costs in excess of the total contract price under his Agreement incurred to
complete the services herein provided for and the costs so incurred may be
due or that may thereafter become due to the UNDERSIGNED under and by
virtue of this Agreement.
B. The CITY may, without terminating this Agreement or taking over the
services, furnish the necessary materials, equipment, supplies and/or help
necessary to remedy the situation, at the expense of the UNDERSIGNED.
Page 7
ARTICLE XIV
ADJUSTMENTS IN SERVICES
No claims for extra services, additional services or changes in the services will
be made by the UNDERSIGNED without written Agreement with the CITY prior to the
performance of such services.
ARTICLE XV
EXECUTION BECOMES EFFECTIVE
This Agreement will be effective upon execution of the contract by and between
the UNDERSIGNED and the CITY.
ARTICLE XVI
AGREEMENT AMENDMENTS
This Agreement contains the entire understanding of the parties with respect to
the subject matter hereof and there are not oral understandings, statements or
stipulations bearing upon the meaning or effect of this Agreement, which have not been
incorporated herein. This Agreement may only be modified, amended, supplemented or
waived by a written instrument executed by the parties except as may be otherwise
provided therein.
ARTICLE XVII
GENDER AND NUMBER
The use of any gender in this Agreement shall be applicable to all genders, and
the use of singular number shall include the plural and conversely.
ARTICLE XVIII
NOTICES AND AUTHORITY
A. The UNDERSIGNED agrees to send all notices required under this
Agreement to the City Manager of the City of the Colony, or his designee, at
6800 Main Street, The Colony, Texas 75056-1133. The UNDERSIGNED
understands that only the City Manager or his designees has the authority to
represent the CITY or bind the CITY under this Agreement.
B. The CITY agrees to send all notices required under this Agreement to the
UNDERSIGNED at:
Halff Associates, Inc.
Jerry F. Roberts, P.E.
Vice President
4000 Fossil Creek Boulevard
Fort Worth, Texas 76137
Page 8
ARTICLE IX
CLOSURE
IN ~TNESS WHEREOF, the parties hereto have executed this Agreement on this the
day of r fZ cS ,~OG. .2flKA{,
By: Dale Cheatham
By:
CITY:
g~~
Title: City Manager
Title:
Address: 6800 Main Street
The Colony, Texas 75056-1333
Address: 4000 Fossil Creek Boulevard
Fort Worth, Texas 76137
Attest:
Ap roved as to Content:
~r
Page 9
EXHIBIT "A"
SCOPE OF WORK
for
Construction Plans, Specifications and Estimates
Major Thoroughfare Roadways
in
THE COLONY
1. Description:
The project will involve the construction/reconstruction of two (2) major
thoroughfare roadways; along with associated drainage, water, sanitary
sewer gravity main and force main, streetscape and traffic signal
improvements. The roadways will be designed and bid in two separate
packages as follows:
A. Memorial Drive - Memorial Drive is classified as a 5D-A. It will
ultimately be constructed as a six lane divided major arterial with
12-foot lanes. At this time, construction will provide for only the four
outside lanes. The project will include construction two segments.
1. Construction of the eastbound two lanes of Memorial Drive from
Blair Oaks to Paige Road. The westbound two lanes have been
built. The total length of this segment is approximately 3,200 If.
2. Construction of the eastbound two lanes of Memorial Drive from
Worley Drive to South Colony Boulevard. The westbound two
lanes have been built. The total length of this segment is
approximately 1,700 If.
Memorial Drive construction will include paving, drainage, streetlight,
and streetscape improvements. Sidewalks are not included. It is
assumed these will be constructed with future development.
B. Paige Road - This roadway segment extends from South Colony
Boulevard to North Colony Boulevard. Paige Road is classified as a
5D-B and will be constructed to six lanes divided with 11-foot lanes.
The total length of this segment is 5,200 If
Paige Road reconstruction will include paving, drainage, streetlight,
and streetscape improvements. All water and sanitary sewer lines
under new pavement will be replaced as well. The existing traffic
signal at North Colony Boulevard will be replaced. Sidewalks will be
A-1
replaced. Strom drain lines in the right-of-way will be replaced and
upgraded in some areas.
It is understood and agreed that the City may authorize design work on
each package individually or all packages as a whole.
C. 20-inch Force Main - A 20-inch force main is required to be
constructed from the Austin Ranch Pump Station to the Stewart Creek
Wastewater Treatment Plant by Year 2010 according to the
Wastewater Capital Improvements Plan.
Halff will prepare a route a study for the main from immediately south
of SH 121 to north of North Colony Boulevard, a total distance of
approximately 10,000 If. Halff will also design the section of force main
along Paige Road from South Colony Boulevard to north of Yeager
Street. Construction of the force main will be a part of the Paige Road
reconstruction project package.
It is understood and agreed that the City may authorize design work on
each package individually or all packages as a whole.
2. Design Assumptions - Certain assumptions were employed in
developing the scope and fee for this proposal.
A. Environmental Documentation - No federal or State money will be
used for design and construction. Therefore no environmental
statements or studies are required.
B. Construction Packages - The work will be produced, bid and
constructed in two separate construction packages:
(1) Contract Package "A" will include the two sections of Memorial
Drive, one section being from Blair Oaks to Paige Road and the
other from Worley Drive to South Colony Boulevard (Item 1.A.1 and
1.A.2. above).
(2) Contract Package "B" will include Paige Road and the 20-inch
force main (items 1.B. and 1.C. above).
C. Design Standards - All roadways will be constructed to City standards
with 8-inch jointed reinforced concrete pavement on a lime stabilized
subgrade. Alley and driveway returns within street rights-of-way will be
constructed as well. Design will be in accordance with City standards
and latest AASHTO guidelines.
A-2
3. Work Plan:
A. Surveying: The Consultant shall provide surveying services, which, in
general, may be defined as normal services applicable to a project of
this type. The following particulars will also apply.
(1) Vertical benchmarks shall be established such that all points of
construction shall be within 500 feet of a benchmark. Benchmarks
should not be subject to loss during construction. Fire hydrants and
similar appurtenances are not to be used for benchmarks. The City
will furnish one or more benchmarks for this Project. The surveyor
shall establish temporary benchmarks throughout the length of the
project.
(2) Topographic features will be surveyed along with any and all other
features needed for design, review, permitting, construction and
inspection of the project. Coverage will extend beyond the
proposed rights-of-way far enough to integrate the design with the
adjacent properties.
(3) Existing property corners, iron pins, etc. shall be tied into
established existing rights-of-way. Prior to surveying on private
property, the surveyor shall secure written permission from the
property owners and/or tenant and shall provide the City a copy of
said written permission. Should only oral permission be granted,
the surveyor shall document the permission granted by letter to the
property owner/tenant, with a copy to the City. If permission cannot
be obtained, the City will assist or other arrangements worked out.
B. Right-of-Way Determination: Right-of-way plans, exhibits and legal
descriptions for all right-of-way and temporary and permanent
easement acquisition required for construction of the project will be
prepared as follows:
(1) Right-of-way plans shall include City title block, location map,
monumention, ties to project centerline, area required, area
remaining, parcel number, owner of record, and existing
easements. Right-of-way plans shall be included in the
construction plans.
(2) Individual Exhibits shall be on 8-1/2" x 14" paper and shall include
area required, area remaining, parcel number, and owner of record.
Individual exhibits shall be stamped, dated, and signed by a
Registered Professional Land Surveyor.
A-3
(3) Legal descriptions shall reference volume, page and owner of
record and shall be incorporated into the standard City of The
Colony easement instrument document. Individual parcels shall be
cross-referenced on the plan and profile sheets.
(4) Upon approval of the right-of-way plans by the City, the Consultant
shall then stake and flag the taking for inspection by the appraiser
and property owner. The documents, including legal description
shall be furnished to the City on a disk or CD ROM in Microsoft
Word or WordPerfect format.
C. Construction Plans: The Consultant shall develop construction plans
for review, permitting, bidding, construction, inspection and record
keeping. In general, construction plans shall be consistent with normal
practice for projects of this nature. The following particulars will also
apply. The construction plans will consist of numerous sheets ordered
as follows:
(1) Title Sheet - (Sheet No.1). The title sheet shall include a location
map. It shall also include a sheet index with drawings numbered
consecutively and without subscripts. Additionally, the title sheet
shall show the project name, project number, date, City logo,
Consultant's name, address, and telephone number and other
items as may be specified.
(2) Proiect Layout Sheet(s). The project layout sheet(s) will be drawn
to a scale of 1" = 1 00' and laid out with the north arrow up or to the
right. The purpose of the project layout is to depict the project in a
simplified view. Major items of work will be shown without
excessive detail. This sheet(s) will include a listing of
abbreviations, legend, general notes, and key map.
(3) Typical Sections. Typical sections shall be drawn to scales of
1" = 5' hand 1" = 2' v and shall depict a view looking north or east.
As a minimum, typical sections will be drawn showing the
relationship of the proposed street and existing and proposed
improvements. Typical sections will include existing roadways,
utilities, right-of-way lines, etc., along with all proposed utility and
highway improvements and will depict all significant items of work.
(4) Plan and Profile Sheets. Plan-profile sheets will be arranged from
south to north and from west to east, with the north arrow up or to
the right on the sheet. Plan-profile sheets will be drawn to scales of
1" = 20' hand 1" = 4' v. Stationing will be from south to north or
west to east with the beginning station being set at approximately
0+00. Each plan-profile sheet will include no more than 500 feet of
street; thus, leaving ample margins both left and right. The plan
A-4
and profile station will align vertically on the sheet with the
proposed centerline drawn parallel to the profile grid. When there
is a centerline curvature, the plan-profile should be drawn so that
as much of the plan view is in alignment as possible. Plan-profile
sheets shall depict all existing and proposed items pertinent to the
project.
(5) Detail Sheets. The City's standard drawings will be used as a
beginning point in developing standard details for this project. They
will be reviewed and modified for this project. Where other agency
standards are used, they shall be reduced as necessary to fit on
the City's standard sheet format with complete title block.
(6) Miscellaneous. Construction plans will also address erosion
control, traffic control (including detours, road closures, signing,
barricading, etc.) and all other improvements.
(7) Cross Sections. Cross sections shall be drawn to scales of
1" = 5' hand 1" = 5' v on sheets of 1" grids Hand V. They shall be
arranged from bottom to top of the sheet looking up station and
shall show existing and proposed features and improvements.
Generally, no more than twelve (12) sections per sheet are to be
plotted. Each section should extend beyond the easement and
rights-of-way a sufficient distance to clearly show the relationship
between the proposed improvements and the existing properties.
Full sections will be drawn at critical locations, such as steep
driveways, retaining walls, and at maximum spacings of 200 feet.
(8) Review Plans - Schematic Plans will be prepared and submitted at
the 30% milestone. Preliminary plans shall then be prepared and
submitted at the 60% milestone. Final plans shall be prepared and
submitted at the 100% milestone. Also, the Consultant may submit
plan sheets or working drawings to the City for review and
comment to reduce the number of revisions that otherwise would
be required. During development of the plans, the Consultant shall
attend meetings as needed. The Consultant shall, in company with
the City, perform at least one plans-in-hand review.
(9) Deskin - The design of the project shall be in general accordance
with the City of The Colony ordinances, standard details, and good
engineering practices. During the design phase, the Consultant
shall contact various utility companies and obtain information
relating to existing utility lines. The design should avoid major utility
relocations, where practical. When required, proposed relocations
or replacements will be shown in plan and profile.
A-5
(10) Prints - The Consultant shall provide prints of construction plans
for review and permitting. Two sets of plans will be submitted to
the City for each review stage. The Consultant will provide utility
companies with copies of 60% plans for review. The Engineer will
run thirty-five (35) sets of half-size prints for bidding and
construction.
(11 )General - Construction plans shall be furnished full size and half-
size. Full size construction plans shall be on 4 mil, double matt,
mylar sheets measuring 22" x 34" overall dimensions. The City's
standard format shall be used. All prints shall be furnished on
22" x 34" sheets. Construction plans shall be suitable for half-scale
reduction and shall be provided as follows: one set of 11" x 17"
paper originals drawn by laser plotter.
(12)Generic Sheet List - Following is a general list of plan sheets
required for each construction package.
(a) Cover Sheet
(b) Project Layout Sheet
(c) General Notes and Legend
(d) Typical Paving Sections
(e) Right-of-Way Maps
(f) Paving Plan and Profile Sheets
(g) Detailed Intersection Grading
(h) Drainage Area Map
(i) Drainage and Inlet Calculations
U) Drainage Plan and Profile Sheets
(k) Storm Drain Lateral Profiles
(I) Water and Sanitary Sewer Line Plans and Profiles
(m)Erosion Control Plan
(n) City of The Colony Paving and Sidewalk Standard Details
(0) City of The Colony Storm Drain Details
(p) Box Culverts Details
(q) City of The Colony Water Standard Details
(r) City of The Colony Wastewater Standard Details
(s) Miscellaneous Details
(t) Streetscape Plans and Details
(u) Irrigation Plans and Details
(v) Pavement Markings Plans and Details
(w)Traffic Signal Layouts
(x)Traffic Signal Installation Details
(y) Roadway Lighting Plans and Details
(z) Construction Sequencing and Temporary Traffic Control Plans
and Details
(aa) Roadway Cross Sections
A-6
D. Specifications: The Consultant shall prepare a project manual and
technical specifications required for bidding and constructing the
project. The project manual will be provided in the City's standard
format. Only specifications amending or supplementing COG
specifications need be furnished. Project manual, specifications, bid
items and quantities shall be furnished on hard copy and by electronic
file.
E. Estimates: Estimates of probable cost will be developed at each
milestone submittal.
F. Bidding, Construction, Closure:
(1) Bidding - During the bidding phase, the Consultant will prepare bid
documents and assist the City in advertising of the project for bids.
The consultant will address technical questions and prepare
addenda and issue to the bidders. The Consultant shall attend a
pre-bid meeting, if required, and prepare minutes. The Consultant
will tabulate bids and make recommendation for award of contract.
(2) Construction - The Consultant will prepare an agenda, attend the
pre-construction meeting and prepare minutes of the meeting. The
Consultant's design engineer and/or project manager shall visit the
site at least once per calendar month to evaluate the general
progress of the construction. Monthly reports shall be prepared
and forwarded to the City outlining any deviations noted from the
requirements of the contract documents. The Consultant will not be
responsible for the contractor's work, nor shall the Consultant be
required to perform inspection services. The Consultant shall
assist the City in the preparation of field changes and/or change
orders that may become necessary for the orderly completion of the
project. The Consultant shall assist the City in performing a final
walk-through inspection and prepare a written "final punch list".
(3) Closure - The Consultant shall prepare "record" plans,
incorporating all changes and known variations to provide the City
the best possible set of record drawings. The final record drawings
shall be furnished on mylar, of the same specification as provided
for in the Agreement and on CD.
G. Permitting. The Consultant shall prepare applications to the Texas
Department of Licensing and Review (TDLR) for code review of
sidewalks and ramps. After construction the consultant shall notify
TDLR of completion date. Consultant shall address any questions or
issues by TDLR as a result of review and inspection. TDLR review
and inspection fees shall be paid by the City.
A-7
H. Geotechnical Investigation. The Consultant shall engage a
geotechnical sub-consultant to provide sub-surface investigations in
the form of boring logs. Borings shall be of sufficient depth and
spacing to provide general information needed for the design and
construction of the project. The geotechnical sub-consultant shall be
selected by the Consultant using the standard two-step method
complying with applicable state laws and guidelines established by the
Texas State Board of Registration for Professional Engineers. The
City should be contacted for concurrence of the recommended
geotechnical sub-consultant.
I. 20-inch Force Main Route Study. The Consultant shall perform a
route study for the 20-inch force main to extend from south of SH 121
to north of North Colony Boulevard. The Consultant will study at least
two alternatives for location of the force main. The alternatives will
consider construction costs, right-of-way requirements, permitting
issues, utility conflicts, coordination with other City projects, and
construction issues associated with construction traffic control. No
hydraulic studies or modeling are included. A specific recommendation
will be made the route. A brief written report will be provided with the
route recommendation shown on a photographic base map showing
property lines and major improvements. Estimates of probable cost
will be provided for each alternative.
J. Miscellaneous. Miscellaneous services not provided for herein and
not generally associated with a project of this type will be paid for
under an amendment to this Agreement and for an additional fee.
3. Schedule:
A. Completion of design surveys and geotechnical investigation: 90
calendar days from date of written authorization to begin work.
B. Submittal of force main route study: 120 calendar days from date of
written authorization to begin work.
C. Completion/furnishing 30% schematic plans, specifications, bid
quantities, and construction cost estimate: 135 calendar days from
date of written authorization to begin.
D. Completion/furnishing 60% preliminary plans, specifications, bid
quantities, and construction cost estimate: 195 calendar days from
date of written authorization to begin.
E. Completion/furnishing 100% final plans, specifications, bid quantities,
and construction cost estimate: 255 calendar days from date of written
authorization, excluding City review times.
A-8
F. Bidding services: 30 calendar days from city's approval of final plans.
G. Construction services: In accordance with construction schedule
(estimated to be 390 calendar days total)
H. Closure: 60 calendar days from the date of construction completion.
A-9
EXHIBIT "B"
COMPENSATION
for
Construction Plans, Specifications and Estimates
Major Thoroughfare Roadways
in
THE COLONY
Exhibit "B" defines the basis of compensation to the Consultant for the services
rendered.
A. Basic Fee Services - The basic fee for the services for both construction
packages as described in Exhibit "A" will be $506,000 which includes
printing, direct costs and computer charges normally associated with
production of these services and reproduction of up to fifteen (15) sets of
plans for review purposes for each construction package.
The basis of compensation for Basic Fee services shall be as follows:
1. $136,600 for Phase I - Schematic Design Phase (30% submittal)
2. $136,600 for Phase 11- Preliminary Design Phase (60% submittal)
3. $182,200 for Phase III - Final Design Phase (100% submittal)
4. $50,600 for Construction Phase Services
Items (1) through (4) will be billed in accordance with the billing schedule
in Item D. below.
B. Special Services - Special Services will be paid for lump sum. The
following table summarizes special services fees.
TASK DESCRIPTION FEE
1. Design Surveys $54,000
2. Right-of-Way Parcel Preparation $12,000
3. Geotechnical Investigation $15,800
4. TDLR Plan Review Fees and One- $1 ,400
Time State Inspection Fee
5. 20-inch Force Main Route Study $20,000
6. TDLR Inspection Fees $1,000
7. Printing of Plans and Specifications $5,000
TOTAL SPECIAL SERVICES $109,200
B-1
(J)
c
'3:
o
o
'+-
(])
..c
l-
I
CI>
Ol
(tl
..:a::
(.)
(tl
a..
!:
o
:;::;
(.)
;:j
l...
....
1Il
!:
o
U
>-
.c
>-
l...
(tl
E
E
;:j
(J)
CI>
CI>
LL.
u
(])
(J)
ro
.::s::.
o
ro
Q..
c
o
+-'
o
::::J
'-
+-'
(/)
C
o
o
..c
o
ro
(])
-
l'Il al
0"0
I- a:
'-
J2
(/)
(])
(])
'+-
(/)
(])
N
'C
ro
E
E
::::J
(/)
(])
..0
ro
+-'
OJ
()
...
o
u. c:
..c: l'Il
g ~
"
o
N
c:
o OJ
:;:;
() OJ
2 OJ
en ~
c: ()
o l'Il
o 0..
c:
o ~
t5 OJ
2 OJ
_ l'Il
III ..:r::
c: ()
o l'Il
00..
o 0
00
,-- ,--
WW
00
00
(0. (0.
(0(0
C') C')
,-- ,--
WW
gog
"!.go
NOlO
OOl!)O
~W~
oooog
ggg.~N
(O(OOONN
WWWW~
00
00
000
~o~
C')I'-O
C') C') I'-
w(-l7~
ggggg
l!)l!)I'-C')~
000 M
("")('l")-.::::t~"f"'""
WWWW;;;
Q)
<lJ (/)
(/) ro
ro ..c:
..c: 0... <lJ
~ ~ ~ (/)
OJ .1ij ..c: ~
.1ij <lJ 0... '>
<lJ a c: ~
a c.21 c'}5 III
U (/) Ql
:.=; ~ <lJ <lJ ()
ro ._ a (/) ':;:
EE-ro...
~~ ~ct~
U 0:: u.. c "
(/) 0 ~
I I I i3 'Vi
::l l'Il
... al
t5(ij
c: _
o 0
01-
III
OJ
()
':;:
...
OJ
(/)
,~
rn
l'Il
al
<lJ <lJ <lJ
III CfJ CfJ
ro ro ro
..c: ..c: ..c:
0...0...0...
000
000
000
"<j" 0 N
l!) N ,--
WW W
o
o
00
Wo
N
W
000
000
oo"<j"o
L[) . -
www
o
00
ON
om
l!)0
W.....
tR-
o
o
000000
WWWWWo
N
tR-
o
o
00
OOW
,--
W
00
o 0
OC')
NOO
~W
g 0 og
ooooggo~
~WW~~~~~
W tR-
rn
OJ
()
.~
OJ
rn
iij
'u
OJ
Co
rn
>-
"0
::l
(j)
<lJ
CfJ "5
>- 0
<lJ 0:::
2: c
::l ro
(/):2:
c
OJ <lJ
.- U
CfJ ...
<lJ 0
au..
c
c 0 u..
o :.+:::i "0
~ ~ c
- .- ro
ro (j) >
g. <lJ iV
0: E ">
- <lJ
~TIO:::
s .c ~
-t{3iL
, <lJ 0:::
1: 0 -.J
.21 <lJ a
0:::01-
oogg
OOL[)O
I'-L[) -N
WW~;1
(/)
<lJ
<lJ
u..
OJ
c:
(/)
c
o
~
U
<;::
.0 rn
CfJ <lJ OJ
<lJ 0.. ()
<lJ (/) ':;:
u.. "0 ...
c: c OJ
o ro rn
n en (ij
<lJ ~ 'u
0.. - OJ
CfJ 0... Co
c: OJ rn
c:
::lE2
a .;:: 0
1-0...1-
o
o
~
10
.....
10
tR-
o
o
~
N
"<j"
tR-
o
o
o
00
.....
"<j"
tR-
o
o
o
.n
10
.....
tR-
N
I
OJ
-
()
OJ
'0'
...
0..
iij
-
o
I-
0)
c
O~
o
.2
Q)
.!::
.......
.!::
.......
.~
Q)
()
c
cu
""0
~
o
()
()
cu
c
""0
C
cu
00
Q)
c
o
.......
00
Q)
E
.......
()
Q)
'0'
~
0.
-----
<0
x
00
.......
cu
""0
Q)
.oQ)
Q) 0)
.o~
- ()
.~ ~
00 c
Q) 0
()-
'2 g
Q)'::-
(f)~
I 0
()
Cll.!::
::s ()
cu
~ Q)
..c~
0.2
cnQ)
C):J
c:""O
.- Q)
.!::
.- ()
co 00
c
~
oa:l
:;;
u CIl
::l Cl
.;; l'll
Ul~
~ U
o l'll
()o..
~ -
o<!
'; :
U CIl
::l Cl
.... l'll
"ti~
~ u
o l'll
uo..
ro
-
o
I-
o
o
co
('")
'<t
W
o
o
('")
CD
N
W
CIl
~
o
-
Ul
.S!
~
-
o
c m
o 0
+==' .e
~~~
a.. 0 0
E2~
ooal
()Olu
c(;)c
o u ro
a.. c 0
::::>m"'"":
Ol(J)al
Ol >, (J)
LLOlE
E 2: Ol
::J~
::J 00 ::::.-
ooc~
a.. 0)0-
E O(fj u
:J<D.3
-.JOoo
-
u
CIl
'0
....
0..
o
o
CO
en
CD
w
-1O
o 0
-al
g E
oE 2
..0 ::::.-
::J>,
OOu
c.3
&00
::::>2
Ol ::J
Ol 0
LLO:::
E o~
::J m
00::2:
a..Ol
E ~
::J 0
-.JLL
o
o
o
o
N
W
o
o
o
o
N
W
o
w
-
o
g
oE ---:-
..0","":
::J<(
00 E
C Ol
o~
a.. -
::::>';;
Ol C
Ol m
u..o::
E 0S2
::J~
00 ro
a..E
E1?
::l 0
-.JOO
o
o
CD
CD
('")
~
w
o
o
CD
o
~
w
o
o
CO
o
('")
w
-
o
.~-
EN
..0 0
::l<(
OOE
C Ol
o=:
a..~
::::> (J)
Ol C
Ol~
LLo...
EC
::J m
00 o~
a..E
E'ai
::J ....
-.Jo...
o
o
CD
CD
('")
~
w
o
o
CD
o
~
w
o
o
CO
o
('")
w
_C'!
Oal
$9 E
."t:: Q)
E=:
..0';;
::J~
00 C
C Ol
o E
a..::J
::::>0
o
OlO
Ol >,
LLm
Es
::J......
00 0
a..~
E~
::J 0-
-.JO:::
o
o
~
N
W
o
w
o
o
o
N
W
-
o
-~
E
..0
::J
00
g~
0..<(
::::> E
gs2
LL ::::.-
E ~
::J m
000::
a.. _
E m
::J o~
-.JLL
o
o
C'!.
N
CO
~
W
o
o
CO
o
o
r---
'<t
w
~
'<t
~
w
o
o
r---
o
'<t
W
o
o
r---
'<t
w
-
_ 0
0=
~ m
oQ.u
Ol C
ii5 ro
0:::'<1:
c<(
&E
::::>2---:-
-r---
Ol - 0
Oloal
LLcu
E 02 ~
::Jt
ooo..q:
a.. 0
o..mal
E~(J)
::J (J) E
-.J~Ol
<(al=:
o
o
'<I:
en
w
o
o
CD
CO
'<t
W
o
o
('")
CO
('")
W
o
o
('")
o
~
w
C
o
.- -
Q) 0
0...0:;
Eu
o C
o .co
C E
o Ol
0..L.-
::::>Ol
~~
Ol ~ 0
Ol ~CD
LLgal
E."u
::l 0 C
oo2ro
0.. U) ~
EC<(
::J 0 E
-.JO
<(-Ol
o=:
o
o
C't
10
....
<0
U).
o
o
C't
o
<0
"'"
U).
o
o
~
10
10
....
U).
C0
I
a:l
o
o
N
L(')
T""
CO
~
00
00
Q)
()
O2
Q)
00
Ul
ro
-
o
I-
cu
~
.2
Q)
Q)
'+-
E
:J
E
'x
CU
E
cu
(5
.......
Q)
.!::
I--
ACORD CERTIFICATE OF LIABILITY INSURANCE I DATE (MMIDDIYYVY)
TM 11/07/2005
PRODUCER (972) 581. 4800 FAX (972)581-4850 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION
Bell Insurance Agency ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE
HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR
16980 Dallas Parkway ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW.
Dallas, TX 75248
Suzanne Flores INSURERS AFFORDING COVERAGE NAlC#
INSURED HalfY Associates, Inc. INSURER A: Republic Companies Group
Mr. Roger Burns INSURER B: Continental Casualty Company(CNf)
8616 Northwest Plaza Dr. INSURER C:
Dallas, TX 75225 INSURER D
INSURER E
COVERAGES
THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING
ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR
MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH
POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
INSR DO' TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE Pg~!f/ EXPIRATION LIMITS
GENERAL LIABILITY TXP56543985.00 07/12/2005 07/12/2006 EACH OCCURRENCE $ 1,000,000
-
X COMMERCIAL GENERAL LIABILITY DAMAGE TO RENTED $ 100,000
- =:J CLAIMS MADE [!] OCCUR 10,000
MED EXP (Anyone person) $
A X Contractual Liab PERSONAL & ADV INJURY $ 1,000,000
-
GENERAL AGGREGATE $ 2,000,000
- 2,000,00(J
GEN'L AGGREGA TE LIMIT APPLIES PER PRODUCTS - COMP/OP AGG $
I POLICY [Xl jfc?-i n LOC
AUTOMOBILE LIABILITY TCA5643986.00 07/12/2005 07/12/2006 COMBINED SINGLE LIMIT
7 (Ea accident) $ I,OOO,OO(J
ANY AUTO
r--
ALL OWNED AUTOS BODILY INJURY
J-- {Per person} $
SCHEDULED AUTOS
A rx
HIRED AUTOS BODIL Y INJURY
X $
NON-QWNED AUTOS (Per accident)
-
- PROPERTY DAMAGE $
(Per accident)
GARAGE LIABILITY AUTO ONL Y - EA ACCIDENT $
=1 ANY AUTO OTHER THAN EA ACC $
AUTO ONL Y AGG $
EXCESS/UMBRELLA LIABILITY UMB5643987.00 07/12/2005 07/12/2006 EACH OCCURRENCE $ 5,000,00(J
m OCCUR D CLAIMS MADE AGGREGA TE $ 5,000,00(J
A $
f;I DEDUCTIBLE $
X RETENTION $ 10,00(J $
WORKERS COMPENSATION AND WC5643988 07/12/2005 07/12/2006 X I T~~~T~J.~; I IO:~-
EMPLOYERS' LIABILITY EL EACH ACCIDENT I,OOO,OO(J
A ANY PROPRIETOR/PARTNER/EXECUTIVE $
OFFICER/MEMBER EXCLUDED? EL DISEASE - EA EMPLOYEE $ I,OOO,OO(J
If yes, describe under I,OOO,OO(J
SPECIAL PROVISIONS below E.L. DISEASE - POLICY LIMIT $
p~mWESSIONAL LIABILITY AEE008220956 07/09/2005 07/09/2006 $5,000,000 Per Claim Limit
B r'laims Made $5,000,000 Aggregate Limit
.f,ESCRIPTlON OF OPERATIONS / LOCATIONS I VEHICLES / EXCLUSIONS ADDED BY ENDORSEMENT / SPECIAL PROVISIONS
~er: Major Thoroughrare Roadways (P.3842)
CERTIFICATE HOLDER
CANCELLATION
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE
EXPIRATION DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TO MAIL
City or The Colony 10 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,
Att'n: Gordon Scruggs, P.E. City Engineer BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY
6800 Main Street OF ANY KIND UPON THE INSURER, ITS AGENTS OR REPRESENT A TIVES.
The Colony, TX 75056 AUTHORIZED REPRESENTATIVE ::z:'~ -4/+
Thomas J. Ashley/SHF
ACORD 25 (2001/08) FAX: (972)624-2317
@ACORD CORPORATION 1988
IMPORTANT
If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. A statement
on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may
require an endorsement. A statement on this certificate does not confer rights to the certificate
holder in lieu of such endorsement(s).
DISCLAIMER
The Certificate of Insurance on the reverse side of this form does not constitute a contract between
the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it
affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon.
ACORD 25 (2001/08)
eMJ ENGINEERING, INC.
7636 Pebble Drive
Fort Worth, Texas 76118
www.cmjengr.com
Proposal No. 04-882
December 13, 2004
Halff Associates, Inc.
4000 Fossil Creek Boulevard
Fort Worth, Texas 76137
Attn: Mr. Jerry F. Roberts, P.E.
PROPOSAL FOR:
GEOTECHNICAL ENGINEERING SERVICES
ROAD IMPROVEMENTS AND NEW ROADS
THE COLONY, TEXAS
Dear Mr. Roberts:
INTRODUCTION
CMJ Engineering, Inc. (CMJ) is pleased to submit a proposal for providing geotechnical
engineering services in conjunction with the above-referenced project. We prepared this
proposal based on a December 10, 2004 meeting with Mr. Jerry Roberts, P.E. and on the
preliminary scope submitted to this office.
The project, as currently planned, will consist of refurbishing or adding new lanes to the
following roads in The Colony.
1. Memorial Drive - Blair Oaks to Paige
2. Paige - South Colony to North Colony
3. Memorial Drive - Worley past Morningstar
For purposes of this proposal, it is assumed that all borings are accessible to truck-mounted
drilling equipment. In addition, it is assumed that underground utilities at boring locations will be
coordinated by CMJ Engineering, Inc.
Phone (817) 284-9400
Fax (817) 589-9993
Metro (817) 589-9992
CMJ ENGINEERING, INC.
Halff Associates, Inc.
Proposal No. 04-882
December 13, 2004
Page 2
SCOPE OF SERVICES
I. BASIC SERVICES
A. SUBSURFACE EXPLORATION
Based on past experience in the vicinity of the project, we anticipate subsurface conditions to
consist of soils and rock of the Eagle Ford geological formation.
Experienced drillers and technicians will evaluate subsurface conditions with the following field
program:
1. Memorial Drive - West - 6 borings to 12 feet
2. Paige Road - 11 borings to 12 feet
3. Memorial Drive - East - 7 borings to 12 feet
The field personnel will drill the borings using truck-mounted equipment. Cohesive and non-
cohesive soil samples will be obtained using 3-inch diameter Shelby tube samplers and 2-inch
diameter standard split-spoon samplers, respectively. A soils logger will extrude the samples in
the field, check the samples for consistency with a hand penetrometer, carefully wrap them to
preserve their condition, and return them to the laboratory for testing. A log of each boring will
be prepared to document field activities and results.
CMJ's personnel will stake the boring locations using normal taping procedures. Approximate
locations of the borings will be shown on the plan of borings. Precise surveying of boring
locations and elevations is not included in the cost estimate. These services may be provided
as Additional Services upon request. At the completion of drilling operations, boreholes will be
backfilled with drill cuttings and plugged at the surface by hand tamping.
B. LABORATORY SERVICES
Considering the planned facilities, anticipated soil conditions and geology, laboratory tests will
be required for classification purposes, and to determine strength characteristics. The following
types of tests are therefore recommended:
· moisture content and soil identification
· liquid and plastic limit determinations
· unconfined compression tests on soil
· unit weight determinations
· Eades and Grim lime series tests
· Soluble sulfate test
eMJ ENGINEERING, INC.
Halff Associates, Inc.
Proposal No. 04-882
December 13,2004
Page 3
The specific types and quantities of tests will be determined based on geologic conditions
encountered in the borings.
C. ENGINEERING SERVICES
An engineering report will be prepared for each road section to present the results of the field
and laboratory data together with our analyses of the results and recommendations. We will
provide three copies of the report. The report will address:
· general soil and ground-water conditions
· recommendations for pavement subgrade stabilization
· potential effects of high sulfate soils and remediation thereof
· earthwork recommendations
Items other than those specified above, which are revealed by these studies or are necessitated
by a change in project scope, may require revised field, laboratory, and engineering services.
These services, if required and requested, will be performed as Additional Services. Additional
Services are described in Section II.
D. COMPENSATION FOR BASIC SERVICES
It is proposed that the Basic Services described above be performed on a unit price basis, in
accordance with the attached Basic Services Cost Estimates. Based on the anticipated scope
and the attached Basic Services Cost Estimates, the total cost of the Basic Services should be:
1. Memorial Drive West -
2. Paige Road -
3. Memorial Drive East -
$4,500
$6,800
$5,000
The estimated costs shown in this proposal are based on the anticipated soil conditions. The
final invoice will be based on the specific quantities drilled and tested. If unanticipated
conditions are encountered during drilling, we will notify you accordingly.
E. SCHEDULE FOR BASIC SERVICES
Weather permitting, we plan to initiate these studies within seven days of receipt of notice to
proceed, and anticipate that two working days will be required to complete the subsurface
exploration for the site (weather conditions permitting). You will receive the final report
approximately three weeks following the completion of the field phase. We will make
preliminary design data available sooner if necessary.
eMJ ENGINEERING, INC.
Halff Associates, Inc.
Proposal No. 04-882
December 13, 2004
Page 4
II. ADDITIONAL SERVICES
A. AUTHORIZATION AND SCOPE
Additional Services will be performed only if specifically requested and authorized by Client.
Additional Services may consist of the following:
· Additional subsurface exploration, including quantities or items other than described in
Basic Services.
· Bulldozer or other equipment services required to achieve access to boring locations.
· Stand-by time or time in excess of one-half hour required for travel between boring
locations.
· Additional laboratory services, including quantities or items other than described in Basic
Services.
· Additional insurance coverage or limits (if available) other than CMJ's standard policies.
· Additional engineering services, including personnel time and expenses for items not
specifically described in Basic Services. This may include, but is not limited to,
additional meetings requested by Client or Client's other consultants, assistance to
Client in dealing with regulatory agencies, preparation and engineering assistance in
legal proceedings, and evaluation of alternative designs for the project or relocation of
structure, following initial submittal of the geotechnical report.
· Additional copies of the report, other than the number described in Basic Services.
· Any other required or requested services authorized by Client, other than those
specifically described in Basic Services.
B. COMPENSATION AND SCHEDULE FOR ADDITIONAL SERVICES
Additional Services, when authorized by Client, will be in accordance with our Schedule of Fees.
Additional Services will be performed at reasonable times and within reasonable schedules as
requested by Client. Authorized Additional Services will be billed as a separate item on invoices
and a description of the Additional Services will be provided.
III. TERMS AND CONDITIONS
The scope of services will be performed pursuant to the attached CMJ Terms for Geotechnical
Engineering Services, which is incorporated into this proposal.
Thank you for the opportunity to present this proposal. Please sign the attached Terms for
Geotechnical Engineering Services and return one complete copy of this proposal as your
authorization to proceed. Facsimile signatures shall be sufficient unless originals are requested
eMJ ENGINEERING, INC.
Halff Associates, Inc.
Proposal No. 04-882
December 13, 2004
Page 5
by a third party. Do not hesitate to call if you have any questions or if you have suggestions
regarding changes to the agreement or to the proposed scope of services.
* * * *
We look forward to working with Halff Associates, Inc. on this project.
Respectfully submitted,
eMJ ENGINEERING, INC.
copies submitted:
(1) Mr. Jerry F. Roberts, P.E.; Halff Associates, Inc. (by fax)
(2) Mr. Jerry F. Roberts, P.E.; Halff Associates, Inc. (by mail)
CMJ ENGINEERING, INC.
GEOTECHNICAL ENGINEERING SERVICES
BASIC SERVICES COST ESTIMATE #2
PROPOSAL:
DATE:
PROJECT:
04-882
DECEMBER 13, 2004
PAIGE ROAD
SOUTH COLONY TO NORTH COLONY
THE COLONY, TEXAS
SUBSURFACE EXPLORATION Quant. Unit $ Total $
Mobilization 1 150.00 150.00
Soil Drilling-Intermittent Sampling (0-25 ft.) 132 10.00 1,320.00
THO Cone and SPT 6 20.00 120.00
Underground Utility Check 5 60.00 300.00
Subtotal Subsurface Services $ 1,890.00
LABORATORY SERVICES
Moisture Content and Soil Identification 88 6.00 528.00
Liquid and Plastic Limits 11 45.00 495.00
Unconfined Compressive Strength-Soil 5 40.00 200.00
Unit Weight 11 10.00 110.00
Free Swell 2 135.00 270.00
Soluble Sulfates 11 11 0.00 1,210.00
Subtotal Laboratory Services $ 2,813.00
ENGINEERING SERVICES
Senior Principal Engineer 1 105.00 105.00
Staff Engineer 22 60.00 1,320.00
Drafting & Secretarial Support 16 35.00 560.00
Misc. Expense (report production, mileage, etc.) 1 100.00 100.00
Subtotal Engineering Services $ 2,085.00
TOTAL ESTIMATE
$ 6,788.00
SAY $6,800.00
CMJ ENGINEERING, INC.
GEOTECHNICAL ENGINEERING SERVICES
BASIC SERVICES COST ESTIMATE #3
PROPOSAL: 04-882
DATE: DECEMBER 13, 2004
PROJECT: MEMORIAL DRIVE
SOUTH COLONY AND MORNINGSTAR
THE COLONY, TEXAS
SUBSURFACE EXPLORATION Quant. Unit $ Total $
Mobilization 1 150.00 150.00
Soil Drilling-Intermittent Sampling (0-25 ft.) 84 10.00 840.00
THO Cone and SPT 4 20.00 80.00
Underground Utility Check 4 60.00 240.00
Subtotal Subsurface Services $1,310.00
LABORATORY SERVICES
Moisture Content and Soil Identification 56 6.00 336.00
Liquid and Plastic Limits 7 45.00 315.00
Unconfined Compressive Strength-Soil 3 40.00 120.00
Unit Weight 7 10.00 70.00
Free Swell 2 135.00 270.00
Soluble Sulfates 7 110.00 770.00
Subtotal Laboratory Services $ 1,881.00
ENGINEERING SERVICES
Senior Principal Engineer 1 105.00 105.00
Staff Engineer 19 60.00 1,140.00
Drafting & Secretarial Support 12 35.00 420.00
Misc. Expense (report production, mileage, etc.) 1 100.00 100.00
Subtotal Engineering Services $ 1,765.00
TOTAL ESTIMATE
$ 4,956.00
SAY
$5,000.00
TERMS FOR GEOTECHNICAL ENGINEERING SERVICES
THE AGREEMENT
This AGREEMENT is made by and between CMJ ENGINERING, INC., hereinafter referred to as GEOTECHNICAL ENGINEER,
and HALFF ASSOCIATES, INC., hereinafter referred to as CLIENT.
The AGREEMENT between the parties consists of these TERMS, the attached proposal identified as Proposal No. 04-882, dated
December 13, 2004 and any exhibits or attachments noted in the PROPOSAL. Together, these elements will constitute the entire
AGREEMENT superseding any and all prior negotiations, correspondence, or agreements either written or oral. Any changes to this
AGREEMENT must be mutually agreed to in writing.
STANDARD OF CARE
CLIENT recognizes that subsurface conditions may vary from those observed at locations where borings, surveys, or explorations
are made, and that site conditions may change with time. Data, interpretations, and recommendations by GEOTECHNICAL
ENGINEER will be based solely on information available to GEOTECHNICAL ENGINEER. GEOTECHNICAL ENGINEER is
responsible for those data, interpretations, and recommendations, but will not be responsible for other parties' interpretations or use
of the information developed.
Services performed by GEOTECHNICAL ENGINEER under this AGREEMENT are expected by CLIENT to be conducted in a
manner consistent with the level of care and skill ordinarily exercised by members of the geotechnical engineering profession
practicing contemporaneously under similar conditions in the locality of the project. Under no circumstance is any warranty,
expressed or implied, made in connection with the providing of geotechnical engineering services.
SITE ACCESS AND SITE CONDITIONS
CLIENT will grant or obtain free access to the site for all equipment and personnel necessary for GEOTECHNICAL ENGINEER to
perform the work set forth in this AGREEMENT. CLIENT will notify any and all possessors of the project site that CLIENT has
granted GEOTECHNICAL ENGINEER free access to the site. GEOTECHNICAL ENGINEER will take reasonable precautions to
minimize damage to the site, but it is understood by CLIENT that, in the normal course of work, some damage may occur and the
correction of such damage is not part of this AGREEMENT unless so specified in the PROPOSAL.
CLIENT is responsible for accurately delineating the locations of all subterranean structures and utilities. GEOTECHNICAL
ENGINEER will take reasonable precautions to avoid known subterranean structures, and CLIENT waives any claim against
GEOTECHNICAL ENGINEER arising from damage done to subterranean structures and utilities not identified or accurately located.
SAMPLE DISPOSAL
GEOTECHNICAL ENGINEER will retain samples transported to the geotechnical laboratory for testing for a period of thirty (30)
days following submission of the report covering those samples. Further storage or transfer of samples can be made at CLIENT'S
expense upon CLIENT'S prior written request.
MONITORING
If GEOTECHNICAL ENGINEER is retained by CLIENT to provide a site representative for the purpose of monitoring specific
portions of construction work or other field activities as set forth in the PROPOSAL, then this phrase applies. For the specified
assignment, GEOTECHNICAL ENGINEER will report observations and professional opinions to CLIENT. No action of
GEOTECHNICAL ENGINEER or GEOTECHNICAL ENGINEER'S site representative can be construed as altering any
AGREEMENT between CLIENT and others. GEOTECHNICAL ENGINEER will report to CLIENT any observed
geotechnically-related work which, in GEOTECHNICAL ENGINEER'S professional opinion, does not conform with plans and
specifications. The GEOTECHNICAL ENGINEER has no right to reject or stop work of any agent of the CLIENT. Such rights are
reserved solely for CLIENT. Furthermore, GEOTECHNICAL ENGINEER'S presence on site does not in any way guarantee the
completion or quality of the performance of the work of any party retained by CLIENT to provide field or construction-related
services.
GEOTECHNICAL ENGINEER will not be responsible for and will not have control or charge of specific means, methods,
techniques, sequences or procedures of construction or other field activities selected by any agent or agreement or CLIENT, or
safety precautions and programs incident thereto.
BILLING AND PAYMENT
CLIENT wi." pay GEOTECH~J1C/I,L ENGINEER in ac:;cordance with the procedlJ~es indicated in the PROPOSAL and it~ ~lt~C~~s.
Invoices Will be submlltea to CLIENT by G~OT~CHNICI'.L ENGINEER, and \lo',lIee due and payable upon presentat'e.. f I IT
objects to all or any portion of any invoic:;e, CLIENT will so notify G~OTECHNIC^L ~NGI~lEER in writing within fourte;~ '(11)
calendar days of the invoice date, identify the cause of disagreement, ana pay when dlJe that portion of the invoice not in d;;~~t~. In
the absence of '.witten notification descrieed above, the amount as stated on the in'Joice will be paid.
Invoices are delinqlJent if payment has. not been received within thirty (3Q) d3Ys from date of invoice. At the ~P~i:a~~~h~
GEOTECHNIC/'.L E~IGINEER, CLIENT Will pay an additional charge of one and one half (1.5) percent per montA (or h .
PROPOSAL NO. 04-882
TERMS - Page 1 of 3
CMJ ENGINEERING, INC.
percentage allowed by law, whichever is lower) en any delinqblent amoblnt, except for any portion of the invoiced amount in disputo
and resolved in favor of CLIENT. Dispblted amounts withheld by the client which are sblbseqblently resolved in favor of the
geotechnical engineer will carry the additional charge, as described above, effective thirty (30) days from the date of the original
invoice. In the event CLIENT fails to pay GEOTECHNICAL ENGINEER within sixty (60) days after invoices are rendered, CLlE~lT
agrees that GEOTECHNICAL ENGINEeR will h3'/e the right to consider the failblre to pay the GEOTECHNICAL ENGINEER's
invoice as a br.oach of this I\GREEMENT.
TERMINATION
This AGREEMENT may be terminated by either party seven (7) days after written notice in the event of any breach of any provision
of this AGREEMENT or in the event of substantial failure of performance by the other party, or if CLIENT suspends the work for
more than three (3) months. In the event of termination, GEOTECHNICAL ENGINEER will be paid for services performed prior to
the date of termination plus reasonable termination expenses, including, but not limited to the cost of completing analyses, records,
and reports necessary to document job status at the time of termination.
RISK ALLOCATION
Many risks potenti311y affect GEOTECHNICAL ENGINEER by virtble of entering into this I\GREEMENT to perform profession31
engineering services on behalf of CLIENT. The principal risk is the potential for human error by GEOTECHNIC.'\L ENGINEER. For
CLlHlT to obtain the benefit of a fee which incllJdes a nominal allo'Nance for dealing with GEOTECHNICAL ENGINEER'S liability,
CLIENT 3grees to limit GEOTECHNICAL ENGI~JEER'S 1i3bility to CLIENT and to all other parties fer claims arising out of
GEOTECHNICAL ENGINEeR'S perform:mce of the services described in this AGREEMENT. The aggregate liability of
GEOTECHNICl\L ENGINEER will not exceed the amoblnt of the GEOTECHNICAL ENGINEER'S fee for negligent professional acts,
errors, or omissions.
I I I .
(inclblding negligence), strict or statutory liability, or any other Gause of action, except for willful misGonduct or gross negligence. The
parties also agree that CLIENT will not seek d3mages in excess of the limitations indirectly throblgh sblits with other parties who may
join GEOTECHNICl\L ENGINEER as a third party defendant. Parties me3ns CLIENT and GEOTECHNICAL ENGINEER and their
officers, employees, agents, affiliates, and subcontractors.
Both CLIENT 3nd GEOTECHNICl\l ENGINEER agree that they will not be liable to each other, under 3ny circumstances, for
special, indirect, consequential, or punitive damages arising out of or related to this AGREEMENT.
DISCOVERY OF UNANTICIPATED HAZARDOUS MATERIALS
CLIENT represents that CLIENT has made a reasonable effort to evaluate if hazardous materials are on or near the project site, and
that CLIENT has informed GEOTECHNICAL ENGINEER of CLIENT's findings relative to the possible presence of such materials.
Hazardous materials may exist at a site where there is no reason to believe they could or should be present. GEOTECHNICAL
ENGINEER and CLIENT agree that the discovery of unanticipated hazardous materials constitutes a changed condition mandating
a renegotiation of the scope of work or termination of services. GEOTECHNICAL ENGINEER and CLIENT also agree that the
discovery of unanticipated hazardous materials may make it necessary for GEOTECHNICAL ENGINEER to take immediate
measures to protect health and safety. CLIENT agrees to compensate GEOTECHNICAL ENGINEER for any equipment
decontamination or other costs incident to the discovery of unanticipated hazardous materials.
GEOTECHNICAL ENGINEER agrees to notify CLIENT when unanticipated hazardous materials or suspected hazardous materials
are encountered. CLIENT agrees to make any disclosures required by law to the appropriate governing agencies. CLIENT also
agrees to hold GEOTECHNICAL ENGINEER harmless for any and all consequences of disclosures made by GEOTECHNICAL
ENGINEER which are required by governing law. In the event the project site is not owned by CLIENT, CLIENT recognizes that it is
CLIENT'S responsibility to inform the property owner of the discovery of unanticipated hazardous materials or suspected hazardous
materials.
Notwithstanding any other provision of the AGREEMENT, CLIENT waives any claim against GEOTECHNICAL ENGINEER arising
from GEOTECHNICAL ENGINEER'S discovery of unanticipated hazardous materials or suspected hazardous materials, including,
but not limited to, any costs created by delay of the project and any cost associated with possible reduction of the property's value.
CLIENT will be responsible for ultimate disposal of any samples secured by GEOTECHNICAL ENGINEER which are found to be
contaminated. This includes any soil or rock cuttings, and contaminated drilling or wash water which is generated as a consequence
of drilling activities.
DISPUTES RESOLUTION
All claims, disputes, and other matters in controversy between GEOTECHNICAL ENGINEER and CLIENT arising out of or in any
way related to this AGREEMENT will be submitted to "alternative dispute resolution" (ADR) before and as a condition precedent to
other remedies provided by law. If and to the extent CLIENT and GEOTECHNICAL ENGINEER have agreed on methods for
resolving such disputes, then such methods will be set forth in the "Alternative Dispute Resolution Agreement" which, if attached, is
PROPOSAL NO. 04-882
TERMS - Page 2 of 3
CMJ ENGINEERING, INC.
incorporated into and made a part of this AGREEMENT. If no specific ADR procedures is set forth in this AGREEMENT, then it shall
be understood that the parties shall submit disputes to mediation as a condition precedent to litigation.
If a dispute at law arises from matters related to the services provided under this AGREEMENT and that dispute requires litigation
instead of ADR as provided above, then:
(1) the claim will be brought and tried in judicial jurisdiction of the court of the county where GEOTECHNICAL
ENGINEER's principal place of business is located and CLIENT waives the right to remove the action to
any other county or judicial jurisdiction, and
(2) the prevailing party will be entitled to recovery of all reasonable costs incurred, including staff time, court
costs, attorneys' fees, and other claim related expenses.
GOVERNING LAW AND SURVIVAL
The law of the State of Texas will govern the validity of these TERMS, their interpretation and performance.
If any of the provisions contained in this AGREEMENT are held illegal, invalid, or unenforceable, the enforceability of the remaining
provisions will not be impaired. Limitations of liability and indemnities will survive termination of this AGREEMENT for any cause.
The parties have read the foregoing, understand completely the terms, and willingly enter into this AGREEMENT which will become
effective on the date signed below by CLIENT.
CLIENT
By:
Position
President
Position
Date
December 13. 2004
Date
PROPOSAL NO. 04-882
TERMS - Page 3 of 3
CMJ ENGINEERING, INC.