HomeMy WebLinkAboutResolution No. 05-96 RESOLUTION NO. 05- Cf ~ ORIGINAL A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF THE CONSTRUCTION MANAGEMENT CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND POGUE CONSTRUCTION FOR CONSTRUCTION MANAGEMENT SERVICES FOR THE NORTH COLONY FIRE STATION, WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT CHANGE ORDER; AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City and Consultant have entered into an agreement such that the Consultant is to provide the following services: CONSTRUCTION MANAGEMENT FOR THE NORTH COLONY FIRE STATION; and WHEREAS, the City has determined that it is in the best interest ofthe City to enter into the Contract with POGUE CONSTRUCTION, which is attached hereto and incorporated herein by reference as Exhibit "A," under the terms and conditions provided therein. WHEREAS, with this Construction Management Contract the City of The Colony is agreeing to pay the sum not to exceed $139,229.00 for such work. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THAT: Section 1. The Construction Management Contract, which is attached and incorporated hereto as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved in the amount of $132,599.00 as the base amount, plus a $6,630.00 contingency amount for a total not to exceed $139,229.00, and the City Manager is hereby authorized to execute the Agreement on behalf of the City of The Colony, Texas. Section 2. That this Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED, APPROVED and EFFECTIVE this 17TH day of OCTOBE~,,+005. ...-..---....-......-'..~~- ~ - I, { -.-- . ~,.(:>~ ~\' _' l"1 , '? /r.'_'_ . {:' '", / ~ Dillard, Mayor ty of The Colony, Texas - -,';, 63918 --......- , " 'AlA Document A121"CMc - 2003 and AGC Document 565 Standard Form of Agreement Between Owner and Construction Manager where the Construction Manager is Also the Constructor AGREEMENT made as of the Sixth day of October in the year of Two Thousand and Hve (In words, indicatt day, month andYtar) BETWEEN the Owner: (Name and address) ADomONS AND DELETIONS: The aulhor of lhIs document has added lnfOfTllatlon needed lor its completioo. The author may also have nMsed the text of the 00ginaI AlA standard form. An Addilions II1J(/ DeIetfons Report that notes added infonnation as well as revisions to the SIandard form text is available from 1he author and should be reviewed. A VllfticaJ Hne in the left mougln of thi$ cIocument indicale$ where the author has added necessary inlOlTllatioo and where the author has added to or deleted from the original AlA teltt. This document has important legal COI\SeqUerlces. CollSl.lltation with an altomey is encouraged with r&spect to its completion or moclfJCatlon. The 1997 Edition 01 AlA Ooc:urn..u A201, General Cooditfons of the Contract for ConstrucIion. is retemld to hereill. This Agreement r&quires modification it other generaJ conditions are utilized. City of The Colony 6800 Main Street The Colony, Texas 75056-1133 and the Construction Manager: (Name and address) Paul Pogue, L.P.. limited Partnership 405 Interchange Street McKinney, Texas 75071 The Project is: (NQ1M, add~ss and brief description) The Colony rire Station North Colony Boulevard at Main Street New Fire Station approximately 10,000 SF The Architect is: (Name and address) Wiginton, Hoolter. Jeffry Architects 9696 Skil1man Streel, Suite 255 Dallas, Texas 75243 The Owner and Construction Manager agree as set forth below: AlA Ooc-. A 121"CMc - 2003 and AGC 00c:I..ment 585. CopyrIght 0 1891 and 2003 by The Americln lniIIIlu1e of An:hItecta and The Associated GeneI1II ~ 01 Amellca. AI rfg/lta ~ WARNING: This document I. proleel8d by U.s. Copyright Law and lnlernatlonal Treaties. 1 UlWllhortzecl nlp<'Oductlon or dl5trlbutlon of thl. cIoct.m~.. Ot' any portion of ii, may resuII In sev... cfvllllld criminal penalties, end will be proMCUlodto the maximum Clltlent po.sible Under the IH, This doculTI8nl_ produced by AlA IOIlware a114:38:05 on 1Of1212OO5 under Order No.1 000191 0'6_' ...tich expires on 81112006, and is not for .... u.. Notes: (t599011364) ~ ----. \.....!. ~ ,.. TABLE OF CONTENTs ARTICLE 1 GENERAl PROVISIONS S 1.1 Relationship of the Parties f 1.2 General Conditions ARTICLE 2 CONSTRUCTION MANAGER'S RESPONSIBILITIES S 2.1 Preconstruction Phase S 2.2 Guaranteed Maximum Price Proposal and Contract Time S 2.3 Construction Phase S 2.4 Professional Services S 2.5 Hazardous Materials ARTiClE 3 OWNER'S RESPONSlBIUTIES ! 3.1 Information and Services S 3.2 Owner's Designated Representative S 3.3 Architect ! 3.4 Legal RcquiremcnL'l ARTICLE 4 COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASE SERVICES S 4.1 Compensation S U Payments ARTICLE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICes 5 5.1 Compensation S 5.2 Guaranteed Maximum Price 5 5.3 Cbanges in the Work ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE U.1 Costs to Be Reimbursed f 6.2 Costs Not to Be Reimbursed S 6.3 Discounts. Rebates and Refunds S U Accounting Records ARTICLE 7 CONSTRUCTION PHASE 5 7.1 Progress Payments f 1.2 Final Payment ARTICLE 8 INSURANCE AND BONDS t 8.1 Insurance Required of the Construction Manager f 8.2 Insurance Required of the Owner S 8.3 Perfonnance Bond and Payment Bond ARTICLE 9 MISCEllANEOUS PROVISIONS 5 1,1 Dispute Resolution 5 9.2 Other Provisions ARTICLE 10 TERMINATION OR SUSPENSION 510.1 Termination Prior to F..stablisbing Guaranteed Maximum Price t 10.2 Termination Subsequent to F..slablishing Guaranteed Maximum Price S 10.3 Suspension ARTICLE 11 OTHER CONDITIONS AND SERVICES AlA Document A121 "'CUe - ZOO3 and AGe 00curnt0ll565. CopyrIght 0 1991 and 2003 br The Amerioan InIlIIuIe of An:hitec1s and The As80cIalecI l3<<lwaI Conrra::Iot. of America. All rIgIt,- ~ W ARNIHG: TIlls document I. proIecled by u.s. Copyrtghll.8w and IllIemallone! Treaties. 2 Unaulhorlztcl reproduc;Uon or cllatrlbutlon o11hl. dOeumenl. or any ponIOn 01 it, may result in ...,.,. civil and crknfnel ~tIn, and will be pr_Uled 10 llle mexlmum exJen, pcIlJlIlble Under dle law. TIll. documenl_ procfuoed by AlA MlIlware. 14;38:05 on IC/1212OOS under Ordw No.10001&101IU whIcIIellpl_on 8I112OOe. and II nollor retaIe. U_.....: (l!l88011~) c , ~ .. ARTICLE 1 GENERAL PROVISIONS ~ 1.1 RELATIONSHIP OF PARTIES The Construction Manager accepts the relationship of trust and confidence established widtlhe Owner by dtis Agreement, and covenants with the Owner to furnish the CooslruCtion Managel"' S reasonable skill and judgment and to cooperate with the Architect in furthering the interests of the Ownel". The Construction Manager shall furnish construction administration and management services and use the ConslruCtion Manager's best efforts 10 perform the Project in an expeditious and economical manner consistent with the interests of the Owner. The Owner shall endeavor to promote harmony and cooperation among the Owner, Architect, ConslruCtion Manager and other peI'SOl1& or entities employed by the Owner for the Project. S 1.2 GENERAL CONDITIONS For the Construction Phase, the General Conditions of the contract shan be the A!A@ Document A20 I TIoL 1997, General Conditions of the Contract for Construction, which is incorporated herein by reference. For the Preconstruction Phase, or in the event d1at the Preconstruction and Construction Phases proceed concurrently, A2011loL1997 shaD apply to the PrecoflStruction Pbase only as specifically provided in this Agreement The term "Contractor" 1$ used in A201nCI997 shaD mean the Construction Manager. ARTICLE 2 CONSTRUCTION MANAGER'S RESPONSIBILITIeS The Construction Manager shaJJ perform the services described in this Article. The services to be provided under Sections 2.1 and 2.2 constitute the Preconstruction Phase services. If thc Ownel" and Construction Manager agree, after consultation widt the Architect, thc ConSll\lction Phase may commence belore the Preconstruction Phase is completed, in which case both phases will Proceed concurrcntly. 52.1 PRECONSTRUCTION PHASE 12.1.1 PRElIMINARY EVALUATION The Conslruction Manager shaIl provide a preliminary evaluation of the Owner's program and Project budget requirements, each in terms of the other. 52.1.2 CONSULTATION The Construction Manager with the ArcbileCt shan jointly schedule and altcnd regular meetings with the Owner. The Construction Managcc shan consult widt the OWQel" and Architect regarding site use and improvements and the selection of mlUCrials, building systems and equipment The Construction Manager shan provide recommendations on construction feasibility; actions designed 10 minimize adverse effects onabor or material shortages; time requirements for procW'eltlent, installation and construction completion; and factors related to construction cost, including estimates of alternative designs or materials, preliminary budgets and possible economies. S 2.1.3 PREliMINARY PROJECT SCHEDULE When Project requirements described in Section 3.1.1 have been sufflcienUy identified, the Construction Manager shall prepare, and periodically update, a preliminary Project schedule for lhe Architect's review and the Owner's approval. The Construction Manager shall obtain the ArchileCt's approval of thc portion of the preliminary Project schedule relating 10 the performance of the Architect's services. The Construction Manager shall coordinate and integrate the preliminary Project schedule with the services and activities of the Owner, Architect and Construction Manager. As design proceeds, thc preliminary Project schedule shall be updated to indicate proposed activity sequences and durations, milestone dates for receipt and approval of pertinent infornwion, submittal of a Guaranteed Maximum Price proposal, preparation and processing of shop drawings and samples, delivery oC materials Or equipment requiring long-lead-time procurement. Owner's occupancy requirements showing portions of the Project having occupancy priority, and proposed date of Substantial Completion. If preliminary Project schedule updates indicate that previously approved schedules may nol be met, the Construction Manager shall make approprilUC recommendations to the Owner and Architect 52.1.4 PHASED CONSTRUCTION The Construction Manager sball make recommendations to the Owner and Architect regarding the phased issuance of Dl'2wings and Specifications to facilitate phased construction of the Work, if such phased construction is appropriate for the Project, taking into consideration sucb factors 1$ economics, time of performance, availability of labor and materials, and provisions for tempor.uy facilities. NIl. Docu~ A121"'C&1c - 2l103l1nd AGe 00c:um.nI ses. Copyr\Qht C 18111 and 2003 by The AmtricM InaUlule of ~ and The Assocl8ltd General Contractora 01 America.. All rights,...... WARNING: this cIocuIMnt is prolecled by U.s. Copyright Law snd Int.msUORII Trestles. 3 Unauthorized r.procIuctloll or chtributlon of this document, or any portion of It, m.y r.sult In sev.... chtllllnd criminal peRIIllea, lInd ~ be ptOS4lculed 10 lhe mall/mum extent possible under lhe iaw. ThIa document _ produced by AlA ~ 8114:38:05 on 10(1212005 undw Ordar No.looo19101lU wtUch uplres on 81112006. lIl1d is not for resele. UMr "otM: (1599011384) , . i 2.1.5 PREUMINARY COST ESTIMATES f 2.1.5.1 When the Owner has sufficiently identified the Project requirements and the Architect has prepared other basic design Criteria. the Construction Manager shall prepare. for the review of the Architect and approval of the Owner, a preliminary cost estimate utili7ing area. volume or similar conceptual estimating techniques. f 2.1.5.2 When Schematic Design Documents have been prepared by the Architect and approved by the Owner, the Construction Manager shall prepare, for the review of the Architect and approval of the Owner, a more detailed estimate with SUpporting data. During the preparation of the Design Development Documents, the Construction Manager shall update and refine this estimate at appropriate intervals agreed to by the Owner, Architect and Construction Manager. f 2. f.5.3 When Design Development Documents have been prepared by the Architect and approved by the Owner, the Construction Manager shall prepare a detailed estimate with supporting data for review by the Architect and approval by the Owner. During the preparation of the Construction Documents, the Construction Manager shall update and refine this estimare at appropriate intervals agreed to by the Owner. Architect and Construction Manager. f 2.1.5.4lfany estimate submitted to the Owner exceeds previously approved estimates or the Owner's budget, the Construction Manager shall make appropriate recommendations to the Owner and Architect f 2.1.6 SUBCONTRACTORS AND SUPPLIERS The Construction Manager shall seck to develop subcontractor interest in tbe Project and shall furnish to the Owner and Architect for their information a list of possible SUbcontractors, including suppliers who are to furnish materials or equipment fabricated to a special design, from whom proposals will be requesled fur each principal portion of the Work. The Architect will promptly reply in writing to the Construction Manager if the Architect or Owner know of any objection to such sulx:ontractor or supplier. The receipt of such list shaJJ not require the Owner or Architect to investigate the qualifICations of proposed subcontractors or suppliers, nor shall it waive the right of the Owner or Architect later to object to or reject any proposed subcontractor or supplier. i 2.1.7 LONG-lEAD-nME ITEMS The Construction Manager shall recommend to the Owner and Architect a schedule for procurement of Iong-lead- time items which will constitute part of the Work as required to meet the Project schedule. If such long-lead-time items are procured by the Owner, they shall be procured on terms and conditions acceptable to the Construction Manager. Upon the Owner's acceptance oflbe ConstnJction Managers Guaranteed Maximum Price proposal, all contracts for such items shall be assigned by the Owner to the Construction Manager, who shall accept responsibility for such items as if procured by the Construction Manager. The Construction Manager shall expedite the delivery of long-lead-time items. i 2.1.8 EXTENT OF RESPONSIBILITY The Construction Manager does not warrant or guarantee estimates and schedules except as may be included as part of the Guaranteed Maximum Price. The recommendations and advice of the Construction Manager concerning design alternatives shall be subject to the review and approval of the Owner and the Owner's professional consultants. It is nol the Construction Manager's responsibility to ascertain that the Drawings and Specifications are in accordance with applicable laws, statutes, ordinances, building codes, rules and regulations. However. if the Construction Manager recognizes that portions of the Drawings and Specifications arc at variance therewith, the Construction Manager shan promptly notify the Architect and Owner in writing. S 2.1.9 EQUAL EMPLOYMENT OPPORTUNITY AHD AFFIRMATIVE ACTION The Construction Manager shall comply with applicable laws, regulations and special requirements of the Contract Documents regarding equal employment opportunity and affirmative action programs. S 2.2 GUARANTEED MAXIMUM PRICE PROPoSAl AND CONTRACT TIME f 2.2.1 When the Drawings and SpecifICations are sufficiently complete, the Construction Manager shall propose a Guar:anteed Maximum Price.. which shall be the sum of the esti mated Cost of the Work and the ConStruction Manager's Fee. f 2.2.2 As the Drawings and Specifications may not be fmished at the time the Guaranteed Maximum Price proposal is prepared, the Construction Manager shall provide in the Guaranteed Maximum Price for further development of AlA ~ A121""CUc - 2003 and AGe Document 565. Cop~ C 1991 Md 2003 by The Amenc.n Inslilute of Archilects and The ~ CHnerlII ~ 01 AmerIc:a. All r1ghta...~ WARNING: This <IOculllent Is protecllld by u.s. Copyright Law and Intvnatfonal Treetles. 4 Ur>llUlhor/ad reprodllC1ion or dislrlbution of this docwn....1, or any portion of It, may result in MY'" clYil and criminal penalties, and will be prosocuttll to tile maximum .x~ possible unet<< 1M 1_. Thia ~umenl_ procIuctlI by AlA IOI\wtre at '.:38:05 on 10(1212005 under Order No. 1 0001111 016_1 wflIch expires on 81112006, -.cI i$l1Ollor I9AIe. u.r Notes: (1S99011384) _~_._l_. the Drawings and Specifications by the Architect that is consistent with the Contract Documents and reasonably inferable therefrom. Such further development does not include such things as changes in scope, systems, kinds and quality of materials, finishes or equipment, all of which, if required, shall be incorporated by Change Order. S 2.2.3 The estimated Cost of the Work shall include the Construction Manager's contingency, a sum established by the Construction Manager for the Construction Manager's exclusive use to cover costs arising under Section 2.2.2 and other costs which are properly reimbursable as Cost of the Work but not the basis for a 0Iange Order. i 2.2.4 BASIS OF GUARANTEED MAXIMUM PRICE The Construction Manager shall include with the Guanmleed Maximum Price proposal a written statement of its basis, which shaD include: .1 A list of the Drawings and Specifications, including all addenda thereto and the Conditions of the Contract, which were used in preparation of the Guaranteed Maximum Price proposal. .2 A list of allowances and a statement of their basis. .3 A list of the clarifications and assumptions made by the Construction Manager in the preparation of the Guaranteed Maximum Price proposal to supplement the infonnation contained in the Drawings and Specifjcation.~. .4 The proposed Guaranteed Maximum Price, including a statement of the estimated cost organized by trade categories, allowances, contingency, and other items and the Fee: that comprise the Guanmteed Maximum Price. .5 The Date of Substantial Completion upon which the proposed Guaranteed Maximum Price is based, and a schedule of the Construction Documents issuance dates upon which tbe dale of Substantial Completion is based. 5 2.2.5 The Construction Manager shall meet with the Owner and Architect to review the Guaranteed Maximum Price proposal and the written statement of its basis. In the evcnt that the Owner or Architect discover any inconsistencies or inaccuracies in the information presented, they shall promptly notify the Construction Manager. who shall make appropriate adjustments to the Guaranteed Maximum Price proposal, its basis, or both. S 2.2.6 Unless the Owner accepts the Guaranteed Maximum Price proposal in writing on or before the date specified in the Proposal for such acceptance and so notifies the Construction Manager, the Guaranteed Maximum Price proposal shaD not be effective without written acceptance by the Construction Manager. S 2.2.7 Prior to the Owner's acceptance of the Construction Manager's Guaranteed Maximum Price proposal and i.~uance of a Notice to Proceed, the Construction Manager shalt not incur any COSt to be reimbursed as part of the Cost of the Work. except as the Owner may specifically authorize in writing. 52.28 Upon acceptance by the Owner of the Guaranteed Maximum Price proposal, the Guaranteed Max:imum Price and its basis shall be set forth in Amendment No. I. The Guaranteed Maximum Price shan be subject to additions and deductions by a change in the Work as provided in the Contract Documents, and the Date of Substantial Completion shall be subject to adjustment as provided in the Contract Documents. ! 2.2.9 The Owner shan authorize and cause the Architect to revise the Drawings and SpecifICations to the extent necessary to reflect the agreed-upon aSsumptions and clarifications contained in Amendment No. I. Such revised Drawings and Specifications shall be furnished to the Construction Manager in accordance with schedules agreed to by the Owner, Architect and Construction Manager. The Construction Manager shall promptly notify the Architect and Owner if such revised Drawings and Specifications are inconsistent with the agreed-upon assumptions and clarifications. i 2.210 The Guaranteed Maximum Price shall include in the Cost of the Wort. only those taxes which are enacted at the time the Guaranteed Maximum Price is established. 52.3 CONSTRUCTION PHASE 6 2.3.1 GENERAl 5 2.3.1.1 TIle Construction Phase shall conunencc on the earlier of: AlA Document A 121 "'CMc - 20031lnd AGe DIlcuIMn15ll5. Copyrighl 0 1~1 and 2003 by The Amerlc:an ~ of AteNItcIa and The Associalad General ConlrIctOIS 01 America.. All r1ghlt ~ WARNING: TIlls documllllls prolected by u.s. Copyrlghl uw IncllntematlOlll/ T....lies. 5 Unauthorized r.prOdualon or distribution of this documenl, or Iny potlion of II, IMy result in M_I clvU encl criminal PlnW/les, IncI will be pr_ted 10 the mlxlmum extent possible under Ihll..,. This docunl.nt _ produced by AlA softwer... 14:38:05 on 1011212005 under On:Ier No.loooIIII016_1 whieh ellpires on 81lf200S, lIt1d is not lor....... U- Notes: (15990113641 ( I) the Owner's acceptance of the Construction Manager's Guaranteed Maximum Price proposal and issuance of a Notice to Proceed, or (2) the Owner's first authorization to the Construction Manager to: (a) award a subcontract, or (b) undertake construction Work: With the Construction Manager's own forces, or (c) issue a purchase order for materials or equipment required for the Work:. S 2.3.2 ADMlNlSTRAnON S 2.3.2.1 Those portions ot the Work that the Construction Manager does not customarily perform with the Construction Manager's own personnel shaJl be perfOrmed Wlder subcontracts or by other appropriate agreements with the Construction Manager. The Construction Manager shaD obtain bids from Subcontraclor5 and from suppliers of materials or equipment fabricated to a special design for the W orkfrom the list previously reviewed and, after analyzing such bids, shaD deliver such bids to the Owner and Architect. The Owner will then determine, with the advice of the Construction Manager and subject to the reasonable objection of the Architect, which bids will be acceplcd. the Owner may designate specific persons or entities from whom the Construction Manager shall obtain bids; however. if the Guaranteed Maximum Price has been established, the Owner may not prohibit the Construction Manager from obtaining bids from other qualified bidders. The Construction Manager sball not be required to contract With anyone to whom the Construction Manager bas reasonable objection. f 2.3.2.2 If the Guaranteed Maximum Price bas been established and a specific bidder among those whosc bids are delivered by the Construction Manager to the Owner and Architect ( I) is recommended to the Owner by the Construction Manager; (2) is qualified to perfonn that portion of the Wort; and (3) has submitted I bid which conforms to the requirements of the Contract Documents Without reservations or exceptions., but the Owner requires that another bid be accepted, then the Construction Manager may require that a change in dJe Work be issued to adjust the Contract Time and the Guaranteed Maximum Price by the difference between the bid of the person or entity recommended to the Owner by the Construction Manager and the amount of the subcontract or other agreement actuaDy signed With the person or entity designated by the Owner. i 2.3.2.3 Subcontracts and agreements with suppliers furnishing materials or equipment fabricated to I special design shall conform to the payment provisions of Sections 7.1.8 and 7.1.9 and shall not be awarded on the basis of COSt plus a fee Without the prior Consent of the Owner. i 2.3.2.4 The Construction Manager shall schedule and conduct meetings at which the Owner, Architect. Construction Manager and appropriate Subcontractors can discuss the status of the Work. The Construction Manager shall prepare and promptly distribute meeting minutes. f 2.3~5 Promptly after the Owner's acceptance of the Guaranteed Maximum Price proposal. the Construction Manager shall prepare a schedule in accordance with Section 3.10 of A201 1V.... 1997. inCluding the Owner's occupancy requirements. f 2.3~6 The CoMtruction Manager shall provide monthly written reports to the Owner and Architect on the progress of the entire Work. The Construction Manager shall maintain a daily log containing a record of weather, Subcontractors working on the site, number of workers. Work accomplished, problems CncoWltered and other similar relevant data as the Owner may reasonably require. The log shall be available to the Owner and Architect. S 2.3~7 The Construction Manager shall ~lop a system of cost control for the Work, including regular monitoring of actual COsts for activities in progress and estimates for uncompleted tasks and proposed changes. Thc Construction Manager shall identify variances between actual and estimated COsts and report the variances to the Owner and Architect at regular intervals. f 2.4 PROFESSIONAL SERVICES Section 3.12.10 of A20 JT/oL I 997 $ball apply to both the PrcconSlrUction and Construction Phases. f 2.5 HAZARDOUS MATERIALS Section 10.3 of A2011V....1997 ~haU apply to both the Preconstruction and Construction Phases. AlA noa-.c A121"'CMc_ 2003 -' AGe Document -Copyright C 1991.00 2003 by The American In...... 01 ~ Uld The Naodal8<l General eonnao.. of America. All rlg/lls ~ WARNING: This doculll8nlls P-'-d by U.S. Copyright Lew and Intem.lonal T....lles. 6 Uneuthorized ntpIOductlon << distribuJlon of Ihls dOQlllltnt, or any portion 0111, may result In severe civil end crimlMl penaltles, and will be prOMcUl.s 10 the maximum exlent POSSible under the 1_. ThIe document _ PlVdUClld by AlA aonw.,. II 14~:O5 on 10112/2005 under 0nIer No. tOOO111101lU which elCJlires on 81112006. and Is not lor~. UserNocM: (1599011364) ARtICLE 3 OWNER'S RESPONSIBILITIES S 3.11NFORMATlON AND SERVICES 5 3.1.1 The Owner shall provide fun information in It timely manner regarding the requirements of the Project, including It program which sets fonh the Owner's objectives, constraints and criteria. including space requirements and relationships, flexibility and expandability requirements, special equipment and systems. and site requirements. f 3.1.2 The Owner shall. at the written request of the Construction Manager prior to commencement of the Construction Phase and thereafter, furnish (0 the Construction Manager reasonable evidence !hat fmancial 8Irangcments have been made to fulfill the Owner's obligations under the Contract. Furnishing of such evidence shall be a condition precedent to commencement or continuatioil of the WorIt. After such evidence has been furnished, the Owner shall not materially vary such financial arrangements without prior notice to the Construction Manager. i 3.1.3 The Owner shall establish and update an overall budget for the Project, based on consultation wi!h the Construction Manager and ArchileCt, which shall include contingencies for changes in the Worle and other cosas which arc the responsibility of the Owner. S 3. 1.4 STRUCTURAl AND ENVIRONMENTAl TESTS, SURVEYS AND REPORTS In the Preconstruction Phase, the Owner shall furnish the fOllOwing with reasonable promptness and at the Owner's expense. Except to the extent that the Construction Manager knows of any inaccuracy, the Construction Manager shall be entitled to rely upon the accuracy of any such infonnalion, reports, surveys, drawings and tests described in Sections 3.1.4.1 through 3.1.4.4 bUI shall exercise customary precautions relating to the performance of the WOIt. 5 3.1.4.1 Reports, surveys, drawings and tests concerning the conditions of the site which are required by law. S 3.1.4.2 Surveys describing physical chllCllcteristics, legal limitations and utility locations for the site of the Project, and a wrillen legal description of the sileo The surveys and legal information shall include, as applicable, grades and lines of streets, alleys. pavements and adjoining property and structures; adjacent drainage; rights-of-way, restrictions, easements, encroachments. zoning, deed restriction.'l, boundaries and contours ofthc site; locations, dimensions and necessary data pertaining to existing buildings, other improvements and trees; and information cOacem.ing available utility services and 1illC.'l, both public and priv8tc, above and below grade, including inverts and depths. All information on the SUlVey shall be referenced to a project benchmarlc. ! 3.1.4.3 The services of a geotechnical engineer when such services are requested by the Construction Manager. Such services may include but are not limited to test borings, test pits, detenninations of soil bearing values, percolation tests, evaluations of hazardous materials, ground corrosion and resistivity tests, including necessary operations for anticipating subsoil conditions, with reports and appropriate professional recommendations. 53.1.404 Structw-aI. mechanical, chemical, air and water pollution tests, tests for hazardous materials, and other laboratoly and environmental tests, inspections and reports which are required by law. S 3.1.4.5 The services of other consultants whcn such services are reasonably required by the scope of the Project and are requested by the Construction Manager. f 3.2 OWNER'S DESIGNATED REPRESENTATIVE The Owner shan designate in writing a representative who shall have express authOrity to bind the Owner with respect to aU matters requiring the Owner's approval or authorization. This representative shall have the authority to make decisions on behalf of the Owner concerning estimates and schedules, construction budgets, and changes in the Work, and shall render such decisions prompdy and furnish information expeditiously, so as to avoid unreasonable delay in the services or Work of the Construction Manager. Except as otherwise provided in Section 4.2.1 of A201 TW.-I 997. the Architect docs not have such authority. 53.3 ARCHrrECT The Owner shall retain an Architect to provide Basic Services, including normal Structural, mechanical and electrical engineering services, other than cost estimating &elYices, described in the edition of AlAe Document B 15 J TW.-1997, Abbreviated Sumdard Fonn of AgreelMnt Between Owner and Atchitect current as of the date of Ibis Agreement The Owner sbalI authorize and C8U.'iC the Architect to provide those Additional Services described AlA ~ A121"'C:Mc - *3 8nd AGe ~ 5&5. ~Ilt 011181 and 2003 by The Americlln InatIluIe 01 ~ MdThe Aaoc:ialed o.n.rw Conlraetofa 01 Aonenc:.. AI r1ghta --. WAItHING: Tllb document Is PfOI4lc:I8d by u.s. Copyright law and Intemational Tru..... 7 Unauthorltltd reproduction or dlSlrlbution of Ihls cIoculMnl, or Iny pottion 0111, _Y "SUit In ..v_ civil and Cttmlnal pene/lles. and wig be prosecuted 10 !he mulmum extent possible under tlllllsw. ThIs document _ prod.-d by AlA ~ 8114:38:05 on 10fl2l2OO5 under Order No.100011l1018_1 wt!Ich eJCpIres on 8/112008. and is nollor ....... U-Noc.., (IS1l9011384) " , in H 151"t1oL1997. requested by the Construction Manager which must l1CCCSsari.Iy be provided by the Archilect for the Prcconslruction and ConsLruction Phases of the Wort.. Such services shaIl be provided in accordance with time schedules agreed to by the Owner, Archilect and Construction Manager. Upon request of the Construction Manager. the Owner shall furnish to the Construction Manager a copy of the Owner's Agreement with the Archilect, from which compensation provisions may be deleted. S 3.4 lEGAl REQUiReMENTS The Owner sball determine: and advise the Architect and Construction Manager of any special legal requirements relating specifically to the Project which differ from those generally applicable to construction in the jwisdiction of the Project. The Owner shall furnish such legal services as are necessary to provide the information and services required under Section 3. I. ARTICLE" COMPENSATION AND PAYMENTS FOR PRECONSTRUCTION PHASe SERVICES The Owner shall compensate and make payments to the Construction Manager for Preconstruction Phase services as foDows: t 4.1 COMPENSATION 54.1.1 For the services described in Sections 2.1 and 2.2, the Construction Manager's compensation shall be calculated as (onows: Lump Sum of $2,500.00 (State basts of Compensation, whether a stipulated nun. nudtipk of Direct PeTSOIIMI Expefl.1t, actual COif!, etc. lru:lMde a staltltlt!nt of reimbursable COSI items as applicable.) S 4.1.2 Compensation for Preconstruclion Phase Services shall be equitably adjusted if such services extend beyond One hundred eishty ( 180 ) days from the date of lhis Agreement or if the originally contemplated scope of services is significantly modified. 14.1.3 If cOl11pensation is based on a multiple of Direct Personnel Expense, Direct Personnel Expense is defined as the direct salaries of the Construction Manager's personnel engaged in the Project and the portion of the Cost of their mandatory and C\JS(Omary contributions and benefits related thereto, such as employment taxes and other statutory employee benefits, insurance, siclc leave, holidays, vacations, pensions and similar contributions and benefits. S ".2 PAYMENTS S U 1 Payments shaJl be made monthly following presentation of the Construction Manager's invoice and, where applicable, shall be in proportion to services performed. 114.2.2 Payments are due and payable Thirty ( 30 ) days from the date the Construction Manager's inVOice is received by the Owner. Amounts unpaid after the date on which payment is due shall bear interest at the rate entered below, or in the absence lbereor, at the legal rate prevailing from time to time at the place where the Project is Jocated. (ParaglTJph deleted) (Usury laws and requirc17U!nJs WIder the F t!fkral Truth in Lending Act, similizr srate and local C01LJU1nl!r credit laws and other regldations at lhe Owner's and Contractor's principal places of business, the location of the Project and eiJewhere may affect the validity of tIrU provision. Legal advice should be obtained with respecllo dektions or modifications, and al.w regarding requirements such as written disclosures or waivers.) ARTIClE 5 COMPENSATION FOR CONSTRUCTION PHASE SERVICes The Owner shall compensate the Construction Manager for Construction Phase services as follows: AlA Document A121 ""CUc - 2003 .rId AQe Document 5lI5. Cop)rtght C 1991 I.IId 2003 by The Arnertcen lnIlllute of An:hIt.cl8 I.IId The ~ GenerlII ~ 01 America. All rIglI1lI.....,. W ARNlNQ: ThI. doc:umenlls Protedecl by U.s. COP)'l1gtlllaw 8nd tntem.lIo.... rrellll... 8 Unanh~ ntfll'Oductlon or dlslrfbUlIon of th/. doc:umw.l" or .ny portion of h. may reSU1l1n MV_ clvll8nd crfmiNII pe...._ lInd will be pro..cuted to the maximum a.....1 possible under U_IM. ThIa ~t _ ~ by AlA ~ III 14:38:05 on 1 (1(1 2I2OOS under ClRIer No.1 000191 016_1 wf1lctt axplres on 8/112006. and Is not lor-.Ja. U- NoIae: (1599011364) i 5.1 COMPENSATION f 5.1.1 For the Construction Manager's perfonnance of the Work as described in Section 2.3, the Owner shall pay the CollllrUction Manager in cumnt funds the Contract Sum consisting of the Cost of rhe Work as defined in Article 7 and the Construction Manager's Fee determined as follows: 3.00% of the Cost of the Work (S1IlIe a lump sum, percentage of actual CQst of llu! Work or otlu!r provision for determining llu! Construction Manager's Fel!. and explain how the Construction Manager's Fl!e is to be adjustedjor changes in the Wori.) f 5.2 GlJARAHTEED MAXIMUM PRICE 15.2.1 The sum of the Cost of the Work and the Conslruction Manager's Fee are guaranteed by the Constru<:tion Manager not to exceed die amount provided in Amendment No. I, subject to additions and deductions by changes in the Work as provided in the Contract Documents. Such maximum sum 8$ adjusted by approved changes in the Work i$ refem:d to in the Contract Documents as the GUanJ1tced Maximum Price. Costs which would cause the Guaranteed Maximum Price to be exceeded shan be paid by the Construction Manager without reimbursement by the Owner. The CM does not participate in any savings. (Insert Jpecifrc provisions if the Construction Manager is to participatl! in tmy savings.) 15.3 CHANGES IN THE WORK 55.3.1 Adjustments to the Guaranteed Maximum Price on account of changes in the Work SUbsequent to the execution of Amendment No.1 may be determined by any of the methods listed in Section 7.3.3 of A20I TM..1997. 5 5.3.2 In calculating adjustments to subcontracts (except those awarded with the Owner's prior consent on lhe basis of cost plus a fee), the terms .cost" and "fee" as used in Section 7.3.3.3 of A201 TM..I 997 and the terms "costs" and ". reasonable allowance for overhead and profit" as used in Section 7.3.6 of A201TloL1997 shall have the meanings assigned to them in that document and shaJJ not bc modified by this Article 5. Adjustments to SUbconlracts awarded with the Owner's prior consent on the basis of cost plus a fee shall be calculated in accordance with the terms of those subcontracts. f 5.3.3 In calculating adjustments to the Contract, the terms "cost" and "costs" as used in the above-referenced provisions of A20 ITM.. I 997 shall mean lhe Cost or the Work as defined in Article 6 of dlis Agreement, and the term ftand a reasonable allowance for overhead and profit" shall mean the Construction Manager's Fee IS defmed in Section 5. I . I of this Agreement f 5.3.4 Hno specific provision is made in Section S.J.I for adjustment of the Construction Manager's Fcc in the case of changes in the Work, or if the extent of such changes is such, in the aggn:gate, that application of the adjustment provisions of Section 5.1.1 win cause substantial inequity to the Owner or Construction Manager, the Construction Manager's Fee shall be equitably adjusted on the bw of the Fee established for the original Wort. ARTICLE 6 COST OF THE WORK FOR CONSTRUCTION PHASE f 6.1 COSTS TO BE REIMBURSED 58.1.1 The term .Cost oClhe Work" shall mean costs neccs.li8rily incurred by the ConstrUction Manager in the proper performance oC the Work. Such costs shall be at rates not higher Ihan those customarily paid at the place of the Project except with prior consent of the Owner. The Cost of the W orlt shall include only the items set fonh in this Article 6. i 6.1.2 LABOR COSTS .1 Wages of construction workers directJy employed by the Construction Manager to perform lhe construction of the Work at the site or, widl the Owner's agreement, at off-site workshops. .2 Wages or salaries of the Construction Manager's supervisory and administrative personnel when stationed at the site with the Owner's agreement. NA Document A 121 "'CUe - 2003 and AGe Doevnent 505. Copyright C 1"1 and 2003 by The Ametican Irlatilug of An:IliIecIa and The Aaaoeialed Gentral ~ of America. All r1ghta --. WARNING: ThIs doclllllenlls prol~ by u.S. Copyrfghl Uw and Inlllmltllo...' TrAlles. 9 U..uthll<l>>>cl reproducUon or dlslrlbullon oIlhis documenl, 0/' any portion of II, may rwll4lllln se-. dvl/ and criminal pelllllles, _ wlIlbe JHOMcuIed 10 lhe maximum alltent pou.... under the /fir. Thl8 dacumenl_ prod\Qd by AlA IOIIwaIw . 14:38:05 on 1M Z'2OO5 under Order No.1 000191 018_1 whlc:h expires on 8/112006. and i. not 10< lWSIIe. U_~ (1599011364) Classification Projcct Manager Office Engineer Name (If if il in/ended that me wages or salaries of certain perso~l stationed at the Construction Manager 'I principal office or offices other than me site office shall be inchukd in me Q]sl of the Work, such personnel shall be identified bekJw.) .3 Wages and salaries of the ConstnlCtion Manager's supervisory or administrative personnel engaged, at factories, work.mops or on the road, in expediting the production or transportation of materials or equipment required for the Work, but only for that portion of their time required for the Work. .4 Costs paid or incurred by the Construction Manager for taxes, insurance, contributions, assessments and benefits requited by law or collective bargaining agreements, and, for personnel not covered by such agreements, customary benefits such as sick leave, medical and health benefits, holidays. vacations and pensions, provided that such costs are based on wages and salaries included in the Cost of the Worle under Sections 6. J .2. I through 6.1.2.3. S 6.1.3 SUBCONTRACT COSTS Payments made by the Construction Manager to Subcontractors in accordance with the requirements of the subcontracts. f 6.1.4 COSTS OF MATERIALS AND EQUIPMENT INCORPORATED IN THE COMPLETED CONSTRUCTION .1 Costs, including transportation, of materials and equipment incorporated or to be incorporated in the compJeted construction. .2 Costs of materials described in the preceding Section 6.1.4. I in excess of those actually installed but required to provide reasonable allowance for waste and for l.poiJage. Unused excess materials, if any, shall be handed over to the Owner at the completion of the Work or, at the Owner's option, shall be sold by the Construction Manager; amounts realized, if any, from such sales shall be credited to the Owner as a deduction from the Cost of the Work. t 6.1.5 COSTS OF OTHER MATERIALS AND EQUIPMENT, TEMPORARY FACIUTIES AND RElATED ITEMS .1 Costs, including transportation, installation, maintenance, dismantling and removal of materials, supplies, temporary facilities, machinery, equipment, and hand tools not customarily owned by the construction workers, which are provided by the Construction Manager at the site and fully consumed in the performance of the Work; and cost less salvage value on such items if not fully consumed, whether sold to others or retained by the Construction Manager. Cost for items previously used by the Construction Manager sbaJJ mean fair market value. .2 Rental charges for temporary facilities, machinery, ~uipment and hand tools not CUSlOmarily owned by the conSlnlctiOD WOTkers, which an: provided by the Construction Manager at the site, whelhec rented from the Construction Manager or others, and costs of transportation, installation, minor repairs and replacements, dismantling and removal thereof. Rates and quantities of equipment rented shall be subject 10 the Owner's prior approval. .3 Costs of removal of debris from the site. .4 Reproduction costs, costs of telegmn.~. facsimile transmissions and long-distance telephone calls, postage and express delivery charges. tel<.'phone at the site and teasonable petty cash expenses of the site office. .5 lbat portion of the reasonable travel and subsistence cxpenses of the Construction Manager's personnel iDCUlTed while traveling in discharge of duties connected with the Work. S 6.1.6 MISCELlANEOUS COSTS .1 That portion directly auributable to this Contract of premiums for insurance and bonds. (/1 charges for self-insurance are to be included, .fpeCify the basis of reimbursement.) .2 Sales, use or similar taxes imposed by a governmental authority which arc related 10 the Work and for which the Construction Manager is liable. .3 Fees and assessments for the building permit and for otbec permits. licenses and inspections for which the Construction Manager is required by the Contract Documents 10 pay. AlA Document A121 "'CUe - 2003 and AGe Documtnt St5. Copyr!gllt 0 Illlll and 2003 by The American NliIute of An:hllects and ThI AHoclat.d General ConntI.otw of A1Mr1ca. All rigfI" ~ W ARHING: This document Is P'"otec:ted by u.s. CopyrIght L.-. Md Intemetlonll TrNties. 10 U......hortzed rvproduCllon or cllSlrlbulion 01 Ibis documsnt, or any portion 0111, may result In severe civil and criminal pe...n.... and WlI be prosecuted 10 the mal(lmum IO'ent ponlble under the '-. ThiI ~ _ produced by AlA $OItware 1If 1.:38:05 on 1011212005 WIder 0nIer No.1 000191 016_' which expi_ on 81112006. and Is not for ,..... U_ Nates: (15llllO113&4) " , .4 Fees of testing laboratories for tests required by the Contract Documents, except those related to nonconforming Wode other than that for which payment is permitted by Section 6.1.8.2. .5 Royalties and license fees paid for the use of a particular design, process or product required by the Contract Documents; the COSt of defending suits or claims fur infringement of patent or other intellectual property rights arising from such requirement by the Contract Documents; payments made in accordance with legal judgments against the Construction Manager resulting from such suits or claims and payments of settlements made with the Owner's consent; provided, howevu, that such costs of legal defenses, judgment and settlements shall not be included in the calculation of the ConStruction Manager's Fee or the Guaranteed Maximum Price and provided that such royalties, fees and COSts are not excluded by the last sentence of Section 3.17.) of A20)DLI997 or olherprovisions of the Contract Documents. .6 Data processing costs related to the Work. .7 Deposits lost for causes other than the Construction Manager's negligence or failure to fulfill a specific responsibility to the Owner set forth in this Agreement. .8 Legal, mediation and albitration costs, other than those arising from disputes between the Owner and Construction Manager, reasonably incurred by the Construction Manager in the performance of the Work and with the Owner's written permission, which permission sbalJ not be unreasonably withheld. .9 Expenses incurred in accordance with Construction Manager's standard personnel policy for relocation and temporary living allowances of personnel required for the Work, in case it is necessary to relocate such personnel from distant locations. S 6.1.7 OTHER COSTS .1 Other costs incurred in the performance of the Work if and to the extent approved in advance in writing by the Owner. ~ 8.1.8 EMERGENCIES AND REPAIRS TO DAMAGED OR NONCONFORMING WORK The Cost oflhe Work shall also include costs described in Section 6.1.lwhich are illC1ll1'ed by the Construction Manager. .1 .2 In taking action to prevent threatened damage, injury or loss in case of an emergency affecting the safety of persons and property, as provided in Section 10.6 of A201 TloL 1997. In repairing or correcting damaged or nonconforming Wode executed by the Construction Manager or the Construction Manager's Subcontractors or suppliers, provided that such damaged or nonconforming Worle was not caused by the negligence or failure to fulfin a specific responsibility to the Owner set forth in this agreement of the Construction Manager or the Construction Manager's foremen, engineers or superintendents, or othu supervisory, administrative or managerial pcrsannel of the Construction Manager, or the failure of the Construction Manager's personnel to supervise adequately the Work of the Subcontractors or SUppliers, and only to the extent that the COSt of repair or correction is not recoverable by the Construction Manager from insurance, Subcontractors or suppliers. 16.1.9 The costs described in Sections 6. J.1 through 6.1.8 shan be included in the Cost of the Wode notwithstanding any provision of AlA or A20 I DL 1997 other Conditions of the Contract which may require the ConstnlCtion Manager to pay such costs, unJess such costs are excluded by the provisions of Section 6.2. 18.2 COSTS NOT TO BE REIMBURSED 16.2.1 The Cost of the Wode shall not include: .1 Salaries and other compensation of the Construction Managec's personnel stationed at the Construction Manager's principal office or offices other than the site office, except as specifICally provided in Sections 6.1.2.2 and 6.1.2.3. .2 Expenses of the Construction Manager's principal office and offices other than the site office, except 8.<; specifically provided in Section 6.1. .3 Overhead and general expenses, except as may be expressly included in Section 6.1. A The Construction Manager's capital expenses, including interest on the Construction Manager's capital employed for the Work. .5 Rental costs of machinery and equipment, except as specifically provided in Section 6.1.5.2. ~ Docwnent A121"'CUc-2OIl31nd AGe Doc:um.nt SII5. Copyrigllt C '., and 2003 by The ~ tn.tltuIeot An:IlilecIs and The ~ ~ ConhCIofs of "'-ic:a. All r!glllllr--. WARNING: This dacun.m .. pt'oleCled by U.s. C<:lpyrlgllt Law ancllntern.uONl Tredes. 11 U.....horiad reprOduCl1on or dlstrlbullon of Ihla document, or any pordon of II, may .....It In ..__ civil end criminal penellleS. Md wiD be P_u\ed to \he maximum eXl4lnl ~aib" unci.. IIle Jew. This document ... procfUQed by AlA ~ .. 14:38:05 on 10(12'21lO5 under Order No.1000191016_' wllIcI1 expifM on 81112008, and 1& not far ,...... U- Notes: (1~11364) " . .6 Except as provided in Section 6. I .8.2, costs due to the negligence of the Construction Manager or to the failure of the Construction Manger to fulfill a specific responsibility to the Owner set forth in this Agreement .7 Costs incurred in the performance of~'tnJction Phase Services. .8 Except as provided in Section 6.1.7.1, any cost not specifically and exprcs.~ly described in Section 6.1. .9 CoSIS which would cause the Guaranteed Maximum Price to be exceeded. i 6.3 DISCOUNTS. REBATES AND REFUHDS D 6.3.1 Cash discounlS obtained on payments made by the Construction Manager shall accrue to the Owner if (I) before making the payment, the Construction Manager included them in an Application for Payment and received payment therefor from the Owner, Or (2) the Owner bas deposited funds with the Construction Manager with which to make payments; otherwise. cash discounts shall accrue to the ConslruCtiOD Manager. Trade discounts, rebates, refunds and amounts received from sales of surplus materials and equipment shall accrue to the Owner, and the Construction Manager shall make provisions so that they can be secured. i 6.3.2 Amounts which accrue to the Owner in accordance with the provisions of Section 6.3.1 shall be credited to the Owner as a deduction from the Cost of the Work. S 8.4 ACCOUNTING RECORDS S 6.4.1 The Construction Manager shall keep full and detailed 8CC()unts and exercise such controls as may be necessary for proper financial management under this Contract; the accounting and control systems shall be satisfactory to the Owner. The Owner and the Owner's accountants shan be afforded access to the Conslruction Manager's records, books. correspondence, instructioO$, drawings, receipts, subcontracts, purchase orders, vouchers, memoranda and other data relating to this Project, and the Construction Manager shall preserve the.'lC for a period of three years after final payment, or for such longer period as may be required by law. ARTICLE 1 CONSTRUCTION PHASE f 7.1 PROGReSS PAYMENTS S 7.1.1 Based upon Applications for Payment submitted to the Architect by the Construction Manager and CenUkates for Payment issued by the Arehitect, the Owner shall make progress paymenlS on account of the Contract Sum to the Construction Manager as provided below and elsewhere in the Contract Documents. S 7.'.2 The period COvered by each Application for Payment shall be one calendar month ending on the last day of the month: 17.1.3 Provided an Application for Payment is received by the Arehitect not later than the Twenty-fifth day of a month, the Owner shall make payment to the Construction M~ not later than the Tenth day of the following month. If an Application for Payment is received by the Architect after the application date fixed above, payment sbaJ] be made by the Owner not later than Fifteen ( IS ) days after the ArchilCCt receives the Application for Payment i 7.1.4 With each Application for Payment, the Construction Manager sbaJJ submit payrons. petty cash accounts, receipted invoices or invoices with check vouchers attached and any other evidence required by the Owner or ArchilCCt to demonstrate that cash disbursements already made by the Construction Manager on aCCOunt of the Cost of the WorIc equal or exceed (I) progress payments already received by the Construction Manager; less (2) that portion of those payments attributable to the Construction Manager's Fee; plus (3) payrolls for the period covered by the present Application for Payment i 7.1.5 Each Application for Payment shall be based upon the most recent schedule of values submitted by the Construction Manager in accordance with the Conlract DocumenlS. The schedule of values shall allocate the entire Guaranteed Maximum Price among the various portions of the WOrle, except that the Construction Manager's Fee shall be shown as a single SCparate item. The schedule of values shall be prepared in such form and supported by such data to substantiate ilS accuracy as the Arehitecl may require. This schedule, unless objected to by the Architect, shall be used as a basis for reviewing the Construction Manager' $ Applications for Payment. AlA ~ A121"'CMc_2003 and AGC Doctlment.. CopyrIJtIt 01&91 ancl2003 by The American InSlltuIe 01 ~ end TheAaocleled ~ ~ 01 AmerIca. All rlghca ~ WARNING: This doc:umelll b JlfOlllCted by U.s. Copyright l.ew encllntemellonaJ TIMI"'" 12 Ul1lllllhorfHd rtpfOducllon or distribution ot Ihia document, Many portIOft of II, mey rnulllft severe c1vllllnd cnmlnel penellles, and will be JIfOHCukId to the maximum extent poasible under the 1_. Thla ~ _ produced by AlA IOIIwIrw lit 14:38:05 on 10112/2005 under Onler No.l0001910UI_ 1 MllctI explra on 81112006. anclla not lot,.... ~Notes: (l59S0f1364) S 7.1.6 Applications for Payment shan show the percentage completion of each portion of the Work as of the end of the period covered by the Application for Payment The percentage completion shall be the lesser of (I) !be percenl8ge of that portion of the Wort which has actually been completed or (2) the percentage obtained by dividing (a) the expense which has actually been incurred by the Construction Manager on account of that portion of !he Wod for wbicb the Construction Manager has made or intends to make actual payment prior to the next Application for Payment by (b) the share of the GUaranteed Maximum Price allocated to thaI portion of the Wort in the schedule of values. 5 7.1.7 Subject to other provisions of the Contract Documents, the amount of each progress payment shall be computed as folJows: .1 Take that portion of the GUaranteed Maximum Price properly allocable to completed Worlt as determined by multiplying the percentage completion of each portion of the Wort by the share of the Guaranteed Maximum Price allocated to that portion of the Wort in the schedule of values. Pending final determination of cost to the Owner of cbanges in the Worle, amounts not in dispute may be included as provided in Section 7.3.8 of A201 TN.. 1997, even though the Guaranteed Maximum Price bas not yet been adjusted by Change Order. .2 Add that portion of the Guaranteed Maximum Price properly allocable to materials and equipment delivered and suitably stored at the site for subsequent incorporation in the Wort or, if approved in advance by the Owner, suitably stored off the site at a location agreed upon in writing. .3 Add the Construction Manager's Fee. less retainage of Five percent ( 5.00% ). The Construction Manager's Fee shall be computed upon the Cost of the Wort described in the two preceding Sections at the rate stated in Section 5.1.1 or, if the Construction Manager's Fee is stated as a fIXed sum in that Section, shall be an amount which bears the same ratio to thattixed-sum Fee as the Cost of the Work in the two preceding Sections bears to a reasonable estimate of the probable Cost of the Work upon its completion. .4 Subtract the aggregate of previous payments made by the Owner. .5 Subtract the shortfall, if any, Indicated by the Constnlction Manager in the documentation required by Section 7.1.4 to substantiate prior Applications for Payment, or resulting from errors subsequently discovered by the Owner.s accountants in such documentation. .6 Subtract amounts, if any, for which the Architect has withheld or nullified a Certificate for Payment as provided in Section 9.5 of A201 TN.. 1 997. 57.1.8 Except with the Owner's prior approval, payments to Subcontractors shall be subject to retention of not less than Ten Percent ( 10.00% ). The Owner and the Construction Manager shaJJ agree upon a mutually acceptable procedure for review and approval of payments and retention for subcontracts. S 7.1.9 F.x.cept with the Owner's prior approval, the Construction Manager shall not make advance payments to suppliers for materials or equipment whicb have not been delivered and stored at the site. 57.1.10 In taking action on the Construction Manager's Applications for Payment, the Arcl\itect shan be entitled to rely on the accuracy and completeness of the infonnation furnished by the Construction Manager and shaU not be deemed to represent that the Architect has made a detailed examination, audit or arithmetic verification of the documentation submitted in accordance with Section 7.1.4 or other supporting data. that the Architect has made exhaustive or continuous on-site in."pections or that the Architect has made examinations to ascertain how or for what purposes the Construction Manager has used amounts previously paid on ~nt of the Contract. Such examinations, audits and verifications, ifrequired by the Owner, will be performed by the Owner's accountants acting in the sole interest of the Owner. S 7.2 FINAL PAYMENT ~ 7 ~ 1 Final payment shall be made by !he Owner to the Construction Manaier when (I) the Contract has been funy performed by the Construction Manager except for !he Constnlction Manager's responsibility to correct nonconforming Work, as provided in Section 12.2.2 of A20 I TloL 1997. and to satisfy other requirements, if any. which necessarily survive fltUlI payment; (2) a final Application for Payment and . fmal accounting for the Cost of the Work have been submitted by the Construction Manager and reviewed by the Owner's accounl8nts; and (3) a final Certificate for Payment has then been issued by the Architect; such final payment shall be made by the Owner not more than 30 days after the issuance of the Architect's final Certificate for Payment" or as follows: AlA ~ A121'"'CUc - 2003llnd AGe Documenc 565. Copyrlgllt 0 1081 IIIld 2003 by The Amorican ...,.,. of ~ IIIld The Aaeoc:lated GenenIl ConncIo.a 01 Amellc:L All rIghss ~ WARNIHQ; This c:\ocumentls pl'O(~ by US Copyright Law and IntelNlUonal Trellllft. 13 u....thcxtzM refl'Oductlon or distribution of this document, or any ponlon of It. may 'flUllln ..__ civll _ crimi.... ponelllH, and wlD ~ Pl'OMCUled to llle maximum extent poulble under lhe 18w. Thill docun."t _ JWocluc:.-cf by AlA soIlwwe . 14~ on 1 <V12/2005 YIld<< Onler No.l000111101IU wl1Ich .xplrMon 81112OOe.1IIld Is not tor...,.. U-HoIM: (15990113&4) " . 5 7.2.2 The amount of the final payment shall be ca1culatedas follows: .1 Take the sum of the Cost of the Work substantiated by the Construction Manager's final accounting and the Construction Manager's Fee, but not more than the Guaranteed Maximum Price. .2 Subtract amounts. if any, fur which the Architect withholds, in whole or in part, a final Certificate (or Payment as provided in Section 9.5.1 of A201TJC1997 orothcr provisions orlbe Contract Documents. .3 Subtract the aggregate of previous payments made by the Owner. If the aggTcgate of previous payments made by the Owner exceeds the amount due the Construction Manager, the Con.~truction Manager shall reimburse the difference to the Owner. 5 7.2.31be Owner's accountants will review and report in writing on the Construction Manager's final accounting wilhin 30 days after delivery of the final accounting to the Architect by the Construction Manager. Based upon such Cost of tile Work as the Owner's accountants report to be substantiated by the Construction Mana8Cf's final accounting, and provided the oIher conditions of Section 7.2. I have been met. the Architect will, within seven days after receipt of the written report of the Owner's accountants. either issue to the Owner a final Certificate for Payment with a copy to the Construction Manager or notify the Construction Manager and Owner in writing of the Architect's reasons for withholding a certificate as provided in Section 9.S.1 of A20ITW_J991 . 1be time periods stated in this Section 7.2 SUpersede those stated in Section 9.4.1 of A20 I TJoL.I997. 5 7 .2.4 If the Owner's accountants report the Cost of the Wark as substantiated by the Construction Manager's final accounting to be less than claimed by the Construction Manager, the Construction Manager shall be entitled to proceed in accordance with Article 9 without a further decision of the Architect. Unless agreed to otherwise, a demand for mediation or arbitration of the dispUted amount shall be made by tile Construction Manager within 60 days after the Construction Manager's receipt of a copy of the Architect's final Certificate for Payment Failure to malee such demand within this 6O-day period shall result in the substantiated amount reported by the Owner's accountants becoming binding on the Construction Manager. Pending a final resolution of the disputed amount, Ibe Owner shall pay the Construction Manager the amount certified in the Architect's final Certificate for Payment. ! 7.2.5 If, subsequent to final payment and at the Owner's request, the Construction Manager incurs costs desaibed in Section 6.1 and not excluded by Section 6.2 (1) to correct nonconfonning Work Or (2) arising from the resolution of disputes, the Owner shall reimburse the Construction Manager such costs and the Construction Manager's Fee. if any, related thereto on the same basis as if such costs had been incurred prior to final payment, but not in excess of the Guaranteed Maximum Price.. If the Construction Manager has participated in "vings, the amount of such savings shall be recalculated and appropriate credit given to the Owner in determining the net amount to be paid by the Owner to the Construction Manager. ARTIClE 8 INSURANce AND BONDS S 8,11NSORANCE REQUIRED OF THE CONSTRUCTION MANAGER During both phases of the Project, the Construction Managec shall purchase and maintain insurance as set forth in Section I J.I of A20 I TW- 1m. Such insurance shall be written for not less Ihan the following limits. or greater if required by law: 58.1.1 Workers' Compensation and Employers' Liability meeting statutory limits mandated by state and federal laws. If (I) limits in excess of those required by statute are to be provided, or (2) the employer is not statutorily bound to obtain such insurance coverage or (3) additional coverages are required, additional coverages and limits for such insurance shall be as follows: S 8.1.2 Commercial General Liability including coverage for Premises..()perations, Independent Contractors' Protective, Products-Completed Operations, Contractual Liability, Personal Injury and Broad Fonn Property Damage (including coverage for Explosion, Collapse and Underground hazards): $1,000,000.00 Each Occurrence AlA Oocwnene A121"'C11c-2003.nd AGe ~S65. CopyriQht 0 19911t1d 2003 by The AmerIcan InslIUI of ~tllldTM Aaoclaled GonetaJ Connclot. or Americ:a. All riglIta ~ WARNING: this doc:umentls p'04~ by U.s. Copyright L... IInd 'n1<<1ll111oMl TrMtIet. 14 UNI\Ilhorfud reptoductlon Of' d1strlbullon of this document, Of Iny ponlon of It, may 'ISUIt In .....r. cfvll.lI/Id criminal pe~1n. lI/Id WIll be prOSlCUllClto the _imum extent polllb.. under thelMw. Thia ~t_ pnlducICI by AlA __.,4;34;05 on 11Vf2l2OO5 uncler Order No.l0001$101$_1 which expn. on 811/200$. lIIId is noC for 191a1e. IlMr No&ee: (1599011364) $2,000,000.00 General Aggregate $1,000,000.00 Personal and Advertising Injury $2,000,000.00 Products-CompJelcd Operations Aggregate .1 The policy shall be endorsed to have the General Aggregate apply to this Project only. .2 ProdUCts and Completed Operations insurance shall be maintained for a minimum period of at least One ( I ) year(s) after either 90 days fonowing Substantial Completion or fmal payment, whichever is earlier. .3 The Contractual Liability insurance shall include coverage sufficient to meet the obligations in Section 3.18 of A2011lf-lm. S 8.1.3 Automobile Liability (owned, non-owned and hired vehicles) for bodily injury and property damage: $1,000.000.00 Each Accident ! 8.1.4 Other coverage: (If Umbrella Exc~ss Liability coverage is required over tM primary insurance or retention, insert the coverage limits. ConutJercIaJ Gt!M'ral liabJ'lity and Automobile Liability limits may be attained by iIuflv/dual poliei4s or by a combination of primary policies and Umbrella and/or Exass Liability policies. If Project Managt!menz Prot~ctive liability Insurruu:e is to be provitkd, state the limitJ Mre.) S 8.2 INSURANCE REQUIRED OF THE OWNER During both phases of the Project, the Owner shaI1 purchase and maintain liability and property insurance, including waiVCl'$ of subrogation, as set forth in Sections 11.2 and t 1.4 of A2011X.J997. Such insurance shall be written for not less than the following limits, or greater if required by law: S 8.2.1 Property Insurance: $5.000.00 Deductible Per Occurrence Aggregate Deductible S 8.2.2 Boiler and Machinery insurance with a limit of: (l/TWt a blanket policy. list tM obJ~cts to be insured.) S 8.3 PeRFORMANCE BOND AND PAYMENT BOND S 8.3.1 The Construction Manager shaJ] (Insert -shalt" or "shall not") furnish bonds covering faithful performance of the Contract and payment of obligations arising thereunder. Bonds may be obtained through the Construction Manager's usual source, and the cost thereof shall be included in the COst of the Wort. The amount ofeacb bond shall be equal to One hundred percent ( 100.00% ) of the Contract Sum. S 8.3.2 The Construction Manager sha1t deliver the required bonds to the Owner at least three days before the commencement of any Work at the Project site. ARTICLE 9 MISCElLANEOUS PROVISIONS 59.1 DISPUTE RESOLUTION ~ 9.1.1 D:=::~:::=:~~~~~ ~:. ~;:. :::~==:~~li: =S::=~=~';'~::~'>::='::~I" IRN18Y9R er'RIlFa1jsR. f 9.2 OTHER PROVISIONS S 9.2.1 Unless otherwise noted, the terms used in this Agreement shall have the same meaning as those in AlO] 'DC.- ]997. Ge1U!ral Conditions of the Coll/ract for Constftlction. AlA Doalment A121"'CMc -2003 and AGe eo-.nt S65. ~ C leel *"tf 2003 b)'TheAmerlo:.n Incl/llltt of M:hlt<<:II *"tf The~ 0enerIIl ~ of America. AIlltllhc. ~ WARHlHG: Thl. cIoc:ument I. proc.cled b~ U.s. Copyrlllhl LllW and Inl_llo... TresCles. 15 Ul'IMIthcmz.d rePfOCfuctlon Cl( diStribution of thIa doc:umwol, or .ny portion of It, ....y rHult In _re civil .nd crlminel ...""It'-.. .nd wiD be Pf'O$acuted to lhe m.xlmum e"lenl P<lUlb1e und" the 1_. ""docurMnt_ prodlleeclby AlA IOIIw-. It 1-4:38:05 on 10/1212005 urIcIetOrder No.l00019'OI0_' which .lIpIr.. on 8/112006. end N llOllOl' ..... u.rNol..: (1599011364) f 9.2.2 EXTENT OF CONTRACT This Contract, which includes this Agreement and the olller documents incorporated herein by refezence. represents the entire and integrated agreement between the Owner and the Construction Manager and IUpersede$ aD prior negotiations, representations or agreements, either written or oral. This Agreement may be amended only by written instrument signed by both the Owner and Construction Manager. If anything in any document incorporated into this Agreement is inconsistent with this Agreement, this Agreement shaJl govern. f 9.2.3 OWNERSHIP AND use OF DOCUMENTS Article 1.6 of A20 I TN.. 1997 shan apply to both the Preconstruction and Construction Phases. f 9.2.4 GOVERNING LAW The Contract shall be governed by the law of the place where the Project is located. 19.2.5 ASSIGNMENT The Owner and Construction Manager ~ti vety bind themselves. their partners. successors. assigns and legal representatives to the other pany hereto and to partneB, successors. assigns and legal representatives of such other pany in respect to covenants, agreements and obligations contained in the Contract Documents. Except as provided in Section ]3.2.2 of A20J t\LJ 997, neither pany to the Contract shall assign the Contract as a whole without wriUen consent of the other. If either pany attempts to make such an *SSignment without such consent, that party shall nevertheless remain legally responsible for all obligations under the Contract. ARTICLE fO TERMINATION OR SUSPENSION 110.1 TERMINATION PRIOR TO ESTABLISHING GUARANTeED MAXIMUM PRICE 110.1.1 Prior to execution by both panies of Amendment No. I establishing the: Guaranteed Maximum Price, the Owner may terminate this Contract at any time without cause, and the Construction Manager may tenninate this Contract for any of the reasons described in Section 14.1.1 of A20 I 'DL.1997. f 10.1.2 If the Owner or Construction Manager terminates this Contract pul'SU8ntlo this Section 10.1 prior to CODUnencement of the Construction Phase. the ConSlruction Manager shall be equitably compensated for PreconsUuction Phase Services per{onned prior to receipt of notice of termination: provided, however, that the compensation for such services shall DOt exceed the compensation set forth in Section 4. J .1. 110.1.3 If the Owner or Construction Manager terminates this Contract putSuaIltlo this Section 10.1 after commencement of the ConstructiOll Phase, the Construction Manager shall, in addition to the: compensation provided in Section J 0.1.2, be paid an amount calculated as follows: .1 Take the Co.'it of the Work incurred by the Construction Manager. .2 Add the Construction Manager's Fee computed upon the Cost of the Wode to the date of tenninalion atlhc rate stated in Section 5. J or, if the Con.~truction Manager'spec is stated as a fIXed sum in that Section, an amount Which bears the same ratio to that fixed-sum Fee as the Cost of the Work at the time of termination bears to a reasonable estimate of the probable Cost of the Wort upon its completion. .3 Subtract the aggregate of previous payments made by the Owner on account of the Construction Phase. The Owner shan also pay the Construction Manager fair compensation, either by purchase or rental at the election of the Owner, for any equipment owned by the Construction Manaser which the Owner elects to retain and which is not otherwise included in the Cost of the Work un<ler Section 10.1.3.1. To the extent that the Owner elects to take legal assignment of SUbcontracts and pun:hase orders (including rental agreements), the Construction Manager shall, as a condition of receiving the payments referred to in this Article 10, execute and deliver all such papers and take all such steps, including the legal assignment of such subcontracts and other conCnlctual rights of the Construction Manager, as the Owner may require for the purpose of fully vesting in the: Owner the rights and benefits of the ConstructiOll Manager under such subcontracts or purehase ORleB. Subcoruracts. pun:hase orders and rental agreements entered into by the ConStruction Manager with the Owner's written approval prior to the execution of Amendment No. I shall contain provisions permitting assignment to the Owner as described above. If the Owner accepts such assignment, the Owner shall reimburse or indemnify the Construction Manager with respect to all costs arising under the subconlract, purchase order or rental agrecmeD( AlA 0-- A1211111CMc - 2003 aIld AGC ~I S65. Copyright 0 11191 McI2003 ~ The Amwtcen InSlllule of Atl:hhctw rod The AasodaIed GeneqJ Connctara of America. All rlghta ~ WARNING: TI'lls doaIlMnt I. prol4lcleCf by u.s. Copyrighll_ Md InternaCloNlI T....ties. 16 U......horlz.d rwprOduc1lon M CIIstr1buuon of this documenr, or any portion of it, ....y rnullln ..vere civil Md criminal penallle$. llnd will be proHCuled 10 the maximum eX1ltn1 possible under "'el_. ThIs ~t_ produced by AlA SOfIwant ., 14:38:05 on 1(1(1212005 under Order No.l00018101IU wllicIl ~ on 8/112008. and is not lor...... Ue<<NolR: (1599011364) " except those which would not have been reimbursable as Cost of the Work: if the COntract had nor been rerminaled. If the Owner eJects not to accept the assignment of any subcontract, purchase order or rental agIeement which would have constituted a Cost of the Wort had this agreement not been terminated. the Construction Manager &ball ~ such subcontract. purchase order or rental agreement and the Owner shall pay the Construction Manager the COSts necessarily incurred by the Construction Manager by reason of such termination. f 10.2 TERMINATION SUBSEQUENT TO EST ABUSHING GUARANTEED MAXIMUM PRICE Subsequent to execution by both parties of Amendment No. I. the Contract may be tenninated as provided in Article 14 of A201T1oLl997. S 1 0.2.1 In the event of such tennination by the Owner. the amount payable to the Construction Manager pursuant to Section 14.1.3 of A20 InL 1997 shall nor exceed the amount the Construction Manager would have been entitled to receive pursuant to Sections 10.1.2 and 10.1.3 of this Agn:cment. S 10.2.2 In the event of such tennination by the Construction Manager. the amount to be paid to the Construction Manager undtt Section 14.1.3 of A20 )TW-1997 shall DOt eJl.ceed the amount the ConstnJction Manager would have ~....tIal ~ -:-...... Secti"", 1O.~.2'" 10.,;, = =.:;.."="-=~ '=:; = ~:':':f':.::::: ~a;::~ =:~:=:. 110.3 SUSPENSION The Work may be StlSpended by the Owner as provided in Article 14 of A20 tTloL I 997; in such case. the Guaranteed Maximum Price. if established. shall be increased as provided in Section 14.3.2 of A201 'IloL) 997 except that the term "cost of performance of the Contract~ in that Section shan be understood to mean the Cost of the Wort and the tena ~protit. shall be understood to mean the Construction Manager's Fee as descn'bed in Sections 5.1.1 and 5.3.4 of this Agreement. ARTIClE 11 OTHER CONDITIONS AND SERVICES This Agn:cment entered into as of the day and year firs OWNER cLl.~ g~ (S~re) OMe ~~-rIfA-tt- (Printed 1II.U1re and tide) ~~ AL LJ 4J[';- ( gnature) ?/fq( If-,. G VB (Printed name and litle) /o-1t-OS Date ? ~ NA. Document A 121"'CUc - 2003 end AGe ~ 515. CopyrIght 0 1981111ld 2003 by TIle Am.tIc:an hslIlu1e of AtthlIIcIa and The Auocitred o.-.J ConncIot. of America. All /'IgIlta ~ WARNING: '111.. doc:umenl Is protec1ed by V.s. Copyright lAw Ind Inlarnatl-' Trestles. 17 u~ rept<><*Jctlon or d1....ll:lutlon of Ihla document, or any portIon or It, mey rnuh In ..v.... eMl snd criminal pensllln, and will be PC-OHCuted 10 lhe mulmum elCIslll POlI8IbIe UndIr 1hI1sw. This ~ _ produced by AlA soIlwln.. 1~ on tlW1212OO5 undtr 0Ilfet No.l0001~tOl'_1 WIlklh 8xplres on 8/1I20OI. snd IS notlOl",.... U_ HClIft: (t59l1011364) 12 13 14 Aft- a uhtv1 €h.T . AlA Document A201- - 1997 G'ez2~Z'al Gon<U'ti..ons 'Or tbe GOlJ't.ll"actfoZ' COZlstruC't.i.c>Z1 TABle OF ARTICLES ~~. _>~IGNs: 'li6eal1~hOr Ofrhi.doc~nt qall flddai:llnfOrmation nem4t:or tt*I~16tion. ,'l'bll WthOJtlQ y i alSliI h.v:e :r~rs.aiHe text ol'tne :onVine1--AlA.t.~~ "fom; ~Aa;litjcma andoellltio'!4 R!i!]1O,1'(: that notes _~a 1rifo::i':llatiOll .all li~li~~L - -- reviji~if .tl:) . ~'standa%:'d ttr'm t~)tt >is"'availabletrom ithe-illthl?1: and should be -rhie.lJ!ed. > 'rhi, do.:_nt ho.. .,iJnp(Srtan,t 1~9.l cl.)na~q\l~n9.1I~ '<.. COtt$!1ltAtlon with an a}tOtnEty b~riCCiur.a~~'~ht~ .re",~ t<>. it, ~le.t!F lot ~odinolifio.C "," . i. i . ., /" tTJ1~s dOCUlllel'it ~s b.flen 'aPtrrov~ ;jtnd e~dQrfl(l~y r'1'M A$llo(:iiltedGenih:al cQnlractoi,.J.Of ~i~&l'. 1 2 ~~l PROVISIONS OWN~ OONTRACTOR AOMlfllstRATfONQF Tlii CONrAACT stJSCGNtRACTORS 0088TRVCTIQH 8Y OWNeR QRBY SEPARATE CONTRACTORS 3 4 5 6 7 CIiANGESIN tHE WORK 8 TIME PAYMENtS AND COMPLETION ~ 9 10 PROT!CnONOF PERSONS AflOPROPERTY 11 INSURANCE AND BONDS UN.COWRiNG ANOOORRECT<<JNOF WORK M1SCELtl6;HEOUS PFtO\'JSIONS TERMINAT10NG.R SU$PENSfONOF THE CONTRACT ~~. ~Of any Pl>rtionof t:hisAII,"DoCw1Ient to an~t~er el~ctr~ic tile is prohiJ:J.tt.d and con'$t.it~tt!.ll.a Violation> ofcc>Pyright laW$ AS . set fottb in .thefoot.er of thiIJ doc~nt. "--""'~-"""'---"'''''- '''''-'-~'''.,~-_._>_.y-"", AtA~,\20i..,"ljl~1. ~vh~. ~til,l.~,Oi., i;~, i'll3-7'1HiJ1;'"!i"i,,~,.~. liff'~i.l,'iQil'7"1"7IU>Cll~nbY The AIIol('ic:... Inst.iM. tff~rc:h"'~ilct.. ,~.u ~~t.n.ftoNd' .~; t'IU:. .~. ~t 18 ~ blr ll...~t loA" AIICl 1 IlIwl'll&l\i_l"~u..e.II""'-~..~ ..J>..,:;a~On 01;' ~.t".u1;itt....' ist tbiAI>.a.. ;~.'&U.~ Po~.... ot ..t.. "'~,suu. ............ . "lii.l .Ud CriJoi....l ~tl.., -and'. oi;J.ll ~~~ ~ ~ .~~t ilOaaliUo. ~ ~ 1_.> TIl1. dr.,RlI4I11 P~ii<l by ~A -.>rt<oate at 1I,5'l:!lIOII lC>f~G/!i)45Ui\d..t llti!/>r JiihjO~OI'loi~_1 toihleh .ltp.L.tIl.ol\t'/1t~DllG, li2il:l is not.lot ......1..' . If.... Mota, tn4H45fUl INDEX (N1.Un~ and Topics in BQ)d ~ S~ction Headings) A~ptaDee of NoJttt)lI'folillfllg Work 1J.6.6.9.9.~.U.3 Acceptance of Wotk 9.6.(). 9.8.2, 9.9.3, ~.1().I, ~.10.3, 12.3 ~ to Work 3.16, 6~1, 12.1 Accident Prevention 4.2.3. 10 Acts and Omissions $2..3.3.2, $.12.8. 3.18,4.2.3, .U.8,4.4.1, 8.3.1, 9,5.1, 10.2.S. 13.4.2, 13.7, ]4.1 Ad~nda 1.1.1.3.11 Ad<fitipn" costs. Claims for 4.3i~. 4.3.$,4.3.6,6.1,1.. H>.3 Addifi.. ]ns~s and Testing 9.U, 12.2.1, 13.5 Additiollal Time. Claims for 4.3.4,4.3,7,8.3.2 A1>~STRA TION OFTRE CONTRACT t 1.3.", 9.4. 9,s Advtrti$ement or InvItation to aid 1.1.1 Aesthetic EffeQt 4,2,13,4.,s,t AUowaJlee$ 3.8 AIl~risk Insurance I1A.1,t . AppJ~tioDs fu"~>,meot 4.2;$. 7;3.8,9~ '~.9.4, 9.S.1.9.6.~,9.1.1, 9.8.5, 9.JO,1 1.1.3,14.2,4,14.4.3 ApproVa1s . 2.4,3.U.3..s.. UO.2, 3.12, 4.2.7,9.32, 13,4.2, 13.5 Arbitratioo 4.3j~ 4.4. 4.5.1, 4.$.2.4.6, $.3.1. 9.7.l, 11.4.9, 11.4.1 0 Architect 4.1 Arohitecl, Definition oJ 4.1.1 Architect, Ext~ of Authario/ 2.4.3.12.7,4.2,4.3,6.4.4,5.2.6,3,7,1.2.7.3.6,7.4, 9.2,9.3.1, !>;4, 9.5, 9.8.3. 9.10.1, 9.JQ.3, 12.1. 12.2.1, 13.$.1. 13.S~, ]4.2.2, 14.2.4 .. Arclii~ Limitations of Authority and RespoflSibility 2.Ll, 3.3~3,3.12.4, 3.12.8.3;12.10. 4. l.2.4.2. 1. 4.2;2,it2.~i 4.2.6,4:1..7,4.2.10, 4.2.J2, 4.2..13, 4:4, 5.2.1.7.4.9.4.2,9.6.4,9.6.6 . Architel1!'S Add,itional Services and Expenses 2.4, j 104.], 1, 12.:tl, 13.5.2, 135:3. 14;2.4 Ar~blt~t'5 Adntinistration()f the Contract 3.l.3, 4.2, 4.3.4,4.4, 9.4,9.5 AtchiteCfs APPl'C)vals 2.4, :t1,3, 3~S.t, 3.]().2, 4.2.7 ArcJ1iteet's A\I1hQrity to Reject Work 3.5.1,4:1..6.12.1.2,12.2.1 Arohitett's Copyright Ih I Architect's Deci$ions . 4.2.6. 4.~.1, 4.2,11, 4~.12, 4.2.13, 4.3.4, 4,4J, 4.4.5;"' 4.4;(1,4,$.6.3,7,3.6,7,3.8, 4.t.3; 8.3..J ,.9.219.4,.,,. . 9.5.l~ 9.M.!t9J.13.5,2, 14.U~ hU.4 ArelUtect'S Insp~eti<ms 4.2.1,4.2,9,4.$.4,9.4.4.9.8,3,9.9;2,9.10.1.13.5 .-\robbed's Ins4uCti()D$ 3.2.3, ~,:p, 4,2.6. 4.~.7.4.!."8;1.4.1, 12.1, 13,$.2 A:rchiteetl1lrt$ptellitiOn$ - 4.2.1 1,4.2.12. 4.3.~ Architect's Project ReprC$erhtive 4.2.10 ; Architect's Relatioqsltjp wtt6 COl1tract(>>' 1.1.2,1.6,3.1.3, 3.2.J. ~.2.2~ 3.2.';-3:9;'I;.3.4.2,3:i:-t. 3. 7.3. 3.10~ 3..l1, 3.]2, 3.16.!~,IJ..4.q. 4..L~. 4.~, 4.304,4.4.1, 4A.7. 5.2, 6.2.2.7,8.3.),9.2,9.3, 9A. 9.5,9.7,9.8.9.9, 10.2.6. 10.3, t q, 11.4.7, 12, 13.4.2, ItS . Architcct'~ Relationship With Subcontra~~ 1. t .2.4.2.3. 4.2,4, 4.2.~, 9.6.3,9.6.4,'11':4.7_ Architect's~reSentations "'" ,. . 9.41. 9.5.1, 9.10.1 Architect's Site Visits 4~.~, 4.2..5,4.1.9,4.3.4,9.4.2,9,5.1, 9,9.g. 9:10.1, 11.5 . Asbestos 10.3.1 Attorneys' FeeS 3.18.1, ~JO.!.IO.3.3 l Award ofSeparare dolltracis" 1 L,.N 6.1.1,6.1.2 . ., . ,'t, A....i'd of Suileonh'aets .a~ Op.tr COll~,tcfl' Portions of the Work !. 'i ~.2 BOje Definitions 1.1 t:lickiD\g Req\iiremeuts LLt, 1.1.7,5.2.1. iI.S.l BoilClr aod Madtioery ta,suraoee 11.4.2 Bonds, Lien 9.10.2 ,,; B~.d$. PerfQnnM~, IUld Plijltnent 7.3,(j.4, 9.6.7. 9.10.3.. 11.4.9~ t ItS Building Petmit 3.7.] Capit1tlizatJon U CertifiCate of Sub$tanti~l Cmnplcrtion ..' ~. -, '" .,.fII1.- , , ;W.~t ~.. - ,t.n'CciJ>lr><i~t . Itt1. li>>;$.UU, lP2~,. 1'2j. 'l.~$~, lt~.. 1".. ~lJlSj, 1lI~. i~7~, lf1-; lve:1 .llril:iltl'7 -'Y TlI* _..1"... lll.titute o( AtchltlKtta. . ~r~~ r~. ~XjlQ; ro. Aii." . .~t 1~ ~~ .bv II.. '~lIht tAli tmd 2 I"tlU:iu.~i fi..~..-...t:i.od.&_ ~OduCUon II>: ..s~....~.... oi tbt& AU." ~t. ." -.; pottiilct ot it, MY ..~tUt ___. civil. .i;;d ....1I!1n..lpl1n.Uu~. - ;,ui l't<l ;>>:.:;...."Iiteci to the.~ .......t """'i:b.. UildoO' eMi.... .lIU:. draft .... l>rodlIcad by Al~ 1Iof....... ..t 1~'~.:5i 011 1010&/20115 uitderQt<loti iii>. iiioDitioi,_~ 0IIl1C), .xpire.on 'l1IiO~Il. .nd' h,,,..t to. ruat... . u... ...1:<0., .. (<!24434i!>4411 9.8.3,9.8.4.9.8.S Certificates for Payment 4a.Si 4.2.', 9.3.3, 9.4, 9.5,9:6.1, 9.6.6,9.7.1,9.10.1, 9.10.3, 13,7, 14.1.1.3.14.2.4 ~fi~of In~on,TestingorApproval 13.5.4 Certifi~of Insutan~ 9.102, H.tS ChaltgeQrdets 1.1.1, ~.4.1,3.4; 3.8.2.3.3.11.I,).I~.8, 4.2.8. 4.3.4. 4,$.9,5,2.3; {.l, 'l.~.7.3. 8.3.1; ~.3.1.1. fMO.a, llA.l.2, 11,.4.4, I.l,4.9~ 12.1.2 Chaqge Orders, Dttmition of 7.2.1 . CIIAN<;ES IN THl1: WORt( 3.1 I. 4.~.g.7, gj.l. 93. t .1. t 1.4,9 Claim, Def'ulitioa of . 4..3.1 Clablts,ad Pi$p1ites 3.2.3. 4.a. 4.4. 4.$. 4.6, 6.1.1. 6:3, 7.3.8. 93.3,~J0.4. )0.3.3 ... . Qafms .bd ~eJ,y AsS~rti"D otClairils 4.~.$ Clai.. forAddJtiOnalCO$t 3.2.3.4.3.4.4.3.5,4.3.6.6.1.1,1,3.$. 10.3.2 Clabltl fotAdcUticUUlI Time 3.2.3, 4.3.4,4.3.7. 6.1. t, 8.3.2, 10.3.2 Claims for COAte!lled or tJnkrlown Conditions 4.3.4 Claims for~~ 3.1.3. 3.18. 4~3.10, 6,1.1, 8.3.3~ 9.5.1. 9.6.'7,lOJ.3i JL1.1.11.4.5, 1l.4.7. 14.J.3. 14.2.4 Clall11S SubjeCt to Atbltraij()l1 4.4.1,4.5.1.4.6.1 Cleanh~g Qp ~.IS, 6.$ COsn'lIJeqcellJclltof ~tutOry Limitation Pericld 13.7 PonimOl1cemellt of the Wotk.CORltiti~ R,~hltin& to ~.2.1, 3.~.l. $.4.1. 3.7.1,3.10.1. 3.12.6, 4.~.5,$.2.1, 52,3.6.2.2. 8.J.2, 8.2.2,8.3.1. ]] .1, 11:.4.1; 11.4.6. lUJ CC)ftUJI!m.c:ement of the Wotk" Defmitionof 3.1.2 COmmunielijo.D$FadlitlitiDgCottt.-.cl A4'inildstratiol'i 3.9.1.4.t4 Comp~on.Conditions Relatingt<! . L6. 1,.3.4.J. 3.1 J.. i.n, 4.22.4.2.9,8.2, 9.4.Z, 9.~, 9.g.1. 9~iq. I.~~ 13~7,14.l.2 ... C()MPLETION, P'Al'MENTS AND 9 COntPleti()11, Subst$ttial 4.2.9,8.1.1,8,1,:3. 8.2.3.,9.4a, 9Ak9.9.1. 9.10.3, 9.10.4;2. 12.2. 133 ComplianCe With YWS l.6.1; 3.2.2, Hk3.7j3.J2.IQ. 3.1~. 4.l.t, 4.4JI..t6A. 4.6.6.9.6.4. JO.2.2, J 1.1,11.4.13.1.13.4,13.$.1, 13S~ J3.6,14.l.J. J42;1.3 . . ConceaJed otVnknown Conditions 4.:304, 8.$.l,IQ.3 Conditions of ~ G4ntJ:act i.t.1.1.1.7,6.1.1,6.L4 I ~i.~~~:. 3.14.2,.4.L2.t3.4.4.6.4. 9.3.2. ~..8 ,.$. 9...9......)...,....9.1().~j9..1().3., '. II ..1..4.4.JI.. ....1 13 3.......~2,..ll~.2 CQNSTRl.JC110N BY ~..JJ\'- $IP~n:cON'I1L\CTPa$ .. . l. L~.6 .... .... .....~.., Con&tn1~n Clwige Dlttcttve. DeftnitiOti of 7.3.1 .. QJnRru~nqha..ge Di~tv~ hU, 3.l2.~. 4.2.8,4;3.9, 7.1, 7IS. 9.3.1.1 ~On .Scbodqles, Cootraetors 1,4.1.2,3.10,3.12.1, 3.12.1,r4.3.7.2, 6.1.3 gOll,tmgent Al$lplIJeIlt of S..bcot,itract$ 5.4.14.2~4 . . ContiludlJl: ContJ'lCfp.,rIt)rmaQe'e 4.3;3 . . .Oontract, Del'fuition .9f 1.l.2 e0NT~CT. TE~ATION QR SUSPENSION QF THE 5.4.1.1. 1l.4.9. 14 Conb'act Adn:linistration 3. D. 4, 9.4, 9.$ Contract Award and Execution.. Condltion$ ~J.~g ro ~ 3.7.1~ 3.10,5.2.6.1,11.1.3,11.4.6, 1 J.~.1 ~tr-.ct DoCuments, The l.l,t.l Contra4t~, CopiC$ F~~ U~ of ,.' L.6, 2.2.5, 53 ... ,J'. " /' , COntract Docwnents, Defi~on f --, ".,,' J.U ""J ;I Contr-.et ~.um ... I .. . 3.8, 4.3.... .,f,3.$.. 4.4..5. S.~.~. 7~. 7.3. 7,4, ~.t p.4.2. .9.5J.4,9~6"7,l).7~ lO;3.2. 11.4.~. 14;2.4, 1~.3* Contraet $un1,~finition of! i ,;.. ..~J 9.1 CO~cttime ,.. ".'"~,,_ 4"3.4, 4;3.7, 4.4.5,5 .2;3f 7:1.. t3, 7.3.1.4, 8.1. 1,8.2. 8.3.1,.9.5.1,9.7, 10.3.2, 1~.1.1.14.3.2 .,; Con~ot T'lDIc. Def'Uiition of / ",' . 8.1.1 CONTR.AcToa 3 Contractor. Defmition of ~.1, 6.12 . .... . . . ....! CODtra~tl)r.$ Construction l~Ji!'dult!S 1.4. L2.U~. 3.l2.1.~.12.2.l4.3.'l.2; r>:1:3 .- Contradtor's amployees :, ,..~. , .,,,.... .. ~-'''',,.,;..,....,''''._-.~.'+_.- ~ .",. '~ c.~... ;-" ~~~~, 'l:l;.~"':....~; ~;~~ 'll:< Q; llf~:.:~, ~ ;:.';::''''''' r:nl>>.....~i.OJI&1~ti...VnUtllorl... ..~~~ lU."",..lwtilon of tItj,.o ~'O~l;,.or &nr PO"~~";it, 1Iiioy~..tl:..".~ 3 cilV1~ .""11 ....iIoi:Jlal. !-Ll~, Hl1,,*,11 lie ~ ~. ~~~4I't~t-"'~b1.. ~ tbe lati.. 1'ltbllr.tt _ ~ Df Au. '.ott",r~ It 1'~5.4'$' on 10/06/2005 cinde~ Orde.r 119'.IOOOl1l1016_1.WlUdvell/>lh", all 8(1/200$; "'d .....""tr.... reUl... OM.. ""tW"2U431$441) 3.3.2, 3A.3,l.8.1, 3,9, 3.]8.2, 4.2.3j4.2.~> 10,2, 10.3, 11.1.1, J 104.7,14.1, 14.2.L1, Contractor's Liability Ihsuran~ 1l.1 Con~tofs Relat~nship with .~parate Contractors and Owner's Forces 3.12.5.3.14..2,4.2,4.6, 11..t7, 12.1.2, 12.2.4 ConU'aet()rs R.elatillltl:shipwitb Subcontractors U.~;3.3;2,3 .18.1,3.:18.2.5, 9.6.2, 9.6.7i 9.10.2, 11;4.1.2. 11..1.7. 1 Uk8 Ctmn-aOWt'si{clationship with th~ AJ#titCl:t Ll.2, 1.6.3.1.3; 3.2.1,3.2.2,3.2.3, 3.3.1,1.4.2, 3.5.1, 3.1'3,3.10; 3.11,3.12, ~A6, rut 4.1.2, 4.1,J.4.2, 403.4.4.4.1, 4.4.7, 5~2, 6.2.2, 1, 8.3.1, 9.2,9.3,9.4, U, 9,7, U,9.9. 10.2.6, J{U, 11.3, 11,4.7, 12, 13.4.2, 13.$ ~s R~entatiOtls LS.2,3,U, 3. 12.(j, 6.2.2, 8.2.1, 9.3.3,9.8,2 Contractol"$ Responsibility for Those Pmol'inmg the Wotk . 3.3.Z,3.18, 4.2.3, 4.3.8, 5.3.1,6.1.3, 6.2, 6,3, 9.$.1, 10 Cont3ctors Review of ContraiZt OQcun,ents LS.2,3.2,3.7.3 Contractor's Right to Stop the Work 9.7 COtltn,ictor's Right to Termina1c the Contract 4J.lO, 14.1 . Contractot's..Subm.~. 3.10., ~..II,.3.12, 4.2.7, 5.:U, 5.2.3,7.3.6,9.2,9.3, 9.8.2,'9.8.3,9.9.1,9. Itt2, 9.10..3, 11.1.3, 11.5.2 Contractor's S~l1dent 3;9, 10.2;6 Contractor's SuperviSion and ConstruQtion Pi'ocednres V2.2, 3.3. 3.4, 3.12,.1(). 4.2.2"4.2.7, 4.3.3, 6.1.3, 6.2.4,7.1.3, 7.3.4, 7.3.~~ 8.2~ 10. 12. 14 Con~ J.,iabUity l)1surance II. J. U, I U, JI.3 Coordination and Correlation 1.2, 1.S.2, 3.3.1, 3.IQ" 3.12.6, 6.1.3~ 6.2.{ CQ,pies FtinJi~()fDtaWings and Spe<:i~ 1.6,22;',3. H Copyrights 1.6; 3.17 Cdrteetion of Work 2.3,2;4,33.4,4.2..1,9.4.2.9.8.2, 9.$.3,9.9.1. 12,L;Z, 12.2, Ia.7.l.3 Correlation and Intent of the Co.-tract Doc1lrnelitS 1.2 Q)st,.De'tirtition of 7.3.Ci Costs 2A,32.k$.7.4,3.8.2,3.l.5.2,4.3. 5.4.~, 6.1.1, 6.2.3, 7.3.3.~~7.3,~, 7.3.7. 7;3.$; 9.10.2,10,3.2,10.5,1 U. I J.4. 12.1, 12.2.1. 12.2,4, J 3 .~, 14 Cutting and Patc:bing 6.2.5.3.14 ~e to ~on crOWner or Separate Oontra~ 3.14.2~ (i.2A. 9.2.1.5, IO.i2.I.~. UU.~. 10;6, 11.1, J ).4, 12.ZA . Oamq~ to tile Work 3;l4.2,9.9,J, 10.2.1.2, 1'0.25,10.6,11.4, 12.2.4 Dan188es. bJaitn,S lot . . . .. 3.2.3, 3.18. 4.3.1 0, 6.1.1. 8.3..3, 9.5.1,9.6. 7,tO.3 .3, 1l.1.1,llA..S. JL4.7,14.1.~, J4.2:if'''''''''''-~ ~'^ Oan1ag(ls fot De~ : .' .. 6.I.l.8.'J.3. 9.5.1.6. 9.7, lO~~ Date ofConunencemem oCtile Work, Detinitirinof 8.1.2 I , Date of Substantial ContJjlct\c:.fir.~ DefinitiOn of 8.:].3 ,~ t>a,y, Defillitim. of $.1.4 ~ions of theArcl1itett 1 '. ..: 4.2.6,4.2.7, 4.2.11, 4.2.l~ -1.2.$, 4.3.4, 4.4.1; 4.4.5, 4.4.6~4~, 6.3.7.3.6.7.,3~8.8.l.f 8.3.I.~.2, 9.4. 9.,5.1,9.&.4, 9.9.1, I3.S.~. 14.2. ,1'4.2.4 ~i$ip~ to Withbold Cer1il~<<OQ 9.4.1.~.5, 9.7, 14.1.1.3 DefeCtive or N~neortfonnm,g Work,Acceptance. Rejection an4 Correcponof ... .... ~ 2.3,2.4.3;5.1,41.6,5.2,5. 9's.J. 9..5.2, 9 ,~.6; 9:..8.2, . 9.9~3.9;IOA. lU.l, 13.7.1.3 Dcf'ective Work, Dennition I)f 3.5.1 Definitions ~ 1.1,2.1.1. ~.1, 3.5. t, 3.12.1, 3.12.~, 3.12J, 4J:1, 4.3.1. S.l, 6.1.2, 7.2.1, 7.3.1, 7.3.6, 8.1, 9.1.9.8..1 D,blys ~nd EstensiQ~ OtTilll,e 3.2.~~ 4.~,1. 4.3.4.4.3.7,4.4.5, $.2.3,7.2.., 7.:U. 7.4.1,8.3, P.i.l, 9.7,1, 1O.3~ J~.6Jf14~3.2 Disputes 4.1.4,4.3, 4.4, 4.~. 4.6, 6.3, 7.3.8,. J)ocumentland Samples at th, Site $.11 ; DQlwing$, Definition of : 1..1.5 ... i . i DmwiJ)gs 4f1~ Specifleatjo~; U~, 8!l4 Q",~etsh,!p ~L... !.l.t, 1.3,2.2;$., 3.n,5.3 . Effective ~w of Insurance 8.2.2, J 1.1.2 ElIIe~cies 4.3.5; J:0.6, 14.1.1.2 Emplo)'~, COntractOr's . ..' 3,3.2, 3.4.3,3,.8.1, 3.9,3.J8.~,4~.'3, 4.2.6.10..2, 1M, 11. J.l,l1.4.7, 14.1, 141. LJ .' Equiprnent,tat>or. Materfa{+ ana 1.J ;3, L 1.6,3.4,3.5.1, 3.8.2, 3;~.3. 3.12,3.13,$.15.(, 4.2.6,4.2.1,5&.1, 6.2.1.. 7.3;6,~.3.2, 9.3.3, 9~S.I:3, 9.10.2, m.2.J,10.2.4. vq.U- ^. ~,".. Exc::cuti()O and Progress of the, Wotk <~'-... '.- -i1 I ::r~~Ql";fl~!:m~1u..,~~.~~1l'#~~;~~,,1~ ~~rl~ t.W~.wt~~'.~i~r:':=~ bY.Th.' x"t.a.th_;J.oij.: ... u.iI';lJna"~.~.a ~tl.... .0.:; ctin.,tb!l.tl....ot tli>:ii w..- ~~.... atIY "",t>.)H1 .ot tt. ..o.y __..it ,i~ ........ 4 l>i~l and .. . ....1 >P;na1U~. .- ,.1.1.1 blo. ."""'""'I!- to .~ ~ ~t pQ.I.'~ ,,~ thoi. 1... 'l'ht' tU'~tt ....Ii mclllC!t4 ,>>,. "'1" aoftware at 18:S4:S' bb 111/11"20.11~ tJ!ld..rOtdiir llo;lOIlO1ll1I1H_l Wljic:;b .x,.1n'.0ll 811/20llf. _nci ia noe for .......1.. ~ lIobl., f22443454Hl 1.1;3,1.2.1. L2.2,2.2.3. 2.2.5,3.1. 3.3.~A.3.5,3.7. 3.10,3.12,3.14,4.2.2, 4.2.3, 4.3'j~ 6.2,'2,7.1,3.7.3.4. 8:2, 9.S~9.9.1. 10.~, 10.3,12.2,14;2, 14.3 ExtensiOns of time 3.2.3 ,4.3.I,4.3.4~ 4.3.7, 4.4.5, 5.2.3,7.2.1, 7.3,7:4.1. 9~S.l; 9.7.1, 10.34, 1 0~6.1, 14.3.2 FaU.h'e.,! PaymCJlt 4.3.6, 9.5.[.3.9.'. 9.101, 14:'1.1.3, 14.2.1.:2,. 13.() Faulty Work (Sue DefetQ\ieor NOnconi()rming W'PJ:k) Filial CQ~P~tiOD and Final Pajr~nt 4.2.1, 4.2.9~ 4.3.2, ~.8;2, !i.10.] 1. 1.2, I U.~. ] 1.4,1, 1104.5,12.3,.1, 13.7, 14.2A,14.1.3 ' FbllUlClal Atrangements, OWners 2.2.1, 13.2.2, ]4.1.1,.5 Fire and Bxtc:nded Coverage1bSUJ'anCC 11.4 GiiNlUW:. PROVISIONS 1 Ooyml-.g Law 13.1 Ou~ (See W'amI1tty) ~:us Materials nt~.4, lO~. 10.$ Identification ofContTactDocumefits ' , 1.5.1, Identification (If SubcontractotS and Suppliers 5..2.1 IndelDDi,flQfloD 3.17,3.18,,9.10.2,. 10.3.3, 10..5, 11.4.1.2,11.4,.1 Inf()rm~ ',nd services Req~ of tb~ Q~r 2.1.2.2.2" 3.2.1, 3,.I~.4j 3.12.10,4.2.7,4.3.3,6.1.3, 6.1,4,6.2.5,9,3.2, 9:(i.I,9..6.4, 9.9.2, 9.10.3. 10.3.3, I 1.2, 11.4~ 13.5.1, 13.5.2. 14.1.1.4, 14.1.4 Injury.(}f I).~agtto Pel'$On or property 4-3.B! 10.1, 10.6 l~~ctions ,,', ' 3. 1.3, ~j.3,. ~. 7.1,4.2,.2,4.2,9.4.2,.9" 9A:2,9.8.2, 9.8.3. 9.9j, 9.10.1, 12.2.1, I',~ lnstructions to EUdders 1.1.1 Instructions to the COntractor 3.2.3, 3.3.1,3.8.1,4.2.8,5.2.I~7, 12,8.2.4,13.5.2 Insurance 3;)8.1,6.1.1.1.3,6,8.2.1,9.3.2.9.8;4, 9.9.1, ~UO.2, 9.10:5, 11 ' , lll$UnlDc~ BOiler aildMac:hioery ]1.4;2 Insutallcc, GoDtrac:tor~s Liability ll.) lnSu.t$l~, Etf~y~ Date of 8.2~,11. L2 Ins llrallc" ~. or IJsc 11.43 IllSura1lte, Owner'ca Liability 1L2 Insura8te, P~lectManagement Protective Liability 11.3 ~ura~~ .Ptoperty 10.205,11... ' Ins~ Stbted ~aJs 9.3.2, 1l.4.1A , IN$lJRANCE AND 80NDS 11 ln$tn'allce Companies, CQnseqt to Partj8J ~Ujailcy' 9.9.1. Jl.4.I.5 ' , '" lQS~ Companies, ~Iement With 11.4.10' , : I~ of the Contract Doc:umen+ 1.2.1,4.2.7,4.2.12,4;2;)3,7:4 . ID~rest ~3.6 Iaterp~ 1.2.3,1.4, 4.i.l, 4.3.1, S.J, 6.U. 8.1.4- InterpretaUOQ$, Written :4.2.1 I, 4.2.1~, 4.3.~ J,oinder and Consol~t1 of Claims R._~ ,"', _ , . 4.6.4 Judgtnerat on Final AWard 4.6;6 Labor an~ Ma~Is,EquipllJent " " ""." 1.1.3,1.1;6,3.4, 3.S.1,:U.2, 3.~.~, 3.12,,,a,13; ~.IS:~, 42.ti, 4.2.7,$,,2.1, 6.2.1, 1.3.6, 9.:;2'r9.3.3,9.5.I.3/ 9.1~.2, 10.2.],10.1.4, 14.2.1.2 .... l4lboT Disputes 8.3.1 L.aW$ IIDd Regulations , ~.~,3;2.2, 1.6, 3.7. 3. ,~.tO! 3.13, 4.1.l,4A.'.'4.6~ 9.6.4,9.9.1,10.2.2,11.1, IJ.4,13.I, 13.4j 1).-$.1. IS~5.2, 13.6, 14 :LIen$ 2.1.2,,4.4.8,8.2.1,9.3,,3,9.10,' ,,,- t~~ltation 01 COQsolldatii' OidOmcie\ \V - LUn~~, ~es of f " 4.6.3,12.2.6, 13.7 ;, l.irnitati011$ QfLiJbiIity : i . 2.3. :U.l,3.S.1, :t1~3,J. 12.8,j"g, 1{)4 !, rr,3.!!A.., 4.2;6; 4.2.7,4.2.1,2, 6,2.2,9.4.2,9.6.4, 9.6,7,9.10.4, 10.3~3, 10.2.5, 11.1.2, ] I.2.f.I1.'t'7; 12-.2':5, thoJ.2-- Lhuj.ta.tion~ QfTnne " , ", , " . 2.l.2, 2.2; 2.4, 3~.1. 3;7.3.,3.10, 3.I),.3.t2.~il.-JS.lt. 4.2.7,4.3,4.4,4.5,4.6, 5.2. S.3~.S;:(, 6.2.4,7.3,7.4, ' ~.~. 9.,2. 9.3.1, 9.3.3. 9,4.1, 9.$:9.6,.9:7, I}.S;9.9, ~.lO, 11.1.3, 11.4.1.5, 11.4.6{I1.4.J0, 12.2.13.5, 13.7, 1:4 LossQf Use ln$Untnce 11 .403 Material Supplien 1.6,3.12.1,4.2.4, 4.2.6,5,2.1, 9,:r~'9;~.~9.7i;9.10S"'- Materials, a~us . . 10.2.4, 10.3, 10.5 ." / A1ADO!l"~'l; ,Qopoi"' lm.~l~1: .. 19i~,i'i$,l'l~, l.-~, 1"1, US!,: ill~.. l~,l~,i~; l'ilJq, l11j.,l~'h1Jd Iii" byTl>c _rl_ l"~tWte 6lArCl\ice<!t"..ul,.#\ih~ ............ IrAalItMqi ~h AV;, ,~t 1" ~~ iii' l1,.s:, ~111bt J;!f" aIld 1..~.ta,....,;u n:DCl;".'\In."1:b=~,a""lI~cUQn Or dioi.t"U...tion, iI<l' tiU,. au.4 ,.......'t, @."vpoiUi1.... iI<l'it, ~ re-a'flt ." _". Clvi1aild"*1M1....1p....xtt.... .ild ....1iblJl'~t<lKtto ~~ -ul\~........til.. 1fi!'" _ kW. ,Tli'ts d~.tt..... P"odu':;ei1 br "Ill ...:>ft....~. .t"U:~..':$, an 10/o6t200$llIld<i~ O';d'~1lo.1000U10l'6i liiucll *'<1>1... ~n 8/11200&, .nd ill not "for "...d... U... Ji"te.: -, , C2'U434s.1UI 5 Materialsl Labor, Equipment and 1.1.3, 1.t6, 1.6.1,3.4,3.5.1,3.8.2,3;8.23;3.12;3.13, 3.1$.1,4.2;6,4.2.1,5.2.1,6.2.1, 1.3.6, 9.3.2. 9.3,3, 9.5.l.3, 9.10.2, 10.2.t, 10,2.4, 14.2.1.7 Means, Metb9d!l, 'l'ecbniques, Sequ~ces and ProQedures of Construction 3.3.1,3.12.10,4.2.2,4.2.1.9.4.2 Modlanic's Lien 4.4.8 Mediation 4A.I,4.4.S,4.4.6,4.4.8~ 4o$,4.6.l. 4..~l., 8.3.1, lO.S ~()rCb""~e;t III tlteWUl'k . 1.1-1,3.12.8,4.2..8,4.3.6,7.1,"" M1SC~LLANEOUS Pk(')~ION'S 13 ModificatiOll$. Defil1i~()Il of 1.1.1 ModifjcatiQns to tM Contrtet 1.1.1, 1.L2, 3.7.3, 3.11, 4.1.2,4.2.1, 5.:2.3,7,8.3.1, 9.7,10.3.2; 11.4.1 .. . . Mllhult 1b!sponflbflity 6.2 NOneOllf9Tll1ing Wotk, Aeeepta"ceof 9.9.6; 9.9.3,12.3 . Non~nforming Wot~ Rejection and ~ of 2.3.2.4,3.5.1,4.2.6.6.2.5, 9.S.l, 9.8.2, 9.9.3, ~.lO.4, 12.2.1, 13.7.1.3 Notice 2.~.I, 2.3, 2.4, 3.2.3,3,3.1.3.7.2, 3.7.4, ~.12.9, 4.3, 4.4.8,4.(;.5, $.2,1, 8.2.2.9.7t9.10, IO.~J, 11.1.3, 11.4.6,12.2.2,12.2.4, 13.3,13.5.1, 13.5.2, 14.1. 14.2 Notice, WriUen :U~ 2.4, 3.3.1, 3.9, 3, ru. 3.12.10,4.3,4.4.8,4.65, $.2.1,8.2-2,9.1, 9JO, 10.Z.z, 10.3, 11.1.3, 11.4.6, 12.'2.2, 12.2.4, 13.3, 14 Notice of't~g Md .ctioOs 13.5,'.1,13.5.2 Notice Ii) J>rocee(i 8.Z.? NQti~j Penn;t$, Fees and 2.Z;2.a.7, 301 3,7,3.6.4~ 10.2.2 Ohscrvanons, Cbntnlctor's 1.5;2,3.2,3.7.3,4.3.4 Occupanq' 2.2],9.6.6,9.8, 11.4.1.5 Orders, Written 1.1.1, :2.3.3.~, 4.3.6, " 82.2, 11.4.9, 12.1, 122, 13.52, 14.$.1 OWNER 2 Owner. Definition of 2.1 OWller, Infonitatji)lI aJ1d .SetV~ ~ilqlJ.l"ed otthe 2.1.2, 2.2, 3.2~I, 3.12.4~3.12.IO. 4.2.7, 4.S.3, 6.1.3. 6.1,4,62.$,9.3,2. 9.6.1,9.6.4, 9.9.l. 9.10.3, lO;t3. 11.~. 11.4,13.5.1,13.5.2114;1.1.4,14.1.4 . Owner's .AUthonty 1.6.2.1.1,2.3, 2;4,3.4.2, 3.a.I,3.12~lO,3.14.2,4.1.2, 4.1.3,4.2.4,.4.2.9,4.3.6,4A.7, .5;2.1,5.204,5.4.1, ~.1.6.3,7~2.1, 7.3.(,8.2.2, S.ll, 9.3.1, 9,3.2,95.1, 9.9.1,9.10.2,10.3..2, ILI.3" n.3.l,IL4.~,11.4.10. 12.2.2, 12,3.1, 13.:2.~, 14,3, 14.4 Owner'!! Financial ~lity 2.2.1,13.2.2, 14,.1.1.S Owner's Liability InsUraoet 11.1 Owner's LPss of Use (nsunmce lL4.3 Owner's R:elationsh!p With.. Sl1bcoottactorS 1.1.2,5.2, $.3, SA, 9.6.4,9.ioa, 14.2.2 Pwner's lUght tp parry Olat the Work 2.4, 11.2.AJ.14.1.2.2 Owner's Right to Clean Up (i,.3 OWller'~ Right to PerfonnQolls'truetiOn ud to AWard Sepai'Jlte Contra~l$ 6." Owner's ~gbtto Stop the Work 2.3 . . pwner's IUght to S~en4 tb~.Work 1,4.3 Owner's Right to Terminate tbe ContraCt 142 . "'-' -- OWllilrship and Use of Drawings, SpeeUitalfOn$ ,,_ ud Other Ins~rumeut$ OfServ* ~.,.._ ' 1. Ll,l.6, 2.2.5, 3.2.1, 3,ILJ ;"3j7.~.4.2.12, 5.3 pa". Oecupao~ or Use 9.6.6,9.9,11.4.1.5 P-.ttbi., Cutting and 3.14,643 Patents iLl' P...ym~~ Applications for ." _ '_" 4.Z.S, 1.3.8, 9~ 9.3, 9.4, 9.U{9.6j,!~7.1,"9.8.S. / 9.10.1;9:10,3,9.10.5,11.1.3;142.4114.4.3. , ^ Paymef1t. d!rtificat" Cor ( I .... .. ...: ' 4.2,5,4.2.9.9.3.3.9..4,9.5,9.6. (, 9.6.6,9.7.1, 9.HU, ~nl).3, 13.7, 14.1J .3, 14.2A P.)'$ent,Failllre of .. ~ _ 4.3.6.9.5.1,3, 9.7, 9.tO,2.14.1.1.:~, 14~.I ,t 13.~ PaYmen~ Final . .. . . .. .. 4.2.1.4.2.9, 4.3,z. 9.8.2. 9JO, -11.1.2, 11.1.3, 11.4.1, 11.4.5, 12.3.1, 13.7, 14.2.4. 14.4.3 p~Ym~~ Sqn4, Performance Boll~ aDd...... _. 7,3.6.4, ~.6.7, 9.10.3, 11.4.9, U"J"~ . .h'_" Pa,ymen~ .~. / ,.." 4.3.3~ 9.3. 9.6,9.8,5. 9.10.3. )3.6,14.2.3 fA YMENTS ANl)C()MP~TJON 9 I I Paymet1~ to S~ntract~l . . 5.4.2,9.5,1.3,9.6.2, 9.6.j, 9:6.4; 9.6.7, 11.4.8. 14.1.1.2 .. PCB 10.3.1 ." -, "",," W. ~t .>.2l)1...~9117'~1: .~'ili l'lll,'1~"..ljijll. 18,1'T,lli,~. l,s'. 1"". 11J~~. 1,i.\ilJ'io,U14. lHla0\4 l'~bY.on.. _~1"";'.lmtUt4t.. of Arc:lUt"t..AU "ljj!it.~. IN!i1l1Ci; .'I'h4.I<JA.~t u p:to~ by a.li; COpydllilt ""''' aN;!. l,,:~u""'"-l. """ti...~ Unall_iaad ~i.....<!. ~d;"lbVl;t"" oEth1.AUi.'~t. o.anYilorti.... of It, -.y"HWtiA """".... .<:lv1.l and. ""'Uli!liil~ti~., .M~:tl."" .~i:.dl:9,~......"""" ...."""t_liibl.. .mdHthio 1...... 1hi..dutt....llrod..<<d OVAl"" ,;o(t....... u. un.. :S9. .on 10/0,/ZOOS unci... onteti;O.IO.00c19.l01'i 1 ..1\l:en exj)ie.a on 8/1/%Ob6. and t. .not tar ...nl.. Uur IIOt..; . ~ 12Z44,.S44l) 6 Performance Bond and PaYIDent Bond 7.3.6.4,!M:.7, 9. Ht3, 1 1.4.9,J h5 Permits, F~ and ~otlte$ . 2.2.2,~, 7. 3.1 .3,'.3 .6A, IQ.2.2 PERSONS ~ PROPER'I'Y, PQ.OTEtrIQN OF 10 P()lyChloriJWed Biphenyl 10.3.1 l1:oduct Da1a,Definition. of 3.12.2. .... Product Da~ IUld Samples, ~(jp DraMnp 3.11. 3.11, 4.2~7 Prog~ and OODt,pl~oll 4.2.2,4.3.3, $.2, 9.8, 9.9.1., 14,1.4 Prognoa. .P.~mc~ ... ... ... 4.:3.1,9.3,'.6,9.8.5,9.10.3, 13.6, t42.~ Project, Definifion of the . 1.1.4 Project Man.gementPrbt<<twe LilIbil1tY In$ul'iP1~ .... 11.3 Project Man,ual, Definffion of the 1.1.7 Project Manua~ 2~2.5 Project R~tatiYe$ 4.2,10 Prqp~rty IDSUtan:c~ 10.2.5, H.4 .. . PlWrECtION ()1l' PERSONS. ANn PROPERTV 10 .. Regulations an4 LaW$.. . . 1;6, 3,2.2, 3.~,3.7. 3.14,10,3.13,4,1.1, 4.4.$, 4.~. !t6A, 9.Si.1. lO.~2, 11. 1.11.4. 13.1, 13.4, 13.5.1, 13.5.2. 13.6, 14 . I.tcjection of Work 3:$.1,4.4.6. 1,2.1:1 Releases and Wa,iven of Liens 9.10.2 Rq,rcsentations 1.5.2,3.5, I, :U2;(l,6.2.2, 8.2; 1.9.3.3,9.4.2, 9.5,1, 9;8..2,9.10.1 RcpresentlltiVes 2;1.1, 3.I.T,3.9, 4. LJ,4;2.1, 4.2.10. S.U, 5.L2, 13.2.1 Rt$olutjonof Claims and l>isj)ute$. 4.4,4.S,4.~ .... .... . . .. ReSponsi1>in~ (or Those P~tfol'tniJ)g the WOrJc 3.3.2, :U8., 4~.3, 4.3.8,5.3.1; 6.q, 6~ 6.3,9.5.1, 10 R.c$in",g~ 9.3.1,9.6.2, 9.8.$, 9-SU, 9.10.2, 9.1,C);3 R~iew ot Q>.ltraet Documents and Field eoIJdiftOlJ$ by. COnttador 1.5:2,3.2,3.7.3,3.12;7, (;.13 Review ofContt'actot's Submittals by Owner and Arcllitect 3.10.1. 3.10.~~ 3.n, 3-12, 4.2, 5.2, 6.1.3, 9.~. 9Jt2 Review of SbopDrawings, Product Data and Samples by Contractor S.l2 Rilhtl 'Ul~ Remt4if$ . 1.1.2, 2.],2.4, 3~S.I, 3.15.2,,4.2.6, 403.4, 4~~, 4.6.5.3, .s.4, 6.1, 6.~, 7.3.1,8.3,9.5.1.9.1, 10.2.5, 10.3, ]2.2:2,12.2.4, U,4, 14. .. ._d .... RG.f,*lties. Patenf$ nd CoPYriJht$ _ 3.t7 'j RUles andNQtices for Arbitration 4.6i ., ; S.tety rrl' PCI'$ODS and Property IP~ 10.6 Safety p~.~oa$ ,ad Proa~.an,s 3.3.1,4.2.2,4.2.7,5.3.1, 10.i, 10.2, lOli Sa,mp~ DCtifiitkm of 3.12.3 ~mp:le$, Shop U"':Wi11p. Pli)(Juct: Data _ad ~.J1,3.U,4.:t7 . . ~DtPJes at the Site. l)Qeum"..,...d _ ".'__.." 3.;11 SebeduleOfValu. '.2, 9.3.1 Schedules, .."". 1.4.1.2, 3.10, 3.Constructi~nI2.l, 3.12:2',4.3.7.2, 6.1.3 .0' . ~CoJUracts and Cqn~cmtS" 1.1.4,3.12.5,3.]4.2,4.2.4,42.1,4.6.4,6, g.$.J. 11.4..7, 1~.1.2, 12.2.5 . . Shqp Drawings. Definition of 3.12..1 Sbopl>raW'i~ Prodnet >>ala and Sample$ 3.1 I, 3.1t, 4.2.7 . Site, lJse of I 3.13, 6.l1, 6.2.1 " \.' .> ". Site Ins~ans.. .. ..: ....... ... ... '. '/' '1.-2.2.3.2.1.3.3;3.3.7.1,.4.2,4.3,4,9.4.2,9.J0.I.tlJ.5 Site ViSit$, AI'Chftec:t's. ., .; 4.2.~, 42.9. 4.3;4, 9.4.2., 9;51 1,~~,9;2.9J 0.1, 13.5 SpeoiaI f11spect~ and test,ingL. . . ! 4~2.6. 12~. J. i3.S ! ' Specifications, Definition of the 1.1,6 $~irl@tion5~ Th<<l " 1.1.1,1.1.6,1.1.7,1.2.2, L6.3.11;3.12.10,3.17 .S~te()..JL.nn.itati...ons ..'/ < ~'-'__U" 4~<i.,3, 12~..6_, .~ 3..1 I" Stl)ppinS 1t!~ Wo~ f 2.a. 4.:U. 9.7.10.3. ]4.1 Sto~ MaFials. ..; 6.2.1,93.2, I 0.2.1.2, J.O.2..4~ )] !4. 1,4 Subcontractor, Defudti~ of 5.1.1 SUBCONTlt\C't()~ ...'...... . . ......,<< AD,~t A201'" -UIl1.CoJ>:trtOlit. _nIt, nl$~1,u.U25,11131.'1'~,m.,,1'6~. ~" :l.lf6.i.111, Int, 1m aiid.U1I7 ~'l'he Mli<i~l~'Ht;>gootJ\n:lincet.. "'1.1.r19b"~.lIAMlltlllt1'tWl'\v'.~t Le PNUClUlt by. g.s.COpy~~t IA~and 7 in~""'h""'l ~u~.,u"""I:li""ulld"r~uOO1 ~r cU,strAbuJ;Lon .000tlihMA" .~~>"""'rPO"Uon*' .ft. ilar~<!I\l1~ itl..<rota oLvil andDr~"l'peQa1ti...., alltl.W1.ll .t>e~~t004. .t<>.tIio........."""""lI'~tpo..~.. \tndv tit. .1... ,11\1'. draft".. .prOlhli:e4'by AQ. ."ttwar.Q ,at: 1hSl:$'on 10/06/2{lO~. under ()"<!t!r.llO;.l~DOllllCll6'J\/l\!l:Ii. -..ph'.. Oil. .f1l2IXlJ,. tl'Xl 1.. not rornu1e. lIaat .Jloteo, . - (2U04S4,U I 5 Subcontractors, Work by 1.2.2,3.3.2.0 3J2.1. 42.3, 5.2.3,SJ, 5.4,9.3.1.2, 9.6.7 SubtolltraetuaJ R.e'-tions 5.3,5.., 9.3.1.1t 9~6, 9.10 lIU.l, 11.4;7, lhU,14.1, 1402.1, 14.3.2 SupmiUils . 1.(i,3.10,3.! I, 3.12, 4.2,7,.5.2.1, S~.3, 7:3..6~ 9;2, 9j. 9.8,9.9.1,9.10.2.9.10;3; Il.t3 SiJbrogatiOn, WaiVers of 6.l.l. llA:5,U...7 S..,.~.tiaICoInPletioa 4.2.9, $.1.1, 8. f.3. 8.2,3,9.4.2, 9.8,9.9.1,9.10.3, 9.10.4.2. 12.2, 13.1 Substantial Completion, Dtffin.ition of 9.8.1 . Sub$ti~on of Subcontractqrs 5.2.3. $.2,4 Substitution of ArCbiteQt 4.1.3 SubstltutiOtl$of Materials 3A.2~~.5.1, 7,3:1 Sub-,subcontractor, Definition of $.1.2 Sub$urface Conditions 4.3.4 Suc.sors Slid .\ssjgDs 13.2 . Supetin~4eRt 3.9,10.2.6 SaaperVision ~PoDstructioll Pf'Oced~1'eS 1.2.:l,3~. 3.4. 3.J..2.10, 4.2.2,4.2.7.:4.3.3, 6.l.3, 6.2.4. 7.1.3, 7.3.6~ 8;~ 8.3.1, 9.4~ 10, 12. 14 S~ 4.4.7,5.4. U. 9,8.5. 9.1O~. 9.10.3, ]4.2;2 ~,Co~ent of 9.10.2, ~.I0.3 Surveys 2.2.3 So,penhoD by t~~ OwnerforCOflv~ieJlee 1:.f.4 Suspension of the Work 5;4.2, 14.3 SuspensionotTenIlination (}f th~ Oofiiract 4.3.6, 5.4.Lt, 11.4.9,14 Taxes 3.(),3.UI,7.3.6.4 TermiJuUlon by !be Contractor 4.3.l(), 14.1 T~nniDatWft i)y tbe Qwaet' for Caltlle 4.3.10, SA. 1.1, 14.2 . Termination of the ~it~ct 4.l.3 TermiJi~on oftftc Contractor 14.2.2 TERM1N4 TfON OR SUsPEN$ION OF THE CQ.NTlU.cr 14 .Test$ Ind W~s 3.1.3,313:3. 4.2.2.4.2.6i4:2,9,9,4.:!, 9.8.3, 9.92, 9.10.1,10.3.2,11.4.1.1,12.2:1,;13.5 TIME 8 Tinae,DeJaf$ tnd .~II$lons dr. ...... . 3.2.3, 4.3.1. 4.3.4, 4.3.7, 4.4;5,5:2.3~ 7.2'.1 ,i.3or; ~- 7,4.1,8.3,9:5.1,9.7,1, 10.3.2... l.O.6.i, 14..3.2 . TlDIe Limits . 2. t.2, 2.2~ 2.4~ 3.2.1,3.7.3, .t to, 3.11. 3.l:a, 3.15.1. 4.2,4.3,4.4.4.5,4.6,5.2, S,3,5.4.6.2.4.7.3. 1.4. 3.2, 9.2, 9.~.J, '.3.a, 9.4,1,9;5;"9.6, 9.7,9.8, 9;9, 9.10.11.1.3, 11.4.1.5, 11.4.~1.4.l0. 122; U.S. 13.1.14 . . Thlle LlJRits oaOlaiDlJ , 4.3.2, 4.3.4, 0.8, 4.4, ".5. 4.6 T~e to Work . l 9.34. 9.3~ ... . i YNCOvElUNQ .ANnCO~N()F .'_h wotU< !. "_ 12 tJncovering of Work 12.} tlnforeseen Conditions 4.3.4, 8.t t, 10.3 UnitPrlcllJ 4.3.9,1.3.3.2 Use of Oocuments 1.1.J, 1.6, :2.2.5, 3.11.6. $.3 Use ofSite 3.13, 6.U, ~.1 V,I.u(l$, SeHdule of 9.t, 9.3.1 . . Waiver of Claims by the Architilct 13AJ f Wli~ ofC-Iflimsby the CofMlctor 4.3.10.9.10:5, 11.4.7. 13.4~ . ! W.iver of ClaimS by the OWner . 4..3.IQ, 9.9.3. 9.JO.3,9,J().4.h 1.4.3, 11.4.5.: ll.it1, 12.2.2.1,13.4.2, 14.1.4 , L., .,,_..: Waiv~r (jfCon~iae..tbd n.mages 4.3.10, 1.~2.4 Waiver of Liens 9.10.2.9.1(l.4 WaiVers (Jl$"brj)ption 6.1.1. I lA.5, 1I.4~7 Warranty j~5,4jJ). 4.3.$~ 9~.;3.9'''~,9~9.t,~.1 ~.4. 12.2.2. 13.'7.1.3 Weather Delays 4.3,7.2 WOIX, Definition of 1.1.3 Written Consent ..,....c -'" !\"""" '...., ":,.... .....'<... . ,. ,J'l " ,,"'~ 4! \ ,. ...,~ ...n. ~ iiZill'"'- ltG'. C<lpy):iOh~ . 1'1.1.. un, Iftt, iUs, In;, Ij~i.. l:1ile. 1,"~' 1~( 'Ii"'; 1~~. 111'15dIl87 ....lWf byTtle liao.<l""ni,,'<l;lt'u~e O~A.l;clIltlO!'t.. ~ld9hta~."'lllg, !hi. #otA' . ~tt.. *"",t.o"~ Iior fi"'c."py~l~ 1.0&. &lI!I In\'4lm.ol:i~ "~l:i.... UnR~i:a:i~~9j; ~"b~1""1;iO.. ottll.t6 AYA' ~/.lt. ~ .",. Poirt.J:.... 0"( u, ..rroiaolltin _.. 1Iil'U .anderWnal.~e....aill:r".i1~ l;>e p~iicvted to ~. ~.eit.nt l\104Ioihl. u_ the laJl.,.hi. clraft .... Produo:.i:l by idA .~ft""~".t U'5~H,'on IG/GG!:IOC5 ionlkr OriIeT 1IO.10q011101., l"'!>1c:h ',,"ph... on 011/2006. and 1.rwt for. <...u. Ihre~ 110\'41&, - . . 12l~HtM4H 8 1.6,3.4.2, 3.12.8,,3,14,2., 4.1.2.'4,.3,4, 4.6.4,9.3~2, 9.8.5, 9;9.1,9.Ht2, 9.10.3. 11.4.1,13.2, 13.4.2 Written ht~etations 4.2.11, 4,2.12, 4.3.6 Written Notice 2.3, 2.4, 3,,3. J ,3.9,3.12.9, 3.12.10,4.3, 4l4.8, 4.6.5, S.2.l, 8.2.2, 9.7, 9.,10, 10.2.2, 10.3, 11.1.3, II .4.6; 12.2.2, 12.2.4.1~.3. I" Written Oi'deJ'$, LLt.2.3,3.9,4.3.~,7, 8.2.2,1 hU,12.I, 12.2, 13.52, 14.,3.1 . """-' ., ~.".~ ""; '. t Lo_ - ; ,.~,.,~ ...r'-~ -......... ,Y ~~ li~ , " l\Vl, ~.' A20~-- tilt"!. Col>yrtliht .e1Jj.l~., 1'15,1,". in-a; 183'1; 18i.. 111$j, 1'G~/ 111ii), u~';mo. 117~. 1'" '..1"7 by 71i. ~ri......II\'Utllteot J\cch.lt..ct....A11d9hh ~.~. 1M. toW ~t t. 'p"'"tAo\'lJ::eid IJi ui.. ~JIljt~i! """ '.' Intm.~ ,.....i:i...~tIlori.z. %.~t~F d!.~onot ~1.. Af,j." ~~, ~ -air JI<lZ'tto/\ ot .It; ...,.r"io1t .l~......... .UvJ:l -=Olo:I.Aiil):1i11\al~. -..111 bit ~~.to'~ 1Ila#-.~ ~i:.1. ~ tile. i.." 'lIi.l. d.l:al'twa. j>rodU'*b)'AtA .on~~...a.tlh$t:59cnl010tftoc5 linde.t m:CIOi l'Io;10001:'1015_) WI11il!t ~i\tms.... 8tll~OC$:. aJ\d 1* not forruale. Uurtf..tAos,. 122H3~S4Hl 9 ARTICLE 1 GENERAL PROVI$tONS fi 1.1 BASICDEFlNmQNS fi n.1 THI:OQNTRACT DOCUMENTS The COntract Documents C()nsist of the~em between Owner ~d COIlb'actor(hereinafter~~enO, Conditionsot' the Contract(Gener81~S~PPI<<:mentary and t#ilerCOllditions)'l.lraWing$;$PCCifica.tions, Addenda issued prior to eXecution oithe .Cc>ntract,otber document$listed in.tbe Asreentent and Moditieations issu.<<f after execution of the Contract. It );fodi~cati~is (I )awrjUCA ~!hnent t() the Comtact $l$Jled by both parties, (2) II Chalt&c Order, (3) aCOl1Stt1JCtion qb~Directive or (4) a written order for a mmor ~e in the Work .Issued ~y thC:ArGhite(:t. Unless speciti~ly enum~. in tile Asreemcnt the Colln-aetDpeuments don~ include other dOCUD1MlSStiCh. as bidding reqJtircm~f$ (tld~scment orinvitati()l1 t() bid. InstructiQns tQ' BidiJeri; sarople forms,' the COn~sbjd or portions of Addenda .-elating to bidding reqldrwent$:)t S 1.1.2 THE CQNTRACT The Con4-act DQClUll.ents form the Con. for Construction. ~ Contract represcnf$ the ~tire and int~ apemcpt .belween the paqie$ herem and supersedes prior ~ns, represen~ons or a~, either Written or oral. The Coruraet ~y be am~ed or modified cmJy i)y a Modification. The Contract ~nts.sIudJ not be QonstJue(f m 9J"eate aeontnlctual relationship oranyJdnd (1) ~. the. Architect Imct CoJitractC!T, (~ ~ the QwrIer and a $ubcotrtractotor Sub-$pbconti'aCtor, (3) betweam the Owner and Aniliiteot tlr (4) between any .pclrSOns or ~~s other ~ the OWner and OontrQctor' The Al'tbitCCt shall, h<>wever, be ~tJcd tQ pert'oDnanCC and :enf~ent of Obli,gations~ the Contract intended to &clUtate pedOrmanee of~ Arddtecfsduties; t 1.t3 . WORK , ,._~." The teJ1Jl"WQrkq means tl1econsti'UCtion. and services requ~ by the Contract Docum~ts~ :W~~&WnpJ~4_or ])flrtially compJet~.andinc1udes all Other bloor, materuJ!s. equipment a~ s~ces provicied or m be provldedby Ihe Conttactot to fi.1lfiIl the Contnl.etor's obf~ons; The Work may constitutcthe whole ora part of the Project. f 1J.4 'tHl: PROJEQT The Project Is the tOla) construction of whicbthe Workperforrtlcd !D1Oer the Contract Dooumen~ maybe the whole or a part and whiQb mll)'include eoll!ltrUction by the Owner or by separate contractors. ,~. ", . ' ",01"'. t 1. tHHE DRAWINGS .~, I .The Drawings are the ~ic and pictorial pOrtions of the Gontract Documents showing the <iesi,gn, I()CaJion and ~. cfimensiOllS afthe Work,. ~nerllUy iIl~luding pl~, eJeVflticlUS, sections, _tIs, schedules and di~ '" ' f t1.61'HE $eCIflOATION$ .. ~ Specifications ~ tb4t portion oftJie Cf>r1trllct Documents COI1$istjng of the written req~cnt&,fQr rilatCri~, equipment, systems. .~dari,ls -and wOf'lonan$hip fot the WoTk. and petformattce of related services. .,<1" '\ ! 1.1.1THE PROJECTMANLlAl . ... . .... i . . 1 " .' The PrOJect Mariwit is .'vobjIVc a~Jfildf()r tbcWork whiQh m~y include the bidding re9uhtment$. ~plc.. . forms, Conditions of the Contract Ilnd ~peoifi~ons. 1 f . ! S 1.2 CQRRELA1'JC>N AND INTENT OF THE CONTRACT DOOVIefENTS fi 1.2.1 The intent oftheCoil1ra<:t ~ments is toincJude all itetn$ ~ for the PltlJiea; ~ionarid completion of the Work by theCo~r. Tb~ContractDocul1\amts are QOmplemelttaly, artfHvbatisretiplired by onesbaU be as binding as if required by aU; petfonnance by tbeConttacttlc s~I be required only to the extcnt consistent with the Contract Documents andrellsOnl1b1y infe~ble rrom ~ .$ being ~cessary to )JJ;O,(Iuce{he indicated resu14. .' . ~ :"",....."", 5 1.2.2 ~oll of the Speclfkfrtio.tyi into diviSi()ns, sections and articles, ~ arrangem~ qf p,.Wings shall not COJ'ilJ'Ol the Contractor in dividing the Wort amoni ~~ntract()t'$ or in eStablishing the extent hf Work to bet . perfonned by fJlY trade. . i , g 1.U Un~$ ctherwiscstatedin th~Coritn\ct OoCll1ll~ts; wordS which havewCll.;known ~iC.tI oc eonstru(loon indusqy ~Ilitt~are wed in the Cohtract Doct1Jltents.in a~ancc witb sUtili recognized ~nlngs:""- .., ,_ '''_.".' .. .. W. ~"~~Ol'" - lPt7.~iQbt: · *1,1015, flit_; i~,1"7i l.st. 1'5.. lNl. 1.~. IHe; 1.711. 1"1, 111" ailci i.., by 1'M ~1'i....., 1nst.tUU~f~Chit."t." AU d"'~ ~. . IQMl*", fti.l. AlA. ~'t b .~~ I1!,r V-B. Ci?PPt~t LoW and . .. 1 IIl_.tiOJllll~.'tt..., "'''!U't!>9rlltOld. "~qtt".; or .u.t.r,u..tt!oOI tit ttu.AV\. ~t.; -."1' .....u.... ol ii, *'Y..~ti,n ...,.... 0 "iViI - ........,...1 po-hh... '""'" 00;11..... ,*"a~ ~ ~_~ ~p.,.dbl,<i.....1:b<i la....'lh1l. drd.t was Pl'O~.by AU .l>lc..."e,.t l"!i4:U'onUf06f:tOO!ilWderOrCle" 1I~.loclitJHji6 l~Ch..""ir... oriGllliZ01l6. ...db n01: .tOt totoalo. . U.n Bot.., - . 1124H4.!>401) fi UCAPITALlZATIOH . G 1.3.1 Terms capitlJized in t1tese Genc:ral. Condi#otIS in91ude ~~. Which are (1) ~ificatJy lieftne4. (2), the titles of nUlnbmd articles Ot(3) the titles of other .docurnents pubiisped twtbe .4;meri~ Institutt ofArchiteaS. . .fi 1.4 INTERPRETATION 11A.11uthe intel'est6f.brevity tbe.CObtJ'a(;t Doeum~~lletltly ~nUtmCldit)ingwotdssucbias "BII" and "ant' andricles such as "tbe'o and 'lan." but tile fact thata mQdffilWl;)f 8!)article 1$. ab$Cil.t from one ~ent and 8A))e8rS ln4notl1er is IUlt intended to ~ct the in~rpretltion of either statetnent fitS ac;cUTION Of: CONtRACT OOOUMENTS · U.1The GootraCt Do.cuments $baU be .edby the. 0Wl1el" ~ CoJlt1aCtOJ'. If either t1Jt 9Wnor ~~Contraotot or. both do not sip all the COntract Documents, lite Architect slulD identifY$ucb unsigr.led fiocumentS uponiequcst. 5 1.502 Execution ()f the. Contract by the Contractor is a rcpresen~ that the Contractor bas visited the site, ~llle genctaPy familiar with looal conditions under which the Work is to be performed dna. Corre~ personal obset\llticms with requbmems of the ContraQt Dooumertts.. . ~ 51.6 OWNERsHIP ANI) USE OFDRAWJNGs. SPECIFICATION~ _ OTHER It4STRUMEH'r$ OF SERVICE . . . ... f 1.~.1 The Dr8wi~ ~ifiClttions and oiber documents. inclpdfu.81hose in el~ic fonn, ~ by the A~~ end the ~s ~nsultants are lnatrwnems ofSefyice th,rQup whfcb the Work toIbe ..~~ b>'. the Contractor is d*"'be(t11t~Con~ may tetai~ one ~ stt. ~~ithet the ~tfJrnPr aw Su~~r, Su~ or material or~utpment suppber shall t)W1I or claun a eopYli$ht lD the DraW1llP~~ and other ti()el1lneDtS p~ by the An:hitect.oc the M:i1iJeet's <:onsu~, &net wtlt.nC)th~'Q.~th~ _, _, ,.. Ambitecf and the A~tect'JQOnSuJtants mail be deemed the authors of~ and will retain. all conunonlaw, statutory and Other I'eStrVed ,.ts, in addition totheeopyrigJ1ts. Alll;Opies of Jnsfnurt~ts Of~Mj:e, ~ the. .. Con~recorQ.set;,sbaIJ berctumed or suitably ~ for to the ~. 011 mq~. UPOQCQtnpletio,g M.. ~. the W()fk.1beQttw. Spcciu(18tionnnd Qthet.. documentsP~ by the ArcJ)i~tand the Arobi~~-' . . "/,.... consu1tan~.and ~ie$thereof furi1isb~ to the COtttl'actOr. are for _solei}' with .reSpect tothis.~ .~. not.to belJ$ed by 1he Contractor or any SUbcolttrilCtor, SU~bc()~r or rnatCrial or eq~nt ~tier.on~ther projects or for Idditi~tothi$ PrQjectoutside tbe~o~ of the W~ Witboutthe specific~.enlof ~ .' oWner, Architect~d theArch.i.~ ~ltan,ts.The Qwlnctor, SUbcontraotors, Sub-su1)~ ~d ~ oreqwprnontlluppliers ~ ~~ to use ~ ~ applicable .pOmOns ofabe Drawin&s, S~tiori'Y Slut. olherdocuni_.~ by 1he Architect and tpe Arcbitect's consultants appropriate to and for U$e in the ex~ion .~, of lheJr WOIic lmder the Contract Documents. AU QOp~.m.ae WIder this 8U1horilation shalt bear th.c sta~"", . copyri~ no.t;ice. if anY, shown on ~ ~~ Speciflcatiorw and other .docwnent,. ~. twthe ArCb~and . ';\ ~ Aroh.itAlct', 9O~ltm1~.S.Ub,ntittalor distrlQutiOn to m~9~1 rcgu~ req~~ts Of. for~l'urposcs in /,., : cotUJCI:ltion with thIS PfoJect~not lobe ;COD$b'DCd _ pubhcatiofi m derogation of the Atch~s or ~$ ,.'_ consul.' COpyrigbtsor oth.er' ~ rigbls. ., i". "'\ \. " I -" f i f .;~ ART~ 2- -OWNER : 02.1 GeNEIW. . .. .,.. .... . .. I 52.1.1 The Owner is the person or ~ityidcnt,ijied as BUch in the ~em and is rcferre~ to througho~jtbC!i COrltraCt Docuntentsas ihinguJ.-in mnnber. The. Owner shatl dO$Qpl$'e in ~ . rcpre~~~~(). ~IJ~. . cxpress ~ to birld tbt Owner with r~c:t toalI matters reqWri~ tful Owner'sapprofal or autb6rization. ~cq>t - otberwiseprovidedin SeCtion 4.2.1..theArchitectcioes not bavt $ycfl'aWttnity. 11Je.tertn ~ means . ",., . the O\vner Or the owner's 8utbor~reptesentative. i 2.1.2 The OWnershalliUmishto theConttactor Within fjfteert 4ys after receiptor '- Written ~ hlfoi1natitm ne~ and ~levant fQr thCC<JntractOi" to eva1uateigi~ n~of'or enforce tne(;hanic's lic;ri' ~;'~uch" '. '" c infQl11)at1on shall include a ~t statement oftbe record legal liUe t(> the p~perty on which th(ProJeot is located, \ ~QaUy ~~n'Cd to as the site, and the owners interest thereiJi.. . I i ,~ -"""'<-'~",----"", ..",...,.-.~ fiUINFORfMTlOH;4NDSER.YlCESREQUIREbOFTHEOWN;R .... ... ...,' ..... i ~2, 1 Tbe~~~ ~ll. at tbeWIitten n:qu~ oftbe Q)ntracfur, prior to commcucement O(the'V{ork81ld~, furnish totbeGontractor rea5()bable evidenj:e tMt financIal amuagemcnts bave~ made 1P fu1fiUlhC" owner's . oblig~ions lmger the Qontract. fll,nU$hing of such evidence shaJI be a cQ.gditi(Jn precedent to commencement ot~___F .,. . 11 12U43~S<l411 continuation o(the Work. After suCbevidenpe has l'leen furi:tlsIt~d.. the Owner shallrtot mateliallyvsy suCh fmancial arrangcm~nls without prior notice to the Contractor. . . !~.2.2 E~cept for.permit.s and tees,ip~lQPing those rcqWredunder Section 3 .7,1, wh'icbare therC$pQD$ib1Iil)' of the CorltradOr unde.rthe Contract ~UDlenls, lheQwner slu~U secure and pay.. fqr De~.approvals, easements, 8S$esmtentS and:~srequjred for-CQnStruetion,use Ofoeoupanc.y ofper,rnanctlt ~-or for permanent cha.Dgc:$in existing facUities. . I '.' i .2.2.3 .~dwner Mll11 ~ s\1IVey$ descn1>angphys~ charaeteristics. ks&a1 JirnitatiOl1$ ~ -mlity lOCations for =::=~~~=~=~~~.t=mOf Waik '. . 5 2.2.4lnfonnatjon or services reqWred of~ .Qwner by th~ Contract Doc:wpenusblll ~~i~~ by the Owner with r~bleprotJ1ptnC:SS. AllY ~ htfOlTllJtjon or servi~ relevant to the Con~s ilCrtonnanC'e oftbe Woik under theOwiteKs control shall be furnished \)y the Owner after receipt from the ContrllCtOr-of. written reqUCst for sUCh infomuttion or servic:es. __. . .2.2.5 Unless oth~ proyi~ in the Contmct Documents, the Contractor wql be furn~frceof charge, sUCh LW.)pies afDra-wings arn:i. PrOjt(:t Manuals as art reasonably n~ for exccutfoil of the Work 52.3 OYJHER'S RIGHT TOsrOP THE WORk 5 U.1 If the ~ fail8 to correct Work ~1UChIs n~ in ~ Witb.then:quiremewsJlfW.Cp~ Documents as requUedby Section 12.2 or pe1"$istcntly fails to~ out Wqtk ina(lCOrdante withtheOon11act Doctunent;tbe Owntrtimy jss~~ a written ordert() ib~. C9l1~r to ~p ~ Work, oranyp(n'ti01 thCte~ Utilil the caus~ forsllCb Order has been .elim~ bow~er; theriglit Qftlie Owner to stop the Work shall not give rise' ~Q 8"" duty on the part of the 0wnerto .ex~ise.thi$ right for the benefit of th~ ContJ'aCtoror any other persqn ~. entity, .~. cxcept to the extent required by Sel::ti0l6.1.3. .,~~ ,y-'" i 2.. oy/HER'S RIGHT TO C.Y OUT THE WORK . .'. . . 1. . S ~.4.1 lfthe Co~tor defaultS or ncgl~ to carry outthe Work in accordance with the COIltnl~ oOco~uts and fails within a seven~perlod ~ _ipt of written noric:e from the Owner to commence an4 cOntin~ correction , of such default or nql~ with (jilisence and proptp,tn~. the ~er mar alter such seven-<hly period giv~ lbe., .. ~ .. . Contractor . ~d wri~ notice tQ COInlCl Such deficiencies within a ~ period. rftheCo.1tra~r within .. .' s~h tbree-da)' periQdatW~iptot such socondnotice tails to ~ence and continue to COrtect any doficien~, the Owner ~y, wiltoutprejudil=C to other ~iesthe Owner may have. CI)l'RlCt ~ deticie~.-IQ.s~ ~ an 8ppI'()pri~~e Ordet; ~ be ~ d~~g ftpmpaymcnts tUn or the~ dttC. fu.,aD~.~ .....' '" teaSOll&ble - ot~. sJJCb de&ienGles, m~ludmg Ownus oxpell$eS and com~ f'pr die ~hi.,~ . ". addi~oml1servi~ mfSCie necessa,ry \)y Such der.ult, n~lect otfailure. ~ ac:tion \)ytbe ~and amwnu/ .. c~ to the Contl'a(:tor are ~s4bj~ to prior approval of tile ~ lf~entstt(en ... thcreaftet d~the Co~or are not sufficient .to covet SUcb ~QJlJH$. the ConlraCtc)r shall pay the di.fference:m ~ Owner..! r i ,. ; , ARTlCt..e 3 90N'J'RACT()R. ! L ! 53.1 GENERAL S 3.1.1 The ContJ'ador is the person or entity identified as such mthe Agreement and is refCrredt01hrougboutth~, CO~ Documents as ifSingularin numb(lr; The term "Q>rrtractor" means the Contractotor the Contractor's authorized ~resentative. _. ~".. ~,.. ~ ~ ~ 1 3.1.2.The Contractor shan perform tb~ Work in a~~cc \Vi!b theCoritract [)O(l~ts. .i .' . " ~:t~~':~;:~~~~~,w.:~ot~~-;~ inspecti()ns or epp..ovals required or peifo~e~ by pecsC)t1$ other than the Contractor. :' . . L. IU REVIEW OF CONTRACT POCUMENJ$ AND FIElO CONDh'lONS BY CONTRACTOR i U.1 Since the ContractDocwnents .&te eOrnP1ementSy, before startiJtgeach portion of the wOrk, the Cpnt@<:tOr.;~__.. . . sha11.caretWJ.y study and compare the YlU'ious. llrawings and other Coturact I>oCtJmentsrelativc to. that pprtton of the ArA ~t ~Ol. ,"l..'.eqpyriOh~O 1'11,11115, 1.ie, t'~$.. l;n. 1j81. ;.~., 1"'1, 1~~; 1~.', Ino,. tt7., 1~' ....., 1~' liy",.' ~~~=fl=~.~==~,,:~'::t::J:::-:i.==~ :l~'"t~~~t ~:L~s~f~':~ ~r1.. ..,... 12 Civll .Illid Cl";j.0Il.crlr4 ~",..., .and \f11.! ~ ~~ Ii" ~ NlU.... ut.lnt. po.o.il:i1;, ~~. 1.... Tlii., ~.ft "". p~~ liv ~TA .<>t~)t&r' .t. I8::;-4,~' em lO/ll6Z2QO$lilider 0!:4iol:' ~..looOlgioH_l wtilCh explr..on "1f~OP6, and Is n<>t. to.. .....ale. . U...r lIOte.< . (2~434~41J WQrk,as wollas the lnftltn1atiQI1 furnished by the Owner P~ttoSection 2.2.3. shall take. field ln~rementsof any existing COIiditi(lfJsrc~ ~ that ponj(moftbe Work and shall Obsl:rveany conditiOns at the site ~g ~, 'rhcsc ol)1igati()11S are forth.e putpQseM facilitating tlOnswction by the ContIJctor and. not fqr the PUl'J'P8C ~f tUsCQvering errors. om~i~ or inconsistencies in the) co'ntract Documents; however) ~ etrorSJ inconsUimeies or ODlissiQDs discovered by thC) Contlac;tor shall be reported JX'Omptly to the Architect as a request for inf~ation in sQ~ form as the ArchiteCt ~~y require. S U.2 Arty. d~ign errors or~iS$jons ~ by the Contrector duripg thi$ review shall be ~poitedprompt1Yto the Archite% .llUtitis rec~ ~ lbe QontnlCtor's review ~ ~ .in theeol111'actors capaqity as a coDtnlctorand not as ali~ design ~fe~io1'lll unless othln'* specifically provided in the Contnlct~meil1S:"1'bC V' ,~ ConttactQr is Dot require<! ~. 8S~ ~ the Contract Documents ~ in ~onfImce~~licab~6riSCltut4lSj ordbt~*. building coties, ..and J1.ll$ - reguJati()QS, but'JDY n~ ~~ , or ~ known to the Contractor shall be ~rted promptly tQ the Arehitect. . i ! . . I f 3.2.3 IftheContractorbelie~. ~atadditionaI epst or tUne is inVOlved ~eQUlarificatibn$ or ln$trucUOllS is$ued by the~inl'eSpfJll$etQ the~f'SDOticeS orreq~ for irrlOnnation ~. to Seetions3.2.1 and .3.2.2, theC<lntmctor-VialJ m~Claimsas P/'Qvide(i m Sections ..a~6itt<14.3. 7. Tfthe €0ntl'acrtorfaiJj1o" peffQtm theobligatj()nsofSecti~ 3.2.1 .1U1d3.2.2. theCQnttactor ~ ~ ~uct1.COStS and48nlag~ to theOWneJ' as would have been ,avoided if the .~ bad ~ SU~ob,I~. The CO~Sh8Jli1ot beUablCl to the Owner or ArchiteCt for muna~~ resldtins from ClTOri, lncon8~~ or onriSsions in the ContraCt Docllqleots or tor diffetences betWeen field. measuremellts or ~ons and tile Contract Documents unlqss ttte ContraQtor recognized $Deb error. inConsistency. omission or cillterence and knowingly falle<1 to Ripon; it to1hcArcbiteet. s a~ st1PEFMSlON~DCtNSTfWcrION PROCEDUReS 83.3.1 nc ContractorShills~ .00 direct the Work, ~. the Contraet()J's .be$t skill and attention. The G9f1~ctbr sban be solClly ~ble for and.bave C9Dtro1 over ~~on means. medtods, techniques, $~f and ptOoedurCs and for coordinatins al1. pot1ions oftbeWorit under the Co.ti.~U1lleSS the Contract ~itt$ gi~ Other~fkinstru~onseonc:enUng these matters. Iftbe ContractDocwn(lftt$ ~e speci~~jOJlS , Qoncomiqg c:ol1StrUCtiQn m~ methbds~ ~ques. sequcn~ or ~, the Contra~or Sballe~hUUe the e:~~~~~;:~~m:=~M teCbniqucs, S<<luences oip~ ltIW not be _te. tbo Cmttractor ~Q give timel)'written notict1Q tile OWbcr ~ and Architect and shall notproceeci with that portion of the Work Wi1&out further written i~ctionstrom.the . Afd1iteet. If the Con~r ish instructed to proceed with t!J<:.required Ql~s, methods. teCJmiq~ ~ence$ or. prq~ures wlthblJt aCcepWIctof cha~espt'op()$Cd. bY the ContnlctOr. the bwne.r shall be SQlclY I'llSpoI1Siblefor ~ 1ll$ulting Joss or darn~~ .. ,,/ __~'" . 5 3.3.2l'he ContrattorSbaU.bc respo~~le to the Owner for acts and omi~ions oftbe Con~qrs einp~. .,' ' Subcontract0r5l11)d their agcmt$ IUld #nPlO~llnd other ~ or entities performing portions of the WorkTor or on beblllf of the Corl~r or ~ ofitS Su~~. .. . . . / , -.'*' ...... ''''-.-v. j , I.. . '..' flU ~ Con1ractors~1 be ~bte forin$pection of POrtions tif WOJt Il1readx perfo,imfJ,d to d~ine~ s~ch portions ~ in proper C(Ildition to receive stibsequent Woil<. f L _ \ L ^ .._ ! 63.4 LAS()R AND MATER1AL$ . I. t 3....1.. Unless otherwise prpvidbd in ttle COllt:rIlet Documents.. the Contractor sball provide and ~ for labor, m~ equipment, tools.l:0nstr0cUon equipment and mac~nery. WItter. h~ util~. tIUsJ,1orta.tiOD.-end other . facilities and ~ces ~ for pr~ oxecution and CODlPl<<ion of the WOrk, whether tcll)pOriry or pepnanem '" ~d whetheFor not inCOi'potatN or to be inco11pOnlted in th~ WOJt. .' . ,,' " _ t .'/ G 3.".2 The.COntraclor tnaymake$U~~tnti()ns onlY with the ~t of the Owner. alter ev~l~tiol1 by the Architect and in ac<lordanceWith a Change Order. ... , . G3.4.3TheContractorshaU Cflforcestrict diS<5ip1ineand good o~ amoD& ~. ~~etQrS'entptoyees and other persotlS carrying out the Contract. TbeContractor$bl1 not permit emplqytntmf ()f~rlt per$cinS 6fj)ijiOiiS not skilled ittfa$k;s asSigned to them. ! AUo,~t.:uol;'" ,.. .1..~; '~t. .~.u, lt15.1!Jtlll. ~~t 1tl1.i~1.. nil'; It!U.1.H:i.,l.~''. ,1:J1Q, U7!i,1N1 aqd .11., by TIll' _t:..~.., lUPtl!~.of Ar"tti~>l.AU nv1>t'lI ri.......... ~; rbt. AlA. ~~ ;U ~ by g... ~~t J.ioil....., 1n"...,...~.~~...~t:bOd......~CR> Cii:' di..tft.b"ju,OI'l f>ftl>.t.- ~.~.cij,.iqi P<>rt,>0I'l.f>f i.~..,.y _.~ Ul .......... 13 c!."i'. andc.i;~...l pefta:lti_., - .w..u. be __l:lVt,o,:t. to thiIo --. __t ~.atbl.. ~. l:!\tt llllt; 'nil' dr.l't~A.lP"oQu~ by .A.lA ..,tt....t...t: u,~ :5t,,;, n/06/200S\llii:jec oi:iiIor 1Io.t~ooi91016_1""1Clt'""P~'.oi OIl '/.ln~O', and li11l1t1t tor ......1.. . .. u.... llQt...., . . unU.SHlI '3.5 WARRANtY t U.1 The: Contractor W8mU11S to the Owner an~ Areh~.eet that mlUerials and equipn:tent furnished uDder the Contract~n be of $ooaquality andnewUJ1le~ otherwise reqgiredor permitted by die COntract PocwnenlS. that the W()Jtwillbe treefromdeiectsn9t h1llerent in tile qUlllity~~or permitted, and that the Workwill e<mfonnto the l'e9llitemcnts of the Cootract D()CIJIJlen~ WOr]( llottonfomtfug t() ~e$Clrequirem.ents. inclucfmg substitutions not propetlyappitwed and authotize4, maybe ~4ered dcl~ve. 1"lu: COrrtra~sWammtye~cludesremedy for damage or defcctcaused by ~e. modifi~tiOn$ not~ecutedby~ContraCtor, intproper:orinsufticient maintCl1an.cc. improper operation, or.norm(1 wear atId.~ andnonnalusege; If required by the, Atchit<<t,the CoiltrattOr shall fittnWt satisfactoJf evidefice as to the kiitd and qlUttUyofmaterials and cqbiptfent. H.6TAXEs .. ... .. . .. .. . ... . .. I '3.6.1 The ~sltan pay ~, co~, use and ll.imilar~. for tbt WoJkpro~by the Oontractor WhiCh are legally .~. ~en bit:isate r'eeeiYe(J or negotiations ConcbJd~ whether or not yet eftect1ve Or merely scheduled to go intoetretlt. . ~3.7PERMJTS,FEESANDNOTlCES . '. . .. ' G 3.7.1 Unless otherWise provided In the CoJUract Document$. the Contractor ~aIl ~ and pay for the building permit aDd other perti1i1s ;utd governmental fees. licenses aJld ~ons Ilccess.ary for ~ eXecution IUld . completion of the Work whi.oJilltc custOmarily secured .afttr execution of the Contract IUld wbiCh are legally required when bids are recei\(ed or negotiations concluded. , . ! 3..7 .2ne Contractor sball comply with and give notice$ requ~ by laws, ordinanees, n&s, regnJatiOt'l$ and lawfUl orders ofpl1bli~ atltborit1esllpplicable to perfOllDlUlCC otthe Wolk. L ...._ _. ._ ~ 3.7.3 It is not th~.~rs responsibility to ~ that~c COB11'act Documents ~ in ~c:~ce. with .J" . llppJicab.e 1aws. Stlltutes"orijinanccs, bulidingctldes. and.ndes and regijlations. HOwevC!i'>'lfthe.Contractoro~ that portions of the Oonnet Documentsareahariancc therewith, the Contrac:tor sh#ll p1'<)mptly notify the Arcbi~ and OWner in wtiting,and necessary Cbal1ges shall be acComplished by appropriatct ModifiC2lti, _ #<,' 5 3.7 .41fthcContraCkKpetforrm Wort knoWU18 it to be contrary to laws, statutes, ordinances. btiU4!ng codes, !and. ~les anc:I~()fJS wilbout such bOtice to the ^rcbiteet and OWner, the Contractor shan ~ appi'OP"'t~; . respoilsibility furslich Work an.d sbalJ beat' the costs attributable to correction. >^?'-' fi 3.8 ALI,.OWANOES 53.8.1 The Con1;ractQr sb"U mcludc m the 0011tracf Sum IU allo~ SWed in the Contract Documents. hems covered by allpwances ~U be ."pplled for _ am.o~ and by such ~ or entities as theJJwnermay direc:t; but the Cotttnwtor $ball not be FCqldrect toempJoy per$OD$ or entities to whom the Co~rbas ~ " objeQtion. l " ....., ," i 3.8.2l1uJess ~ p1'QVtcJed i.nfheContract Documents; ...... f.1 . .' .1 allowanpes sm.p ccwet the ~~ tc>. the Co~Q!actor of materials ;utd equipment. de~vered at tIf site and aUrcq~it"edtaxes,less liPP11CJble trade dISCOunts; ."..' ! .2 OoUtra4nofScosts for urlJQadiqg anci ~ at the $ite~ ~abor, inste1Jauon ~.9'!'~r!!~,!pro)lH!rI~ other expcosesC:Qlltempl4ted fQr stated allowance .amounts shall bcincl~ in the Contnlct Sqm but nQtin the allow~; .... ... .. . ....... . .: .3 whenever costs ~. more than or I~ than alJOWJJlC~ ~ ~ Sum sh!1lJ fje adjustcdaccord~1y by CbattgeOtder. The amount of the ~e ornet ,baU refl.~ (I) the differmce .~ actuaJ ~Sts and the aJlOwlim:esuoder Section3.8.H and (2) ch~ in COntl'aClOr's t9StS ui1det~ion " 3.802.1. . ." I t 3.8.3 ~al$ and equipment untteran allowance shall ~e selected by the Owner in Suffi4iClrt(troJe to avoi<l delay intheWotk. . I.. . ; . .... .. I ' 53.9 SUPERINTENDENT .. ..... .'. . .... .... .. . ..' . .... .. i , S U.11be ~shallelt1p19Y a competerrtstr)1e,l'inteoiJent and..~ assistantswJ;tQs~m)eiiiatienaance If the ~ojeet site dlll'mgpetformance of the Work. ThesW'Orintendentshall t'q)res.ent the Con~~ md . . ._._ CC)IllMunications given to the superinten~t shall be as bindin~ as if given to the Contractor. ImJlOl'lllnt Au; Il'~l: A:.llll"" .;; 10U. ~lIi>r....l'1i;.l.i.,.l91.. I~,t:ri? 1'011. 1".51, *~l.. l~.itU.I"~. 111'1.. 1..1 ..~ t1trz by~. ~rl~ 1,,'tl~u1:.ot ""d>1tech.~ln:~I:II. ~~ !Wikt"",~. AlA- ~t. h p.ro"",*_ ~ !l.S. ~i9I>l'. 1,*" ~ 1..~~ r'-;U...VJ>aill:h9,,1e'" ~. ..... d1.tJ;'.l;llc.~"" ottbh AU..~. ~ anv PM......M U:. ~ ~.tla\L\.r. I" ......3 cl\ri;I.Iidc.;a.t._lpe"&liie.~ ~..m b;, ~.,","!":i"'d .1>> tlse..~ ~r.F9."lbi. uiidl!r ~. lao;. TIlt;; ar,ri wa". pri.ci~ by. ~ ....tt...". ..t a"'i4:~' (lh 10/.b6/,20ll5 IlIIder O'rihir lio.iOo~tflOi6...i llIIi;1t iI.~lr" Oft *1i/ii006. .ni.I i. ""t te>r u.ale. . u..~~.:. j~24U~5441) 14 cQmrnumcatiQDSsbalJ ~ confirmed in writing. Other COtnnlunieatkms Shall be similar1)! confmned on written request in ca(;b Case. . B ~.1.0 CONTRACl'OR'SCONSTRUCTION SCHEbULES fi 3.1.0.1 ~ coUtractor.~kptlJy after being awarded the Contract, shall ~ end submit for the QWnc;ts and ArcbitecWs infocm.rion a Contractor's constructi{)11 sch!'dule for the Work. ThcsoheduJc sbafhlDt ~cecdtinie limits :cwrem u~ tile ~~nQcuments, shllJl be revised at appropri~.~ as ~uired by rt.e conditions ot'ihe Work .lig~ Plqj.~ $haIJ bere1ldeQ t()the en~pt()ject to the ~ required by the Con~ ~nt$. and shall provide for expedltious81id prBcd~le execution of the Work. .. , 13.10.2 The Conb'actof sbalr~ and keep current for thc Archite<<'s ~val.IlSCbcdUle of4UbmiUals.whichis coPt'dinatedwith the ContractQr'si constru<:tion scbedl.i~ andalloW$ the ArCh. reasonable time to review submittals. fi 3.10.3 The Contraetorshall perf"otmfhe Work in genet'$! ac<lordan~ With the most ~bcmJes suhttlitted to tbe OWner and An:h~ . I I 13.11 rx>euMam AND SANJPLa AT THE SITE ... . ; ;. .... 13.1U The ~shaJJ~in at thc .site for the ~ ~ ~d CQl)Y Oftbc~, ~ifications, 4d4end~Ghanse Ot'ders.and other Modifications, ~ ~ order end l1lfUked ~ty to recotif fietd ~ees and Ildec(ion_ .~e dqring C()QStruction, and one ~ cOJ?1 of approved Shop Drawi~ Ptof,tuct Oa",SarilplCs and ~iInil8r .~uited ~htaJs..These ~n be avaiJ#ble to the ArChitect and shall be delivered ~ thcr:Alttitect for ' . subrnittttl tl) the Owner qpon completion of the Wotk. t . _. _".. fi 3.12 SHOP DRAWINGS, PRODU9T DATA AND SAMPLES . "' ,# ' '3.12.1 Sl!Q1> Orawingsare drawiJl8S. di~. scheduks and other _ spe~iaQ)' prepared Cor ~ Work by ~, .. .._' Contl'actQr.Or a S\IbconttaCtor, SutHubcOrittac;tor. m~faCturer, $Upp1ierw distributor to illustrate ~.pOI'GOn of ..... the Wm-k./ . 5 3.t2.2 Product p$.~ .ilblstrations.smtdard sehtdUles, perfQrmance .~. instru~ons.. br~s, dia~s and Otherinformation1UmiSlic:d by1he ColltraCtor tOiUUsti'ate1t18teria1sor equipmenlforsome ~gn.o(tb.e W~rt. 53.12.3 SamplesarephY$ica1 exampl~ wl1i~ iUUstrate~ equiPment or worianansbip AAd ~Jisb $landarefs by whichtbe Wo~wiU be judged. . . ~~~~~:::t..~~=~:~~~.~ /, ()ocwne~ts.~ ~y by Which Iful.~ pI'QpQSCS to conform to the lnfoptiatiOlJ Jiven ~ Jhedest~ ~ expressed in~e ~ D~ents. ReView t>y tbe Architect is subject to the limitations pr"c:tion4:J.Y;. \f ...... .ltJf'ognational suJml~ ~ wllich theArcbittct is I,lot ~ to take ~ive actioIi qubt be so ~!'d in ~ ~ntract Documc:nJs. ~itW1s which ~ not reqJlired by ~ Contract Doc1.Imcms ~ ~- returned ~ ~ An:lilieot wi,thout action. . . I:. , U.12.5.TheC()lltractor sltaUreview f<n' C9mptiancewitb the COlttl'ICt OOcumcnts. approve:3J1d submlttdthe .... ArChitect Shop Drawing$~ Product D~ ~P~and simn. SllbmittaJs "'9Yil'ed by the cdntraet- ~With., reasonable prcl1llptn~ ~dii1 SlJch~uence as to C8lI$C no delay in the Work or in ~ activities of the .()Wner or of Jeparafecon~ Subrnitta~. wllicl) ~ not t1UUiced urevie'Wed for ~mp1iance with the Contras..t>.ooumCllts.aQ~ approved by the Corttraetor may I;lc. returned by the Architect without action. ,,' .. , ! 3.12.6 By approving and submittb1g Shop Drawings, Product ~ Santples and similar s.,6mi1fiiJs. the Contractor '" , represents that the COnttac;tor has determined and verified ttlaterials. field measurements ~ fi~d construction ~terill teJate4 thereto, orwilldos()~andbas Checked an4CQordinateQ theinftmttaltion<:on~ within such Ilubntittals with the requirements oftheWor'k andoftheCon~t DocUlQents; .. 5 ~.12.7 TheContracltor shall pert'Qrmno portion of theWOi'k&rwhich the Conttac't ~entSiCqtiire siJbriiiffil.'.--.' ... . and review ofShpp t>rawiDgs. Product Data, Samples or similar suhmi\Udsunnl the repcU\'Cl s1JJmUttal has been . approve,d by tbeArchitect. . ~ ~lIt ~01,,;"1.11i? CI#"~t. .n1~, l:,n. ~'1i.~,I.i:.j7. i'4;l 1~, 1"'1, '1~. ~~,.l,'q. '1~j'i 1~1.~ 1'" b!~. llIan:~"".. In.tjt~.. .OfArcMt..:t", ...UJ, ri~~. ""'~. WIiI!ltIllG. ~i' I.rJ{ ~t... ~ lllrV.$. ~~t.1.lIJ! and '1itM"abO"'.lTi'liaC4.... . iln..viltO~"'jl:oid -Pt~cUOJO ci~ cll..""u;i,u.., o~. th1~~" ~~. _ uy ticttuclt] or it, ..." r~lt in......... <=l'4i .~ ~riil ~"""j ._\<111 bo ~.....""'" to t:Il!o ,..~ _~" .......M..~r ~ta".'ffil~ duCt .... ~ bV.AIl\ aOft"llt~ "t i\h!l4:5t im'iU/O.G/-21105 ,,""at ol;.d<ltllji); IOC/I)I9roi, I .....1e.. ~~:on ./lI!!:AAJi "lid. .... ho.t:tOt: .,....at., ~"ll""*..: . - {2Z.U.;4411 15 S 3.12.8 The Work shall be fu ~ordance WithapprtMd su\:ltnittals except that the COnl1'actor shall nattle relievedaf responsi})ility for deviations from reqtJircments of the COntrm:t Documents by the Affititect's approval of Shop 0rawiIiJs. ProdUct Data,Sanmlesor simU8.f submj~ls un'less the Contracior has specIfically jnfonned the Architect in writing of such deviatiOl1at the time of su~iital and (1) the A~ has ,ivetI writtctJ 8pPI'QVaI to the. specific deYiatioDas a minor ~ge in the w~ or ~) aChang~ OrderorConstrucijon Chan8e~ve haS bcml issued lUthotizi~~ deviatiollThc CORtraQtor'.slWJ not be relieved of~ibillty for et'rOTS '.' l omissions in ShOp Draw.; ProduCt D~ SamplC$or similar submittals by the Architect's approval thereof.' . , fi 3'12.9 The ContraGtorshaIl direct $~ifie atte~~oP. ~wrhin& or on tl$Qbmi.lted ShQpDr!lwi~1 trrOducfOiti, SampI~ onimilarstibmittals,. to revisiOJi$ other than th~ requested t)y the .Arc,hl~ on PreVi~.submittals.,JA.the """ abscmce Of such written notice theArCh~'sappl'O~ofa ~mis$ion shaJInqtamply to'stich teYisions. 5 3;12.1D The ContractonbaU not be req~ toptOvide Rrof*ional services Whicbconstiprtetlte practiee of atchiteclUre or engineeringlJriIess slichservicioS are spccifica1.ty ~uired by the Contract DOcuments for a porti()l1 of theWorkQr unf~s the ContraCtorneeds top~idesucbservices in order to carry out the C<<ittactor's responsibilities for construction means, methods, tcehnNue~, sequences and fJFOCe4lJre$.. Tlte ~or sball, fiOt be req~~ !OprGvide prressionaJ ~ioes in violation of appJicap~ law. If~iQ11aJ ~in sbtv~ or . ' eertJfications by a dCligiJ profesSional related to systemS,mamials or ~oot ~ l~d"tcaUy reqUired 9fCbe .. ,'...' .. . " .' .. "". ". I .... .'.. Comractor by the CQntraCt D~en,t.s. the Owner and the Arqbitect wUl spcci1y. all pel'forqt-. ana deSi~ mterta .that .sU4}h scrvi~mu$t Nt\$fy.. The Coniractor shall cause such services or certitlCllliQlls tol\le Provided by a ~Iy licente<! ~~ pt()~ionJl. ~ose s~ ~ s~.~ appeI!r on an dnrwi~ ~lcglatiQDS, .. . specifications, Cc:rtific:afions, shop l)nrwtrJgs arid other submittals prepat'tl(1 by such profes~QnaJ. Shop ORWUl4S .~. '"' and other subrnittJlsreJatechothe Work dCsignedor certified by such professional, if~ by others, shall bear such profeq~onal's writienlpproval when submitted to the Architect. The Owner and the Architect shall be entitled to rely upon the adeqtJJCy, acturacy and comp1eteoess of the $CI'Vi~ certifications or apPl'O~s performed bX such desip pi'OfessiOnals;prO:vlde<i the Owner and Architect have specified to the ~tractQl' al1 perfonnan~ JIft4 &$ign , C1'itf;ria that S\leh services must satiSf.y. Pursuw to this Seotion 3.12.10, the Arcldtect wi1lreviel!;oipprov~9f'~. .~ apprt>priateactronon,submittal$ only for tbe. limited purpose of ~ for CORfc>rmpnf:cw!~~ giVen and the deSign co1lCCptexpressed in the Contnlet Doc~ts. The Conhctor'shall not belis~ible fOJ; th~ adeq~ oftbe performance or deSigne,rlteriareqtifred by theColttraCt Documents, ~. ' !. . . .. '. '..., : f 3.13 USE OF sITe. .'. .. . ..' . .' . .' . . .' . . . . ..' '. '3.13.1 The ~shall COIlt1neoperatj~ at the site to areas pennitted ~ law, ordinances, permits and thr", <. (Jpntrllct D<x:wn0QlS and $baijl rt()t \IlU'C8$01Ulb~)' encumber the site with materials or <<tuiptnent. fi 3.14 CUTTING AND PATCHING , /' '~''\ ' ,"" "",J S 3.14.1 The ContraQtor shall be respot1$ible for CUtting. fittllig or patching required to complete the Wor~ or to JMke its P!lrtS fit toedher properly. 1 , I .5 3.1-l,2 T.Jte Contra<<or stull! n~~s,eQt~.. a ~onoftpe Wodc or fu.1ly Qr~U~Cl()mpl~... . .... . CC)i1StructlO1l oftb(: Owner or ~ C()D~ tlY cutting, patChing or Otb~~ ~~ coMtfUcflon, or by excavation. TheGol1tractor!i~U ~ cutQl' otherwise alter !Such consUuction by the <>wn~ br~!i9~tc c::o~ e1(cq)t witJl written consertt of 1Jtc Owner and of suoJJ seplI1'atll co.ntnU:tor; such eottsent shall not be unreasonably withheld. The Contral:tor $ball nQl. un~onablywitbhold from the Owner or a separlJte cQdtractorthe~etor's-'" . consent to cutt1ngor9therwisealt~the Work. . ......,..,~" is.15 CLJ:ANING UP .' '. ...... . ..... '. " .... 53.15.1 The CoJrtmctorshall keep the ~ andsU1T()Utiding ~.~ ~ accmnuIationOfwJJste mileriil.sol"", rubbish caused by operations under the Contract,At C()l11pJ~~9I1 oftbe Work, the Cmttt'adtQc: slJa!lremove ftQ~and ~tbe Projec1wastc materials, rubbish, theContraet~rs ta<>Is. construedpn eQ'!1iPmen4 ~ll,*,~and:surplQs materials, ". ': ' . fi 3.15.2 If the ContI'actQr fails to Clean yp .asprovidCd intheContraet Dcx:umel1t$, theOwn~~Ydo so and tbecost thereof shall be charged to the COntractor; .. _ .. _,~,_. w~ A2~1"- li1F1.~illit . un!, 1'1$, Ul'. .,h. It,n. H.l. 111~. 1,,1. l'C~, U~..I"'O. fJ?, 1'.7..,.s lllfl7 I>YTM -...,.,.., J",,~l~lit_ of ArCMt.;,;u. All dfht. "..~. ..~1 'b\.l. AiA" ~~ i,it ~t-is *'" iI.s. ~tObt .~~ a<ld Int..""t:J.~.",..t;..'v..-~"lHi4 .~~ .~ ~ia~tllcrl;l.."" ~ tIli. AlA" ~i. ~ ""y "i'~"", ~ it. tIiOy.""lta.1t 1.... uw'. 16 cJ..v.i atiif "'~"1 ~"".i ~ U~l. hlo ~.....t.:I .... tW ~_""~~ ~lt1.l:>1. """"". the 1.... This lIt.tt..... P~lli:<Id),1' IITA .......'t.~..t 11'&('119 onlO{I)f/10"05 _.r 'Ord<oi' .0; I Oooulai(.i i.iilC:1i .liplr..~ an till:lOI)f; ..nd h ....t to.. .......1.. '. u.... WOtoi..:. 122443(54(11 i 3.16 ACOESS TO WORK i 3.16.1 The Contractor shall provide the Owner and An:bileet acc~$ to the WOrkliLpreparation and }l1Qgt'ess wherever located, . . . 5 3.17 ROYALT1E$, PATENTS AHD OoPYRlGHTS . ... ... .. .. . 5 ~.17.1 The ~ sh4U pay all rQy8~ and Jieen$c ~. The ~or slJall defcnd~ or claims for infri~ent of ~ ~ ~t rights an4 shaUbold the Owner and Architect hannlcfss rtomlossOl1 ~unt ~... .....tbUtshal.. I. not.. .. be.... ..~..... iJ'O. ns....~..........foi'...... Suf.bd.... efcn. ~.. Be. or. .10$$ "'.h en ilf)Jlffi......CU. Jar. d.esign..,~... .... ttr.PJ'OdU tJrodu. '. ..C ct ~fa.. particUlar tnanuf4lcturcr or manu~ IS R:qutrec;l W the Contract Documents or .where the cbpyright Violations lI'e ~ntaihed in OraYji~. ~peCifiCatiOns 9rotber c1oc~~. by tbe Owner or Ar):ImCct.'ftOwcver.rt1be' __*. . =;=:.u~=~J7.:"'''':=i.~~''T.t... Anmtt~ . i , 5 3.1'INDEMNIFfC.ATIOH ~ · 3.18.1 Totbo fu1Jest.~ ~ by la.w andtQ the extem ~im;~s. ~ or ~SCsare not ~~rod by Project ~ent Protective Li~lity inswancepun;based by ~ ConqaclQrin 1lCOO~ witIt SeCtion 11.1. tbeConll1lCtor shalt in~eR1Ilify ud .hQId barmI~ the:Owncr' Ardritect. Archi~ ~#jandlp\b aria entPloyces oranY ()fth~ :from and apinst clalntr, ~, ~. ~~, incllldin,J bqt not llinlted ~ attomo)<s' teea.ari.SinS out ofor~ting froJn per~onrmnceoff11c Work,providcd tl1at. stich etaim, _~ loss or eq>enseis attrlllut8J)~l(j bodfW injury, slckgea$. ~~ or deatb, .01' tQ injury ~ or demuciionqf ~bJe p~ (OOlertban the Workltsdt). but Orily to the .oxte1U..~ by the ~Jjsem aclsoromissmos ()f~ eomra~' 'S ._,. Sgbcon~tan)'Onedirectly ~r in<l~y empJ~)icd by .them. or anyone for w~ 8ct$ tbpy may b~JiilQl~ ^~'...._~_" ,... rep'd1ess ofWhedter0rQot SuCh eJaw,damage, 1~()T e~ is caused iJJ part f?y . party indenmified _under. SUch obligation shall not be COI1Sttu<<f to ~ abridge. or reduce otner righ1s fir obJigatiQns of indelrQiJty whkb ." " WOt.!ld odlerwiJe exist as to II. party or.~ described in thi$ SectiOn 3.18. ~.. 53.18.2 III claims ~ ~yperson or entity indemnified under this Sectior13.1 S by an ~pl~~- ~;, a SubeQn,~. ~one d~ or indirectJY ~loyed lly ~em Or anyone for whose acts theY~>'lfaDlc,the incl... emn1.. .... ....6.. catiO..... ...... D...d.bl..igati. .. .... ......00... ... un. .. der...... Secti. . .. . '.. on, 3.18. ,.1 shaJ. '. ... . t no.t be finti... ~ b.>, a Jim. ita..D(lf1. on IntO.. unt~.. . er..~ .. ... ..... of damages. .. ..' .', ~nsation qr bmofits payable by or for the. Contractor or a Subcontractor under workerS'COlppen$8tiOQ ~, : diSability ~tit llct$orothet~pl~ee ~IlCts. . '. . ARTICLE. AQMlNlSfAAtlON t;)F THE CON1RACt l'" 1 AROHfTECT ~';:=J'..~::",*~~~~~':~~~~" ' , in Dumber. The ~ ~ArchiteQl'i tneanS the Architect or the An::b~ authorized repres~ri~.' '. \./ . .... . i J '. 10" ../" lU,i Dqties, ~ibiquesapd lhn~ ofa~ortty 01 the Archi~t <<IS set forth in ~.~ ~ sb~ not})e restrictcd,J1\Odifi~or ~ With()Ut written CODstnt of the Owner, C~ lsnd Architctct, i Goll5etit SllalJ not beunreasonabJYwithheld, i . ; .. . ...... .. . .. . . . .... . .. . .. . .. '. . L... .............. .. .w~.<.. S 4.1.3 Ifthe~l()yb1cntoftheArchitectisterm~ ~ Owner $b#1I emplO)' a new Ar~itCctagain$t whom the Contnlctor bas no reasQllabIe.~bjectlon an4 Whose statUs 1l1l4er tile .CoJitiact Poc:wnent$ $ball-beib~Oftl'tc fOrmer An:hQct. - S ..2 ARQIiITECT'S ADt.fINISTrtATfONGF THE COHTRACT . ... . /.. _. "-. ai:F~1it~=~l=S~.,l~~~::-mbe Arthitect wilJ have authoiily to.act..OP beba.lf of theC>wner only to me cxtcgtprovid~m tbp CQDtIlct Doeumetlts, unJtssotheIWise mOtiitiedin writing in acc9idar1ce with otlter pnJvi$ions of tIle~. I ! 54.2.2 The An::bi~ as.a repr=ntativeofthe Owner, wiUvisit~. site atirltervaJs ap~tOtltes~-o.rtne'.' Con11'actor'$ opet'lltions (I) to ~ generally wmliar with anel to keep the Owner infortOcdabout~ pJ'()gie$s and quality ()ftbe p()mpn oftbeWorkCOInp!eted, (2) to endeavor to guard the Owner ~~ d~lUJd A%A~~A2in" - ml1.,tapy".lVht.. .1'11,. aiS,l.i.; .l~~,. tU?, l;~tj l~'i. i.?f1:. ill6~, l~j 1"0,U'16. 1'" aIId 1,,7 ~y TIle. .......it:"" IlI4tlt11t.qt""Mlt1Ct...Al+~vtI.~ -'~~lIIiIliIl~1 thh "fA' ~. U ~tildW U.I.CDr!Y#~t. Law eDCl .1"~at.on&1 ~ti9..Una"~...IUId. ....~.. ....ck.t:rtboiu.... .Q€ w. ~. ~.. .t:: ..""Y Po~OCIor ~ i<. "'"Y"Hl)1 t.ill ..~ ~vil"'" ............1 pIII>altt..,ari!l ...>.11.l:lio J1.......IlCIl~to .~..~ -~q-..b14o ~u.. !-ail'. Thi.drarl: wa. pt'OCIu<:e<! by "u. .o.>ttt<...".t U:$.:~:9.on Ulffl6J~$ ~tOi.'d.r .110;10001:91016 lWliich~lt.s'l'll.. t/!l2/1lli:. .nd is not tOt ra.1e. u..,.. ......... . - (UCU434ft i 17 0;"'1 ~,r~~-11 ~ios in lI!" W.... and ~ to~... iJI- ifl!te WOd< is Iiejll~ ~ in a J ~..... the Work.. When ful1ycomp~d. wil} be in aceorallllcc with the Contract DoCuments. However. the Arcllitect will Dot be required to rnaIce ~lUIStive or continuo~ on-site inspections tocbeck the quality or quan~ofthe \Vblk The Architect Will neiither havecontl'Ol oY(!t'tlr cbarge o( nor~. res~sible for, the cOnstnJctionmeans~ mcth9ds, tcefutiques, seqtlences or ~ures. or for the safety precautions and pt'OjUlUns in conn.ection with the Work, .since t1t~ are $()1~'y the Contr'actWs rights andn:sponsibiIities under the Contract Documents, ~ as provided in SectionS.S.l. i . I '4.2.3 'I'M .\rchita:t Will not be respottsib~ for the ~s failw-e to ~onn the wmlinLC<lOrdaACC With the ~~oftheContract Docw;n~'TheArchite<<wil1 notbavc.cootrol OV<< or~Clf'ina wiDilofbC.. -'. responsible for aCts or omissi~ oftbe Contl'adtOr,SubcontractorS, or their ~gentsoremplq~roran,yother . ...... .". ~ Pmons orentitiesperl'OnningPortions Clf the Work. fi l2.4.COnunuttications ~aciHtatin; Contract Adm~i()n. ~ as otl1erwi$e Pt()vi(I~ iMhe Contract DoCuments or when direct communications have lHlen speci!illyati1horized, the Owner andUon~r SbiJI ~deavor !Pcommunicate with ea.:h ~ th,oUfh th~ Arcbi~ abc)ut matters arisi~ out Otnrre~ing to the Contract. CommunieQions by and with the Ardi~ ~{1l~ shall be thrQsI&h the Ani1hitect. CoplnlliiiiGatiOns by and with SUbcon~ !lmI material s,uppliers $ball be thrdugh the dcwractot. Comntu?tications by aDdwitb ~e eotttrac:t()B snal be through the Owner. ; i 5 4.2.5 Ba,sed on the !.nzbitect's evaluations of the C~s ApplicatiQIIS for Paysnent. tIte Architect wiN revieW and certify the amounts due dte Contractor and will issue CettifiCates for payment in such dJn01Jl1tS;.- _ . ._~ .-~ ~._..,._... -,-....... S 4.2.6 Th~ AnlbitoctwiU baveauthori1f to ~ \VotktMt does not confoqn t() the Contract DocumentS. Whenever the Ar~itect considers it ~ or fldvi~le. th.c Architect win bave authority to requite inspemol1 (jJ' testing of _ _ the Work in ~cc With Sections 13.$.2 and 13.S.3! whether or not such Work is .~ insta11tdor ,_' ~pleted. However. n,eithcrthis authority of the Architect nor a decision made in ~ faith either tCl ~ or notto exercisesucb autlJ.otitYsilan give riso tc! a dut.yor responsibility of the ~ to the ~or. ." S~ll1!lteriaJ andeqwpment supplim. f.l1cir agents or e.nployoes. or other ~ or ~ JiCrfonniqg portiOns of the WCitk. co '4.2.7 TIle .\rcllitect\Villreview anci approve or take other appl"O,Priateaction upon the Con~r'sS\lbnuu.issucb, . as ShOP DraWini$.Ptoduct Data andsantplC$. but onLy for the limited purpose of check~ forcon~Qe wi.th ,~ Information given .nd the d~ign conceptexJ>i'ess~ in the. ~tract Ilocum(lllts. The ArclUtcct'saction will ~.takln . ~h such~n@Je PfOD1Pt.neSsas to Cause nO dolay in the Work or in the t,Crivities or the Owner. Contractor or s.~con~rs. while allowing lIUffici~t time ill. th~ Architect's professio~ j~ent topl;tMit'M~ate :;W~~~~~~",,;':~;:'::::t~~~qr/ ' equtpn1ent or ~~~lof\Vhich ~ the rcsponsibdityofthe CqntractOf as requtred ~ the.Contra<:t v.... J" ~rIts. The ArcNt<<es revieW oftbe CoBtractor's submittals abaIlnot relieve the Gonthtctbr ofth~ 9~liga~ "' ,,-,,- ",: -';'-. ".'.. .-- -. . -' ',,- ,',' . ",':.:: " -:i' " . ....,'1 - ',':..: under$ections 3.3,;U 8J1d 3.12. ~ ~hitccfs review shall DQt ~ appr<walofs~ pr:ecauti~ or.(unless otherwise ~i~Uf *.ted bf the ~hitect, of any construcUt1n means, method$. techniq~~Sequenl:esjor ! proCedu~. The Arcl1itect's ~proval or a specific item shall not indicate ~proval ot an asS~l?ll of whj~ ~~m . is a QQmponem. ; I. 4.UTh~ Architect will P~Bre CblUl$cOtdClS and COltStl'u4tion Change DirectivC$. and may authorize minor cbau@.cs in the Work as provi~d in Section 7,4. _" __'.', ". /'. 5 4.2.9 Th.c.A~hitect wiU:C()bduct mspectionsto de~ the date Or date$ of Sub$~~~~fi. iIiiftbe date of fmalconip1ction. will receiyc and forwar4 to the Owner, for the O\lVrlCl"S review and re~. r.mttet1 wammties llnd ~ documents ~ired by the Gontraet .artd8S$embled by the Conlractol'. ~ will ~~ a final CertifiCtrie for ~t Upon tonlplianee with th~ requirements oithe OO~DocWn~~ S U.!O Jfthe e>wnerand Ardlitect~:,theArchJtect will p:o:iIideone oJ ~o;rep~j~ ~~s~~.!~..t~t~!~ in carTy1ng Ol1t t1teArchitect's respcmslbdities at the SIte, The duties. responsibilities and hml~ons OT~Ufliortiji of such project repteseJttatives shall be as setfurtb mane:dtibit lObe inCOrporltt<i in tbeCoJltr&ctDoClul1c($... \ Atl\~t Ji201-- in~;Cot>iirl~i . 1.11, 1'1~, ~lii'.J;ns.j"", 1"1, 1~., ~'ili. iHj, tHe. iil?o. ~iI, 1m..... 11lD? by 'th ""Tl""" .~t1t1.1~ ~f ATeMtec.e..:A1; 11llht.- .......~, ~l":',il!.i.. JaA. ~t. t. p;f"~toO:J .l>lr u~.. ~li'lIt ......net ).. .8. ...~ "~t2,... U~l1tlloo;l.hod "~w. ~ ~.~t1o.. ~ tl!'e~. .~t.. ... ~ ~"l;i... ~ Le, My ni&"H in...,..... ~~H a<id c:z'i.&1Ntl ~1t::l",.~ IrtU lie ~ted. t,I> t:hoii ~ ..bait!: ......ibl. ~~ tM 1_, Tll;. dtaft was __cad by I\lA ....ftwa,... .~ 18:M:~' Db 10/06/2005 ~t lltdet ~.laoOI910li_l WIil\:b .,q>iJ:ea Oli "1/2(ICil, aiid hhOt bit ""lIle. Qt.er 1I<:l~: (U~4jCS441' 5. 4;2.11 Th~ Arcl1itect wiUinterpret and decide mJtters conoemingperr~Ce under and req~entS of, tije OOlt1nlct DOctJlllentl! on \\'ritteD request ()f eithei'the Owrjer or Cpn~or. The Arch1tect's respo~ to sudt requests will be mad~ in writing wftbin~ ~.l1ttiit$ ~ upon or 9tAerwiae ~ ~JUlble promptrte.ss. If rt.o ~ent is'IJ18de~~iIlg tgethne wi1Jtin which mtc:rprcfatjons requJrod oftbc Arcb~ Shill! be futI1i$hedin complianec with this s.ction 4~ fh~ <k:!ay shall not be remn'ized on aCQOllnt of failure by the Architect to furniSh such intel'prewiODS untillSda~anerwrlttenreque$t b.rrI4lde tor them. I 5 U.1~ In~tions and dec;i$ions (It'~ I\rchitect will be_. with the intent ofllld ~Yinrem,le from the Corittact O'OCUIIlcl1t$andwiJI be in ~ or in 1i)c Conn otdrawmgs. \Vb~ making ,ucl1 itltetpn:tations and. itlitiaJ ~ons. .~ ~~ wiU~or to Secure fam1tul performanCe by both Owner'ii#f COtitiiciOr:wiJl not show pliUtial~ to either and wiUn()t be I~le fo.. results Qf'ir1terp~ti~ or ~i~ so ~.m'aood,f.itb.>. I U.1~ the Architcct'sdccisiolls onrna~ mblting tOBe$fhetic eft'eCt Will be fin~ ifponskumt Witbthe intent expreSSC(i in the Contract Docwnents; . !4.3QLAtMSANOorspurES ... .'. ...... .... ' , S 403.1 Definition.. A C1aimislldertumd or assertion by one .of~ ~ seeki~ ~. a~r of ri,aht. B(Jj~ ()t in~Olt ofContmt tr:.I;ltlS,p8)'mCDt of money. ~.iqn Q(_ or othernaiefwith ~ to dte~ of'lhe Contract. Th~ ~ "~.. also mCludes 9ther ~ ana matters in Cflleldon between the Owner and Gonlra<:lm' arising Out of or relating to theC9ntra<;t~ Claims ml1St be bti~ bf written notice. The responsibility to siU>stanUatr: Claims S!l411l'e$t with the partyrnaking the Ca. . ; , S 4.3.2 t~eLimits on Claims, Claittl$ by either party must be ilUtia1edwithin 21 days eftcr~cc,Qflheev.cgt . givi.ng rise to such ClaimQr Witbin 21 daYS .. tfJe cJaimant ~ ~izes the condition giving ~ to the Claim. Which~r is later. Claims must be initiated by written notice to the AtcbitCGt and the other party. S 4.3.3 Continuing ~tnl1:t P:erformance. Pending tinaI ~lution of a Clain1except as 9therwise llJI'Oe9 in1mifng . ,. ()r 8$ prQvided in SoctiQt19.7.1and ArtiCle 14, the CoIitf8CtOtshalJproceed djliJClU~ witb ~~ of,ttu: OontraCt aD4lhe Owner shall continue to m~e payments in ~~.With the Contract ~~.,_ ,_ . . .' ". '. i .,.?~~ t 4.3.4 ~ fw ConCealed or lhlknowrlCOnditiOns. lfcqnditions are enCountered at the s1te l\'llich'At;,'~n ~ ~ubsurflc.e Qr QtbetWi~ concealed ph)'$i~eonditiQllSwhieh differ matmallf 6-om tbo~iJldicateCt1n~CoDtract.... Documents or (~) urtknownphysi~ conditions of$1'unusual nature. which ~materlallY from tb~ oiiliMQ!y~.' '-, fOund tp cpdst Bl1d generilJly I'OC(?gnjr;ed as inher-ent in construction activities of the dulracter providc:d for in.the"'" ""> Cpntract lJoQuJ;n~ tbennotice}))"1he obrorviilJP8J1YshaU be given ~.1he ~.~ ~ be~ conditi~ C"~':;~~:;~~~~c..~~~~ ' ~~~~~";'~W~~~~J~ ' 4iff'erent fromth~ in!i.~~ in the ~ Documents lPld U1at DO ~ inth~.~ ot~ C011tra~ ~ j~eQ. the Architect shall $0 notify the.~ .4lld.C9n~r in wPtin&. ~ the ~ns.C~ byehher ~ " ~~=~~~1;.~":~~"t'~ butifthcQwner and'~ camiot agree on an atUUstmentiq the C()Qtcact _ or ~ Time, the adjustment shall be ~<l to the Arch~ for initial ~tion, subject to further p~ pumJallt1() ,> S~4A. . . . iU.5 Claims for Additional Cost'. If~ Con~ wjshes to make Claim for an incrcqe in ~~m, written notice aspnrVided herein shall be given ~fore ~dfugto cxec~tbe Went. Pri?!,1i~1s'nQt requfri:l!...., for Claim~ r.Jat;Ulg to anem~ency cndaJi8.eri~g life or prQperty arising under Section 10.61 .. fA.U If the Contraetorbelievesadditful1alcost is involved for~ inclndingbut n~ litit~ to (1) a written Urte.pretation from theArcbiteCt (~)an order by the Ownetto stop the WOde ~ tb~ COJrtntcrtw~ n<<- tault~ (3) a written otder for'amihor~$e in the WOrk issued by the An:Jiitcc~(~)fiillure ()f~Ymentby.~ OWner. (5) termination oftbe Contract Q)' the Own~. (6) OWnerssuspemiion ()T (7) othet~bIe ,gtoun1lS. Claw SllaU be - - filcUi ill accQrdance w.itbthisSectiob 4.3..' , ~~t~Ol--n91.~~". 111~~. 1915',1'1', lN$,l'~', 111$1,,1'~~ 1,ffl1.. 1'53' i~l,l~'IO. 1117~. t.ll?...., 1.J7~y"", ,...dr:aftIll~tlt"t" .of ~t~tJI. l\11..~~. ~~: ~.1.IA. Jli.'>ciiMilt H lWotoo!:~ ~Q,.. eowri9ht ~.. _ .' I"~""'l:i~ "~ti"'\I~.rU.cI ~~~.".; ~t~""lj",~"" ~( ttiijj AlA.. ~t. ..~ ""t Sio..ti.... <Jf tt~ ~~t i.. ......%<0 c1vl1 aiul....aj....l JlOI-w l:i.. , .- wUlboi .............tAii. u, !:he ............ ""~t pctOIt@iI ~,.. th,t 1.... !hit dratt .... Produ~t'H;;YAIA tOnvue at 11:54,51 <:C: 10/0tltOllS ,md,.., Order l(o.toooUlOU ~ .mith fti>ir.. ......ltl;zilo~; >>Iie! ia ....t tor 1:'.081... Ute. WOboor' . . . * , .. .. . ". . 42zH34S4UI 19 14.3:7 Claims for Additional Time U.U.1 lithe Contractor wisbe5t() make Claim fQi"$linereaseln theContriCtTun~written notice as provided . berein ShaU be ~ven. the Contractor'$ ClairnSbalJ inc~ean estim~ofcost and Of probable effect of deJayon progressoftil.e WQrk.lnth.ecase of'IlCQI1$uing de~y only one Claim is necessary. f U.7..2 If I!dv~ ~ cQndItions Jlfe.the basis for a blai~ foradditionaJ time, sUCh C'1fun'ShaU be'ocnnnented by data. substantiating that w~ c:ortditions .\IVeI'C abnonnal fortht period of time, CQuld .-ot have been .roasonably anti.cawed and had an 8dvers,e ~ect on the scheduled ctlDstruetton. : ! 4.3..8 Injury or ~geto Pmpn()l"~. {feither parr.y tQ tbe CQUtraCt suffers injUry or damage to person of' })ioperty bccause~flln actor Oftl~llion of the other party. or of others, for wbo$e ~ SQcbparty.,i6~...U)l I'e$pOnsiblcl writtcfl. noti.<>> of liUcb iqjtll)'. or ~~. wh~ or not insured, SQIl be givettttQ the other.partY within a reasonable time not cxceeding 21 dayS der discovery. 'Ibetiotice $hall provide suftjcien~ detail to enable the other party to investigate the nwter. ; .1 14.3.9 If unit priccsare stated in the <Jontract Doclunents or subsequent!)' ftgreed upon. and' if quantities originally ~onwmplated are ~aJW changed in J:l' P~ed Chattge Ordc;- 01 Construction CbangeDirelct,ive so that-, application of slicb Wiit ~ to quantiti~ of Work PTQpC>SCd wUl ~S~tbll ineqwty to; the Owner or' COntractor. the appliCable unit priCes ihall be equitably adjusted. ! ! 4.3.10 CIIlimll forC~ial ~es. The ~ctorllnd Qwncr.waive Claims again$t tMb ~.for ~tiSeqUenUa) dama~e$ 8risi~out~i or relJtins to thiS Contr.ct This mutual waiver inQI1Jdes: . .. .... .. . .' . ....".~_. ;1 ~ incurredbydte Owner for rental expeQ$eS, for losses ofuse.inco~. pnUit.1i~,.~.. busin* ..m ,~~ and for IOAA of managemC'!rt or employee productiVityo,r of the serYWc:s pf such persom;.d "-~i .2 damages incUrred by the ContractOr for prlncWal office expenses ~ludinsthe compensation of, . personnel Stationed there, for IO$$CS of fmantilli, business and reputation, and for lQS!lofJ)JWif except anticipated prOfit arising diiectly Wm the Work. ,"'" A"/" Thil! mutual WIliver is appU~bJe, without limitation. to all consequent.ia1 damages due to eiJberJiuiy's termination in accordance with Article 14, Notb~ contained in this Section 4,3,10 ih~l be deemed to preclude an aWanlQf Iiq\Ji~ din:ct ~.whcn applioable.in accordance with the requirements oftbe COntJ:act ~~.' 14.4 RESOUI'l10N OFCLAfM$ AND DISPUTES .4.4.1 I>eclsion of J\rthitcct.C~rns. inc1ud~S tho.se al1og~ .~ error or omission by the Architect but excluding ~ arising undOr Sections 10.3 .~ I O~S,sbanbe~ferred initially to the Architect for desisien.~ .iIiitiaI decision ,by the A.R:hj~ sl1aU be requited as a condItion precedent to mediation, arbitrarionl"t'I'tfs,a~on or\~I..... . Claims ~cen theCoiltractt)r~. ~ arising prior to the date ~ payment is d~ unJess;OdaY'~re.~.. ' after we. CWm has been, referred Ul theArdlitect with no dec,isioJl having been rendered bX'the Architect:,; The' ,; , Architectwilloot deej~ d~pu... ~ the Con~ and ~nsor entities other thanj th~ Owner. .- t 4.4.2 The I\rchitect wjJlreViewplili~1$ 8Il!i within ten <It)'$ of the ~ipt of the Claim .~ 04eor more~fthe following actiol1S: (l)reqQe$t adcUtion.1 supporijng_ fh>m U1e. .(:~ or a response wjth~jlO!!!nLdata}~1!L.. .. the other party, (2)~ject the C~ inwbol~ orin part, (~lappr(lveth~ CIaim,(4) s~Cst. COJupi'omisc, oreS) advise the partiesthllt tbeArclritcct is una~le to~lyethe Claim if tile i\r!:l1itoct la<;ks sufficient in~to . evaluate the merits of the! Claim orntile Arc:h!toct concJudC$ that, in the Arc:bit~s SliJle discretibn, it would be inllpproprlate for dteArchitect to rqaolvethe Claim. . '. i 4.4.3Inevaluadng Claimll.the Architect tnay, but shall not l?e obligated to, consult with or. jD.ronnationftOth,. eithct party or frOm persons with special knowledge or expertise Who ~y U$ist the AroJt~ ini'endering I:l decision, TIle Arcl1iteetm~ requeSt the Owner to authorize retention of such persons at the'9wn~s cx,peng. S 404,4 Jfthe Architcct regue$ts a party to provide a resppnsetoa C1aimor to i\Jmishll4diti9rutt'~rtiitg data, such plU'ty shall respond, within ten ckiYS . receipt {)f Iludt request, and shall Clither provUie a I'C;$ponae on the requested. suPj)Qrting ~. advi$e the. Architect when the res~ orsupportiltg ~ will bb fumiSliC(roridvise me"..... ArChitect that nO$~ttingtlata will be fuhl.JShed. Upon feceipt oftiIe response or supporting.datp. if ~;y,thc _. Architect will either reject ()r approve the Claim in whole or in part, . . oUl\ ~t .\201""- USi'~i~"" 4tltl1, U1$', l'J.1t, 41~, un, 1'~~. 1//5., J,'$t., ~13' i,~". 1'-'0,19'1., 111t,1 ....si'" liY'. ,be AIltrlc.ll'l~tltut' (If ~Chlhct..,A11 r1Il"c.o~, ~l 'Jhb AU,' ~.to ~-.tadby v.... ~l9ltt~.. alId . IntilZft.~"""'b....C1fta..t.ho~r~lldQOj;ion...,d.l."",1boItJ.on .r,1:b.i, AU.'~..r...i' ,"""UOf\ O! a'-1''haU1l;lo _... civU and Cralmol1*'&lti... ",~IqU t>j P#>"~ .'to . tIwI ..:au........t4riI~ ~.ibl.. .......,. tNI.l.." TIlt. tint. ..a. I'I:<\duced Jir AIA ""Unto at 11: $hbtolt 1011)S/20;0;$""'1: orilcit ik>.lOO.oit101~.:1 "4~d1 ;"q,1t.ra 0fI. 'hl2oil~. ancl h not .trn: .eud.. U,er .l\(lte.: t2ZH34bHll 20 54.U The Arcliliect wiUapprovc or reject.Clairns Py written .decisic)I1, which $ha1l statethcrCaSoIlS tbcreforand which sballnQtify the parties Q! any dtange inthe~Sum or Coq~ Timeorbotil',The approvaJor,rejection ora Claim by the Arcl1itect shall be final and bmdingon the patties but subj~ tOlllediation and aftiitnttion. ! U.6 When a written decisiollOf(hc Ardilieet #CS that (I)~ded,sion is final but ~bje,et1D mediation and &lr'bitration an,d &}a demand forBrbitrationof a .ChWn <:OVeRtf by suCh ~ision must be 0l8(;Ie Witbin 30 days after diedatcl 00 Wlticb the part;' ~g the dCnWtd ~ves the final \\Titten decision. ~en faime to demaD(! arliitmiOl1 within said 30 days' ~(Jd $ha11 reSult 1ft d.1e Mmitcct's decision bcoo~g final Bnd bin4~g upon the Chmer and =:~=::=:":;~~'7.~f~~...--___ concerned. . . ! . i4;4.7 Upon rcceiptQf a Clabn ~ the C<>ntractot or It anY time ~. the Archit~ OJ: tile Owner, may, ~t unot, ()btigated to, notifYthe$urely. ifany.of the ~, ,and aDl(MU1t of the CJilim. If the <mann' ~lates to a POSSibititYof a ~i de~Jt, the ArChitect or the Owner may, but is not obligated to,-notify the surety and ,~ the ~ assistance in resoiving the ~oversy. '. S 404.8 If.Claill1.re~ to or is the SUbJeet of a ~banic's licn;.tilepat"ty ~8 such Cfaim; mar ~ m ~ With applicable l!lw to col21Pi)' wifbtbelien notice Or Gling deadlines prior to re59tution of1ho C~1ll by the Architect,.bf mediation or byarbitnltion. , IU _lA110H '. . . ' ....~._ . _~ ..c,l 5 4.5.1 ~y Piaimari$ing out-of ()f relait:d to the Cootract, except Claftns relating to aesthetic effect 4fid OXCtiPt ,thO$(! waived ~ provided forinSectiOtl$ 4.3.10, 9.1 o.~ ancI9.IO.5 shall. after initial ~ion 11Y the Architect or 3() d8)t$ _~ a~su~jon ofth~ C~to tb.e ArchiteCt, be subject 10 mediation as a eondition p~ toatbitradon ~_~ .~ ..... in,stifution ofJegal orequifabl~ proceedings by~ither patty. ...._ . S 4.5.,2 The ~rtjes shan et)deavor t() resol~ their Claims by meQia~ whic4. unless the pBltics m1J!Ullllyagree otherwise. sball be in ~.(lC()~ with the GonstrtJction In4us1ry Mediation Rules of the AJttcricanJ\rt)itraUon ~sociadoncurrcntlyin ~ ~fQi rnediatjon shaUbe tu~ iIi ~ with the othfJi'plU't}t totlie'Co~tract; and with. the AJnerican A1b~tion Association. The request may be mad~ ~tly with the filing~~ demand... ftlr arbitration ~t. in ~Qb ~VCOt. ~()Ilsball~ ia adv.nce of arbitrati911 or ~ or ~uitab~ ~ings. Which shan be SUlY~ pending ~iation fora periOd of60 days ftom the- otfiling. imless ~ for a longer , .., " period by agreement or ~ parties or court 0I"deI'. -.'-., 14.1.3 Theperties .U slw'e the mediator's fee an4 any filing feesequal1r. Themcdiation sba1f.be held in'fl1e P~ - wll~ the Project is locateQ.~lcssanother l~ ismuw.llY ~ upOn..~~~jii~i~.l1 be cnforct'8ble as tettlem~ agt'eements in any co~ Mvingjurisdietion tb~t ,.' i 4.6 ARBrrAATJC)N ": S d.1 AnyClaiinari$ing out ofOr related to the Contrac~e~(:labnJ rolatin~ to lICStheUc~ ,ami ~oept those wai~as proVided ffirinSMions4"~',lQ. 9.I0;4and 9.tO~~$bJll;after ~iou by the Ar~b~~r ~ ~ ~'.'.','.u.c. submission oftl1eClaillltQ tbeArdhi~t,~ ,subject to arbfuation. PriQr to arbflration. the parties shaUet)dea~to resolve di$plltes by tnediatiOnin _r4arice With the provisiqnsofSc<<ion 4.5. ;,. ___.", ~w "r .f < ~ i .;6.2 Claimsllot n:$olved bymediatJon ~~ be de9ided by arbittation whi~. ,QQless the Parties lItutual1y 1lgree . ~~, shall be inactordancc: with the: Qonstnlctioll Industry Arbitratjon 1WJcS of tbcAm~JAil Atbj~ ~, ~~~~=~~~liI~t~=:~~tI>< : '- ., .' . 54.6,3A dein,811d foratbib1UiOn shalt ~ made w~in the tiple lintitS specified m SectiOIUl~;4.6'and4~6~JaS 8ppliellbl~lllIld in other cases \VittJin a reasonable tiJneafter the Glatnl has ~and in noievtat ~baU it I)e made after the dI1te. .wbcm. insfuutjonof I~or equitabl~ prOCeedings,~ on sueh Claim would be balted by the applicable statUteofIiini~on$lls detCrm~ Pl.lfSUant to Section 13.1. '.. ,-, -'..,w.,~ ....... '.: IliA ~t;li2O"'.lI",~t .. ahi 1't15,1918,1..$, 1.i7,l'51, "".ufi. 1~, iilSS.,'1,p'lli, 11175.1"7111\41'97 by 'fhe .-riC&llIMu"..t:" c>t Ar<:1i1t~til. ,. ,~l'i:i9l>ta~.lQ,llIttli!ai !Iil.. ~, ~1: h ~'t.!l ~ U. ~l;Ollt Ll!!i'aftd JiI_I:i...fJ,~I:i...~~l;%ed~.G% <li..~u...t)"" ottltia 1,U..~.m;,..;,y .~....' <<f.tt. 'MY ".,,It ~iI.....~.. clirJ.llUlli or'!u,qt pinaltj..... ioM 'W1U bot ...........n.... totlMo~--...tP.lJ:>!.. ~\:Il!o lw. Thhdtlltt ..,,* ~dll~' W. lIe'ttlfll1'<l..t: III 5~ ,59,.,1I.10iOG/2005UlllS.t Oraille .10~i..t016_1Wllidi htu~u 'illl '11 (JW" ,,,nil I... not 'lorn."le. u.... 110_, 122H,).S.41 ) 21 fi 4.6.4 Limitation on Consolidation or Joinder. Noar(,ittation ariSing out of or relatirt8 to the Contracrshalline1ude, by consolidation. Qrjoinder orin an)' other manner. the ^r;ch~tecr,tl1~Arehitect'selnployees arconsultants., ~cept by written consent containingspccific ref~~totbe ~.atld $ignedby the Archite<;Qwner,Cootractor l!Ddany ottiei person or eotity~ to beJoined, No arlJitJ1Jtion $11"1 include, 1>>' consolidation Or joinder Or in any other ntal1DCr, Parti~ other than thOOwnCT, CQn~r. a separate tontnctor as deSCribed in Article 6lindotb~ persons. substantially invol\'e<1 ill a co,rntnonQ1iestiC)O offilet ()T law.~ pres~ is r~u~if co1llpl* relief is t() be a~ inarbitration,N~)pet$on or entity other than tbeO\V11Cr, ~ or asepfra~ contraetor as des. .otlOed in ArtiC.l~ 6.sha...... U.be... .....in... '.c Iud... .ed......... III an... Ori.gina1. '. .....tpird...... party... or~.. tionaJ.... thiF.'. d~........ ~~. arb.. .inti. '.'OfI.w. bos..e interest or TCsponsibillty is ~tbll, Consent to ~itration involvipg an additional' . . 9r enti13-' shall not COi)Sti~ COnsent tQarllittation ofaClabn. not ~bed therein or with a person or entitf.~ ~ea'of1tCjbn'bCd th<<ein. Tbefuregojng~tto erbitrate and other ~ ~ ~itra~ with an a4~~"~....uty_. ...... clJilY. consClited to by parties to tilt ~entsMll.be ~r~ly enforceable UD.dw IlppJ~I~ law in any Court having jurisdiction t:htreof. S 4.U Claims and Tirn~y Assertion Of Claims. The party filing a notice of ~ for aibitmiion must .8$Serl in the demand all Claims then kpOwn to ihat.l'8J.1y on widell arbitmtion is penniUe<i to be ~~d; S 4.6;6 .Ju~ .onFinal Award. The award ~ by the II'bitnttor or atbitnUOni~ll be fmlll. and j~ent tnllY ~ ~ Upon it in acconIance with fq)plicBble la}V in IlI1Y t>>U.rt baving jurisdieUon ~erepf. AR1lCLE $ SUSCONTRAGTOR$ ~. U DeFINITIONS fi 5,1.1.!t.SUbcontraetor is a person ()T entity who has a d~c~ with tile COJttntetQr<<U8lrfOJDl_llpm:donoftbc '._.<_oi W~rlc at the site.11le.mm"S~t.t'acitor" ~ TCferred to throu&bout tile e~ 9Q~cnts Q if s~ in number and m~ a Subcontractor or an autbotfttd represent8ti~ of the SubCOn~. The t:enn "SubQon~r" .'-1 does J1()t incl~ a ~ ~tractor or subcontractors of a separate contractor. . J' ,0"" .....: ;,,;.." fiS. t2A SU~~tra~ 1s a persolJ or entity whQ hIlS a direct or indirect con. with a Su~r"tO . perfoI11) a ~rtioq pI1be Work at the site. The .tem1 ~Sub--subcontractor" is referred to throUBhout ~~Con~ DQcwnents as if singlilar in number and mCl8J1S a Sub-subcontractor or an authorized repn:senlativc of the Sub- su~r. , . ~ 5.2 AWAROOF SUEJCOJ(l'RACTS ANI) OTHER CONTRACTS FOR PORTiONS Qf THE W()Rf(. .. . _ ~ 5.2.1 Unless oth~ ~ in the eontta"ct Doc:umemsor the bidd~& requiremen~, the Contractor, as S()onIS practiCable. award of the Col1U'!lct. shaIl furnish in writin8 to the Owner ~ th~ Architect the naipcs of :;-J perso~s orentitics fmeluding ~ .0 an\l to furnish ~~ or equipmept tabricateti toa ~.(f~ ,.- Pr<woscd for.~princjpal portion of~. Work. The Arcbiiect will promptly reply to theC~ctor in w~~., statinjt WhtfhCr ~ not.the Owner or lbf: ~ltitect,~ due investigation. has reasonabl~ oQJ~tm to ~. SIi~" 4 p~ person or entity. Failure of tile Owner or Arthiteetto rq>ly prompijy sb8lI ~nstmne tiOticeofriQ V , reasonable objection. ! . i , . : . , - , _: . ,;. - '. - ': '.' . ; :" ~,' ,:" -. --: . . " S 5.2.2 The OOJl11aCtor JhaJl not e<>>itrac:l witb a Pl'Qposed person or en~ to whoiilthe .~~rAn:bitect has, made reasonable ari<ltimel,Y objection,Tbe COtttmctorshall Ji()f !>e ..equiredto c~ with anyonero. ~!lQm .t!tt i." _. "_~__"_ contractor ba$ n'urOe reasonable obj~i()l1. .'. fi 5~.3 Jf the Owner or Archi~ has ~on~ble objection to a person or entity proposed by the Comractoi" the ~t Shall ~pose~other to Wh()~lbe Owner or Areb~ ~ no ~bleopjec~on. If~prop03cd_." rejec~ ~tQlctor was reaso~ly capabJe,ofpetforming the W~.the Comr8ct Sum and pontract T!~~ $ball '... be in~ or decr~. ~the di~.if ~r~i<?Dedby such ~~ and an lIppI'Opriat;.e~e Orler.. \ M1al1 be l$sued bo(~ClUmncn~tof the subStit'ute SubC01ltTaCfOr'S W~. }{owever. no!~ m the Co~ Swn or Con1ract. Time shafl ~a1lowed (or suCh chllll8c unl~ ~ Cont,ractor has ~ed ~pttyand I'esp'onsively in sUbmitting names f$ ~n~d. '. . . . ; i ~ i I ' i U.4Thc Contra~rshaJl notl:bange a SubcOntractor, person or entity prmously selecteil if the OWner()t' Architect makes rea$Onable objection tQ such SU~$titute. ; <_. _ , -~'''''-'''''''''' AL\ ;oo......tUlll.. ->1"7.. Copyd9ltt ,_"nt,' u1S.il~t..lj*le3't. t~S~~. mll,i~11,1;~. . lllJ,~.islll!i' 1"1.1""..,.; 11191 by 1'b& l\at1:iQanJ".~~bt.(lt "reh\~;oc:ts..All.".i.lIIltll_~.~ll1Cf 'l'lU.. "tit' ~t l. ~-'lr.i."';" '~rll!bt Law.~. . lnt.ri>aUOi'.a1'r""",t1...unall~1."ec1 ~~..,. Q" dht"u.vtWi1 ot'th~" i.1".Dc>ciuoooon~.i""~I'O"b."" or It.. ~_lti:1i __ <lLlti.l - ~Uli.tW:poon&1t.\;n. aniSviU.1loo FOM""~ toUlio~ lllIUftt I'OAdl:il...~ .tM. la... 'l'h4 drllftvaspl:O<luced ~v AlA at>fl;W..."."t U:$41~j.OI\ 10/0612005 ilnd<Ir Ot<iar ....10001$10)$.:;1 iili:t'*IIlt};>1""" 0;; l(litlilO5; 6lId 1# not fO""".41.. 11.." lCotD: (2240HHll 22 i 5.3 SUBGO~CTlJAL RaATIGNS 55.3.1 By ~pr~ ~ ~ where ~gally R()uifed for vaii~.the Contractor shall requite ~ SubeonlraCtOt;, to th~ ~t oftbe WQit to beperlonned by ~ SubcoJrttaCtot. to be ~dto tbe ~ by terms of the C<nrttact, Docurnellt$. ~ l()~e toward tbe ~ ... the obligauOl1$ imdres~nsibltitie$. . includinJd1e rcsponsibiti~ for ~ofthe Sul2contmctQlls Work. whiob !pc Contractor,by these ~~ assumes toward the ~ ~d ~i~. Eac;b su1x:ontract qretntent ~l ~ and ~ tile rightS of the C>wner andArcb~Qn&Tthe.~~. ~ ~.to d:te Wodcto be ~ed ~ythe S\ibcomramdr so tb&t:~~tbereorwiU Dot prejudice _ ~ and ~I allow to the S~. unless specifically proyj~.oduwwise in the ~bconttact .~~ the bmefitof ~J ~~~ ~ aqd rodFess~~~!~__ Contrac:tor that the Contractm:,by the COn~ Oocurnents, bas agaJDst tile OWl)Cr, ~~_, ffie ' ~ sha1l~u~ ~ Sub~to~terinto Jinlilar ~~t$ with Sl.!b-$uti(:~.~..__*_ ....'"_._. CtmtractorshaJI lII8ke available to each proposed S~tractor, priort() tbe cx~on of~$ubcotttn1Ct agreement, copies of the Contract Documents toWhlch ~eSubconh~ will. ~ bound. and, Ilj>()n WJittentequest of the Subeo1'1tl:aCior. identify .to the. S~ctQr:rerms Itld conditions ~fthe prop()Sed SU~ pernent Which may beat varilJQce with theConUact Documents. S~rs WilIsimiJarlr make copies t)f app1iQable p<ntiOfiS ()f sucb docWnents IlVAilable to their ~ve prQposcd S\1b.subcottttllct()rS. . I M CONTINGENT ASSIGNMENT OF SUBOOm'MCTS 15.4.1 BJch Sl1~,~ for a portion o/the Work is assignccl by the ~'() the Owner provided llurt: . . .1 ~iJn~1!t i$ etfectjve only after termination Qf1he Co~ct by the Owner for e;ause pur$l.Iant to Secthm 111.2 an,d ontyfor diOle ~ ureements which the ()wneracc:epts'by1t~ the SubeQntraetonnd COOtr1lctor in \Vliting; and . ., . ..,." _ ~ llSS~t is subject t() the prior rijhtS of the $UJ'ety, if' any, obligated under bond relating to the Coirtnl~t. .. .2 f 5.4.2 Upon such assiglunent ifthc Work has been suspended for more than 30 days, the Su~." .... cotnpetl$ation shall Pc equitably adjusted fw increases In cost ",SlJlti11g from tbeSQspcnsion. ."..... ~ ..' . - "", . . "'. #"" .- ARTICLE 6 CO~UCTIGN BY ()WNER ()RBY SSPARATE eONTRACT~.. --;: 66.1 OWNER'S RIGHT TO PERFoRM CONSTROOTI~ AND to AWARD SEPArtATE eoNT~~ . ... ' ... . . S 6.1.1 The Owner ~~' the. rightti:l ~ coD~onor operations mated to the Pn>j~ w1titthepwners own forces. and to award ~~inCOlu1eCtion Wittl.otbet porti~~ftbc Project orothCr ClOJlStn1ctkmor QpCl11tiOll$.on tbc.site Wider CollditiQDS of ~ Con~ identicij or substatrtia11y similar to these includin~ ~ ". """ pQrDons related. tp.inslU1lnce~d w~ ofsu~on. If the ~ c~s that delay or additicmaJ cost i$ "_ Involved beceuse of such action by the Qwner, the Comtactor shall ms.ke Such Claim as pro~~on 4.3. "'- " l _ . _ . _ '-~,. ._:" _._' 56.102 Wherl ~~. ~ IW1U'(ied for different portions of the ,Project or otber ~ion-or~~ons .,.'" <m the site. the tenJ1 HQtmtractor" in the Contract ~ents in cacb casc ~l mean the ~r who 'x~ each $epaFI.te Qwner-Qoqtractor AgRement. I' :, ; Ii S 8.1.3 The ~ shall pmvicie for coordin~ of the activities oftbe Own~s ()Wn ~ ~ of e~h ~ <:ontractor With the Work oCtile CQ~i ~ ~U cooperate with.them, ~e Con~sh(l!.P!l!.ti~ Wi_f!, .. ,. ~er separa~ COntractors and.~ Q~ m revtcwm,g thea,r ~on schedules wIlCII dfected to do so. The Contractor sJtafl make any.. revi$ian.s t() the ~~on schedule deemed necessary after ajointrt;yiew-and matua1 . __ . . agreemeQt. The construction $CheduJes shlUl then COIlStitu~ th~$Chedu1cs to be used by the: Co~, separate cl'mtractotillUld the Own~ WWl subse~tly revi$cd. , _. f6;1..cUn1cs$ o~Jse provltJed .itl. the C~ ~~, when ~ O~ p,crfo,nns ~evonor opeiWions " 1'e1atedto the Projeotwith theOwner's own forces. th~ Owner shall be deemed to ~ SU1}jecti~ f1aC SlU11e ()bl~ and to have the satnerlghts which apply.to ~. CQntractori1nder tfieCQnditions oftbe ~ ineJ~with(IUt ~cluding qther$, those Stlltedin J\ttiCle 3, this Artic1e 6 and ArticlC$ l(), l1lSt,ld 12. ; 56.2 MUTUAL RESPONSl8fLITY. ... . .. / .. ... .. .. ... . . .... ...., ". ... ..... f 5 6.~.11he ContraCtOrsballafford~ ewncrand ~COJ11ra~ ~onable owortUrtjty f'oFmtrOaueticin8M ......~ ~o~e of their materi~andequipment and perl'0n1latice of their activities; and llhall.conntc:t ~d~d1e ,__ GontractOrs co~ction and operations with theirs as required by the Contnlct ~ents, ,... IdA; ~t A2G1'" - i'1I7, ~liht . ^""..~ r""tlt..t~ Df Arebit",,"; . AU Xnu-aj:l;oiIid. 1'_~.Un.."'~~z.ci.. .... ..<!<ft ""dI,.~"'~ of t);.. "IA:t. ..r <:iVl.l .apcs cl'lAinal pipiaJ,tl... ,~ ....11. .. ~""t.cl .~ ~ ~ ........~ pcilI~.. .-..r t!Ilo aott_e ..t 18:5.'511 "" lOIO"200S' ums:.;,. Oi'il.~t~.19001~lPlt_i oiiiJ"" >1"*'1.... 011 ,jV200ll^, and. U.... lIo1:ali, . 23 IU443454tlt 6 6.202 If part oftbeContractor'sWork deptndSfor propetel(~cutionOt results llp9tlconstniction or operatiQns lly the OWner orA ~~ contractor, theC0ntr840r slttll. prior W proceeding with tbatpomon of the Work. PJ'9IllPtly n:port to the Arohitect 1Ip~ cJ~or defectsm s~cbotberCOl1StliJction that would render itunsu.ltab1c for such properexecution!l1t!i re$U1is; Failure of the C01\lnlctor ~ to l'epOrt shall con~tc an 8<:knowledgmeDt thlrt the Owners or s~ COl1tractQr'. eompletefjor pattiaUy~p1eted constnlction is fit and -prqper to receive the Contractor's Work,c){cept ~to d~ Ii.at then ~bly discovcmblc. ' . f W The OWner !lhalI~ tehnbursed by the ~tractor.for COSlS in~by the Owner licqare payable to., se~ GOn~r ~~.of de!a,ys, im~y timcci ~vitjes or defective constnJction~fthe contractQr. The . Owner shall be re~ibletQ the <:<mtraetor fQl' ~.osts incurred bytbe C~or because. ord~ ~ly _ timed ~ties.~~ge to the 'Worlc or d~e ~qti()Jl of a ~ contractor. I . S 6.2..1JteContJ'actQrsfutll PJ'Oh1P4Y rem4ldy damage W1'OI1$fully caused by tl1e Contnlctor\to fpmpletedor partially completed cottstrucii~n or to prQpelty of the Owner or ~ con~ors as provided in Sectt~ 10.2.5. S 6.2.5 The Owner and~l1 separate contracttlr shall have tht: SlIme responsibilities for CUUint ~ ~tig as are described for theGontractor in Section 3.14. '. . f t$ ClWNER'$ RIGHT 1'0 GL.EAN ~p i U.1..If Ii diSpute ariSes $IlOng the.Co~,Separa~ C9I1lJld;~ and the ~as to the responsibility under their re$j)ectivc.COnb'tlCts for~1ainiQg the Pretnis~ an4 StJrrOUitdi11g Il'ell ~..from .wast(' matetiaJtllMl rubbish;" the Owner may dean up andtbe .4rchiteet will !l1lQ<l~ tnecost ~ongthQ$e ~nsibJe.. ARl'lCLE 7 CHANGES IN THE WORK 57.1 GENERAL S 7.1.1 ~. in the Work !l1l}' be ~eomplished llfler clCecution ()fthe Co!1tract, and without invatidaqme ~'" CoJ).trad. by Chqe Order. ~c.tiQll ~ge Directive or ()I:der for a minor change in the W. OJk;-'Subjcc:j.~ the llmitations stated m thi$ Article 7 and elsewhere in the Conlraci Oocuments.,' . , "" 1 '1.1.2 A Chan$C Ordei's.ballbe basedUPC1tl~ lIIIl<mg the Owner, Comractor and Arcb4~; aCo~Jtion ChanpDirective requ~ agreement by the OWner and Arebi~ct lfld may or ma.y not be &greed f9 tly.lh~' .. CQll~Qr; an order t'Qra minor change iq the Wotic may be issued l>y the Architect alone. 5 7.1.3 ChanfC$ in the Work ~U bt' ~ed ~ applicAble provisions of ~e Cpntract DocuntCllts, ~the COn~ shall ~ promptly, unless otherwise provided in the Change Order, Construetiog. qbatJ~ D~v(l or order fora niinord1angeinthe Work. J " ,,,..r ~~ ....""'.... ",' I ~ 6 7.i CHANGe ORDERS .. '. ...... ..' .. .' '. .... .. L. \. . . . J~ '1.2.1 A Change Order is.a.~ ~ent prepared by ~ Architec.t and s~.~ytbePwnerj C~..iild A~t, stilting their ~greem'COt uponltJl pfthe following; ( .1 chanachitltc \VotK; .' .2 the anlOUDt.ofthc ,dj~ent,ir8$lY" in the COJ1tn1<< SWn;and .3 the extentot'thc a4justm.ent. if 81'JY. in ibe COntra<< 1'ime~ . i:, ~'-,...._.,.,,, 5 7.2.2 Metltoas U$ed." ..in. de'tcnnining 8d,;ustm. '.'~f$. to the Corlt:ract.. ..... Sum mI\)". include those listed in Seetion 7.3;3. . . . .. . ... ....- --. S 7.3 CONSTRwmON CHANGl; DlREeTIVES . . . .... . . . ~ 57.8.1 A Q,lJ$llc.tionChange J'.)~ve is a WPtten order prepare~ by tbe Arcbitect 8J1tt sipCd bY...ibeOwDCrand" Architcc4 dircctina ll. cltangc. in the \Vorkprior tQ a~ On ad~t, if iUlY, in tbe.~ $Um.Qt Contract Timc; OI'both, The Owner may bY ~tr'Ilcqon Cb. Dir~~., w4hout invat~ t1Jefco~ Qrder Changes in the Work within the. general .cope of the C(mlIaCt eol,lSisting of 8dditiQJ1$, deIeti<ms or o~er l-evi&ions, . the Q:mtractSum and COntract Time being adjU$ted accordbJgly. : i I '. 51.3.2 ^ Construction Change Directive shall be uSed in tbe absence oftotalllgreem.ent on the terms ora Chimge .... Order. '. . .. ._ .,_,...... .. .... "''\" AlA~tll2ot.. - UIr7. ~i;llt .1m,"IIl,I'1',llas.l'"~1i!#. 1'~', 1tS', 1.~..1"5, U1tl, iJ7~. an ancllllV1by Tbe .,...r1.,... I",.tit,,~..fAl;c:nlt..cU. AU....t~t. ....~.. ...t"i!fhh~. ~t hp~~1>yU.ll; CQpf~ll1ht. u.._ In~n.~l 11",,&u!!'l. u..."tli"~'""a9..~ti"" -dhtrtb!iU"!ioc tilt.. AU' Jloc:uoMI\f., .... any l"O"Uon..;L it,..y......."tin_... o:4v.l.1ai1llcrr........l p,o:ft&lti..., and "HI .!Sol ~bIod..t..I:l\....;u_""'blllt poecil>1. ....duthor cte.;. '1hb {tr.It.... prodll':edbyJl.1A ..on......... ..t ~,:'A'$'Oll 10/05/1005 una", O~IIO;10DOIUIlI1LIWlll"Il.icp1t<lllon 81lf2001i..nd .i. ""t tor nul.. a".... lIote.: . " 12HU4S4411 24 ~ 7.3.3 fftbeConstruction Change Directive providesforanadjustblC11t to the Contract SUm, tbeadjustment shall be based on one oftitc fonowingmeti.lo~: . . . . .1 mutual8CCq)1ance of' a lUtnp s~ prt)pCrly itemized and supported by sufficlenl sUbstantiating data to petmitevaluatio1;t; . .. .... '. l OOit prices ~ted in tbeContract Documents or subsequently ~ llpon; .3 cost to. bedCltenninod in a t!18Dner ~ upon by the parties and a mutuallY'1lCCFPtablc fixed or ~tage fcc;or . . , 1 .4 as providcdm Section 1.3.6. ' i 1.3.4 UpoIl receipt of a ~0J1 ChangcOireetive. the~tor .~l promptly prO~d With the c~ in the W~ involved and ad~the ~.offhe Contractors &greemeJlt or di$Weement ~-~.-{f'4lI1Y1 _, provickd ill the CQnsti'uctiooClhange D~iv~ for detennining the ~ adjt.JStntent in the. Contract Suin or COntract Timc. . ~ ; ! 7.3.5 A CollstfuctlOD Chanae O~e sigJ)ed by theContrac!t>r indica,tes the ~ent o1'1he Contractqr therewitlt, inclpdmgadJustm,ent in Contract Sw.n and Contract T~ or the method for determi1'ling thent.. Such agBement shall be embtiveimmodiately and shall ~ ~M<<I asa Chiulge Order. S 7.3.6 If the COl'ltl'actOr does not ~01ld PrOl1tptJ~ or ~ with tbe..~ for adj~tintbe Contract Sum, the. method and tftCJdjtJso:nentshalJ be d~ln~ by the~ on the btIsis ot _OJJa~te~lId~s and savinglJ ofthosC perfunnillilhe Work affribUtabtctothe dwtge, incl~~in caae ofanin~in the Oomract. Swn.a teasOnabte allowanCe for ov~and.ptofit In such case.. and aJSo under SecdPit 7.3.a~3;'theeontraetbt sballkoepand pment,insueb f()1ln as the.~ may prescn'be, an i~d accQuntins~~-Witb approp~ ~data Uitl&$ of11erWise p,ovided in the Contract Documents, costs fOr the'~ oftbis Section 7 .3..6 s~1 be limit~ lO the. following: / .1 COStsotlab<>r; including sOcial security. old ~ and unemployment ~cc. fiinae benefrts l'eCNired byagroement or CllStom, and workers' compensation insurance;. '. ..."".., .2 ~ of rnattria1s.. sppplies and equipme;nt, including cost of trensportatio~ Wm:~'~ or c:onSW,tl~; ,"",. '_' , .3 rental COsts of maChinery and eqttipm~nt. ~cl\lSive of hand tools, whether ntn~ll1the Contractpr or others; '"'' -. .: r .4 COSts. t>f preriiiums thrall bonds and llIsurance. pennit fees, and sa:Ies, use or similar Wte$ relate<! to:" , the Work;ahd .. .5 t\CkUtio~ C05tSof supervisjon lJild field officep~onnel ~ attribptable to the ch~. _ _ ~ i 7.03.7 The antOU1)l of credit to be alloWed by the Contractor to the Owner for a dClet:ion or cbanJe _ieb resultS in a " .".. net decrease in ~ COntract Sumlhall be acmaln<< cost as confirmed by the AtcbiteCt. Whco'bOth ~dd~ and / ." creditS oovering ~Jated WOtk orsubstitutiOO$ arc involved in a clumge, the allowance for ~ aniJ1fOt1f ~IJ J ' be figured on tbe~is of net in~.jfllJ\YiWitb respect to that change. fl' . . ' " '-, .. ....., , ~ , ,,/ , i 7.U p~ .1ma1 determi~Qnofthe ~ costaf ~ Construction Change Diredive t(). ~e Qwnci', arnollIlfsnot in dispute foI'. ~(:bCb~ges in the Work Slta1J be i1'1~lu46d.1n ApplicatiQn$ for ~fmeJ1t.~' by a ~ Orderindl~g the. parties' agreement with part oral! of sucb costs. Por any .pOrtiotto{sud! ctit.th.!t .~~~ia~ j]I .~.___" 4isPIJte, the~~ will ~.~ interintde,te~ for ~ ofinorit4lyceni~on fur pa)'ment for 1hose .co&ts. That d~jnation ofoost sIuill a,dj. the ContraetSwn on th~ ~e !.$is ~ a Chan~ ~;~w tile . right of ~.itber ~ to di~ and assert a clJUn in accordan!:e with Article 4. . i 7.3.9 When ~ 0YnJ~ and Contractor asree with the determination made by the ArdUtcct ~ ~ .. adjustnl~ in tqe ~ Sum and CQntrac,t TiIrle, or otherwise reach ~ment upon ~ f6J~Is.such ~entShall ~ effecilve immediately and shall be recorded by prq>aration and executior Ofi.al1 ~ Change Order. . i I i 7.1, "9NQRCHANGES IN THE WORK 6 7.4.1 Th.e Architect WiUhave autilority to order minor Changes in theWoHc not ~voJ~ ~jd,$tment ill the Ctmtract Sum Otcxt.ensionoftbeContrilct Time and not inconsist,eru with me intent ofthe~ct OOciimennL Such cl1angcs shan be.~ted by \Vrittcrl order and Shall be binding on the ()vmcr ~d Co"~. ~ COn.or __. _ shaJI CfJUY. OJ:I;t such written orders promptly. .....'.;,.--~~ .,.. .~. UA~ A2111'" - 1m. eopyngi;t.. .1111i,m~,1t1.,. 1~.~1.'.J7, t9~1.il..$l,1"1,. l~,'I.~..>U'111, l~"il'.~ .lUldl;..7 by"l'll... lllU~~.n In~th<i~ of Arclli't.cte . ./oll,"l.'ltt<o. -~.-IllG: 'tltt.AIA. ~I: A. ~-!liYV.li. ~lIbt ~ I!ll<I Intema!,'''''1'"l'':"""~~.,, tInIoul:bo,,;....~ct>on OIrcll..!:1'iI:>ltti..... 'oIi"thia.MA- ~..t, .." arty......u... of 1.1:. 1llaY ....i1lt 1.11_'. clvu and <ttUl....l'J'4l1&lU.., .;.oonU. 1'~-t.:>thOo~liUent ~.U>l.'~ ~l.....'1hts drli!t.....p~ by AlA .ort",.". .t18:s<I:.~Jl.C>1t lCflO5/20OS un<l.rOrder 1Io.1000UiOH 1. Wl>ich...q;it.. an 811/:2~6, ..It<:lL.""tCornsalo. u.... No.,..., -. t:22H~54UI 2S ARtICLe 8 TIME i 8.1DEFlNm(i)NS 58.1.1 Unless otherwise I1ro~ Contract TiI1lels the period of~, including authorized adjustments, allotted in the COntract Oo6unettts for Stlbst1mtiaJ Completion of the Work. . . ,-"'"'' i 8.1.2 The date of amunencement oythe \Vorl( is the dateest@lished in the Agreement. ' 18..1.3 The date ofSubstalitiaJ Completion is the~ccrlified twibe A.rcl1itect in aCCord-t 'Yitb.Sectio." 9.8. S 8.1.4 The term "day" as ..usedinthe <Jontract t:>oouIncnts shan nan calClndar day iJJlleS$ otborwiJe ~fi.lJy; .. .... .. .. ....... I amned~ . i .! i ' 58.2 f'ROQRESSANDGQMPlET1QN .. ........ .... .... ........ '. S 8.2.1 TiI1le limit:; statcdin the C4ntraei nocuments ~ of the ~ce ofthe~. B),' execlltiJlgthe ~ment the Go~or eonflnns that die Contract Time is a reasonable period for perfOrming the \v,cnt: 18.2.2 The C<>>$'actorshallnotknowinsly.. except by a~t or in$tru~on of the Owner in'writi~ prematpn:ly cJ)lmftODCCl ~onsOn the site ~ elsOWftereprior to the effective daq: of~ r~ l?r ArtiCle..II to be ftimisbod by the Cotltractor and Qwner. The date of commenc:emtnt of the: Work shaU not be cMnged by,the , eft'octiye dtlte otsuch"insurance. UnlesSthedateofcommcncement is established by the Contract Dqeurrients or a notice.to proceed given by the Owner, the Conmtctor shan notify the Owner in writing not l~ lban~ys or other ~ period befOfe coonnencinl the Work to pennit~. timely filmg ot~. ~'l UgAAd '~.. other security m~. i 8~.3 ~e COntractor sbAll p~ expedItlou,sly With adeq~ forces and shan achieve Substantial Completion . witfili1 th~ Contract Tune.. . ...w .,#'" f 8.3 PEl.AYSANQ EXTENSJONS OF TIME .... .. . . ... . .. .; . .. ..., S 8.3,1 Jf the COtt1r4cfQr is .~laytd u ~)' tim~ in the comsnoncettJent or progressof,the Wotk by an actor neg1ecl of the Own~ or Arohitect, or of ~ ~ploye~Qf ~ither).or ~f a Sep$'atC (;on~r CD1ployed brt8e ~er, or b1 chap~ ordered inlhe WorIco Qr l?y1liliordiSp~ tite.unusu.al delay in deJiveriC$. ~navoidablecaSualti~ar other C8\JSC:$bc)'Qnd the Contractor's ~ntrol, or by deJay aUlhoriZeQby. the Owner Pendingme,diation and aibitrBtion, 91" fly. other at~.. Wbichlh~Arc:hitect d~~ints ttlt.y ju~tY de~y, thC1i thcj COn1'mct Time ShtlJbe extended by . " Ch~ge Order we such ~able time as the l\1'Cbitect U1llf detemtin~. " 58.3.2 Claims relating to time shall ~ ~e In MCOrdanCl'e with applicable provisions of ~ ~:3. '." \ , ~ U~3 This S(lOt1on lq does not preclUde RlCOYery of damages fordoJa)' by either .party under ~ther provisions of tbe Corrtra<:t J:>ocwnerits. ~ . . ""~ j.lt! ARTiCLe 9. PA'lMENTS AHD COII1PLETtQN 19.1 CONTRACT SUM. . . ... . .. .... .. . . . . '. ~"..~i \__._. 5 9~ 1. iThe Cont:raet Sum is Sqted in. the Agreement lUld. incJudblg authorized adjustmen~, is the Wtal amount payable by the Owner to the Co~or for pqfonnan~ oftbe WOtk under the Contract ~..._ 58.2 SCHEDULE Of VALUES ...>. . . . . ... .. ... . . ... . _._., , I $.2.1 Before ~e fi$tAppIieatj<Hl for Payrnent, tbe .Contractor sha11 ~ubnUt to the ~itect a~~ ?!.~~~~" aJI~ to VIl10US pOrfiOll$ oftbt Wqrk, prepered mSlich torm~suppo~ tw s,~h .ttata ,to su~fUlte ItS '. ~CY. the. Arc:hjtect may. ~.This sche,dlde, un~ objected to by the A1'cb;itect,Sh8U 9c Used as a ba$is for te'(iewing the QQnttaCtoI"sAppticiii.tfuns for Pay'ment ~UAPPUCATlQN$FORPAYMENT . ... . ....... ...... .... . .. ....... ... ..' fi 9.3.1 At lCllSt ten daysbeforetl1e date e6fabli$bed for ~h progress payntent. the Q)ntrllCtptsJutUSUb,mit to tbe ~J~:i:~I:~:l:I~~~=Oit=:'=~C~Ill:.:m=~~:~=;$or:~" .M4 ~tA201" - tfil7'~i""t.. llll~; uus, in.; t~5. tliV. 1il5;' 1~. 181. *'~illi~',u'fO, 1''16. 1fl7~ un by 'I'b.o """,c~~..t",Ut..t."t ~re'11-t..e\;$. ..~"t.i.ll!>-*'" ~,~ttlct ~. MI.". ~~ .1.. P"'~ ~ 11,11' ~.1qt\t ~ _ :tii~l:.l0!>ll ,....,.t.i...I1nAUt.!tot'iltad ~"" .... ~!fl;tl'butl"" ~ ~ AlA" ~, c.r "-'!II' ~oc; oX it. MY ......"t 1ft _.. etv.l! - =:uwu.l t*na1titi, , iull:!ilriU boi ~-tlOd ~ ti!a ~ ~ ,G.-rill- ~.. tIwt 1.... fill. d~.it .... ~ by AlA ...tt...... .Ilt IH1i4:'59 on1.Ofo&/aOO:'>l'l>dat O);do;r lro.1000UlOii_1 Which .~1t.. ona/l/lolii. .mi 1" not tor ru'le. 1/11.... IlOtota: ... ... U2404H41I 26 payment as the Ownci'or Arehitect.~ ~~. sU9b as CC)piesofreqti~ons from Subcontractors and materilll suppliers, and ~fl~g reta. jfprovKtedforin1he ~D<<.UmentS. . '9.3.1.1 As provided in Section 1.3.8,$ud1app~,ions ~Yincl~ reqpcsts tOt payanerit onaccomtt of cbanpsir) the Workwhk:hhavebeenproperlYJuthorl2:ed by .Ccmsttucti~Chlln8e Directives, or by interim c:letennin~ons of tt.e Ar#liteet, but not yet m~luded in. Char!8~ ~s.. . 5 9.~. 1.2 SUCh appliclltionsmay n(lt inchJde requests for payment for pt?ltiol1Sof t~ Workftlr wbiCbthe Contractor d()eS Bot intend to pay to a Sub<:ontmctor or material sUpplie.r'. Wlless such Work has been Performed by others. . whom dit! Contractor intends tOptl>< .. . .. . "^^ ^~ _ _"~"_,, ^^._~ '9.3.2 Unl(lS$ o1h~stprOvid~ in th~ Co~ DOc~ts. .paymettlS shalt be .Pi8deODaPcoent of materials and equjpmlmt delivered and sUitably Stored at the site few su~quent inCorporationintbe Wo~ Ir~roved in ad\l8l1CO ;:~;;:;:r,.==':=~eIf"':l~~~ compliance tw the Cpntraetorwith procedures .~~ to the ()wnerto ...,Iish the 0\vneI"~ title t()slJCb materiaJsand equi.-ntor Oth.erwise ~ the Owner', in~ and shaD include the 'Q.OSfsofapplicabte" - ins~ siprage and ~don to the site tor stJd1.~ and ~~ stQnsd offche:site. .. . " "., '.- - , i 19.3.3 The ~ .watrams. that titk to all W9r1t covered by an Application for P~etU w/u pass to ~.'()wner no .. than the titne of ~eDt The Contractor fur1ber wanants that upcm sublQiUal of an Ap,pIican.m ~ Pa)tment aJl Work for whiOh'~ for ~er1t have ~ ptl'viol1Sly ~and~tSTeccived from1he 'Owner...~ tq dt~ best oftheContmctorsknowl~e, ~ ~d Wlictbe fT<<te and iilolIr.ofJi'D$..Ql~.^.~ ~t)i ~ or enClUfibnrn~ ip favor oftheCon~r. Su~ material ~Plliers,or 9ther. penons 0r entititJS making a c:1aim ll)'rCason of having provided labot, materUls andequipme:nt re~~g to the Work.. .,..... .flt1'..~,,, & 9.4 CERTlFIOATES FOR PAYMENT ... .. .' '.. ... .......... ..... ... ../ifi~-" f 9A.1 The Ateh~ectwi)~ . within seven .dllY5 after receipt of the Go~ctor'$ Application forPa~ent,'en~r!.~~m the O\Vner a Cer1iti~ for Payment, with aC()py ~thc; SOOtractor" f~r such amo~t as the 1tf6h~~m~ IS pro.p<<ly d~;ornQtify theCon1mctor~d OWner JO Writing oithe Architect's ~qs for ~~ ce"'.ficapoo inwhoIeor in part 8$ provided in Section 905.1.._," '...) . . f 9.4.2 The is$uan~ (ilfa Certificate for P&yInean will co~ a re~tatioll by the Arch!.tect m the OWn~.. . " ~ .9'J. the Arcb~!i\WaluatiQp ofihe Wolt and ~e _ COrn~iht ~ AppIlattion for Paymettt, tbat the WOrk" , ~pro~ to the pqint ind~d 8IllJ th.. to the ~ 9f1l10 Arcb~1 knOwled~e, ~on and ~llof. the qUaJhy ~fthe Work ism lt~ce with ~ ~ ~.1'tle f~f ~~tati~80~ to an ~uatil)Jl oftbe W~ fiJr ~~ with the ~ntIfaCt. ~~ upon ~ubStanti~ COl1}Pletlo.~. ~ ~.Its Qf " ifi subsequent te$ts. and ~on~, t() correction ~fmmor ~~ from dte ~J:)oc~prtor~..c~Je6911 and to specific qua1ificatWqs ~~ by the Arcbitect 'l1teissuan~ ofa Certificate f~ ~ynfCDt will ~ ? e<mstitute a rep~~n tb1itd1e ContrJlctor is entitled ~ pa)'IDCltt in the ~tcertificd,~ H4wev~r. thel~tice rJ~;X::;~-::~:;~=~~~~ sequenCes or proced~s,(3) reviewed ~iC$ ofrequ~s ~e~vcd fhlrn S~IS !mdlmaJ.~al!!9PP~^ '.. . and other data requested.lJ;t the Owner ~~llsmn_ tJre Co~ctor's ri~ to Hyment,or (4) made !'XMlin~()n to ascertain how or for W1urt pqtpO$e the Gontfact9t'.bAA used q1OI;I~ previou$ly paid on aCc~tbi:'Contrac:t SuM;' " "'~'__ fi 9.5DEOISlONS TOWJTHHGLOGERl1FICATION . . ._". S 9.5.1 The Arqbiteot may withhold a certificate ror Payment ,in Whole orinMtothe extent ~tmablr~:sarY to prQtect the Owner,. if in the Architect's .llpinion t:J1j, rcpt'e$entatiqns to ~O\\'l1Cl' J'fiqUired ~ Se~ 9Aa c~Ot be.made.lftbt ~itectis.unablc.to certiIYpaynrent brtho amount of the Appti~tipD,.tile Nchitecl wjllnotifythc COl1tractol'and Owner as providedinSectiOo 9.4. Llftbe d~rand ArChitect alIlncn~ 911 a reviSed . . ..' amount the Architect. .Will p~~ is$ue^!lCcrtifigtc for Pawment for the tUnOuntfor wbi#l 1iJe Architect ili able. to make such representations m 6Ie Owner. The Aiehitect 1l1a)' also WittlboJd a Oertiticate fi)r \p&~nt or, bec:au$e. of subsequently ~~~C1ence, may nUlli~ the whOle Ora part of a "Certi~ for PaYment previousl)' issued. 10 such extent lIS may be n~sary in the ArcbMct's opinion m protect the OWner frOJllloss for whiclj th~-CoiiftaCtOi- is responsible, ipcluding loss resu'lting from _ and omisSions descnbed in Section :U.2, because of:- .1 ciefeqtive Work IlQt remediedi AlADot:llIIIoeil~A20i"'';''in7.~.l.9bt. . 2)~i'id.i5;nu.ins, 1tr7, 1.51. "'$e.1"1, Iii",. 1"., 1'74,1'7'. 1t1.7 ~ltf7by TU _.r:i:4ah 1lill1.:i:t':le.. .'IIf <Mc:htt,cu:A11ngbt. ,...............~1Illh 'hi.. W " """~~l: .. ~t<>\:ioi#t.id .l;ii:t.1I.1L~911t u" end %nS"'_~'f""U~, .1Ina\lt:....~~~t'""" .~.cI1.t:rlb1;Jti......<i(~;:ii.wo.. . ~t. .... al!V t>o..~...cif i~; lII!lY~t. 1ft.......... ...vU .....a _~1""""1!;t.... an<! li1U be ~tcd. iol:h.e_~ ~t .......1bl. uildtn: ~ b,;, .TI>.h dl-.tt .... proCiu""" ~ AlA ~tt:...u lit n.,..,st "" .loio.~noo$-..t O~;r H("100~niois_l lIhlt1/ll!liji1r.. on 'lll~O'OS. aM i.. 11<>1: f<>rllonU!.. .. . , ... u.... 11""-_' .. 122.43(10441/ 27 .2 .3 .4 .5 .6 thirq party claims flied or ~nable eviden~ indiCating probable filing of $J1C11 clairtlsunl~ security IICccpt4bJe to the Own~r i$ provided by the Con,1ractor; failureoftJie COntract9r t!) makie paymcgts properly to Subcc>ntractors or for lIlbor, mllteri~ or equipment; . .. . . ~ill?leevidencc: tblU tb,e W ~ cannot be @mpleted for the III1ptUO balance of theContrlicf &un; ~ to.thc.Ownet or anothei~r; ~onable~v~ that the WQijC wiJI not be cotnpl~ within the Contra~ Tirilc, and thAt the unpaid .b<<Juee wocdd not be ad~quate to cover.,CtUaJ or liquidated damages. for lIIe antic(p,t<<Idetay; oi' . ptrsjstemfaih1re t() ~. out the Work in atX:ol"dance With the ContJoact Docwn~tS:.. . .7 5 9.5.2Whcn .tbe abqve TeasQn$ forwifhbt)Jclin,g cettificati()J:Iare fe.tn()ved, certification wil1;be rriado for~ount$ previously witbhelq. . . . .. fi 9.6PROOReSS PAYMEH'I'S $ 9.6.1 Afterd1eArcltitect hasjS$Ued a Certificatte for ~ymer1f, the Owri~stu.ll ltitske paytrtl!fitin themaritler and within the time provided in the ~ L1ot;ument5, end $hall so notify the Atdlitect. . ., 69.6.2 TheConttactor$~lprt)mptJy pay ~b S~ntractor. upot1 J'e(:Oipt ofpB)'ment from the Owner~ ollt of~ amount paid to the ~ on account of such S~traci(ril's portion of the Wort. tlle~ to which said SubcOntractot is entic:Jed. reflecting ~ ~Jly retaine<} ftom payments to theCo~tractor on account of such Subc~ porlionof tile W()rlc. The Contractor sball. 9Y ~ agreemcnl with _h'Sub$ntractor. require _h Subcontractor to make pa~s .to Sup.~ in a similar manner. . ,_ ..~_.. S 9.6.3 The Arohltect will, on requ~t. ti,lrnisb to a Subcontractor, if practicable. information regardi11$ percerim$es or..., COmpletion or amOWitsllppUed fur by the CQ~r and action taken thereon W t,he ArChitect atid OWner on ..,." a<<ollnt of portions oillie Work done by such Subcontractor. -' -- .*"" 19.8.4 Nehhl.'J' the QwnernQtArchitectshall bave an obligation to pay or to see to the paymet1t;f]loneYtO a SUbcQlltnietor exeeptasm:ay<<herwise be required by JaW. l . ,..1-<' i 9;6.5 Pllymentto material suppliersshaU be treated in a manner simUar to that provided in Secu.ons 9.6~ 9.~.3 ancI 9.6.4. , 19.6.6 AC~if~ for Payment, a progt't$$ payment. or partial or entire ~se or<>cctJpaney ottheProject by .the Owner ~l not consUl\lteacceptance ofWoije not In ~ With the Contract DOcwn~:,. . " / - -,-~ S 9.6.7 Unlessth"Co~~t provides the Owner With a p8)'I1tel1t bond in the full penal SllD\t~ftJte COotrJCt's,um.' ~~=~~~~;lt;,by co~with tlle~orforwhicb paymOlrt\liQ.~ bythe~. N~ COt1ta~efi .io shaM. .rpq~ I1,1On~ to bc=Placed 111<& ~tt ~. aJ1d ~ot ~ed wftb l110ney Qfthe ConttactQr..s1ulU c.... jny, fiduciaJy liabilitYOJ' tQrt liabiJqy on the part ~fthe COntract()l' fot bro8cb of~or s~n ~tle.!tlx.~ or~!y to 1ln Iwata ofppnitive ~es against tlie Contractor fpr b~h of the requirements ofth'is proYisioJ]. ' - ',' - " '.... - - - " - f ..... 5 9.7 FA!~ Of PAYf.1.ENT f 9.7.1 If the Arehitf:ct; d~ nqt issue a Cettiti~ for Pa~t, thr9uP no fault of the C~ctor,)YidIin'seve&4a.ys after rtceipt ofthc pon~s Applicatio~ for Payment, or ittbe OWner d~ not pay the ContraCtOr witbl!LlIeVCD days after the WrtC. ~lUhed. in .the, Contract BoelJm~ th~. &llloun,~ certified b.y the A.rchitedt or/a~ed I>Y . .... ~i1tatit)n. then ,the ContnlctoT rD4Y, ~ ~~ ackiitiOfJ&I ~)'$l.w,ritten 119~cc:.tI,) the Owne.r an~ Ar~.~optbe Work until ~ent ofthe~ountowiItg has been received.. The Con~ct Time shall tie ~.#d ap~lyand the ConttaCt ;Sum shall be.~ Qy the amOgllt oftbe CoDtraCtQfll rouonjpl~ CO$tS of Sbuti:lOwn, delay and start-up, plus in~st as provided form the Conttact Documents. I AU.~. Ailol...1"7.~t9\i.t . nU.l'15, .1>>1), utI, 1.~'1, 1.$1; 3,11".1 i.~'1K'. lV1Cl, l1i7.. U,7.&lId U" lijo The "",,",riW,i :fn~tltut'''f''rclltb'''~,..; ,A11rll!htil..-~, ~; 'fhi' IdA" ,,",~eQ~ Il!:r ~." l/opy1'l~t tAw.....s 2.8 I~,,:tili,,",l !'.....b... Una\1~l....nl'hl.~..<l~lon or, cU.tr1bQUon ..~ W.. A:J.A' , .,ot anypo=oil of it. 1I!IY....*Ult ill-. <:1Yii~c:t"JOI.""l l*IU~. -.I Will be ~.~~ ~ ~ tolW"""" _....t ~.~1. ,,~ l:IIc! 1'''. tla. ""..~t....., prcicluc:<i<l i!Y ~ :...~:; 18:$'4::>' cjft 10/061200:> unci.... Order 1lQ.10(lOU1CJH.l lith.cb &>tJ:flt" .on 811J200~. and is 1\01. for r...,4i1.. 12z4U<tS<!Cll 59.8 SUBSTAN11AL COMPLSTI()N . .... .' ..... .' fi.9.8.1 substantial CompJ~ .is the $ta$C ~tb~ prOgitS$ of the \Vorl< when the. Work or desi~ pQJ'tion thereof is suftioientlyooJnpIcteJnaCCOf<flmce with tbe Con~ Documents ~ that the Owner can cmupy or utilize the WorIc for its intended use; . . ~ 9.8.2 Whet) the ~r~~ders tbJt~ Work. or II JXlrtionthq-eofwhich the Own""~'to accept '. . s~eJy, is su~nycoiDp-, the Contractor shaI1 ~ and submit to !he Atchitept ~~preheDsive Ii$! ot ~ to be ~p~ Or~ prior to fin~ paymcmt. F4iktte to inc1uge ~ item ~ ~ mt docs not aktr ~ le$pOt1Sibilityofthe CootraCtor to ~mp~ all Work in ~cc with the Contract OocIImeajts. ' ....... .. I"~ ...... '--..... 19.8~3 Upon ~ipt oftbeContractQr's ijsr, Ute..Architect Will m~an in$pe'-titm to ~e ~etthe WOlkor- desjgnated~~thereof is sUbst.antial1y compl~ tf the An:1iiteot'sins~ disetoses 4riY Item, Wh~.". or not inclUdedOD tbCCon1ractor'sUst, which is nptsutlicierrtly COJllpl~ in ~cc \\'ith (he .~ Pocwttentliso' tl1af .thc'C>wJ1CrcatloctUpY()r ~li;e thc Woric or deSigja~ potti!m .th~f for its inten4od, ~i the Contl'actOr . $balJ, beforeiss~oftheCertifi_ofSu~ti41 Comp~on, com~~ or cotrM sudi1t!rit upOn notificatioll ~ the Arthitcct. III $ucb ca$C. the ~ shalJ then submita requeSt for~er iQSpectiOll'by theArohitectto ~e Sub$bu1tia1 Completion, . '. . :. __ U.8.~ W1ieP !heWonc or d~iP~ POrtion ~fis Stij)stan~ly colllpletc. thc ,A.rohi~ Wlp ~ ~ J =:~~~1;:1.;".;t~~~"\":~ insurance. aQd ahaJl fix the thnewithin which ~ CoD1nctor shalt flniih aU ltem$ on the Ii. ~n~lyirig ~.__.. ~~. Warranties ~ by the .C<wract Documonts sbalJ COII1mcnce Of) the- ()f1$ulmuti4,LCmapl<<,iQQ... qfthe Wm'k or des~ portion fhereofunlcss <Jth~ provided in the Certifioateof S1Jbscantial ConwJenon. 5 U.5 TheC<<fificate orSuQstaDtiaJ Completion ,shall ~ ~bmitted to the Owner IltId Contra<<Ot for their ~D. . accept4ln~ of ~QilitieS lissijllecJ toth~ in suclt CertifiCate. u~ suc;h iccoptance and consent of~. if . any. tbe Qwnershall .nab .~ent of ~eapplying to ~~ Work or desipted portjon~~t:~Su,c!t~ent shall be adJ~teci f(lr Work that is mcornplC!~ otnot in aeeordal1cc with the reqUiri:ments of.th6 ,(J()npct ~nts. S9~PAJttIALOCCUPANCYORU$E. . . . . .. . . .... ......... '. ....". .....! t $.9.1'11te. OwnClr' ltllIY~Y Otuse-Q)' completed orpartiaUy09mpletedportiOll of the Work at any ~'wbett.... such pl)raonis de.s~. b,y~. ~ With the Contractor. provided suijl ~oy or ~..it ~~ '" "". to~ the ins~ as requircci un~ ~on I U.l.~ and authorized by public authoriti~ 1ul~jurisdictiOh over tk "'" ... > Work Sllcb patiUll. oocupatlcyor use may <>>rntnencewhe'ther <lr not ~ portion is subs~tYCOlllpl~. pro\1ided '. ~ the Owner an4. Contractor ha~.~ inwritil1gthe responsibUiticsa&$igned to .CIlCb. of thtrn)Or~ts, .' / ~iflUlY.~uri~. IMi~tenanee, ~ ~fti~ datriipto the Work and ins~, arydDave ~.J<<t .. ,-t' ~ WriUng co~g tile 'periodfor ~on of tile. Work and coJrJnenccment~f warrantie.s.feq~ .b)r-ftle ~ ,. ' PoC\1blet1ts. W~ the Colltractot considers a pc)1'tion ~YCODlJ)Jete. ~e eontl'aetOr shfU ~\8ricV ...," =:':~~~~;;~~~;~~~::r~ between the ~ ~ci ~r or, ~fno ~eQt is reached, by ~slon of the. Arcbi~ct.; ,; . . :~. i' i 9.U Imme(Jiatel)' prior to.Such partial ~ Q1"~, thee>wner, Con~ .nd ~eci Sha1iJQ1ii4y iri$'PCci >- thc area to be ~pied Q1" pottiQn of$e Work to bcU$ed in otdtr tq determine and record the"COfldiflon o'ftlte ,,_.-..._. VVOrk. . ,- 5 9,U. U11lC$$otherwi~ aare. ... cd upon., partial ocmwancy or use of a portion or portions oftlle WOIt shall not Con$titute~ee of WOl'k nOt cortipl)'blg with the requirementsw the CclI1tract fiocunumfs.,' _h "'". f .F S9~10 FINAL e.OMPf..EtION AND FINAL PAYMEN,T ...... ." .... . '.' . . . '. ...... i i g 9.1.Q.1 UPont'eCeiptofWritten nOtice tbattbe Work iueady fw rlilal.~n aM ~~. and upon receiptuf a final AJ:ll>Ii~tion forPayment,theArcltiteetwinptom~lY make such ~ntlnd, wh~ t6e Architect finds the Work "-G:ceptabJe under the ContractDoCUJnentundtheCOtttract fu~ypertonned. thcAmiiteotwiH Promptly issue a final Cdrtifi~for Payment stating that to the beSt of the ArchiteCt's knOwletJge.mfOrm~(),n~t)eliet:anaori--'-"-" the~is .oftbe Architeet's on-site visitS and inspections, the Worlchas b~ compJCtet;l.in. ~with .~.and_,..,,_.. conditi~Qfthe ContractDQcumcn~.and Wttthe ~tire balanc(l found to be due ~e Contnlctc)Tand n~ in tbe ,< "._<.."~... AJA: ~"'-"';1: liil9l- "1"'1.~tillot.l~11,"1li, in.. lli2~,Jb'i. iw... i,.H, 1~. 1~; 1''', i"O,l9iJji 111.' aDd 1~ bY 'II. l\Ia~~~ l.-.<<t.lltll or ^rAAlw.c~' . All ~ ~'IIAiiIfI!la1 tbi.. I(U.' ~~.o .,.,o;o.~tliii ~ o.a;CoJltr~t La'; - 29 1"~~~~u.... u..""l:IoOrl.""If ~.~ .....<Ii.ti;o.ll....~ .Of' ~.~.. ~t. .... ~ ~ iJ4 $,t, _1' .....!'lt1.. ......... ..hi1__~l J>ODll.1tal.. aiiOl nIl li.i prciII.....~ to 'tIle ~ ~~t pQo,ll.b1;; ~r ~ 1'.... Tb.i.1 clntt ''')I~ prodUced by 1\1)1, l.,tL""re n lks4;~' cli.l~/OGl20o.suJlItuO!'d.r 110;'1900111016_1 ~..!:i> .xpU.. Olieii/iouG. !iN!. i. not tor ~..le. ' U.." x01:loa' . . U244J45,t411 fmal Ccrtifi~e is due and ~ble. The J\rchitcct'$ final Certif'lC8te for P~yn'ientMIl constitute ,8 ftJrtbcr repRlSelrtation thatcoil<fttions listed in $eQUoo 9 J 0;2 lIS precedent to the ContraotOr's befug~ed to final paytnellt have ~ ftdfiUed. . , ... 59,10.2 Ntither .final p.aYD1entnoranY~aining ~nedperccl1lilge shall becotfie 4u~ .UIltil the COlttra<ltor submits to tb!', A:rObitect (l)an affidaVit that payro~ 1>il~ for materials and equlpmel1G andothet... . . .. e&,e$s connected with h WOrk for whiCh tbeOwttcr or d1c Owner's ~Jniaht be responsible or en. ... ... ....: . (Ies$ 8Ol0LUrt$ withheld ~awn~Jhave beerJ paid. or o~erwise satiSfillt\ (2) 8 certificllte e,vi<<kttcing tI1at ,.. ,. ..., ... teQUirtd by the Contract DOcuments to mnain m fOrcCl ~ f'mal payment is ciurently in etroet ~ will n~ belcanceledor allowed to ~irc, uritilM least 36 day$' prkJr \VIitten nptiCe ~ been given to the Owner. (3) a ~ staiCiiteiifSftTlc ." " COnttattm- knQws afno S~~,that tile. insurmtce will not be ~le to covedthe;POriod~iRld-bf. .... ~~.r_t;~:"~~~It=ru:t:;=r interests, or ~cumbrance4 aris~ (Jut o(the Contract; to the extent and in $UCb ~nn as maX be ~ bytbe ~. If a S~ ~s to tbrnj$ . Terease or waiver RlquiJ'od by the OWner. thelCOJltrattor.y f'urtU,sha bond satis1ilctory to the Owner to bulCJ1lIlify the O~ apin$tsucb lien. if such lien remainnrsatisfie4 after payrpcnts arc madc:. ,tbe ~ ~U refund to the Owner al1 DlOncy that the Owner may bejcompeJledto- pay in diScharainssuch lien. inclt1dhJg all COSts and reasonable attomcysi fees. I i ~' ":=~~04~~T..:t~~"'\fi~~=t.~ OWner $haI~. Upon appliCa@n by dlll ~ ana CCl'tifiQl1iQJ1 by the Arohitect. and widlouttmninll1ing tb~ . Cpntract, make paymmt oftJ:te 6a~ .d~ for that portion (lf~e Work fully eo,mpl~ ana ~. [f~ .~. _"" ~in~ balanCe fQr WQd;n()ttUW<lOmpletcdorc()mciedj~ les$_ l'etJlinsgestipuJlUed b1tlulCon~ PocUinen~ and if bonds have~ furnished, tb.e\Vriuen CO!UCntof su~ tj) ~ent oftlic balattcedut forthat . po~ of the Work fully eompleted and accepted Shall, be ,stibpUtted by the ContraCtor to tlIe Archuect prior to..,"" certification of such payinellL Such paymentslta,tl be made ~der.terms and conditions governing finaJ paytt('CI1t,. ..,. except that it $ball not colJ$titute a waiver of cla4ns. .'"' .. ."" . -... : S9.1U Tho making affinal paymC1lt shall ~stItute a waiv~ of Claims by the Owner ~l dltik.~siIlg from: .1 liens, CJaiJn$; $ec~ty interests or encumbrances arisins out of the ColttnlCt and~~ : I .2 failure of the WQtk tO~ly with tbe req~ents oftbe Contract Documents; or .'...... ;3 terms of spcei4J wattanties regu~ by the Contract Dt)cuments. .5 9.tO.5 A~Cf; oftitult pIiyulent by the ~~. . Su~traaor or materiaJ~1ier ~II ~tituto a wajverof claims by tbatpayCC C(oo,pt those preViouslY niade in writing and identified by that ~yoJ. ~1Cd at the time of final Appl:lC8tjQD for P~. / . '\ . '. \...- ARTICl.E to PR01]:CTlQN OF ~$ ANI) PROPERTY ( / \~ ' . i tn., SAFETY PRecAtmo~S ANt) PR008AtttS .. "...., .. ..' . i I.. . ), 5'0;1.1 The p~ shall ~ ~bJeforin~rtJainlaining and supervisiIl, aU skfelf preeautions apd programs in connection with the petforlnanee of the Contract. . S 10J S4FETY OF PERSONS AND PROPERlY .. .. . . .. ... . ...... i 1002.1 The Contnlctorsball ~ell:8SQJlabte ~()U$ Cpr. safety. of; anc;l shaUprctviije ~le ~ to ,_.~<~.~ -'.... prevent dam~e~ injwyorloss to; . .. .....,., ..m ., .... ...... . ..,. . .1 . emp1oY~Ollthe Wotlcand oth~persons Wbo,J1Ul)' be affected thereby; .2 .~ Work and ~Id$ and eqliip~t ~ bemcorpot'llted therein. whether in ~ Oll~or jl!r~e SIte, und!'rcare;custodY ~ contnJl oftbe Contractr>ror the Contnlctpr'$ ~~bccyitntctorS, or Sub,. subcontraCtors; ~d , ',. . . .., " / .3 other propertY at the site oradjacllnt thereto, $Uch as trees, sbn.tbs, la}\11s. w~.pavemetrts. roadwa~. ttruCturt$ and utilities not designated for rerno~. relocatiOll or r~l~ in the c~ of construoolJ1l. . . : ' . , 1 i 10.2.2TheConftaotOuha11 give noticeS and ~lyWith appJiCilble JllW$.Ordinances, ruJ&s.reiulatwns anti lftWllJl Orders Of PlJbljcrutthoriti~ be~ on. safety of pCrSOn$ or property or their pro~OIl from d$nagtl. 41jury Or loss;~ .~ .~.__:.- ~ ~t ~oro.. Jl1I7. Copy~t. linli,191$, jjl'.l112~,li~', 1)5t. i.. ~.i~.f.~. t,.,~,. tn', 1'~ ..... i,'7bY'M .......1...." I...nt"~'Qt ,...elti~~~. AJ.1 .~lOl>U ~'lr,QIIl~i flU. w.~ ~.j;e pi(o.~ ~ \l.8, ~;.qht ,~..~ I'U;'''_t.t~''~U...\l~~~l.a4iodlt~t1'''''''' ~.t#tbUtlOb "t ~.~. ~t. tit "I!Y porJ;1.~ 0# j;t; ..,. ~~.t 1n 11IW'" ..,hd - orl.ai.ml1I*altl.... a"",1H .~. ~4iCio>t.d to tblo .&1..... ...~tpO..~'" u~t l:Iloo II", Thi. c1r.~t.... Pro<:IilClod bl' AI" ...~t"... at U:ii-4:S' on Uff061200$ iu>c!4r O%cie.rlio.100<iHiCl1!_1 whli:hUj;1I., Cib eil/2'GO!, alY.! t. not t~~ C..de. OIl'" lIoc..'. (22HnS~Ul ,....r' -"'<....- , \ 30 i 10.2.3 TheContI'aCtOT shall erect andm~intain, ~.~uired by .exisMg conditions 8114 pel"fonnance oftbe C()n~ct. ~J)lIble safegu~ for saf<<y .AAd PJ9~ion. including posting danger sigIlS andqtller warningsagau,$t ~ pl'omwglU"ing ~ l'f!8ulauons ~d llotifYing owners and users of Jdjaeent $ites .ami utilities. . f 10.2.4 WltOl1 ~ or sto~ qf explQSives or other hazardous m"'ls or equipment or IJDllsual W(h~ are Decessary ror .execution of the W o~.1be OOl1traCtor shall ex~isc utlno$t care and carry ~ activitie$ under supervision of ptqperly qualified personnel.' i : 1 .l . . S t~.l.s 1I1c~OI>alj ~ ~ ~ ~... (01!1",....., ~r POl4er~ jns~ MqUired. by the C<JnflaQt ~) t() ptOf)etty .~.tQ in SeCtionS 102.].2 .'. .iilb.t.-r.3causarffi .., ~".~, r';~::~:-..~~~t~~~Vd'............~~~-'.."" SCctiOIJS 102;1.2 lUld l()~ 1.3..~cept ~ge or IQU aUnbutOJe tpactsor ODiissiOl'1s ofU$: OWner or Architect or anyone ditectlyor lnaircct1y empl()yCdbytlither of~ l)1' by ~~fOr'whose ~. dtb.o~1Mm may be 1i1b1~, and not atUibutil.bJeto the fatilt Orn.ligencepfthe ~r. The f~jltg obligidions drflfe COntl'llctor are irt aclditkm to the COIrtractor'sonligations under ~i0ll3.Jg. . f 10.2.6 The Contractor Shall design8~.. respons~le member Qf'tbe Conttaetot's ~~n tf ~e site Whose duty sha)f be the prevet1tion 6faeoid~. this ~ stWll1e the Contractor'S ~ 1lJ11~otberwise d~ by theCon~ irt Writing to the Owner 8nd Archi... ! S 10.2.7 TbeContractor sbaJl not l0a4 <Jr peonit lulY partoftheCOJlltruction or site 'to be loeded10 auo ertdang'erffs saf:ety. . S 10.3 H.UARDOUSMAT.BuAlS 11AU.1 If ~Ie prccauti()ns will be~uatt tp ~Cllt foreseeable bQdily inj~ or death to persQn!I Mtlt~ froms ~al orsu~~ ineJl1d~bUt not Jjini~ to asbc:stos or pOlychlorinated biphenyl(PeB), CllCQuntered on the Site by lbe'qon~.1be (lontractor ~J, upon ~iziriJ the eQl1dition, ~eOiate~op i Wmk in theaft'e<:te4 area att4n:pott Ute condition to th.e Owner and.A.rchitcot m writing. f"~' ", i 10.3.2 Th~ Owncr~lldlobtain the servideS of a licenSed W>o~tory tp v~ty ~e .~ce or abs.l!nce of~~terjaJ ()rsUbs1ance.~d bytbe Con~ lUld, irt the event suCh~~1 ()r sU~..i$ foundto be ~t; 10 verifY",. thitt it b~ ~retJdcredhamtless. Unless otherwise requiredb)1~eContnlct P9cwneot$, the pwner sl1atrlbrn~in'" writina to ~ContntctQrand Arobitect the.~ andqllalmcatiQds ofpersol1!l or Cln1:ltjes who IJ"etoporfotm te$tS ""'_ . verttying the ~ee 9tallsence ~ ~h~ or sUoltanceor wb() are to ~ the task 9f remo\'aI or safe ': ~inmentQf such Ipll~ or S9bstam:e. TbeCon~ and the ArChitect will ,rompt~y ~l JtHfte Qwner in ~~ s~ whether or DO! either Iw ~le otfJCCtiOb to the persons or entities pv. b~_~. oWoer. I~ / .' either the Cctrib'aCtor Dr ArCbitett ~ an obJ,~n to .. pel10D or ~ proposed ~ ~. ". ..er'ftbC Gwn~ s~ . .~ y' p~ ~ to. wbomtbe Con~r and the Arobitect haw no ~ objection. \\41cn.tbe ~ df. ..j substance bas ~n l'AAderoc1l1lum~. WQrk in the aiioc:ttd ~ sball ~~ ~pOll writtenJ_meQl of1bc ~ 8l1d ~~. The COntJ'act Tune ~l be~' ~lyand flI!' CQntmct~sb8Jl~i~u( ~ lmountofthe Contractors~l~ ~ttoaaIct)" ofshut~~ delay and _*l)p~ +~juStm~ sh8JI ~ accomplished lIS prov'ided in Artielt 7. . i ',_... h! ~ _, _~.,,' 510.3.3 To the fiJ1le$t extent permitted by law, the OwnershaU indemnify and bold hannless1tte ContJal.1~1'.--' Sub~ Archit2ct,Archltect's ~lJbants and agent! and employees of any ofrqem tfum and against elaim$., damages, losse$ and ~,inc4rdiJ1g ~ r1()t limited to attorneys' ~ -"sing out of or rcstUt~.1rc>rn. . . .....~ ~tfornJatlceoftbe WOrkin~e1lff~ area if in ~the rna~ or ~ce p~ the ri.~bod!l~ iqj.!ff)' or "., ~.u 4escribed.in.Scction 10.S.1 and basnQt~ ~ered~less..Provided ~sucb 9'aint,..dai#l~j IOsS.,r.. ~ i$ atliibut'able to bodily inJury~siclme~ disease 91' deadi, or~ irij~ t() orde$lru~Jon ~taJ1gibleproperty \ (:other tban.lhe WorlciUelf) and provi4(1(f thatsuch ~~. l~s or expenSe is nQl due to ~ sole negligence Cifa party seekirtg indemnity. . .. ! ' 5 10.4Ttic Ownet.shallnotl>,e,r~onsib1C under S~on!O.3 for m~~1s .lUlds~ 6roup!O:~~ .~_by~ Contractor UhlessJu<:hmaterial$ or's.ub$taJ1<:es weurequire<( by the C~ Documents. l ..,; =r~M:::~1:'~1~:~iu.~t~~:;e~t'.~~.t~/~ ~'1~ ~~cb}t~:-.~:;"7=:~m bV ~~. I..~l;i~ 'i_~'1Ina..tl\o",i.~ ~~..... ~ dt.~tliuUon of W;.. ~",..~t, O~ lIlly ~Dc. .otlt. ..~z:oso1Jt.b. --. 31 ~l .ad ~nal ~t1",.Ild".l11'J!jo Jj~",,~tO I:l!io ~"'t.nt 1'001"~ ....." tbe~".'fIii. dr.tt....Fodgcoi~ by AlA IIllCtwil'4l at li:$("55 01)10/0'12'005 "nd.tD1'~r Nil.looot,ioi6 1 ~leh ~i,r.. ~/la/l(2ao~. ~ uhOt tor.......l... . .~ lIo~.:' '. .. ,., '.' .. . '.. IUtU4~Ull ! 10.5 If, witboutnegligetiCt; on the part of the Contraetor,ttie Contractor is held liable fortle costofrernediatiQnof II hazatd()~ ~[or SllOstanCt;solely byreasonofperfonni~ Work as~~ by th~ cOntract DoCwn~!rts, the Owner slu1l1 indemnify the Con1rll<:t9r for aU cost and eXP!'I1Se there;t>y inCU1'nld. . 510.6 EMERGENCIES. .. .'. . '. '. .' . ". ". ..... '. " .... 11,0.6.119 an emera~ affecting safety Qf~~ or~, the ContraetQr Shall' act, ~n~s d.i$Qreqort, w. prevent~ daJnase, injUl)' or Joss. Additional ~pcnsation or ~~~ ~ftime claimed by the Cori~on I()C(illnt.of~ emergimey shall be determined as provUfed in Section 4.3 and Article 7. . ! : ARTICLE 11 lN$UlWfCE Arm BONpS ! 11.1 CONTRAQTOR'SUABlLITY IN$URANCE f 1U.1 TheContractor$ba11 ~ fmtn and maintain ina C()fI)~ or COtnpa1li~ laWftfUytutl10riZed to do busine$S. in the jurisdiction in whiCh ~ Project is ~ SUCh insut'at1pe 8$ will ProteCt.1ful COntrilcmT ftomclllims set forth below wnich may ~ise Ollt of .or~ult from .the Contractor's ~OD$ under the ContraCt 8Ifd forwhi(:h theContraotQl' mil)' be ll;g!llly liabl~w~ sUQb operations bcby the Contractor Qr by a Su1eo11lmCtQr or by anyone di1'eCtJyor indb'ectly ~]oyed by My of them. ()f by llIlY~e for whose .. any oftbe1n may be liablc: .1 claims undeiw~rs' QOtnpet!Sation. disabilityllerletit andotber .mull!' ~ployec benefit iiQtS. whiCh lUll ~ticabte Wlhe Wotk t()~pcrformed; ..... ". . ..' .2 claims 'wr da~es because Cifbodily injury, oec~iona1 sickness Of di~ or death of the Contraetors employees; . ..' .3 c;.laiDls for damages because of bodUy injury, sickness or disease, or death of any pc!J'SOn other than the ~U~ll1pIOyees; . . . . .4 c)!limsfQr ~ ~ by usual ~tl inJury liability coverage; . . ._ ;5 elalms fordaznag~ other than to ~. WO,rk itself, because of irijmy to or destruction of ~giblc property. iocwding ~sQf U$e.resulting 1h~from; i6 claims for damages ~ ofbQdlly injurr. ~~ of a person or property damageari$ing out oi. .. ownei'ShJPtmab1tenanceor use of a mCltor vehicle; . '. . . . '. /'"' .1 claims for boilllyinjury or property damagearisin. out of cotttpieted Qpemtions: ~d' .' '.' . .8 Clldnu involving contr'IlctuaIliability insurance applicable to the ContJ1ctOr't'Obli~~under SettKm3.18. .. . . c...~ _'I"'; ~..."..."l , .. - . """ \ S 11.t.2 Theinsuralice required by Section 1 LLIsl1a11 be wrUten for not less than limits of1iabill(y ~ifjed In the Contract DQcunlentsorrcquiredby~. whichever c:overageis gmter.Co~ whed)er written on llD." " , 'OCCt!Tnmce or clllims-made bas~.$h~. .be mabttained w.itbout interTqpQon from. @e of COnunelicement of the WoJt~., ~ J until date of tinm.paymerit and te.tm~OI1 ofany ~.~. to be, ~ned after fmal pll)'ment. .' ",., . '. ''''''-'./ S 11.1.3 ceJtifica~ofinsuranoc acceptable W the Owner shall be filed with the OWner ptior,.t6'comm~entof.' /' the Work. ~ ce~ _ tho insurance policies rcquirtd hr tJys Sect1.on 11..1 shall ~ina'proviS~ tbat .' ~ ~~lti~~-ir:~::#.==~::~~~ final paym~tand are~t)' ~I~ ~ addiQoDal eertificato evidenc!Ii; cpntinuatioPo~ sUQh cove.iage'sbau be su~d with.the final AJ)plication f9t Payrnem as require~by section 9.10.2. Infonnati~ cooCCrJlini ~dtiOn of C()Yetage on!l~\lfIt of revi$e(i ~jtsor ~laims paid un~ the Oencnd ~, Ql'.~ sb.a}1.~ ~liishCf! ~y ," .~ 1heCol1tractOr with reasonabl~ptomp~ess lQ accordan~ WIth the ContractOrs mforrnatioo;and belIef. i 11.2 QWNER'S UAeIU'h' INSlIRANCE 111.2.1 The Ownersball be l'e$p9IlSibte for ~ul'Qhasing III1d rnafutairimg the Owner's us~lliability inslll'afiee:-.,..-. .. ". .. " " . /"'" " 51UPROJECTMANAGEMENTPItQTECTlVEUABlUTYlNSU,fWlCE .... ... '.. . ..... / . . .J 511.3.1 Opti~YI theOwnerJl18Yreq1Jire ~ Cotltracforto purci)a$elXld maintain PrqjectM~ent ProteCtive Liab~ity ~.ce~m~e Co~s ~ sO~ as prinlllt)'~vc:rage for. the ()~~ ~n~pfund . ArchItect's VleariOU$ 'liab1l1ty for coostructionoperation$ 'under #Ie COntract.UnJ~s oth~ ~~UM by tile =nt:mwn:~'::~::o:~:~=~r:=:r~r=~~~::stOf i purchasing any other liabilityin$urariceon bebAlfofthe OWner. th~. m~urn limitsofliaPil~lircJiasedWiW~-"'~h' such coverage shall be equal to the aggregate of the limits required for COntractor's t.;iabilnyIrisutanCe under ~cti()ri$ll.J.L2tbtot;gh 11.1.1.5. '. . AD. Doc:uoiioiII: ~ - ....,.~.!.Oi>1: . ~~~~, tIll. mil, In.. 11l~7. i'51. li1U, 1~i. i~~. lK$,l.~. l.'..19l17 .... mt by '"'" 100cdGidi ~n:."ie"t.. "~Mchltei::te. AU dl!lI.tt hiiHu:wod. .l~: t'I\1e AfA' ~M Ie Pm..:;~ ~ D.I. ~t r.a".md 1"~!81 ""-\1.." u......thor~_~...~i.... ..... ..u'ilml"" or \:hl.. AU,- ~t.. .... ~PO*Ol'I o! it, .1Ut'1I<NUH ,1,,, ~". 32 c;iVi.1 .~ c,c:iai...1,....lti.... .1U>ii. ..il1 IN. P""~t.ci t<> \:lie' ~.~t _....4>1. a~ tM. ~.". .1'btsdraftwlu ',,:>><tote<! by~" ..,!~;,u.. etn;S4;$9 DnlG/06l20'OS UAdu Qr;,.;r 1Ic:i.100G19111i6 1 wlltt:ll _i.... 0" a/l/%~j\, _OO1a not !<it: ""..de. . 11M" Mobs, .'. ...,.. .' '. . 122.4U4S441) 111.3.2 To !he ~ dam~es .are.~ered by Proj~ ~efu~f~ve Lil1bifit)t ~ce.. the OWner. Contractor and A.rchitectwaive atl rights ~ each Otb~for damaaes. except ~uch rights asth~ may have~the proceeds of such insurance.Th~ poltcy~Uprwjde for $uCh wai\'1n'$ (if subJ'Qgatiol1 by endo~entor otberw~. S 1U.3The Ownerm.Jln()t recruiiethe ~rto inel~tbcOwner, Architect orother~ or ~titics as idditiOllal insuredsontheCo~n Lillbili~ InsUl'at:tce coverage undetSection ILL 511.4 PROPERTY INSIJRANCe.. . . [ I 511.4.1 pnJess otherwise provi~ dleOwnersball purchase and maintain, in a company qr eompanaeslawmni-"--"-~- .mhomed 10(10 business in the J.cticm irl which the Project is J9C8ted, pplperty i~ce.~ a bUildef's risk "atJ..risk" or ~~ poliCy fonnin the awognt ~fth~ inilial Conmlct S~,plus, val~ of subsequent Contract moditiauions andcost(Jt tn!lterials supplieg or instaIIed b)' otttc1s. compris~ total valne tor the entire Project at the ~~'::=t'~~~~~~~ ~iaries ofsqch ~e" untllfinaJ payment I1as ~ JUJde as plQvi~ "'. ~on ~~btuntil no. pel'8Otl or ~.tity other than the Owner tUlsaninslU'able intere$t in the property ~uire4 by ~ Semo9 n iHo be~, Whicl1ever is taler. This ittSl111Ulce shall ~~ intorest$ oftbe ~.the Contractor. SublfO~ an4 SU\)- S!Jbcorrtractoa in the Project. '!' ; . . f 11.4.1.1 Property i$lQnce $hall~pn an "aU.risk" or equi~ poIie)' form and shan intlu~. withO\ltlimitAtion. ~ against CIte ))elils()f tire (with exte~ CO~) IUldpbysica1 l~ or danlage iqCJucting;wftbout . ',,_~_. dtlpiicagOll of coverage. th~,VJt1~l~~ nlaJiC.iQus mis~t col1apse.~~. tlOpd,~. .~.... te$tingapd~. ternpCmuy blrildings Iinddebris rcnlC>Val irl<;ludin8demOl$tion occas;oneg byetlf<>rcementof~y aJlplicable Ie" requirctnenti.811d IbldI cOver reasonable' eompensfltion fQrA~hitect'sandConlTaCfors serviCes and ~ req~irc(1asa resUlt ofsuth insured l~. . -~ S 11.4~ 1.2 Ifth~ Own~ docs not infIm4to purd1ase such pl'Opetty insurance 1!<IuiTed ~y the ~traCt'lnd~~l of 'the cov~ in tb,e~t.dacribtd.llbove, the Owner ~ll so infOrm the ~r in ~~tf> ! C9mmcn~~t of the Work. The (]om:ractor1ll8)' thencfl'ect insurance which wiD proteet Gle ~()f the .' Co1'ltt8Ctor, Su~ and ~~ in the \Vo~ an~~)' approjlriate Ch~e~ the C05l~~ $hall be charpdto the OWner. Jfthc Contractor is damaged b)' ~ failUre or ne~leetoftbe ~lo~hase'i,t.. '. niaintain. insunmce 8$ ~tibed above. without so notifying the ContraCtor in writing, tbentbe Qwnet shall ~all."",,, ~nabJe costs propel'ly fltttl'butable 1heteto. . .. __ ,. .,..~ /'1 511.4.1.8 If the prp~ ~r~ deducdbJ~ the Owner .ball pay costs Dot COvered ~~fsuelt .",' deductiblcs. ,/.." /' / ~ 11.4.1 ~ This ~ ilt$urance ~ll cover portions of the Wort stored off the $he, and.{so ~~~()~th~;' .. ..- In transIt. i I ;. " . .. .. j I I . . .,'. ..' '.. ..................;. t. : S 11.4.1.5 Parijal occupancy Druse ;in~e withSCction9.9 shall not commence unti~ ~insurancepoDl~Y or companies providiagproperty~ce~ ~ to well paniaJ ()~orUS4 by'~~~c;nt qr..,,_ ... othetWiSC;.~ Ownerandtbe CoJ11laCt()rshaU r.keJ'eaSQ11llblc$fCpI to. ~iJrconsentofd1,e itJsurance CQtnpmlyOr companies and shan. withoutJUI,nlUtl\1Vri~ qQns~ ~ no action with .respect iopariiaJ Oecupancy-ar usethat~ ~.. \Vouldcause Canccllation. lapse or tccJuctian of ~ce. . f 1 f .4.2 BOiler and. Macliinery Iitsurance. The Owner shaII purdlUe and maintain boiler and ~~ry !D!~~ .. ""- n=quiTed by the Contract Documents or by Iaw~ which JhaU specifically cover such insured ~cct5.durins . .. . < . . " installation and untjJ final acc~ce b~ the Owner; ~iJWJl'8J,lce.shan !l1CWdc Jntetdts of;ffie~. Contractor, . \ Subcontractors and Stlb-sulx>>nttacton; In th~ Work, and the OWner and Contractor ~U bcf~inslm:ds. \ ".'" ' :- . ::-:,...' '" ,,'u -:, _.:":. , ,.', ". ___," _' , ",':. i f~~~~~;:~~~~IO~=~~~"wlU Qwnet waivC$l!.U flibtsof action apinSt the ContnlctOrfQr loss ofusc of the Owner's. ~. iiiC'rudiiiC -_ _" conseguCtlti8llosses due to fu'e or other l1azards however oa~ I . . . A,.Lk~.t ~o~"'.. t",.~l~f.l~~~~ 1~5, It)lq~. 1,)j, 1~, l~.. 1~$i. i,.3. tm;ltjo, ~T'. l~...al.t'" ~'hiot ~rlq;on lIUUt"t!l ~t Arcl)lteets, 10:11 f71V!il:!l.~. ~l ~1a 'JA. ~t h P~~c~ l1Y \1... ~1'l\t."'"\<...... t."~",,*t,l.ocoal 'i''''''-t.i...... o.nau""~~ ~""'~ c>" i1~..t:ri~\\f<!n ot thi.~.. ~t.. or ""'Y: ~.... ctt. H~ """Y ~1l1l: 1n"-" "iv~l - ~1 p.ioalt.t..,...... "11<1 lloI.~~-t.<Ill to tIwo ~ eof","",t. JliOU1b1"v""". t!l4I.l"ir.'l'bi~ ~..tt """ p~ I>t 1,1.1' I~ft>il".. It II: Sh59 .... lO/ofnOot.lmCi.... l\ltGerllc;1W<il,iiIl6 i ,W!il'CIl '''11.1<.. em'/i/lOOf. Ill" .. ""t tcrruU.; '. 0..." 1lO~" .. . - , 12t44J.CSHlI 33 f 11.'" If th~Co~cior l'C,cmestsin writing that in~lItJnce for risks 'otheJ'tbanthose ,described bereinorOtber spe<:ial C8USe$ of 10S$ be inclUded ,in the PfQperty insl1r8nce policy, the Owner shall, if pOssible, inClude $ucih instiranc~ and the cost th<m>f sball be chmed to the C011tr'aC<tor by appropriate Change Order. $11.4.5 If dUriDf JJ1e Project constnl,ction ~ the Owner insures propertie$, ~l or personaJ or both~ at ora4jacertt t~ .the site by property insutJmcc uncicrpoHcies$eparate fi'om those insuring the Proj~ or ;f* final paymeut ptO{lerty insul'l!llcc is lObe prpvideq ..~ the complctedProfr;ct tbrQup. a pelicyOf policies Othe~ thall thoSe h1sum1g' the PrQjel:t. du~ t6ecorilltruction Pflripd. the Ownet'Shal1 Waive all r~ts in acCOrdanCe .With ~e terms of Section 11-4:7 for ~S~sCd by ~ or othercau~oflOS$ covered by,this~ ~ insUJ'8Jlee. AUsepiIrate pdlicie$shatlp1'()videdtis waiver ofSiJbr<>gati()l1 by endorsemcgt oro1berw~. ,-_. __<._ ..'~. S 11.4,6 Before an expoSure to loss ltllJ)'oocur' ~ Owtter ~1 file with the CoQtractor~ ~ ~f ;dt'P<io;;~ inCludes insurtnc:c!cov~e$ ~~ by'~sectionll.4. Eacb pQiioy SJudl, C()tltaiD ill g~Y8J'Plicab1e c~ons. ~finttiOn$; exclWiionsand endorsements related to this Project. Each policy sbblcomam. proVillion that the policy wilt not be cauceled or IllJQWed to ~ire. and that its limit$ win ncrt be redu~. ~i1lrt lcUt 30 days' prior written notice JW been given to the C<mtractor. ,'. . . , S 11.4.7 WaiversofSubrclgatlon. The Owner and Contlactor waive all rf8hts aga~ (l) ~ ()therlUld arpyof thtir Sti~.su~bcomraetors. ~entsand employe~. cadi of the ~. arid (2) the AJPhitk. Arehiti:ct'~ con~ltmtt$, ~ CObtlW:tors ~ m~iCle 6~ lfany. and.)' oftheirsu~ fuHubcon~, agents ~ emPI~ for ~ ~ by fire orother~ ofJ~ to the extent cowRd ~ ~ insunmce o'-ined punuant to tlJis Section 11.4 or other property i~ appUc@~ to the Wort, ~dt. hey have tQ pn)OCods of Sllclt .insurance held b,y the Owner as fiduciary. The O\ynCf or ContractW..IS.~,JhaU ~uire ofth~ ArcJtitect; mhtied'~ consukants,separatc contlietors describe4 in Artiole 6, if any. and the !Ri~. subo-subooi1tracton,asentsand employees oflll)' ()fth~m. by appropriate ~ents. written wb~ ,'" ,~, 1e&aJ1Y requ~ tOr validity. $Unilar waivers each in favor of other pamesenumcrated Mrein. 1be policies sba!t.- .,.' prOvide - ~vers ofsUbr,option by endOrsement or otherwise. A waiver of sUbroption shall be e~f!'8$ toJI. ' ~orcntity even thoughtltat person or entity would ottterwi.se have a duty ofind~ification,."ri~ 9r. : otlterwf,$C. did IlQt AAY the insurance premilun direCtly or iricMctlY, anci Whether or not !be ~ ~tY had an insurab~ interest in the property dantaged. , .' .- : ~ 11.4.8 A I~ insured~ Ownerllproperty insurance M be 8q;usted by the Owner as tidudiaryand~de payable to the Owner asfiduc~ for the insureds, as their interests may appear, subjec;ttQ requirements of lilY,. applicable m~c:l.1l1lSe ~ ofSeCrion l1A.10.The C<mtractor~I ~y Sub(:on~ their just !l~ of" insurance prqceed$l'C~ved by the Gmt~, and by. ap~ agrCement$, written ..Wherelegally l'Clq\Iired for Vf.Udity, shall req~ S\Jl:!~~ to IDUe pa}'lllentS to their Sub,,$uboorttradors in silnil8t ,1q&DhOr... ", . . ~ ", t 11.4.9 rf~ma in writing 1>1 a ~. in interest, the Owner as fiduciary ~11. upon ~~ of an~~';r give bond fOr prQpcr P,CtfOllD8ll~ ofdte <hvnerl.s dutie,. The cost of required bonds sbalI b~ ~ ~ > / proceeds....... '. .,. ....r.~... '.:~.. Ufi..~.UC.' ..i...~.....'....'... The..... Owner...........~....u. dq)os... ........". it. in..... ~.. .....~a~,.....un......tproeeeds.. '.,. ........ so...:. ~..'. ......'v.~.. wtiwti......ii..CC..ll....d1th...cc....../.. Owner shall dl8trtDtJte m a~ce with such qrecznent as b parties u;t interest tnay ~'r 111 accor4ance with an ~itrati()ll ~in whicbcase the ~.~ $ball be as provided in Sccti0114.6: lh~ s~ Iou no~. .... spec1al agreement lS~attd unless tile OWQer1Crmmates the C~ for ~ven~ 1fP~~ ~t]iatda8ed " .,,,.,,, pmper1y ~ be petfomrcd by the ~or after notifiCation of a Change in the Work injaocordance with Article ~ I ~<--'. f 11.4.10 The Owner 8$ rlduciarY~ball have Power tC) adjust and settle a 10$$ Witll jns~ UJiIess on.~of,the pameS tn intiereSt shaIl.ob~ inwrilin~wifllin tive days .~r ~ce ofioss to the Owner's cXercise,prtliis po~i. i! such", . objection is made, lhe dispuie$baJl be l'eS()lved 8$ PJ't)Yided in Section$ 4.~ . 8J1d. 4Ji. The Q~as.fidticiary shan, in the case of .rnitration, make$ettl~ent.\Vith insurers in 8CGor<lance witb direeti~.or the 8iJ>~rs. If diStribution ()f insurance proeeeds by Brbitration is~ire<l. the arbitrators win !;lirect $UPb, diStribution. r . t 11.5 PERFORMANC~BONDAND PAYMENT BONo . .. ......... .... i fi 11.5.1 The Owner shall have the right to~uire the Golltractor to furnish bon~s covering faithful perfotn1Ance of the ~ and ~ylrtentof oll1i~afions arising ~Wldei as stlpula~ in bidding requirements or speCificallY required in the CantniCt Documents on the date of~ecutionofthe Contract- .A1A~l: 1t.201'" - J'll'l,'ec,;yd.9ht 0 m2,,1.'l~,illl~. In._li13;iiiJ$1,.t,~, 1.~1..1~~, iliCs, U70.lc"'(lWllnd lll" by The .l\Jl!I~lc::." 111St;1tllt. OfA~c;:lltt.et$. . All.~gIIb -__'W,1I,!lIfl!1Ch 'lbt.. ADo" ~t t. .....~ by (l~8. ~l9I>tt.a\<_ l~_~""""l.'~l:,i;'.; Unatl~l.nd ~~~ 'If ",i.t~t1..~.'!f ~114A'~t. ;"t;.&iir ....rt,ion ",t ii:; -y.,..1l1" i.. ~ ellril IllId Cil:""-Ilal. ~t:i..., ..'1U1it lI1..q be ~tW:l.~ th4lI -...- _t pO!o'ft1>l,e ~t; ~ 1..... "rhl. ai-4ft _, pr~II<!'" .JrY AlA :t<>rt....il.t 18<&4:5, on 11)/061%IlO,5.u~r ~t ~'100Ql910t6_] Wl11d> .""it.. Oli .ii/2DOt,. .hIlI', ""t fOt Aule. . U.'):'HotU: . . CUH3UH1, 34 S 11.54l.lpoll tbcrc:questo!any Person oJ"~~ing to. & . potential~~ti~ of bonds covering payment of: obligations IlIiSing under the 00qtnlCt. the ~ $&aJ1 promptly ruriUSb a cop)' of the bonds or $haJJ permit a copy to be made. ARTICLE t.2 u~qovemt4~ .Atm'COAAECT1ON OF WORK i 12.1 UNCOVEtflNGQF wpm< . ,_. '12.1.1 If a potti<moftbe Wort i$ C()v~ ~ ~the Archittct's ~uest or to ~ents specifically ~ in fl1e CtlOtractDocutt\~ it tnust, if RlquiJ'ed in writinS by ~e ArchiJeCt, be Wleovertd forthe ~ ~8IttinaUotland ber~h\ce(i at.~ COntral;t()r'$ ~ without change in the c;Ontract Timc. . ., - , . ., '". . : ' . .....~,.""'._,.,_.^.,.,.=_.,>,,-~,..--~~'"<<*'''''w 11~ 1:.2 Ita PortionoftheWotKh~ beebCGVenlt1wJtjoh theAJ"ClJ1tect ~ l1otlJleeirlClllY~ lQeJrAlmmc ........~,,_.__, prior,t<) its beina toverea, thCArchi~'J'I1aY request to ~ $llchWOIk~. it $h.1I be l1liCo~ bytheC~r.If suchWotkis in accordance with ~ C(m~ 00ctn1l~. 00$1$ o(tmcovering Ind ~~t shaU, by ~It<l Clwlgc 0rUer. be at thcOwncrs expense. ff~ Work is not iit ~danceWith the to_ bocwnents, . Wrrection.shalI be at theC011tnlctor'S ~ unless the <<:OJ@tion'~ cau5cdby the OwMfor a BCParate contractor in wbich event the Owner shall be responsjble for payment of SlICh oasu.' . 11.l2'~~ OF WO~,K S 14 t BeFO~ ~R AFt'&R SUBSTANTIAL COMPLeTION '. .." ," - :' ,", .,' ,.-.' '.- :..', ,'"'. ",...- ',. . '.. . . f 11t2.1.1 'Jbc qor.tnlCtor si1aij ~ CotTect Wort rejected byttle An9iitect orfajUttg~ COQiorm to ~. ! ~u~ents of tho C,qn~Doc:um~!4. whed1er discovered before or~,f\er ~ Oqln))letjon and wbetbertJr not fabricated, inataJle<l or completed. ~ of correc;ting such rejected W~~1udin& ~ltional1eStin& ~a . _ inspectionund ~pensaijorif'or the Arcllitccts services and cxpense$ made necessary tkft~hl1t~Jt ~_ -".w._ GoJ1tJaetor's expense; '. . i 12.2.2 AfTER aUBSTANTWoCOMPL.ettON t 12.2.2.1 In addition to tbeCoDU1iCtoJ"s oblir.auons un4<< ~UOD 3.5, if; witbitt on~ year after the -9t,- . . . __ Su~tia! CompJdiOll .oflfurWork or des~ P9rtion thereof or after the ,d,* forc:onqnonconenf'~ '!~'s estBbljSbed ~ ~ection~.9J. or by terms ofan applicable special ~ ~ by fJt~tr~H)Ocwnents; lUlYoffite Wort is foundt() be nut ~. ac:cotdance With tfie~ents of~ COJittact ~the Con~CtoJ; sbaJ.l CDlTCCtit prornptlyafterr~e~ofWrUten. notice: fi'omthcOwner to do $0 unless the ~,b~~sly . given the Contractor ~wri~n a,ccep..cc (If SUcb QOl1ditioa The Owner. shall give Slich n~ce ~~_ discovery ofttlecondition...Durhig. the on~ period for eom:ction ofWOIk. iftbe Owner fa.il$to ~ lite COII1J'aCtorand give the .~. an OPJ)Ol'tunhyto mike the c:orreotion.. the Owner waives the ~ to reqti.iR'.... ~o,n l,y.the ~ct()r art<! to~e acWrn for bteacJiof wamsnty. If the GontrJactQrfai~ to ~ 1l000confQrnling W'qtk ~in a ~Je _durin,s tbllt ~ioif.af\er ~ ofootice ft1m1.~. OWM( PI' Archi~ !he Owner may ~it in ac~ With Section 2.4. . /. '~, j ~~-- /~ ! 12.2.2.2 The on~)'car peri<Jif tOr COl'J'eQtion of \V~ ~J be mended with res~ to pO~~fWort ~f perfonncd after $u~alCornpletion by the period ohime ~ Sub$1antia] ~mpledon (and th~~ f'er'fortnattccof th~ Walk.' !' ! '. . .. ". ! '. ... 1.12.2.2.3 The ODe-~.PCtiQd t9r ~0tI ofWC)(k IiballlU)t be ~ by corrective W\'~rf()~ by ~~. COntraCtor pursuant to ftti$SCetion 12.2.' : S 1U.3 Thc~CtorSh~I.rentove fJ'Pm the.~ P<>nions o(tl1(; Wort which. arc not inBClCOrdanC<e withthc requii'eoumts of'the COtl~t~~ts and lU'C neither ~ by the ~ Dar accepted ~~. ..... . . / --, f 1U.4 The Contnlctorshafl - the cost ofcon-ectlng deslrQ9Cd pr da~C9n$ttu~iOn.~~ tompiiiCd Or" "\ ~ally eornpleted~oftheOWneror separatecontta.c;t()rs ~ by the ~s eorreetion 9f rernoval.ofWoric \ Whicb is not in accordance with the requirementS Of the ContractOoCtuneJrt$. !.. ! , . , . f 12.2.5 Ni>tbing contained in this Sectiont2.2 ~l be ~to ~lish a periw ot'lbPnafiOtl with respettto o~ o"~ptions wb.ich theConll'aCtor.mi~t !lave, ~dcr the Contract I>ocunmtts. ~~.'m!,!!the~one:;Y~'!L.,.c ,.,... . PCf1(x! for~on OfWCltK as d~cri~ In Socti()n 12.2.2 relates <mly to t,be specific otJijgatl()n of the COilt'iiCfOr to correct the Worf{. and bas DO reiatioriShip to the timc within wbich the QbUptlon to. COtTlP4r.with-tl1cl Contract ,.' > ""~- y " .' AtA..........t ~9~-n.,.~t · l'11;1.i5;. i'l., i;~~ llitl. i",:~ '1t$', j~i.i;",i 1m, 19'10, 1i'f, 1.hDillU" by n.. ""....1~ ~~I~~U.lI~..,~bll:....t...AU "lthl:.oo~'''''IlG' .11U.,w: ~~l. l'i'O~ ~ q...C<lpyr.t:Ol>t Lia" -Dill . 35. Zlltenia%iiirI!'1 ~u...yq.JI~l~ ~~''''' ~ d14rt;riblOU"" .Of thb MI.. ~t. OJ' ./liItY ~Clrl 'cor It.~.......1t in ...... "~'I11.1l<l er......1 ~nlL1U.:.,.Ud..iH ~ ~ro~ to.~. ~ ~t l'X>>~b1e lliiii..t- thoi l....'tliili~.!:t..... pr04ia<;e4 by AI" ::~~.~ If:W'.511on lOI05n005under. otd4tilO,lOOOltlOI.5_i""Ich 1IXp1u* On 1/112005, .1Id 1InotJ'Clr..e..l.... {22443454411 Doc~tsmay be sought to beeof<>rced, nor tQ ~ dm~. Within WhIch pr~ may be. commenced tq.establish the Contr1lctOfs liability With respect to the Con~s obJiptions ot11er th8Q speCifically tOQOill!l:t the Work. 512.3 ACCEPT At,lce OF NONCQNFORMING WOAA ~ 12.3.1 If th~OWnerprefers to acc~f1t Wad Which ~ riQtinaccordance with t!Ie requiremen~ of the Contract ~~ tbeQvmer may do so in$tcad of requir!n& its removal and corroction. in ~ChfClSe the Contra9t Sum will be ~ i$ eprjropriate.ll1ld equitable. Such adjustment shall be effected whether or not final ~yment bas been made. .. .. . . . . i ARJ1O~ 13111$pElI..ANEOUS PR()VJSlONS fi 13.1 CQVCRHfNG LAW f 13.1.1 The Contract shall1>e 8o,,~~ b)' the Jawofthc pJa~ where tlje Project is lQOf;ted. S 1~ S(JCCessoRs AND ASSfGNS 5 13.2.1 Thll Owner and COntractor FeSJ*tive1Y bind themselves. their partners, $~ssors.i'millU and lew ~es tp the()fber J3lUtf hereto and to paI1rIers, SllCCe$SOI'S, !lSSigns and I~ ~ivu of $lIcb other .pany iJI ~ to covenants, ~et,lts and Obl1~ions coJlf.ai,ned in the Go~ [)Qcum~! Except as Provided in SCC(ion J3.2a. neitl1ct ~ tQ dJe Contract sb4ll assign the Contract au wb<>Jc withoutrwrl#en consent of Ute other. tf either ~ IUtempts to .makc such an .~~ent without auch consent, th$ pany ~f ~ remain legally re5pbQ,ibJefo:r aU obJigaticms under the Gonhct. 1 f 13.2.2 The e>wnermay, witboutCOtiSentorth~ ~ctor.~sign tbeContract to an insti~~ lenderproViding- ~ timmcingfor the Projoct. InSUcn ~ the lendersb8.U assume theOwnets rigJ):IJ..IA4.~~~._.,...,,",_ under tbl!:ContractPocuments. The Cc>lttraCtpr shaUcxccute 1ill consents reasonably ~ to facilitate sucb assignment. g 13.3 WRITtEN NOTICE .. . . .. ... .. . _' ~. ti 13.3.1 Written notice ShaJI be deemed to bave been duly served ifdelivered in person t() tile indjYidOiJ ()t.a member of the firm or cnt#>' or to AA Mf1C(:J' of the C01pOration fur which it was intended. or if deJiv,retlat ~ by registerC<i ()r ~fiecl m~dl tc). the last busin~s address known to the party giving notice.! ',.. 1..,.... i1URJ&H'rSANPREMEOlES . . . . . .... '"'" ..~, i 13.4.1 Duties and obligations fitlposed by the ~ Documents and rights an~ remedies avaiJJble thereundtr, Shall be in addition to!U1d not .~ lifuitation of duties. obligations. rigbts and remedies otherwise ~ Qr available ""~. by Jaw. ....',.. : ., -, .', :-..:, ,',.... -'-'-- . . - . ..c'_,. __': ,/ _, ._ <"""'.' .__._, ," S 13.4.2 Nt> ~ion orfailw-e ~oact by th,e Owner, Architoctor Contractor shalJ constitute a w!iVer of a right.or duty .fforded them undCrtbeCon~ not Shall $Ucb ~ion or ~lure to act constitute approval pf or ep9u1~~in a breach ttu'teUrlder. ~t4Smay bcspccifically ~in writing. .. i i \. \-.., I 13;5 TESTS AtiO INSPECTIONS .. ... .. . . . . . ... .. .. ....... I. . ..' f 13.5.1 Tl'StS,inspecuonundapprovaJsofpr)rtiOnsofthe Work ~uired by the Cori1tactnocuments or tW ... ordin~s,rules, l'egulatiOnsororders ofj>>lbIic aulli,oritiesba\iingj~iction shah be ma&e. .a!!JP.P!ojriatt!iwe~....... Unlessolherwise provided. the Con~or ~ ijtaie a,rrangements for Such ~. inspecti~ and approvalS with an in~_.~ lilbOratol'for entity 8C@ptable to the QWner..or withdJe approp~~Ji~~ud.urity;_~aU .. belu' all reiatbd COStsoftests.inlIpections and apJIm\'aJs. The eon~$balJ give 1he A~hitectijmely notice of when and whm ~ andill$Ptctitms arc tt> be fuade so that ~ Architect may be presemfOi' sucb~4ure&:"Tbe . Owner shall b.earcostS Qf ~ inspecti9nS or approvals which d.o not bt~c requirements un~ifttler bids..are . , received or llC-. . )ltions... conclude..... ... d.. /" ~ _ .." 6"" iI'" ,... . ....... .. .. ... ........ ..... I . fi 1 ~.5.2 lEthe Arcb.itect Qwner ()r public authorities~vill&j~isdietion determine ~ portf~$jof the Wark require additiol1a1 testin&~(jn t>r approv81not inc:l\ided undtt Section 13.5. J, the Architect ",ill, .j.qwn written authorization tram the Owner, iDSti'uCt tile Contractor to ~ ~ for $UCIt additional testing, inspectil)n or ~val by. an entity ~ptab!e to tile OWner. ~d ~ Contra~r ~U $lve timcJynotiSetol~ ~~1.U~.!f' c. ., ._ when an4. where tests lpld msPeetl~ are to be made'so that the Architect may be p~tt9r such procooun,s. S~1i costs. except as provj~in Secticm 135.3, $ha1lbe !It the Owner'~ expense. . . "'_h . .AQ. ~1;A2cn-.,:,.1t1l7'Cori!fd'''t.... Ull.,~i5. 1m. ):8#$, .2,j)7, 1151. i.,.... l~.t, 1~c.J..llI".ui~, 1~75, m7 -.ad 167tlyth. ~rlCiln In'iU~!lt. ..~ .Ar~hh~t.. N.l. ~1"'l:it ............... 1IAaIlJ1lQ':rIll' AU.' ~t .1. ptOtecn;.d ."x 1M'. C!;lpfJ.'IClbt 1.*. an<! lft~~nlO.UotIaJ.T....U"" Qna\>tbOdZ<tda'~u.,.. tU d1.t~1t>llt.liO!> ..~tht. AlA" DOclIIMftt, lW lUlY ~l:,loon 0& It, 1IIiIY. 1:..ul1; 1ft"""&e Cl.YI.l and....i.&ll.nal peltll1 ti.. , ..&lUl .,qlltloi~le<:Ito thoo~'<me!l" _1bUi ,,~ the (ait. J'ltl...cIrat~""'l':toclil;edl::YAV< .cittllJl,ro.1t lJ:5MU 01>10/05121105 ~rOriiuNo.IOOOlf10U_1 ""'\Chelll>lru <ll> e/l/zoof, ~ I. nottorr...de. . lJaer illite.: 12UHl~4411 36 i 13.5.3 If slJ'cb proced~ for teStjn&inspeCUon or approval Unde,-Secti()1JS 13,.$; I and 13,S.freveal f~1ure of the portions .oftM. Work to complY With ~eIits establishO<i by the Con1;ract Documents, all CQSts maqe n~ by stich Wlun: including th~ pfrtpeated procedures and compensation for the Architec:tis services anQ expenses shall be at the Contractoi"sexpetlSe. 113.5.4~ired ~fic~ of'testin~ inspeetiQll or approval si!a1J.lJJ1I~ Olherwise requfed by the ~ OoctunenlS;be ~ by.theCopt@mor and prorn~ delivered to the ~. . 513.5.5 Iftml J\rchiteet is to observe test$;in$pecti()llS W approYa]s required by the~1111'adt Doeuments~thc Arcltite<:t wUl q()$OpromptlY....4. where p~ctic8ble. at the Mrtnal place otteSting. . _,~. _. ~*_~, . - I - .. .,. ,,~ '''''''''._~ ,~.~". 'V_' .~.,~,.. S 13.5.6 tests or '.in$~ cond~p~qant to the ~ DoCumentS shalJ be~p1'()friptfy to ,void ~nabJe delay in tml Work. . . . . , ! 13.6 MEREST t 1$.6.1 PaYllJents due ~ unpaid ~der the ~ ~uments ~l bear interest from ~-dlltc pa~ is due .. such rate as the parties may ~ upt!n in wri~ or. in the ~ ~t at the lcplrate pl"CVlti1ins fi'6m time to time at tile place where the Jlmject IS l~. t 13.1 9QMMeNcEMEHTClF stATtlTcmY LIMITATION PERIOD ; 5 '~.7.1 As ~ the OWner and Contractor: : .1 Before Su~tial Completion. As to acts or faibJrestQ act ~ prior ~ tbe'feievantdiJ.teof . Substantial CompJcrtion, ~y applicable statute ofJinUtatiotIs shall eOirimenee,.tQ..mn.~~*lUcaed cause of actiOll shall be deeIned to have aCCl"l1ed in any iInd all events not later than SUch date of SUb$taotialCompletion; . ~... .2 BetwcenStib~1 Com.plcti<m and .Final ~tCatefor Paymellt. As toads or &iJuresto '$::...-, "'~.,~ occurringsubse(}lient to the relev..u date of Substantial ~letion and priortOiss.~.of1he ~l .~ Certifi~.for P.)'Ii:1ent, an.y 8ppli~te ~ QfJimUau~ns aiJall cotroneD(ic to ryn.enf antJlll9d ~lI$e of action shaJI bec:teemed to have 'aecrued. in 1m)'.*Jld all e~tsnot IatF-tfiAn thcdate of ! isSUlUlOCofthe fi.~al.Certificate for PlJ)'meau;artd .. '. . .. . J <.,r '. .3 Afttr. Final Certifi~ forPaymC';Qt As to acl$' or faUut<lStQ act occurringaffer'the rel~ of iSSU8ll~ oftmlfmal Certificate for PI.)1DCnt. artr appliCable statute pflin;.itations sfiiill~~ to". run lindany alleeed cause 9r.adion Shafl be ~ to have ~ in .any ~ a1J ~vents, pat~, '" aum. the date 'of any actorfaiJure to8Cti:)y the .9on1rac:~ pur$1J8Dt tQany W.,-anty providod Wider~"'. Secti~ ~S, 'dle AAte of any ~gn oftheWodt or &uuro toCOtTect the Work by Iile ContJattot , ~ ~on12~ or the date of actual com,riisslon of any ()fbCl' act or failure 19~~y duty or " obUption by the Contractor or OWner. wbichevor occurs last. // . '"". . \ 1> _, ~~M~llFTIlE_. ...1 ( ...1 . / '14.1.1 The OontntCtor ~y~. the ~ if the Work is st<>pped ~ a pori~ orae ~utivC~{ throqgh no act or raultof1be Contractor or a S~tor, Sllb-l11bcontractor or thcU' aa~ts ~ ~IllPI~ or ~y e>ther PersQl1$ or entlties per'{onning portions of the Work under met or indirect contract 'fith~c,Q9!!~or.. ,fer, .._... '. .. 8IlYOfthCfoUOwing~:. .... ...... '. . .... .... .:. .1 j$suartceo{ an o~r'ot a coUJt or ot~r public;; authority bavingJurisdiction. ~ich TCqURs .aJfWQtkto be Sfilppc~; ;2 an a~ of govcnUntnl. such 8$ I declittation Qf national emergency which require$ alJ\V~ be.. " "" sto,pped;. . ..... ...... .... .... ". . .. ./.. . . ." ''":" ~,~", .' "'. .3 ~ethe Architect l1as1lQ~ ~ .~ficate forPa~an~bas notn~(i~ t.beCo~iof " .th'" c...rcaso......... tt. fa. rwitbh.... o1......dmg. ..............m1ifi.... ...... '.Cali.. ..... . 011..8$. prO...Vl.'d. ~in..... s.,.. Cti.....0J1..9...4........J '. or.."".. b... ..~ '. .; '., tI1. c.O. \YD. er......has. '.' .., not.., " made pa)'ment on a QettUu:ate for~entwithin the time stated in the ~DOcunterrts; or .4tbe Ownerbas tailed to t\JnIishtothC Cant;ractQl' promptly, .llpotJ. the Col1ttaqtor.~ requ~t..rcasonable evidence asrequire4 by. Section 22.1. ' I .~ 14.1.2 ~. Contradtor !naytetnlinate the CotttJ'act it: thn>ugh no act or faul~ ofthcContra<<orara Su6COniiiCto..:'''o,,- $ub-suf)corttractor ()ftbeir agentSoremp1Wees or any other~ or ~ ~oiming \xJrtions of:d1e. WoJ%." .' ",. under direqt or indirect contract with the ContractQr,.repeate(I SUSpensions, delays or intemrptions of the Clitire Work AU. ~t. ~.o~.. .. 1I97.~11l1it.. 1'11. 1'1~~ ~"1., t~~;l~, 1.~lt i~,... ~.s~, 1~. u... l''1li, 1",. I,., .iariiI. 1~11 by '11>. ~~1'''''1 InlOU;Ilt., o~ ^,,<:hL~..:t'a; AU ".\.gII?~.~i 1'bl.I.JU);. ~ n jtr~~l:Jod ~!l;S; ~l~t r.;-.....na 1n..n..~1~~.. tlm,atho~i- ~r~L"". Wi.' C1i..~tJ... of tld.~.~" ~.nt. o~."r _Lt."" r# Lt... 'JIII)'~\o1t L:.n ....te clWU - Ci-~~1 ~u..,.""". ,q,lI~.,,~ to tl\e.~ -unt ~nl>J.. ~ ~ la... T1iij. 4c:.ft......""~ bY>\IA ..oft...... at 18:S4,S' "" 10/0./200$ U"""t .Qta.:~~.lOOO1!l1016_1 Mh$Ch "'pl".. .01"'112006, arid h ~t {lk....;S.l.. u..c: Mote.., . . .'. . !2H.4jtS'tlj 37 by~ Owner ~. describcdip $ection14,3 GOtl$titllte ~ the ~e~c znore than 1 (jO percent of &betota} number of days schedUled forCOillp1eticm. or t20 days in any 365-day period, whichever is less. 514.1.3 If oneofthe~s Q~"bed in Section 14.1.1 or 14.1,2 exists, the Cqn~orJt1liy, upon seven days' written notice to the ~er and,ArciJiteet,tenninate the ContrlCt and recover ftcm the Owner payrtlent rorW~ executed and for provenlosswi.tb~spect to materials, equipment, tools, and con~ction e,qtdtmcnt and ~, including ~a\:lle oVethead. priif'1t anci damages. I I ! , '- -'- .' - ,- - - ,:' .'''' - , " . ,'-', - - - " : - . - - _ " . _ f 514.1.4 If the Wotkis stopped f(lra period .of 60 ~V<<l. days ~ DO act or fault of tb~ Cont1'aetor ora s~ or their ~ent$or ergployees or any other persQnJ perfonnm& portions oftltelwoiX Wide:fCOiitriiCt- with the Cootractor.~.the ()Wnerh~ .~~ faile4 to fW1i11 tilt:: ~s ob~~.tbe.eo..tnIct ~~ with respect tomauers ~tt9the ~ of the Wotk.the (ZODtt'actot' m;.>>. i1ponsevenadditjl)J\al ~Y$' WrittenlJOticetothe Owner md the ~t, tenni~ the COntract and. recover ftm11. the ()wneres prov!dCd in ~tion 14.1.3. . . : L-. S.~4~ tEAM1NATlONSYIHE Of/NERFOR CAUse S 14.2.1 TheOwnerrnay~c the Contract if the Contractor: .1 persi$tentl)'or ~dly refu,ses or fails to supply enough properly akilJOd W()~ or ~ rnar.erialS' .. . I '. .2 &fts to ~ PI,yment to Su~JllraCtors for rnamials Ol'Jabor in accordance' wi! the ~Ve ~eni$ between the Contractor llftd the SubcontnlCtors;. .. i. I .... . ' .3 ~y disregards JaW$o ordiruQ:e:s. or roles, regulations or orderS of a publfe-autboritY haYilJg Juri$di~On; or '. _. ^_. ~ ^,. A otherwise is 89i1tyof &U~tiaI ~~f a provision (jfthc Contract DoCuments. ~""~.'!lI_ : <,'''''' 114.2.2 When any of the abOve reasons exist, tho Owner, upon certification by the ArchiteCt that sufficient ca. exists to justifY such action. may without prejudice to any other rights or remedies of the Owner and aftgr giving the Contl'actOl' and the (JontractQ(s $uret)', jf any. seven days' written notice, terminate employment of-thC' Co~or 1 Qnd may. $Ubjcct to any prior rights of the surety: . . . "-.'. .. ^ '.. ..... _ ~ .1 tflke. possession ()ftbe site _d of all materials, equipment, toolS, ~d ~on.ip~t ana m4cl1inety tb~n owned by the Contractor; . . . . "'". .. ~.......~. .2 acceptassignmentof$l:lbcoli~fs p~t to &ctionSA; lUld. ... ........ ~~'~.., .3 finisb the WClrl<by wbatevcrreasonalile rn<<hod the Own~m8y deemexpedientlJpoJi reqti~'oithc Qontractor. the OWtterSball tumish to the Contractor a d~eid ~1~ of the cosrs inCI.i.tred by"'" '~.'" tile Owner in fmish~ the Work. . 514.2.3 When the Owner tetIlrlnates the COnttaet for one oftbc reasons stated in Section J 4.2.-(,"tbe Con~r Shall " .r not be entitled to receive further payznont lUltit the Work is finished. " i ': ,,/., ,I ' " ,.. \; ......~ t 14.2.4 If the unpaid balan~ oftbc CQniract Sum cxce.eds costs of f\Di~h~ the Work. ~~~~ C?mpe~tiop{Or the ~b~~ service$l!nd ~~ made ~ theJebY'lII1d ()ther damaJes incurred ~y tile Owner lPtd ,ot . ex~~I)'wai~ ~ exQeS$ .ball be paid to the Comractor. I!such COSf$ qd ~s ~ tlie unpai~~. the COOtractor sbail pay.. the d~Cy to the Owner. The amount to be paid.~ the Contrac:# ~ .9m!.~~ y ~_.~___ tn4Y be" 1Ib8lJ ~ceJtjfied J>y tbll Ar!:hitect, upon applica~ and this obliption fOr paym~t sheJI. SUi'Vi:ve termination Of the C-ontract; " _ ___._., .,. ...>5' ; t 14,3 St!$PEHSION BY THE OWNER FOR t>>WENJFJlCE . . . .... . ..' ,_ 114.3.1 The ~ maYjwitbout cause. order d1c Contraccor in writing to suspend, delay or ~t the W9r~ !n wholeor in part Cpr suCh peri,od of time as the Owner mlo/ determine. [' / /'" ! 14.3.2 The .Contract SUmMd Confracttime sbllll be a4iu~ forinCl1:8SCS in the cost and' ti~ caused by suspension, ~elay.or inten'UJ:ilionas described in ~on 14.3.1. Adjustmertt oCtile Contra1 Sufn shall include profit. No a(ljU$tlnent shall be ma(ieto tbeCxtent:.. . '.' . ... .... ....... .... .1 that perfonnance is. wasorwoul(l have f)een SO.S'!tSpend~ delayed or interri.!Pt<<id by another cause forwbicl1the Contractor is 'responsible~ or. ,.._ '.'__'_.'. .', ",.. .2 that an equitable adjUstment is made or denic:dunder anQther pr(Jvision of th~,ContnlCt.... ,,_,_... '- MA~~A2ci~- '" U91. .~*9tit. nil., 19,t5, l"U, i.ti2,; i"'. ip5i.1... 181. It#,1'~, 1"0. 1'''4, b81 .arioI! 1'" bY Tb.o ~.rie~ J".tl~..t. II! A'eb.~l~t., ',J0,4. ~t. ~.~:.~, ~L..w.' ~~ i. P~~~'1!:r U.S, ~l,itt LOlli - "8 1..~...t:.."""';'h'<oljI~....ar,...tIl0d.'"!l ~~iOn Ol:Clht.l'tktl,.... ~ ~. AlA- ~1;.. Cl!; any POi'UGri 00", ay ........t 11\ ~ ... l:iVilai14 ....~...l~t:l,.... - rill .bi '~t<ocI tci ~ .........., -"'.t "o..i~. ..~r """ 10&", 'I'lUii cli'at; .... pr~ by Ai#. ""~t"l'r,* at U:S(:U OnlG/OSl200S _er or~.. 1Io.100019t01U Iilii~ ~t.lI on tJII20ll'. aM U not for ....1.; (/lIer 110_' IUUn&t411 ti14.4 TERMINATIONSY THE OWNER FOR CON\IENlI;NOE 114.4.1 The 0Wn~ m~. at any tiItlc,'terrninate the Contract for the OWner's COQvenien~ and without caUSe. ! 14.~ Upon receipt of Written JJotice from theOWnerof $UCh, tenninlltjQn for tftc Owners convcnicn~. the CQnl:tactorshall: ' .1~c~Ons8$9ireete<1bytbcowni:ltinth~noti~; " ' , '" , ',' ! .2 cake actions necessary, or ~ ~ Owner m~ ~ tor the protection end prcserv"on ~f the, Work; and , " .3 except, fotWo1'k d~ to be per(Qt1i1eld prior l()the eff'el:tive date of tenniIlati~n ~jn the notlc:e,terminateaU .~ su~and ~~ andtliter into no lUi11iCfSu'6Co~~ <h tlnd purcbaseordeJ:'l!. .. . ~ .'_, 514.~.3 bi (:aseofsuC:btcrminatiOJl fur,the owner's oon~'the Contractot: shatlbe ~ted tortceive payment for Work executed, and costs moulTed by ~n of ~ tetmiDation, aJong With ~~ o~oadlUld pmfit on the WorkJlot cxecut<<!.' .' , #- ~~.. . ---~ .......". ~~"'" ~ , .,."'"' ~ -,~ ~-'''''', ""-., ''''''',- .... '--. <',>, .;,..~, .. ,f .... " ",-t' \ j'< " ~'~t ~i.. ':1'.'t.c..py.r1~.1tli, l~$. ui.,ln~..1ft'1.. i9S1, i~; 1"1. 183, i.llsi, '1'1~, 1971., :a"1 _l-"l1r. '!'he ~~rt~. t"atHlite or: At-cbU:e,::t.. Al1q;lJI!~ ....iN'Y1ld. ~ll!31 'rt\b A'JJo!pi6~,~ t. ~ ,1iJf u.., ~cillt La"~ ' 3" il:n"......t.I.l:lnIlL ~utl"i{,lnlou~_ npc~"", ..., !llonoitili!ttUn ot' liIi... AJJt.'" ~. 0;, any ~"" Me tt."",l' ...,,,,* in ..ovuo " ciYil....., ~~n..l ~ti"".11d "ll~ ~ ~~ to ,tlIli, ~ ~t pc:ilI.~ ~ ~ 1..., Jhi. met... prod.....\ll1yA1A ~ft""'l:~ ~t itill-i,511 (Nl, 10/0il100Sll'il<Il!,t llt'ihI'r 1IO.109111S10U_l Jiblc,ll _!U..C!1l l'i/2006, *lid b, not torr"".lt. ' U....tllO"..' , , /U443~5~~1J