Loading...
HomeMy WebLinkAboutResolution No. 04-70 RESOLUTION NO. 0410 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF THE ENGINEERING SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND CHIANG, PATEL & YERBY, INC. FOR DESIGN AND PREPARATION OF PLANS AND SPECIFICATIONS FOR REPLACEMENT OF CONTROL VALVE AT WELL SITE #3, WHICH IS ATTACHED HERETO AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City and Consultant have entered into an agreement such that the Consultant is to provide the following services: DESIGN AND PREPARATION OF PLANS AND SPECIFICATIONS FOR REPLACEMENT OF CONTROL VALVE AT WELL SITE #3; and WHEREAS, the City has detennined that it is in the best interest of the City to enter into the Contract with CHIANG, PATEL & YERBY, INC., which is attached hereto and incorporated herein by reference as Exhibit "A," under the tenns and conditions provided therein. WHEREAS, with this Contract the City of The Colony is agreeing to pay a sum not to exceed $19,950.00 for such work. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THAT: Section 1. The Engineering Services Contract, which is attached and incorporated hereto as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved, and the City Manager is hereby authorized to execute the Agreement on behalf of the City of The Colony, Texas. Section 2. That this Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED, APPROVED and EFFECTIVE this 13TH day of SEPTEMBER, 2004. l!t / ~. ¿iC~ . Ie Wilson, City Secretary [CITY SEAL] 63918 63918 City of The Colony Engineering Services Agreement for Design of Control Valve Replacement at Well Site No.3 Exhibit A Scope of Services General The Project includes the design and development of plans and specifications for Control Valve Replacement at Well Site No.3. The plans and specifications developed in this contract will be included in the construction documents for, and constructed within, the Well Sites Ammonia System and Chlorine System Improvements Project. Detailed Scope of Services 1. Preliminary Design a. Data Collection - Obtain field information on the existing control valves. b. Develop preliminary plans for review by the City. 2. Pinal Design a. Prepare plans and specifications for the control valve replacement. b. Submit the plans and specifications to the City for review and comments. c. Incorporate the City's comments and prepare final plans and specifications for inclusion in the construction documents for Well Sites Ammonia System and Chlorine System Improvements Project 3. Schedule a. Consultant will submit Pinal Design in conjunction with the schedule for Well Sites Ammonia System and Chlorine System Improvements Project. T:\2004 Projects\0426 CCO"f'roposals'CoIooy control valves sos.doc