RESOLUTION NO. 04-~
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, APPROVING THE CHANGE ORDER FOR THE
CONSTRUCTION CONTRACT BY AND BETWEEN THE CITY OF THE
COLONY AND TISEO PAVING COMPANY FOR ADDITIONAL WATER
IMPROVEMENTS, SEWER LATERALS, STORM DRAINAGE INLETS,
AND CORRECTIONS TO THE QUANTITY OF TEMPORARY ASPHALT
PAVEMENT, WHICH IS ATTACHED HERETO AND INCORPORATED
HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO
EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE
WHEREAS, the City and Consultant have entered into an agreement such that the
Consultant is to provide the following services: ADDITIONAL WATER IMPROVEMENTS,
SEWER LATERALS, STORM DRAINAGE INLETS, AND CORRECTIONS TO THE
QUANTITY OF TEMPORARY ASPHALT PAVEMENT; and
WHEREAS, the City has determined that it is in the best interest of the City to enter into
the Contract Change Order with TISEO PAVING COMPANY, which is attached hereto and
incorporated herein by reference as Exhibit "A," under the terms and conditions provided
therein.
WHEREAS, with this Change Order the City of The Colony is agreeing to pay a sum not
to exceed $63,775.00 for such work.
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
THE COLONY, TEXAS THAT:
Section 1. The Change Order, which is attached and incorporated hereto as Exhibit "A",
having been reviewed by the City Council of the City of The Colony, Texas, and found to be
acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all
things approved, and the City Manager is hereby authorized to execute the Agreement on behalf of
the City of The Colony, Texas.
Section 2. That this Resolution shall take effect immediately from and after its adoption
and it is so resolved.
PASSED, APPROVED and EFFECTIVE this 13 day of September, 2004.
~~W4~ Dillard, Mayor
'ty of The Colony, Texas
Christie Wilson, City Secretary
[CITY SEAL]
63918
63918
CITY OF THE COLONY
DENTON COUNTY, TEXAS
ENGINEERING AND PUBLIC WORKS DEPARTMENTS
SOUTH COLONY BOULEVARD - PAVING AND DRAINAGE IMPROVEMENTS
CHANGE ORDER FORM
DATE: 09/07/04
Change Order No.2 To The Contract Dated December 1. 2003 between the City of The Colonv (Owner) and Tiseo
Paving Company (Contractor) for South Colony Boulevard - Paving & Drainage Improvements.
Pursuant to the provisions of Item 1.3 7 of the Supplementary Conditions of the Contract, this Change Order
Agreement, when fully executed, shall constitute the authority to change the work of the project as follows, including
quantities and total dollars:
PAY DESCRIPTION QUANTITY QUANTITY UNIT PRICE TOTAL PRICE
ITEM INCREASE DECREASE INCREASE 1
(DECREASE)
The following Item provides a quantity increase for an existing bid item to provide for an additional water
service discovered and replaced during construction,
-28-lReplace Wate~ Service~-I- 1.0 EA--¡--f$-700.oofEA-1$ ~-
700.00
The following New Pay Item is compensation for the extension of sewer laterals (beyond the scope of the plans
and specifications) due to the condition of the existing laterals, The price includes pavement removal,
replacement, and related items,
e-m__~_~__________~~___~____~_ __ _----~_____ ___ _____
201 Additional Sewer Lateral 1.0 LS $ 18,538.94 LS $ 18,538,94
Construction
The following quantity adjustments and New Pay Item reflect paving changes made at the intersections of Blair
Oaks, Branch Hollow, and Alta Oaks. These changes were made to reduce the time required for construction
at these intersections without affecting the quality or performance of the pavement,
: 5 %.ype B Hydrated Lime Sin'; __ ~ _ _ 25~ TON I ;-_ 89.00T TO~f$ (2,296.;;
~ Lime Treatment at 32 I
6 Lbs/SY 1,617.1 SY $ 2,95 1 SY $ (4,770.45)
'-- - ---------- ---- ------- ------ ----
7 8" Portland Cement Concrete 1 ,617.1 SY $ 22.90 I ; SY I $ (37,031.59)
--~-- -- -~- -~--- ----- ---~ -~-_.- ---I--~----~~-~~----~
202 10" Portland Cement 1 617,1 SY $ 27.27 1 SY $ 44 098.31
Pavement' i'
SUBTOTAL $ -
The following New Pay Item reflects work performed by the contractor associated with attempting to locate a
water line shown on City record drawings, After further research and efforts in the field, it was determined
that the water line was never constructed
-203]Fieldfuvesthmtio~---I-l.or Lsi--,--T$- 1,352.071 LST$-l352,07
~ ,
PAY DESCRIPTION QUANTITY QUANTITY UNIT PRICE TOTAL PRICE
ITEM INCREASE DECREASE INCREASE I
(DECREASE)
The following New Pay Item reflects work performed by the contractor associated with the removal and
replacement of a broken valve, The valve failed while being operated by City crews in an effort to isolate part
of the water system. The failure occured after paving at the Blair Oaks intersection was complete. Therefore,
the price shown below includes removal of new pavement, replacement of the valve and associated piping, and
construction of new concrete pavement,
-- ,-----------r- -- ~----~~--r__-----
204 Valve Replace~ent and I 1.0 LS $ 4,874.381 LS $ 4,874.38
Pavement Repair I I
The following quantity adjustments provide for the installation of additional water line replacements as
determined in the field.
--~ - ___~u_____ -~-- ~-~-~-..-------~- --~--~-------r--~-~-~--
10,1 Temporary Asphalt PVMT 178.0 I SY $ 21.00 I SY I $ 3,738,00
___ u¡---__~~_ _~_~_ __ ~ _____~ ___
24 6" Gate Valve 2.0 EA $ 525,00 lEA $ 1,050.00
--- ---r----u-__u_~_~__ _~__~__.~__ ___--'-___~_~ I---_____~
26 6" DR-18 PVC Water Line 200.0 LF $ 30.00 I LF $ 6,000.00
~~ ------------ - uf---u_____u __ ~~_~_ ~____~_
28 Water Service Replacement 2.0 EA $ 700.00 lEA $ 1,400.00
f------ -----------------____1--___ ---._~_ _~__~ _________
31 Water Line Trench Safety 200.0 LF $ 2.00 I LF $ 400.00
SUBTOTAL $ 12,588,00
The following quantity adjustments provide for the installation of additional temporary asphalt pavement
required to meet project objectives and to provide a reasonable driving surface for traffic. This adjustment
corrects a quantity deficiency in the original bid item,
--u -- -----~--~-------,-- ---~ ---,--------l-----~-~~-~,----.---------,-----~-~~-
10.1 Temporary Asphalt PVMT . 3,035.0 SY _ $ 21.00 I SY I $ 63,735.00
I I
The following quantity adjustments provide for the installation of two 15' recessed inlets in lieu of the two 10'
recessed inlets identified on the plan sheets,
1----- --~-- - ~ ~ 1---~ ----- ---------,-----
41 Remove Inlets 2,0 EA $ 525,00 lEA $ 1,050.00
---~--~.--- --- - ~ - ~ - --- ~ 1-----.-
~_ Std. _Recessed Inlet (I~~__~, 2J)_E~ $ 2'000.~/ EA ~__
42.1 Std. 15' Recessed Inlet iß EA $ 3,000.00 ilEA $ 6,000.00
SUBTOTAL $ 7,050,00
The following quantity adjustments provide for a decrease in Fire Hydrants due to a field change,
~~41 'Ai~s~i:ebsl~:~:eHYdra~t-==iI·'· - .' '=-:.:' :-': 2, ;~:::~ ::~:-(2~;~:::;
ssem y .00 I .
SUBTOTAL $ (2,625.00)
The following quantity adjustments provide for a decrease in filter fabric due to field change,
--R~------ -~------F-~~j~-f--:~---f~---~-~:~~F- ---~ ----.--
A-I Curb Drain 10,108.0 LF $ 4.50 I LF T$ (45,486.00)
'-Á=2- 6" HOPE: Cu~bDrain Lin~---u- 1,060.0 - LF $-7.50·~ I LP-$(i,950.00)
SUBTOTAL $ (53,436.00)
The following quantity adjustment provides for a decrease in 6' sidewalk due to field changes,
1416; Concrete Sid~walk~--I--186J)l- LFI$- 17.00 I LF $ (3,162.00)
The following quantity adjustment allows for additional sidewalk reconstruction at Clover Valley Drive.
1214~oncrete Side\\'alk - -i-8<Wl ~ LF TU-i--Ti-11.60 ILF $ ~ 928:00
South Colony Boulevard Change Order NO.2 Sheet 2 of 4
PAY DESCRIPTION I QUANTITY QUANTITY UNIT PRICE TOTAL PRICE
ITEM I INCREASE DECREASE INCREASE I
I (DECREASE)
The following quantity adjustments provide for changes in the SWP P P. ~ _ _ _
,-,- ----- Q,OI'I- . ~F *' . .
60 Silt Fence 2,500.0 LF $ 2.00 I LF $ 5,000,00
6-1 -- S~biliz~d-Con~tructi~n Exit---- ~- --5.0 EA- $ - 1,00Ó~ I EA$(5,00O.00)
SUBTOTAL $ -
The following quantity adjustments provide payment for additional pavement repair on the side roads at Sta
40+00 and 43+75.
, ~~:- --- I -- --- ----~---
3 Remove Existing Concrete 42.0 SY $ 4.20 I SY $ 176.40
Pavement and Curb
-- ----- -~---f___ - _~____
5 Type B Hydrated Lime Slurry r 0.67 TON $ 89.00 I TON $ 59,63
----1- ,- -'---1.--
6 ~'~~~~~ Treatment @ 32 42.0 SY $ 2.95 I SY I $ 123.90
1---- ------~----~ ~-- ~-t--- -~ ----~--- --~~-~_ ----f--- _____
8 6" Integral Concrete Curb 19.1 LF I $ 1.35 [ I LF $ 25.79
f------~m_~ --- --j--I.75T-------m-
205 6" Concrete Pavement 42.0 SY $ 30.75 I SY $ 1,291.50
SUBTOTAL $ 1,677.22
The following quantity adjustments provide for additional pavement repair on Alta Oaks south of South Colony
Boulevard.
-. - - ---'-~~-r----------'--
3 Remove Existing Concrete 76.5 SY $ 4.2~f SY 1 $ 321.30
Pavement and Curb
----I-- - - -- - -~---+- - - --+~- - - - _ __ _ _ _ i----- _ _ __
202 lO"PortlandCement 76.5 SY $ 27.27 ISY $ 2086.16
Pavement , I'
SUBTOTAL $ 2,407.46
The following quantity adjustments provide for additional side street pavement repair North of Alta Oaks at
e - tuthCOlonYBOUlevard -1_ - -::r -'- - - -. ~---- :1- --
3 Remove Existing Concrete 233.3 SY $ 4.20 II SY $ 979.99
Pavement and Curb I
-~-- -- - ---- ------------------- ----
206 8" Portland Cement Pavement I 233.3 SY $ 35.00 I SY $ 8,166.55
SUBTOTAL $ 9,146,54
Total Net Increase $ 63,774.60
South Colony Boulevard Change Order No. 2 Sheet 3 of 4
Original Amount of Contract plus previous Change Orders $ 2,488,673.90
Total Amount Of Change Order No. 2 $ 63,774.60
Contract Amount after Change Orders $ 2,552,448.50
Requested Additional No. Of Calendar Days To Be Considered Prior To The Final Payment: 30 days.
Please sign and return this change order to the Engineering Department as soon as possible so future payments may be
Thank You.
City of The Colony's offer of proposed change:
BY' Ç)~ ~ ~
. f)q.(~ C,^fC4t ,...
Printed Name: S) ~ c1I Date: q!tS (ö'l
Title: C ì 1--1 f\A.(¿~",~ ø V"
Contractor: Tiseo Paving Company
BY:~~
Printed Name:'~p I {" .A1.AI'l,'D- Date: q;2J,oL/
Title: Vp,
Engineer: Teague Nail and Perkins. Inc.
BY: ~~
Printed Name: ~ C-JCLIY'{'-. Date: Q-8-oLj
Title: ~ ÝY\ 81 .
South Colony Boulevard Change Order NO.2 Sheet 4 of 4