HomeMy WebLinkAboutOrdinance No. 03-1507 CITY OF THE COLONY, TEXAS
ORDINANCE NO. C0 ~ '~ f~"~)
AN ORDINANCE OF THE CITY OF THE COLONY, TEXAS,
AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT
WITH FREESE-NICHOLS~ INC. TO PREPARE A STORM WATER
UTILITY FEE ANALYSIS; THE APPROVED FORM OF CONTRACT AS
EXHIBIT "A"; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF THE COLONY,
TEXAS:
SECTION 1. That the City Manager of'the City of The Colony, Texas is hereby authorized
to execute on behalf' of the City a contract with Freese-Nichols, Inc. to prepare a Storm Water
Utility Fee analysis. The approved form o£contract is attached hereto as Exhibit "A", and made a
part hereo£ for such purposes.
SECTION 2. This Ordinance shall take effect immediately from and after its passage by the
City Council of the City o£The Colony, Texas.
DULY PASSED AND APPROVED by the City Council o£the City of The Colony, Texas
this 17th day o£November, 2003.
APPROVED:
)}fihn Dillard, ~ayor -
ATTEST:
Patti A. Hicks, City Secretary
City Attom~
EXHIBIT A
SCOPE OF SERVICES AND RESPONSIBILITIES OF OWNER
This is an exhibit attached to, made a part of and incorporated by reference into the Agre~nent
between thc City of the Colony (City) and FNI providing for professional engineering services.
TASK 1. STORM WATER UTILITY FEE DEVELOPMENT
This study will develop an implementation plan for a storm water utility fee for thc City of The
Colony (City), which will establish a dedicated source of funding for maintenance of the existing
drainage system, allowable capital improvement projects, and the necessary programs to comply
with thc upcoming NPDES Phase II storm water regulations. For this project, we will utilize the
services of Government Resource Associates, L.L.C. (GPA) for financial analysis support. The
deliverable of this study will be a report that describes the estimated cost of service and policy
issues on which the storm water utility fee is based, an updated Master Utility Billing database, a
draft of Fee Schedule Ordinance, and a public education program.
Data Collection
A. Kickoff Meeting - Hold a kickoff meeting with City staff, involving FNI staff and GPA
staff, to discuss the approach and schedule, the degree of support presently available from
the City, and identify important stakeholders or special interest groups.
B. Staff Interviews and Existing Information Review - Schedule and conduct a series of
meetings with City staff to collect information related to the current storm water
problems and needs in the City. Review previous drainage studies, hydraulic models, and
any drainage complaint information provided by the City.
C. Define the Storm Water Management Program - As part of the meetings in Task B, work
with City staff to define storm water program issues, needs, and priorities. Develop a
five-year program strategy for storm water management in the City to address these
needs. Include a projection of future staffing needs consistent with the program strategy.
Document the vision and goals for the storm water management program as articulated
by the City staff.
D. Define the Storm Water Utility Service Area - Also included in the meetings in Task B,
work with City staffto determine the limits of the storm water utility service area, which
can range from the city limits to the extra-territorial jurisdiction.
E. Storm Water Utility Policy Issues - Work with City staff to identify and resolve the likely
funding, program, and billing issues, including: the estimated costs and levels of service,
rate methodologies and rate structures, base billing un/ts and approach, residential
category treatments, commercial category treatments, potential secondary funding
methods, potential exemptions or credits, billing and collections, appeals procedures, and
miscellaneous billing issues.
Funding Assessment
F. Estimate Storm Water Management Revenue Needs - Based on the storm water
management program goals and the current state of the City's drainage system, develop
an estimate of the expected utility revenue needs. Develop conceptual costs for storm
water management Capital Improvement Projects, and present these costs in a meeting
with City ataffto determine which projects to include. Develop costs for administration
and program management, operations and maintenance, monitoring and enforcement,
planning and engineering, and public education. The costs will be estimated without
detailed engineering calculations. Since the City is subject to the NPDES Phase II
regulations, include the estimated costs to comply with the Phase 1I requirements.
G. Determine ConMbution of Each Property to Drainage System - Using tax database
information from the County, the City's utility billing database, and other d~t~ collected
from the City staff, create an inventory of each property's impact on the drainage system.
Stratify the residential accounts in the utility database, and determine the total number of
residential billing units in each residential category. Determine the number of equivalent
residential billing units for each large commercial account in the can'rent utility billing
database, such as industries, schools, shopping centers, duplexes and apartment
complexes.
H. Develop Storm Water Management Financial Plan - Based on the estimated storm water
management revenue needs from Task F, develop a financial plan that shows the project
financing requirements and the funding sources based on three levels of fees. In
conjunction with the City's Finance Department, build the related debt schedules.
I. Draft Report and Council Presentation - Prepare a draft report summarizing the storm
water management program goals and the projected program costs, including the costs to
develop and implement the utility. Develop up to three possible sets of rates for the
storm water utility fee, based on variations of the storm water management financial plan.
Describe the steps required by law to implement the storm water utility fee. Make one
presentation of the draft report to the City Council.
Utility Fee Implementation
I. Develop Draft Fee Schedule Ordinance - Develop a draft Fee Schedule Ordinance that
declares the rate at which developed properties in the City will be assessed user fees.
Work with the City's legal counsel to revise and finalize the ordinance language. It is the
City's responsibility to publish the public notice containing the proposed ordinances.
Master Utility Account File Preparation - Based on the City Council's selected set of
rates for the storm water utility, ex>ordinate with City utility billing staff to populate a
field in the current utility billing database with the appropriate storm water utility fee for
each account.
L. Council Adoption and Final Report - After the public notice has been published three
times, attend one public heating of the ordinances at a meeting of the City Council. The
City Council will need to enact each ordinance through its established protocols. Upon
receipt of City staff's comments on thc draft report, incorporate the comments to finaliz~
thc report and provide 15 copies of the final report.
For this project we will utilize the services of Government Resource Associates, L.L.C., for
financial analysis support. GRA will assist us in the following tasks:
Attend kickoff meeting with the City staff
Attend selected data collection meetings with City staff
Reviewthe storm water management revenue projections
Develop the storm water management financial plan and debt schedules
Prepare three sets of storm water utility fees
TASK 2. PUBLIC INVOLVEMENT
Appropriate involvement of the public in the process of developing a storm water utility is key to
the successful establishment of a storm water utility fee. Public involvement provides the City
with an opportunity to identify public interest and receptiveness in thc storm water utility, and it
provides the public an opportunity to have input into the direction of the utility. The following
public involvement activities will be conducted by FNI for the development of the storm water
utility.'
A. Develoo and Disffibute Storm Water Utility Fact Sheet - Prepare and mail to the public a
fact sheet that provides a brief overview of the storm water utility. The fact sheet will
describe the purpose of the storm water utility fcc, demonstrate what the fee will look
like, describe what services will be provided, and dasca'ibe how each user fee was
calculated. Up to 200 of the utility accounts with the highest projected storm water utility
fee will also receive a site-specific explanation of the basis for the fee. The fact sheet will
also be provided to the City electronically and in hard copy format to facilitate the
opportunity for additional distribution by the City, such as placement on the City's Web
site or in public locations.
B. Public Meetings - Two informal public meetings will be held to update the citizens,
businesses, and other interested parties on thc status of the utility development, receive
comments, and answer questions. FNI will develop handout materials and presentation
materials, such as poster boards and/or Powerpoint presentations for each meeting. FNI will
coordinate with the City to develop and distribute the public notices for each meeting.
& Meeting 1: One meeting will be held early in the development process to provide an
opportunity for interested parties to learn about the storm water utility, present their
drainage issues for consideration in the development of thc cost of service analysis for
the utility, and have questions answered regarding the utility answea~d.
$ Meeting 2: A follow-up meeting will be held near the conclusion of the development
process to provide the public with an overview of the draft storm water utility. The
meeting will include a brief overview of the services to be provided by the utility funds,
the basis for development of user fees, and the fee rate schedule for properties in the
City. An opportunity will be provided for comments and questions regarding the storm
water utility from the public.
ADDITIONAL SERVICES
Additional services will be provided upon request in accordance with the hourly rates on the
Attachment SC Schedule of Charges. In the event either party hereto expresses a desire for
Additional Services to be performed by FNI, FNI shall promptly notify the City in writing
whether such Additional Services will cause an increase in the City's costs or expense. The City
and FNI must execute a written change order reflecting such equitable adjustment resulting in an
increase in cost to the City prior to FNI commencing such work. In the event FNI commences
such work without first obtaining a fully executed change order, it does so at its own risk of
payment therefore.
Additional Services to be performed by FNI, if authorized in advance in writing by the City,
which arc not included in the above described basic services, are described as follows:
A. Field surveying required for the preparation of designs and drawings.
B. Field layouts or the furnishing of construction line and grade surveys.
C. GIS mapping services or assistance with these services.
D. Investigations involving consideration of operation, maintenance and overhead expenses,
and the preparation of rote schedules, earnings and expense statements, feasibility studies,
appraisals, evaluations, assessment schedules, and material audits or inventories required
for certification of force account construction performed by the City.
E. Design, contract modifications, studies or analysis required to comply with local, State,
Fedcral or other regulatory agencies that becomc effective after the date of this
agreement.
F. Visits to the site in excess of the number of trips included in the Scope of Services for
periodic site visits, coordination meetings, or contract completion activities.
G. Providing basic or additional services on an accelerated time schedule. The scope of this
scrvice includes cost for overtime wages of employees and consultants, incfficiencies in
work sequence and plotting or reproduction costs directly at~butable to an accelerated
timc schedulc directed by the City.
H. Providing services made necessary because of unforeseen, concealed, or differing site
conditions or due to the presence of hazardous substances in any form.
I. Preparing statements for invoicing or other documentation for billing other than for the
standard invoice for services attached to this professional services agreement.
TIME OF COMPLETION
Both parties agree that time is of the esscncc in performance of this Agreement. FNI is
authorized to commence work on the Project upon execution of this Agreement and agrces to
complete the services in accordance with the following schedule:
· Storm Water Utility Fee Draft Report - March 19, 2004, assuming FNI receives notice to
proceed from the City by December 1, 2003. The schedule will be adjusted accordingly if
notice tn proceed is received after this date.
If Services arc delayed due to fault of FNI, then in addition to any other remedies available to
The City in this Agreement, The City may direct that the Services be accelerated by means of
overtime, additional employees and/or consultants. All costs directly associated with such
acceleration shall be reirnbursablc as a cost of Services, but shall not increase the lump sum fee,
unless the parties agree otherwise in writing as evidenced by a fully executed written change
order.
If FNI's Services are delayed through no fault of FNI, FNI shall be entitled to adjust the contract
schedule consistent with the number of days of delay. These delays may include, but are not
limited to, delays in The City or regulatory reviews, delays on the flow of infomtion to be
provided to FNI, governmental approvals, or any other event beyond the control of Thc City or
FNI. These delays may re, suit in an adjustment to compensation as outlined in this Agreement
and in Attachment CO.
FNI agrees to perform its Services in a timely manner. In so doing, FNI agrees to examine all
information, studies, reports, sketches, drawings, specifications, proposals, comments, and other
documents presented by The City, obtain the advice of an attorney, insurance counselor and
other consultants ns FNI deems appropriate for such examination and render in writing decisions,
if any, pertaining thereto and proposed change orders within a reasonable time so as not to delay
The City or the Services of FNI.
Notwithstanding anything in this Agreement to the contrary, the Time of Completion of the
Project can only be changed by a written amendment signed by both parties. Any claim for
extension of the Time for Completion shall be based upon written notice from the party making
the claim to thc other promptly, but in no event later than three (3) days, after the occurrence of
the event giving rise to the claim.
RESPONSIBILITIES OF THE CITY
The City shall perform the following in a timely manner so as not to delay the services of FNI:
A. Provide mapping information necessary to develop storm water utility fee rates for
residential and commercial units. This information includes Denton Central Appraisal
District database files for the City, individual commercial site plans, and other mapping
data maintained or available to the City.
B. Provide an electronic version of the current water utility database. The database is
necessary for associating fees to individual utility accounts and will also serve as the
address list for the fact sheet mailer.
C. Secure locations for Town Hall meetings, and provide basic meeting necds, such as tables
and chairs.
D. The individual designated as the City's representative with ms'peet to the services to be
rendered under this Agreement is as set forth in Article V hereto. Such person shall have
contract authority to transmit instructions, receive information, interpret and define the
City's policies and decisions with respect to FNI's services for the Project.
E. Provide ail criteria and full information as to the City's requirements for the Project,
including design objectives and constraints, space, capacity and performance
requirements, flexibility and expandability, and any budgetary limitations; and furnish
copies of ail design and const~edon standards which the City will require to be included
in the drawings and specifications.
F. Assist FNI by placing at FNI's disposai ail available information pertinent to the Project
including previous reports and any other data relative to design or construction of the
Project.
G. Arrange for access to and make ail provisions for FNI to enter upon public and private
property as required for FNI to perform services under this Agreement.
H. Examine all studies, reports, sketches, drawings, specifications, proposals and other
documents presented by FN-I, obtain advice of an attorney, insurance counselor and other
consultants as the City deems appropriate for such examination and render in writing
decisions pertaining thereto within a reasonable timc so as not to delay thc services of
FNI.
I. Furnish approvals and permits from ail governmental authorities having jurisdiction over
the Project and such approvals and consents from others as may be necessary for
completion of the Project.
The City shail make or arrange to have made ail subsurface investigations, including but
not l~m~ted to borings, test pits, soil resistivity surveys, and other subsurfacc explorations.
The City shall aiso make or arrange to have made the interpretations o£ data and reports
resulting from such investigations. All costs associated with such investigations shall be
paid by the City.
K. Provide such accounting, independent cost estimating and insurance counseling scrvices
as may bc required for the Project, such legal services as the City may require and such
auditing set, icc as the City may require to ascertain how or for what purpose any
Contractor has used the monies paid under thc construction contract.
L. Give prompt written notice to FNI whenever the City observes or otherwisc becomes
aware of any development that affects thc scope or timing of FNI's services, or any defect
or nonconformance of the work of any Contractor.
M. Furnish, or direct in writing FNI to providc, any other services that the City determines
are necessary, including but not limited te, Additionai Serviccs as stipulated in this
Agreement.
N. Bear all costs incident to compliancc with the requirements of this Agreement.
DESIGNATED REPRESENTATIVES
FNI and The City designate the following representatives, and hereby agree and represent that
such individuals shall have contract authority to transmit instructions, receive information,
interpret and define their respective party's policies and make necessary decisions with respect to
this Agreement.
The City's Designated Representative: Name: Gordon Scmggs, City Engineer
Address: 6800 Main St. The Colony, TX 75056
Phone: 972-624-3137
Fax: 972-624-2308
E-mail: vscm~s(a~ci.the-colony, tx.us
The City's Accounting Representative: Name:
Address:
Phone:
Fax:
E-mail:
FNI's P~oject Manager: Name: Trev Shanks
Address: 4055 International Plaza, Suite 200
Fort Worth, TX 76109
Phone: 817-735-7450
Fax: 817-735-7492
E-mail: ts~freese.com
FNI's Accounting Representative: Name: Jana V. Collier
Address: 4055 International Plaza, Suite 200
Fort Worth, TX 76109
Phone: 817-735-7354
Fax: 817-735-7496
E-mail: jvc~freese.eom
COMPENSATION
LUMP SUM WITH ADDrI'IONAL WORK BASED ON COST TIMES MULTIPI,1F, R
A. Compensation to FNI for the Basic Services in the Task 1 of the Scope of Services shall
be for a lump sum total of Ninety Nine Thousand Eight Hundred Dollars ($99,800.00).
The fee for each task is provided below:
$ Task 1 (Storm Water Utility Fee Development) $78,100.00
$ Task 2 (Public Involvement) $21,700.00
Project Fee Total $99,800.00
B. Schedule of Charges for Additional Work:
StaffMember Salary Cost Times Multiplier of 2.27
Resident Relxescntative Salary Cost Times Multiplier of 2 0
Salary Cost is defined as the cost of salaries (including sick leave, vacation, and holiday l~y
applicable thereto) plus un~ployment and payroll taxes and contributions for social security,
employment compensation instwanco, retirement benefits, medical and other insurance, and other
miscellaneous benefits.
Other Direct Ex,°uses Actual Cost Times Multiplier of 1.15
Other direct expenses shall include outside printing and repruduclion expense, co~=unnicafien
expense, travel, lranspertstien and subsistence away from Fort Worth and other misca]laneous
expenses directly rclated to the work, including costs of laborato~ analysis, test, and other work
required to be done by independent persons other than staff members. For CAD services
performed In-house by non-17NI employees where 17NI provides workspace and equipment to
perform such services, these services will bc billcd at cost times a multiplier of 2.0. This markup
approximates the cost to Fl, II if an Fl'II employee was performing the same or similar services.
Rates for In-house Services
Computer Priniing
$10.00 per hour Black and White
$0.10 per copy
Plotter Color
Bond $ 2.50 per plot $0.50 per copy
Special $ 5.00 per plot
Binding
$5.75 per book
Testine ADoaratus
Density Meter $350.00 per month
GasDctection $ 10.00 per tcst
4-29-95