HomeMy WebLinkAboutOrdinance No. 03-1454 CITY OF THE COLONY, TEXAS
ORDINANCE NO. 0~
AN ORDINANCE OF THE CITY OF THE COLONY, TEXAS,
AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT
WITH FOUR D CONSTRUCTION FOR CONSTRUCTING WATER AND
WASTEWATER IMPROVEMENTS AT THE SOUTH COLONY SHOPPING
CENTER; ATTACHING THE APPROVED FORM OF CONTRACT AS
EXHIBIT "A"; AND PROVIDING AN EFFECTIVE DATE.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF THE COLONY,
TEXAS:
SECTION 1. That the City Manager of the City of The Colony, Texas is hereby authorized
to execute on behalfofthe City a contract with Four D Construction for constructing water and
wastewater improvements at the South Colony Shopping Center. The approved form of contract is
attached hereto as Exhibit "A", and made a part hereof for such purposes.
SECTION 2. This Ordinance shall take effect immediately from and after its passage by the
City Council of the City of The Colony, Texas.
DULY PASSED AND APPROVED by the City Council of the City of The Colony, Texas
this 5th day of May, 2003.
~_._~ ROVED:
ernetta Henvil~e-Shannon, Mayor -
Patti A. Hicks, City Secretary
APPROVED AS TO FORM:
City Attorng~ /
/
I
I
STANDARD FORM OF AGREEMENT
BETWEEN OWNER AND CONTRACTOR
ON THE BASIS OF A STIPULATED PRICE
THIS AGREEMENT is dated as of the C2)~f~.-~'- dayof Iv~t~Lrc-tx inthe
year 2003 by and between the CITY OF THE COLONY, TEXAS, a municipal corporation
(hereinafter called OWNER) and /-~,~ ~ fO,~f'[f-~cqc,'~,~, ,~,~c. (hereinafter called)
CONTRACTOR).
OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, agree
as follows:
Article 1. WORK.
CONTRACTOR shall complete all Work as specified or indicated in the Contract Documents. The
Work is generally described as follows:
This work shall consist of the construction of water and sanitary sewer improvements in the
Bmokshire Shopping Center. Work shall include all components necessary for the "mm key"
construction of these improvements as shown in the plans including, but not limited to: boring,
PVC water pipe, ductile iron sanitary sewer pipe, and concrete pavement repair completely in
place as shown in the plans. All of the above shall be done in accordance with NCTCOG
specifications with the City of The Colony's Addenda and as per instructions of the City of The
Colony City Engineer. All of the construction sequencing and traffic control will be done
according to the City of The Colony Standards.
The Project for which the Work under the Contract Docments may be the whole or only a part is
generally described as follows:
BROOKSHIRE SHOPPING CENTER WATER AND SEWER IMPROVEMENTS
City of The Colony
Article 2. ENGINEER.
The Project has been designed by Teague Nall and Perkins, Inc. and the Bidding and Contract
Documents have been established by the City of The Colony Engineering Department. Contract
administration will be provided by the City of The Colony Engineering Department who is
Contract Documents
1-23
hereinafter called ENGINEER and who is to act as OWNER's representative, assume all duties and
responsibilities and have the fights and authority assigned to ENGINEER in the Contract
DOcuments in connection with completion of the Work in accordance with the Contract
Documents.
Article 3. CONTRACT TIME.
3.1. The Work will be completed within ~t0 calendar fi.om the date when the
days
Contract
time commences to mn as provided in Itbm 1.13 of the General Provisions, and completed
and ready for final payment in accordance with Item 1.51 of the General Provisions.
Article 4. CONTRACT PRICE.
pay CONTRACTOR for completion of the Work in accordance with the
4.1.
OWNER
shall
Contract Documents in current funds subject to additions and deductions by Change Orders
as provided in the contract documents in accordance with the unit prices listed in the
Proposal and Bid Schedule. The contract sum shall be the amount of$ '7~t /) ~0.0 0
The total tangible personal property cost included in the contract sum ii $ q ~ 0 0 ~. ~ 0 .
Article 5. PAYMENT PROCEDURES.
CONTRACTOR shall submit Applications for Payment in accordance with Item 1.51 of the
General Provisions. Applications for Payment will be processed by ENGINEER as provided in the
General Provisions.
5.1. Progress Payments. OWNER shall make progress payments on account of the Contract
Price on the basis of CONTRACTOR's Applications for Payment as recommended
by
ENGINEER, each month during construction as provided below. All progress payments
will be on the basis of the progress of the Work measured by the schedule of values
established in Item 1.51 of the General Provisions (and in the case of Unit Price Work based
on the number of units completed) or, in the event there is no schedule of values, as
provided in the General Provisions.
5.1.1. Prior to Completion, Progress Payments will be made in an amount equal to the
percentage indicated in Item 1.51.2 of the General Provisions, but, in each case, less the
aggregate of payments previously made and less such amounts as ENGINEER shall
Contract Documents
1-24
I
I
determine, or OWNER may withhold, in accordance with Item 1.52 of the General
Provisions of the NCTCOG Specifications.
5.2. Final Payment. Upon final completion and acceptance of the Work in accordance with
Item 1.51.4 of the General Provisions, OWNER shall pay the remainder of the Contract
Price as recommended by ENGINEER.
Article 6. INTEREST.
No interest shall ever be due on late payments.
Article 7. CONTRACTOR'S REPRESENTATIONS.
In order to Induce OWNER to enter into this Agreement CONTRACTOR makes the following
representations:
7.1. CONTRACTOR has studied carefully all reports of explorations and tests of subsurface
conditions and drawings of physical conditions which are identified in the Supplementary
Conditions as provided in Item 1.3 of the General Provisions, and accepts the determination
set forth in Item SC-1.20 of the Supplementary Conditions of the extent of the technical
data contained in such reports and drawings upon which CONTRACTOR is entitled to rely.
7.2. CONTRACTOR has obtained and carefully studied (or assumes responsibility for
obtaining and carefully studying) all such examinations, investigations, explorations, tests,
reports, and studies (in addition to or to supplement those referred to in paragraph 7.1
above) which pertain to the subsurface or physical conditions at or contiguous to the site or
otherwise may affect the cost, progress, performance, or furnishing of the Work as
necessary performance or furnishing Work at the
CONTRACTOR
considers
for
the
of
the
Contract Price, within the Contract Time and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provisions of Item 1.3 of
the General Provisions; and no additional examinations, investigations, explorations, tests,
reports, studies, or similar information or data are or will be required by CONTRACTOR
for such purposes.
7.3. CONTRACTOR has reviewed and checked all information and data shown or
indicated on the Contract Documents with respect to existing Underground Facilities at or
contiguous-to the site and assumes responsibility for the accurate location of said
Underground Facilities. No additional examinations, investigations, explorations, tests,
Contract Documents
1-25
I
I
reports, studies, or similar information or data in respect of said Underground Facilities are
or will be required by CONTRACTOR in order to perform and furnish the Work at the
Contract Price, within the Contract time and in accordance with the other terms and
conditions of the Contract Documents, including specifically the provisions of Items 1.3,
1.20 and 1.21 of the General Provisions.
7.4. CONTRACTOR has correlated the results of all such observations, examinations,
investigations, explorations, tests, reports, and studies with the terms and conditions of the
Contract Documents.
7.5. CONTRACTOR given all conflicts, errors or
has
ENGINEER
notice
of
discrepancies that he has discovered in the Contract Documents and the written resolution
thereof by ENGINEER is acceptable to CONTRACTOR.
Article 8. CONTRACT DOCUMENTS.
The Contract Documents which comprise the entire agreement between OWNER and
CONTRACTOR concerning the Work consist of the following:
8.1. This Agreement (pages 1-23 through 1-28, inclusive).
8.2. Exhibits to this Agreement (immediately following this Agreement, inclusive).
8.3. Certificate Of Insurance (page 1-29).
8.4. Notice of Award.
8.5. Part 1: General Provisions of the Standard for Public
Specifications
Works
Construction, NCTCOG, latest edition.
8.6. Supplementary Conditions to the NCTCOG, Part 1: General Provisions (pages 1-38
through 1-44).
8.7. Specifications beating the title: '~PROJECT MANUAL - Proposal, Contract, Bond
Forms, and Specifications for:
BROOKSHIRE SHOPPING CENTER WATER AND SEWER IMPROVEMENTS
City of The Colony
Contract Documents
1-26
I
I
8.8. Drawings entitled:
BROOKSHIRE SHOPPING CENTER WATER AND SEWER IMPROVEMENTS
City of The Colony
8.9 The following listed and numbered addenda:
8.10. CONTRACTOR's Proposal, Bid Schedule, and Summary of Section 1 - Bidding and
Contract Documents (page 1-11 through 1-17).
8.11. Documentation submitted by CONTRACTOR prior to Notice of Award.
8.12. The Which be delivered issued after the Effective Date of the
following
may
or
Agreement and are not attached hereto: All Written Amendments and other
documents mending, modifying, or supplementing the Contract Documents
pursuant to Items 1.37 and 1.38 of the General Provisions.
8.13. The documents listed in paragraphs 8.2 et seq. above are attached to this Agreement
(except as expressly noted otherwise above).
The Contract Documents may only be amended, modified, or supplemented as provided in Items
1.37 and 1.38 of the General Provisions.
Article 9. MISCELLANEOUS.
9.1. Terms used in this Agreement which are defined in Item 1.0 of the General Provisions
will have the meanings indicated in the General Provisions.
9.2. No assignment by a party hereto of any rights under or interests in the Contract
Documents will be another hereto without the written of the
binding
on
party
consent
party
sought to be bound; and specifically but without limitation moneys that may become due
and moneys that are due may not be assigned without such consent (expect to the extent that
the effect of this restriction may be limited by law), and unless specifically stated to the
contrary in any written consent to an assignment no assignment will release or discharge the
assignor fi.om any duty or responsibility under the Contract Documents.
9.3. OWNER and CONTRACTOR each binds itself, its partners, successom, assigns and
legal representatives to the other party hereto, its partners, successors, assigns and legal
Contract Documents
1-27
I
I
representatives in respect of all covenants, agreements and obligations contained in the
Contract Documents.
Article 10. OTHER PROVISIONS.
IN WITNESS WHEREOF, OWNER and CONTRACTOR have signed this Agreement in
triplicate. One counterpart each has been delivered to OWNER, CONTRACTOR and
ENGINEER. All portions of the Contract Documents have been signed or identified by OWNER
and CONTRACTOR or by ENGINEER on their behalf.
This Agreement will be effective on /Ltt, r tfl, X d2c{'/'~
OWNER: City of The Colony CONTRACTOR!
......... i~'6;'"~/'a~"s"~'i~i .............. F~~ b ~a^~V~_~
The Colony , TX 75056 ~~~(t ~/~7
'''' ' '' '' Js^a res 'for/W/ no ees: ' '0 - i
City of the Colony LL-ing
6800MainStreet [Ic20~ ~[d ~g__,t~o~,'~[t(e ~Fc~I
The Colony, Texas 75056
Atto: GordonE. Scmggs, P.E. g&{d,, ~'~pr,..~E, F)~
!
(If OWNER is a public body, attach (If CONTRACTOR is a corporation, attach
evidence of authority to sign and evidence of authority to sign.)
resolution or other documents
authorizing execution of Agreement.)
Contract Documents