Loading...
HomeMy WebLinkAboutOrdinance No. 02-1427 CITY OF THE COLONY, TEXAS ORDINANCE NO. ~- Jz/~r~.~7 AN ORDINANCE OF THE CITY OF THE COLONY, TEXAS, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH FREESE-NICHOLS TO EVALUATE OUR WASTEWATER PLANT IN THE AMOUNT OF $61,341.00; ATTACHING THE APPROVED FORM OF CONTRACT AS EXHIBIT "A"; AND PROVIDING AN EFFECTIVE DATE. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: SECTION 1. That the City Manager of the City of The Colony, Texas is hereby authorized to execute on behalf of the City a contract with Freese-Nichols for the evaluation of our wastewater plant for $61,341.00. The approved form of contract is attached hereto as Exhibit "A" and made a part hereof for such purposes. ' SECTION 2. This Ordinance shall take effect immediately from and after its passage by the City Council of the City of The Colony, Texas. DULY PASSED AND APPROVED by the City Council of the City of The Colony, Texas this 16th day of December, 2002. APPROVED: ATT/E/~T: Patti A. Hicks, City Secretary APPROVED AS TO FORM: i"kel, C~~omey SCOPE OF SERVICES TASK ORDER NO. 2 BASIC SERVICES: FNI shall render the following professional services in connection with the development of this Task Order: Task Description The City of The Colony (hereinafter "CITY") needs to perform an assessment of the City of The Colony Wastewater Treatment Plant (WWTP) with respect to capacity, remaining service life and recommended improvements or modifications to improve plant performance, reliability and ease of operation. The assessment shall be performed in three phases: Phase 1 - Evaluation of wastewater treatment facilities with plant flows from the existing service area. · Phase 2 - Evaluation of wastewater treatment facilities with flows to include the addition of Wynnwood Peninsula to the service area. · Phase 3 - Evaluation of wastewater treatment facilities with flows to include the addition of Wynnwood Peninsula and Austin Ranch to the service area. Under each phase, FNI will prepare population and flow projections, identi~ required improvements, prepare budget level opinions of probable construction cost, prepare a schedule for implementation of the improvements, and prepare a detailed technical memorandum outlining the proposed improvements. Evaluations will take into account existing and potential future permit discharge requirements, project funding and sludge management issues. FNI will identify recommended improvements and estimate timeline for reaching 75% and 90% of treatment capacity based on these recommendations. FNI will perform these services in accordance with the requirements of the original Agreement for Professional Services dated November 6, 2001. Task 1.1 Project Administration FNI will perform general administrative duties associated with the Project including progress monitoring, scheduling, general correspondence, office administration, and invoicing. These duties include day-to-day contact and liaison with the CITY and project staff; ensuring the needs of the CITY are met in a timely manner; providing project communication; and monitoring work on the project. Task 1.2 Project Meeting and Workshops Three project status/coordination meetings will be scheduled and held in the City of The Colony municipal offices. Project meetings will be held at the beginning of the project (kickoff meeting) at the 50% progress level and at the 90% progress level. FNI will also make up to two (2) presentations to the City Council upon request. Task 1.3 Evaluation of Existing Facilities Freese and Nichols will provide the following: 1. Consult with CITY to review the scope of services, verify requirements for the Project, and to review available data. 2. Evaluate the existing treatment facilities relating to the current service area, prepare population and flow projections, and evaluate alternatives for improving plant performance and reliability. Evaluation shall include requirements of existing and potential future permit discharge requirements. 3. Evaluation shall take into account design of improvements to the plants existing holding pond, which are being conducted under Task Order No. 1. In addition to other plant reliability and treatment issues, the Technical Memorandum shall address current issues with the existing chlorine contact basin and ammonia discharge permit limits. 4. Prepare a Technical Memorandmn reporting on alternative improvements and recommendations, including preliminary layouts and drawings, opinions of probable construction cost and implementation schedules. Deliverable: Draft Technical Memorandum #1 (5 copies). Final Technical Memorandum # 1 (5 copies). Task 1.4 Evaluation of Wastewater Facilities including the addition of Wynnwood Peninsula Freese and Nichols will provide the following: 1. Consult with CITY to review the scope of services, verify requirements for the Project, and to review available data. 2. Evaluate the existing treatment facilities relating to the current service area and the potential addition of Wynnwood Peninsula, prepare population and flow projections for the expanded service area, and evaluate alternatives for improving plant performance and reliability. Evaluation shall include requirements of existing and potential future permit discharge requirements. 3. Prepare a Technical Memorandum reporting on alternative improvements and recommendations, including preliminary layouts and drawings, opinions of probable construction cost and implementation schedules. Deliverable: Draft Technical Memorandum #2 (5 copies). Final Technical Memorandum #2 (5 copies). Task 1.5 Evaluation of Wastewater Facilities including the addition of Wynnwood Peninsula and Austin Ranch Freese and Nichols will provide the following: 1. Consult with CITY to review the scope of services, verify requirements for the Project, and to review available data. 2. Evaluate the existing treatmem facilities relating to the current service area and the potential addition of Wynnwood Peninsula and Austin Ranch, prepare population and flow projections for the expanded service area, and evaluate alternatives for improving plant performance and reliability. Evaluation shall include requiremems of existing and potential future permit discharge requiremems. 3. Prepare a Technical Memorandum reporting on alternative improvements and recommendations, including preliminary layouts and drawings, opinions of probable construction cost and implememation schedules. 4. Flow projections for Austin Ranch shall be as prepared by the North Texas Municipal Water District and provided by the City. Deliverable: To be consolidated with Task 1.4 Deliverables (Technical Memorandum #2). Task 1.6 Final Report Prepare a Report comaining schematic layouts, sketches and conceptual design criteria / with appropriate exhibits to indicate the considerations involved and some alternative // solutions available to CITY and setting forth FNI's findings and recommendations with / opinions of probable construction costs for the Project, which includes estimates of J/ comingencies and allowances for charges of professionals and consultants. Final Report shall incorporate the findings of Technical Memorandums #1 and #2 into a single report. Deliverable: Draft Final Report (5 copies). Final Report (5 copies). Task 1.7 Schedule 1. Notice to Proceed December 17, 2002 2. Draft Technical Memorandum #1 February 21, 2003 3. CITY Review Comments to FNI February 26 4. Draft Technical Memorandum #2 February 28 5. CITY Review Comments to FNI March 5 6. Draft Final Report March 10 7. CITY Review Commems to FNI March 12 8. Final Report March 17 COMPENSATION: The total fee for this Task Order shall be computed on the basis of the original Schedule of Charges but shall not exceed $61,341. If FNI sees the Scope of Services changing so that Additional Services are needed, FNI will notify CITY for approval before proceeding. Additional services shall be computed based on the Schedule of Charges. Compensation for each phase shall be as indicated below: Phase 1 - Evaluation of wastewater treatment facilities with plant flows from the existing service area, compensation shall be the lump sum of $34,983. Phase 2 - Evaluation of wastewater treatment facilities with flows to include the addition of Wynnwood Peninsula to the service area, compensation shall be the lump sum of $13,179. Phase 3 - Evaluation of wastewater treatment facilities with flows to include the addition of Wynnwood Peninsula and Austin Ranch to the service area, compensation shall be the lump sum of $13,179. CITY OF THE COLONY, TEXAS WASTEWATER TREATMENT PLANT IMPROVEMENTS FEE ESTIMATE BASED ON PROJECT MANHOURS Task Order No. 2 TASK O.__~ER 02 - FEASIBILITY STUDY TOTAL EFFORT TASKS 1.01 PROJECT ADMINISTRATION ~ 5,818 1.02 PROJECT MEETINGS AND WORKSHOPS Feasibility Study Kickoff Meeting $ 2,880 50% Progress Meeting $ 2,070 90% Progress Meeting $ 2,070 1.03 EVALUATION OF CURRENT SYSTEM $ 17,294 1.04 EVALUATION TO INCLUDE WYNNWOOD $ 8,417 1.05 EVALUATION TO INCLUDE ENTIRE CITY $ 8,417 1.06 PREPARATION OF FINAL REPORT $ 1,714 1.07 DEVELOP OPCC'S AND SCHEDULES $ 6,912 LABOR SUBTOTAl 55,591 EXPENSES $ GENERAL EXPENSES $ 5,750 EXPENSE SUBTOTAl $ 5,750 TASK 1 TOTAL $ 61,341 BREAKDOWN BY STUDY PHASE FOR TASK ORDER//2 Phase 1 - Evaluation of Current System Project Administration and Meetings $ 8,344 Evaluation and Technical Memorandum $ 17,294 OPCC'S, Schedule and final report $ 5,607 Expenses $ 3~738 SUBTOTAL $ 34,983 Phase 2 - Evaluation of System to Include Wynnwood Project Administration and Meetings $ 2,247 Evaluation and Technical Memorandum $ 8,417 OPCC's, schedule and final report $ 1,509 SUBTOTAL $ 13,179 Phase 3 - Evaluation of System to Include Entire City (Wynnwood + Austin Ranch) Project Administration and Meetings $ 2,247 Evaluation and Technical Memorandum $ 8,417 OPCC's, schedule and final report $ 1,509 Expenses ~. 1~006 SUBTOTAL $ 13,179 TOTAL TASK ORDER AMOUNT $ 61,341 NOTE ~C~_.~__ MEMORANDUM FOR PHASE 2 AND 3 SHALL BE REPORTED .... ~INGLE TM