Loading...
HomeMy WebLinkAboutOrdinance No. 02-1369 CITY OF THE COLONY, TEXAS ORDINANCE N(~/3_F_~?' AN ORDINANCE OF THE CITY OF THE COLONY, TEXAS, AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT WITH NATHAN D. MAIER CONSULTING ENGINEERS~ INC. FOR DESIGN PROPOSALS FOR THE SUTI~)N DRAINANGE CHANNEL PHASE I AND/OR PHASE II; ATTACHING THE APPROVED FORM OF CONTRACT AS EXHIBIT "A"; AND PROVIDING AN EFFECTIVE DATE BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: SECTION 1. That the City Manager of the City of The Colony, Texas is hereby authorized to execute on behalf of the City a contract with Nathan D. Maier Consulting Engineers, Inc.. for Sutton Drainage Channel Design Proposals, Ph. 1 and/or Ph. 2. The approved form of contract is attached hereto as Exhibit "A", and made a part hereof for such purposes. SECTION 2. This Ordinance shall take effect immediately from and after its passage by the City Council of the City of The Colony, Texas. rxBIIULY PASSED AND APPROVED by the City Council of the City of The Colony, Texas this ~"}~day of ~O~, 2002. APPROVED: s emetta Henville-Shannon, Mayor /s/Patti A. Hicks, Deputy City Secretary APPROVED AS TO FORM: /s~on Hik~l, C~y~tt~mey/ CONSULTING ENGINEERS, INC. April 25, 2002 Mr. Abel V. Saldana, P.E. City. Engineer Cit./of The Colony 6800 Main Street The Colony, Texas 75056 RE: Engineering Proposal #90-0402 for Phase 1 Sutton Drainage Channel Improvements, East of FM 423, north of Colon), Blvd. Dear Mr. Saldana: Nathan D. Maier Consulting Engineers, Inc. (NDMCE) is pleased to present this proposal for engineering services for the Phase 1 reach of Sutton Channel that extends approximately 500-feet east (upstream) of FM 423. UNDERSTANDING THE PROJECT SCOPE At FM 423 (Main Street), north of Colony Blvd., the drainage from a 285-acre watershed concentrates in an earthen drainage ditch that has been named Sutton Drainage Channel. In the past a gabion channel bank protection has been constructed along the soL[them limits of lots 60 through 64 of The Colony No. 48 subdivision within the platted 25-foot drainage easement. Recently the City has obtained an additional 40-foot drainage easement from the Arthur Gibson 4.33-acre tract to the south. A total drainage easement of 65-feet is available for Sutton Drainage Channel conveyance of floodwaters. Currently, about 80-feet upstream of the 4-60" culverts under FM 423, the channel has a concrete drop structure. Upstream of this structure the stream has a small earthen pilot channel with wide earthen overb;mks. The channel and overbanks are maintained as a natural creek allowing for channel erosion patterns and growth of native vegetation. It is desirable to reduce the erosion pattern that is occurring, to limit the spread of storm waters to be within the 65-foot drainage easement, and to grade the channel to increase the channel cross section area which will reduce the average velocities and lower the elevation of the 100-year design flood profile. This objective will need structural bank protection along the limits of the southern easements, either a gabion or concrete bag wall, to protect the bank from erosion. The grade of the channel between the north and south gabion structures will need to be flattened to spread the water. Currently the flow is concentrated along the lower elevation against the northem gabion mat. Two NorthPark / 8080 Ps,k Lane / Salts 600 / Dallas, Texas 7523t I (214) 739-4741 Page 2 April 25, 20O2 Phase 1 Sutton Drainage Channel Improvements SCOPE OF WORK 1. Engineering Design NDMCE will provide engineenng design, prepare the construction plans and contract documents (Quantity Bid Schedule and any Supplemental Conditions) for the channel improvement. We will utilize the City of The Colony standard details to the greatest extent feasible. The contract documents will utilize NCTCOG standard specifications or other standards specified by the City. Progress review plans and opinions of probable construction cost will be provided for City review. 2. Topographic and Design Survey NDMCE will provide the necessary survey data for design of the project and preparation of supporting documents. Field survey of the 500-feet upstream of FM 423 will be needed for design and plan preparation. 3. Drainage Analysis/Project Design/Plan Preparation NDMCE will perform necessary drainage analysis to size the required channel cross section and slope. The design discharge will be calculated and a HEC-RAS modeling of the project will be utilized to insure that the channel is design properly. Using the field survey topographic mapping as the base map, NDMCE will prepare plans / profiles for the construction of the channel and the southern slope protection. 4. Section 404 Permit processing NDMCE will design the project based on acceptable cdteria that is generally preferred by the Corps of Engineers. This will include maintaining a meandering Iow flow channel and providing plantings that wilt restore the biological value of the stream. A Nationwide Section 404 permit will be obtained for the project. 5. Construction Phase NDMCE will assist the City in the bid process and evaluate the bids. We will provide general administrative services during construction including periodic visits to the site to observe the progress and quality of the executed work to determine, in general, if the w~3rk is proceeding in accordance with the Contract Documents. NDMCE will provide basic horizontal and vertical construction control. Construction staking is to be provided by the Contractor. SCHEDULE NDMCE proposes to begin services immediately upon receipt of authorization to proceed. The site survey, engineering design, and consb'uction plans will be completed within six (6) weeks. ~pr ~/ U2 l~:2~p Mathan D Maler C.E. 2~473859~1 Page 3 Ap l 2S, Phase ~ Sutton Drainage Channel Improvements COMPENSATION Via an Indefinite Delivery Contract (IDC for Hydrology/Hydraulic Studies) approved by the City Council on December 18, 2000, NDMCE proposes to accomplish Basic Services for a fixed fee based on percent complete, and Special Services will be provided for a Not To Exceed Fee on a "as needed" basis. Basic Services Engineering Design/Plan Preparation $15,000.00 Special Services 404 Permit (not to exceed amount) $ 8,000.00 Field Survey $ 4,500.00 Construction Phase $ 1,500.00 TOTAL BASIC AND SPECIAL SERVICES $ 29,000.00 Additional Special Services Reimbursable Allowance $ 200.00 TOTAL PROJECT COST $ 29,200.00 Reimbursable expenses that include reproductions, mileage, and deliveries will be billed as direct reimbursable expenses. Any services requested but not defined in the scope of services above will be performed on an hourly basis or an agreed lump sum fee. All services performed will be billed monthly as the project progresses. All invoices will be dUe within 30 days of invoice date. TERMINATION OF SERVICES In connection with the services to be provided to you by NDMCE we agree that you may cancel or indefinitely suspend further work or terminate this agreement, or any portion of it, upon wdtten notice to NDMCE, with the understanding that immediately upon receipt of such notice all work being performed under this proposal, or any portion of it, shall cease. NDMCE shall provide an invoice for all work completed and shall be compensated in accordance with the terms of this proposal for all work accomplished by us prior to the receipt of such notice. ACCEPTANCE We are pleased to have the opportunity to submit this proposal and look forward to working with you on this project, if you have any questions about any of the items contained in this proposal, I would be pleased to discuss them with you at your convenience, If you are in agreement with the content of this proposal, please add your signature and return a copy to our office. Rpr 27 02 12:24p Mathmn D Maier C.E. 2l~739596! p.5 Page 4 April 25, 2002 Phase I Sutton Drainage Channel Improvements Sincerely, NATHAN D. MAIEP, CONSULTING ENGINEERS, INC.: Michael H. Boyd, P.E. ~ Executive Vice President MHB/klb This proposal is accepted by: By: City Manager, City of The Colony, Texas Date: Apr 27 02 12:2~p Mathan D Maier C.E. 21~7395961 p.6 ESTIMATE OF PROBABLE COST SUTTON DRAINAGE CHANNEL PHASE I CITY OF THE COLONY, TEXAS FM 423 UPSTREAM 500-FEET REACH ITEM QUANITY UNITS COST 3'x3' North Gabion Toe Wall 150 CY $175 $ 26,250 South Gabion Wall Protection 450 CY 175 78,750 Unclassified Earthen Channet Excavation 3,000 CY 9.00 27.000 Gabion Erosion Control East End of Channel 70 CY 175 12,250 Re-vegetation of disturbed area 3,600 SY 1.00 3,600 Section 404 mitigation planting I ES 10,000 10,000 Job Site Erosion Control 1 LS 2,000 2,000 SUB-TOTAL $159,850 15% CONT. 23,977 TOTAL THIS PHASE $183,827 FIpr 30 02 03: 19p Matlnan D Ma~er C.E. ~'/~t~b~6.l p.~ CONSULTING ENGINEERS, INC. April 25, 2002 Mr. Abel V. Saldana, P.E. City Engineer City of The Colony 6800 Main Street The Colony, Texas 75056 RE: Engineering Proposal #91-0402 for Phase 2 Sutton Drainage Channel Improvements, North of South Colony Blvd. Dear Mr. Saldana: Nathan D. Maier Consulting Engineers, lnc. (NDMCE) is pleased to present this proposal for engineering services for the Phase 2 reach of Sutton Channel that is north of South Colony Blvd. and extends approximately 100-feet southwest (downstream) adjacent to the Good Shepherd Lutheran Church property. UNDERSTANDING THE PROJECT SCOPE North of South Colony Blvd., east of FM 423 (Main Street), the drainage from a 260- acre watershed converges in an earthen ditch from the surrounding drainage systems. This is the upper end of Sutton Drainage Channel. At the point of convergence from storm sewer systems and an earthen drainage channel a severe bank and channel erosion area has developed. This bank erosion is encroaching onto the Good Shepherd Lutheran Church property and local residential properties. It is desirable to stop the erosion pattem that is occurring to protect the surrounding properties. To obtain this objective structural bank protection, either a gabion or concrete bag wall, will be needed to protect the bank from erosion. The eroded areas will need to be re- graded to reduce the steep bank slopes. SCOPE OF WORK 1. Engineering Design NDMCE will provide engineering design, prepare the construction plans and contract documents (Quantity Bid Schedule and any Supplemental Conditions) for the channel improvement. We will utilize the City of The Colony standard details to the greatest extent feasible. The contract documents will utilize NCTCOG standard specifications or other standards specified by the City. Progress review plans and opinions of probable construction cost will be provided for City review. 2. Topographic and Design Survey NDMCE will provide the necessary survey data for design of the project and preparation of supporting documents. Field survey of about 150-feet of stream will be needed for design and plan preparation, Tu;o NortbPark / 8080 Park Lane / Suite 600 J Dallas, Texas 75231 / (214) 739-4741 Rpr 30 02 03: 19p ~athan D Hai~r C.E. 21~73959G! p.3 Page 2 Apr# 25, 2OO2 Phase 2 Sutton Drainage Channel Improvements 3. Drainage Analysis/Project Design/Plan Preparation NDMCE will perform necessary drainage analysis to size the required channel cross section and slope. The design discharge will be calculated and a HEC-RAS modeling of the project will be utilized to insure that the channel is design properly. Using the field survey topographic mapping as the base map, NDMCE will prepare plans / profiles for the construction of the channel improvement. 4. Section 404 Permit processing NDMCE will design the project based on acceptable criteda that is generally preferred by the Corps of Engineers. This will include maintaining a meandering Iow flow channel and providing plantings that will restore the biological value of the stream. A Nationwide Section 404 permit will be obtained for the project. 5. Construction Phase NDMCE will assist/he City in the bid process and evaluate the bids. We will provide general administrative services during construction including periodic visits to the site to observe the progress and quality of the executed work to determine, in general, if the work is proceeding in accordance with the Contract Documents. NDMCE will provide basic horizontal and vertical construction control. Construction staking is to be provided by the Contractor. SCHEDULE NDMCE proposes to begin services immediately upon receipt of authorization to proceed. The site survey, engineering design, and construction plans will be completed within six (6) weeks. COMPENSATION Via an Indefinite Delivery Contract (IDC for Hydrology/ Hydraulic Studies) approved by the City Council on December 18, 2000, NDMCE proposes to accomplish Basic Services for a fixed fee based on percent complete, and Special Services will be provided for a Not To Exceed Fee on a ~as needed" basis. Basic Services Engineering Design/Plan Preparation $ 6,000.00 Special Services 404 Permit (not to exceed amount) $ 3,000.00 Field Survey $ 3,500.00 Construction Phase $ 1,000.00 TOTAL BASIC AND SPECIAL SERVICES $13,500.00 Additional Special Services Reimbursable Allowance $ 200.00 TOTAL PROJECT COST $13,700.00 Rpr 30 02 03:20p Mathan D Maier C.E. 2147395961 Page 3 April 25, 20O2 Phase 2 Sutton Drainage Channel Improvements Reimbursable expenses that include reproductions, mileage, and deliveries will be billed as direct reimbursable expenses. Any services requested but not defined in the scope of services above will be performed on an hourly basis or an agreed lump sum fee. Ail services performed will be billed monthly as the project progresses. All invoices will be due within 30 days of invoice date. TERMINATION OF SERVICES In connection with the services to be provided to you by NDMCE we agree that you may cancel or indefinitely suspend further work or terminate this agreement, or any portion of it, upon written notice to NDMCE, with the understanding that immediately upon receipt of such notice all work being performed under this proposal, or any portion of it, shall cease. NDMCE shall provide an invoice for all work completed and shall be compensated in accordance with the terms of this proposal for all work accomplished by us prior to the receipt of such notice. ACCEPTANCE We are pleased to have the opportunity to submit this proposal and look forward to working with you on this project. If you have any questions about any of the items contained in this proposal, I would be pleased to discuss them with you at your convenience. If you are in agreement with the content of this proposal, please add your signature and return a copy to our office. Sincerely, NATHAN D. MAIER CONSULTING ENGINEERS, INC.: Michael H. Boyd, P.E. Executive Vice President MHB/klb This proposal is accepted by: By: City Manager, City of The Colony, Texas Date: 8pr 30 02 03:20p Mathan D Maier C.E. 21~7395961 p.5 ESTIMATE OF PROBABLE COST SUTTON DRAINAGE CHANNEL PHASE 2 CITY OF THE COLONY, TEXAS COLONY BLVD EAST OF FM 423, 120-FEET REACH ITEM QUANITY UNITS COST Gabion Wall Protection 150 CY 175 $26,250 Unclassified Earthen Channel Fill 800 CY 9.00 7,200 Re-vegetation of disturbed area 1,500 SY 1.00 1,500 Section 404 mitigation planting 1 LS 2,000 2,000 Job Site Erosion Control 1 LS 1,000 1,000 SUB-TOTAL $ 37,950 15% CONT. 5,700 TOTAL THIS PHASE $ 43,650