HomeMy WebLinkAboutOrdinance No. 02-1350 CITY OF THE COLONY, TEXAS
ORDINANCE NO. 0~ I..~ ~
AN ORDINANCE OF THE CITY OF THE COLONY, TEXAS,
AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT
WITH NATHAN D. MAIER CONSULTING ENGINEERS~ INC. FOR
SURVEY/ENGINEERING DESIGN; ATTACHING THE APPROVED FORM
OF CONTRACT AS EXHIBIT "A"; AND PROVIDING AN EFFECTIVE
DATE
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF THE COLONY,
TEXAS:
SECTION 1. That the City Manager of the City of The Colony, Texas is hereby authorized
to execute on behalf of the City a contract with Nathan D. Maier Consulting Engineers, Inc.. for
survey/engineering design. The approved form of contract is attached hereto as Exhibit "A", and
made a part hereof for such purposes.
SECTION 2. This Ordinance shall take effect immediately from and after its passage by the
City Council of the City of The Colony, Texas.
DULY PASSED AND APPROVED by the City Council of the City of The Colony, Texas
this 25th day of February 2002.
APPROVED:
~3emetta Henv~ille-Shan~on, Mayor
Patti A. Hicks, Deputy City Secretary
APPROVED AS TO FORM:
Gor~jmSl~k~l', City A~o~y' -
February 13, 2002
Mr. Abel V. Saldana, P.E.
City Engineer
City of The Colony
6800 Main Street
The Colony, Texas 75056
RE: Engineering Proposal for
35-Acre Park Site Drainage Channel Improvements
East of Paige Road, north of Office Creek to Worley Drive
Dear Mr. Saldana:
Nathan D. Maier Consulting Engineers, Inc. (NDMCE) is pleased to present this
proposal for engineering services for 35-Acre Park Site Drainage Channel
'Improvements east of Paige Road, north of Office Creek to Worley Drive.
UNDERSTANDING THE PROJECT SCOPE
The storm sewer system that drains the 45-acre watershed from the upper limits at
Paige Road and South Colony Blvd. outfalls into an earthen ditch at Wodey Ddve. An
additional 15-acres in the undeveloped 35-Acre Park Site drains westerly toward this
ditch that parallels Paige Road. This earthen ditch was constructed pdor to the lowering
of the TXU gas line and the construction of Office Creek Phase 1 channel
improvements.
The excavation of this earthen ditch was stopped about 200-feet short of a positive
outfall. Currently the storm runoff collects in the excavated portion and overflows into
Paige Road thereby causing a flooding condition at the old Office Creek sag point where
a 3-60" diameter RCP culvert drains the Home Depot property.
To correct this flooding problem a temporary fix is needed until the improvements in the
35-Acre Park Site are constructed (projected to be about five years). The existing
excavated drainage channel provides some flood storage volume that can be used as a
detention basin. A discharge pipe needs to be sized that will release a design storm
discharge that has been routed through the detention reach of the earthen ditch. The
pipe will be constructed to discharge into Office Creek upstream of the new Paige Road
multiple box culvert. The objective is to maintain a dry channel which will detain storm
water, size a discharge pipe large enough to prevent the annual (or possible greater
storm event) flooding of Paige Road, and control the erosion at the discharge point in
Office Creek. With the future construction of the 35-Acre Park Site detention facilities
this outlet pipe may require some modifications at that time.
Two NorthPark ! 8080 Park Lane / Suite 600 / Dallas, Texas 75231 ! (214) 739-4741
Page 2
February 13, 2002
35-Acre Park Site Drainage Improvements Engineering Proposal
SCOPE OF WORK
I. Engineering Design
NDMCE will provide engineering design, prepare the construction plans and contract
documents (Quantity Bid Schedule and any Supplemental Conditions) for the pipe
outfall and any silt removal for the existing earthen channel. We will utilize the City of
The Colony standard details to the greatest extent feasible. The contract documents will
utilize NCTCOG standard specifications or other standards specified by the City.
Progress review plans and opinions of probable construction cost will be provided for
City review.
2. Topographic and Design Survey
NDMCE will provide the necessary survey data for design of the project and preparation
of supporting documents. Field survey of the recently constructed Office Creek channel,
the 'existing topography between the channel and the termination of the earthen
channel, and some sections of the existing ditch (to determine silt loading) will be
needed for design and plan preparation.
3. Drainage Analysis/Project Design/Plan Preparation
NDMCE will perform necessary drainage analysis to size the required outlet pipe. The
design discharge will be calculated, the available storage volume of the excavated
channel will be determined, and an outfall pipe will be designed to control the release
into Office Creek.
Using the field survey topographic mapping as the base map, NDMCE will prepare plans
/ profiles for the construction of the outlet pipe and possible sedimentation removal of
the existing excavated channel.
4. Construction Phase
NDMCE will assist the City in the bid process and evaluate the bids. We will provide
general administrative services during construction including periodic visits to the site to
observe the progress and quality of the executed work to determine, in general, if the
work is proceeding in accordance with the Contract Documents. NDMCE will provide
basic'horizontal and vertical construction control. Construction staking is to be provided
by the Contractor.
SCHEDULE
NDMCE proposes to begin services immediately upon receipt of authorization to
proceed. The site survey, engineering design, and construction plans will be completed
within six (6) weeks.
COMPENSATION
Via an Indefinite Delivery Contract (IDC for Hydrology/ Hydraulic Studies) approved by
the City Council on December 18, 2000, NDMCE proposes to accomplish Basic
Services for a fixed fee based on percent complete, and Special Services will be
provided for a Not To Exceed Fee on a "as needed" basis.
Page 3
February 13, 2002
35-Acre Park Site Drainage Improvements Engineering Proposal
Basic Services
Engineering Design/Plan Preparation $ 3,600.00
Special Services
Field Survey $ 3,000.00
Construction Phase $ 500.00
TOTAL BASIC AND SPECIAL SERVICES $ 7,100.00
Additional Special Services
Reimbursable Allowance $ 200.00
TOTAL PROJECT COST $ 7,300.00
Reimbursable expenses that include reproductions, mileage, and deliveries will be billed
as direct reimbursable expenses. Any services requested but not defined in the scope of
services above will be performed on an hourly basis or an agreed lump sum fee.
All services performed will be billed monthly as the project progresses. All invoices will
be due within 30 days of invoice date.
TERMINATION OF SERVICES
In connection with the services to be provided to you by NDMCE we agree that you may
cancel or indefinitely suspend further work or terminate this agreement, or any portion of
it, upon written notice to NDMCE, with the understanding that immediately upon receipt
of such notice all work being performed under this proposal, or any portion of it, shall
cease. NDMCE shall provide an invoice for all work completed and shall be
compensated in accordance with the terms of this proposal for all work accomplished by
us prior to the receipt of such notice.
ACCEPTANCE
We are pleased to have the opportunity to submit this proposal and look forward to
working with you on this project. If you have any questions about any of the items
contained in this proposal, I would be pleased to discuss them with you at your
convenience. If you are in agreement with the content of this proposal, please add your
signature and return a copy to our office.
Sincerely,
NATHAN D. MAIER
CONSULTING ENGINEERS, INC. ~ proposal is accepted by:
Michael H. Boyd, P.E. City Manager, City of The Colony
Executive Vice President
Date: ~'~
MHB/klb