Loading...
HomeMy WebLinkAboutFY 2024-2025 Master Fee ScheduleDevelopment Services Master Fee Schedule October 1, 2024 - September 30, 2025 $100 $50 $75 $100 $275 $100 Commercial Tree Removal Other required permits not specifically listed Archiving Fee Commercial Cell Tower Flagpole Installation (over 20' in height) Demolition Temporary Commercial Structure Re-roofing - Single Family (replace decking) Manufactured Home Inspection Manufactured / Modular Home Moving Permit Residential Remodel, Addition or Finish Out Re-roofing - Multi-Family / Commercial $0.159 per sq ft (minimum $50) $10 per $1,000 value ($100 minimum) $75 $50.00 + $100.00 for each protected tree to be removed $10 per $1,000 value ($100 minimum) Miscellaneous Third re-inspection = $100 Fourth re-inspection = $250 Fifth and subsequent re-inspections = $500 each $10 per unit $100 per unit Commercial Building Permit Residential Building Permit Residential Accessory Structure Commercial Alteration, Remodel, Total Finish Out (TFO) COMMERCIAL & MULTI-FAMILY PERMITS (NEW CONSTRUCTION) Valuation and fee determined per the "Square Foot Construction Costs" table provided each August by the International Code Council with a permit fee multiplier of 0.0090 (See TABLE 2) Valuation and fee determined per the "Square Foot Construction Costs" table provided each August by the International Code Council with a permit fee multiplier of 0.0050 (See TABLE 2) NEW RESIDENTIAL HOME PERMITS (NEW CONSTRUCTION) $1.01 PER SQUARE FOOT Other Building Permits $0.159 per sq ft (minimum $50) Rental Inspection - per unit inspected - (Multi-Family) - Program Suspended Late Rental Registration - Program Suspended Late Rental Inspection - Program Suspended First Inspection = $5 Follow-up re-inspection = no fee Newspaper Box - Relocation Rental Registration - Suspended at this time Rental Inspection - per unit inspected - Program Suspended Fee Not Required as of 10/01/15 Rental Registration & Inspection - Suspended at this time $5 per unit annually First Inspection = $50 Follow-up re-inspection = no fee Third re-inspection = $100 Fourth re-inspection = $250 Fifth and subsequent re-inspections = $500 each ANNUAL PERMITS Donation Box $100 $100 Newspaper Box Fee Not Required as of 10/01/15 Donation Box - Annual Permit Donation Box - Relocation Permit Newspaper Box - Annual Permit $5 per page Schedule fee doubled $75 Work Performed without a Permit Re-inspection $50 per hour (2 hour maximum) $100 per hour (2 hour maximum) $200 per hour (2 hour maximum) $50 Same Day Inspection (At the discretion of the Building Official. During Business Hours. After Hours Inspection (At the discretion of the Building Official.) Holiday Inspection (At the discretion of the Building Official, includes weekends in conjunction with holidays.) Special Event Permit Attendance of 0-249 Persons $150 $250 $15 each $50 each $.10 per page $.50 per page $1 per square foot Copies (11" X 17" or greater) Organization Event Sign Permit Tent, Bounce House, Climbing Wall Small Copies (up to 8 1/2" X 14") Attendance of 250-1,999 Persons Attendance of 2,000+ Persons Color Copies larger than 11" X 17" Operating a business without a C of O Re-Inspection Fee - Building Inspections Re-inspection Fee - Fire/Annual Fire Co Inspection Application Fee/Non-Refundable Plan Review Fee (to be paid at time of application) Accessory Structure Remodels Commercial Plan Review Multi-Family Plan Review $75 Scheduled fee doubled $75 $75 Building Plan Review $50 or 25% of building permit fee, whichever is greater $50 or 25% of building permit fee, whichever is greater 25% of building permit fee 25% of building permit fee $50 Inflatable Sign Billboard - Registration Billboard - Annual Renewal Certificate of Occupancy $75 $150 Certificate of Occupancy $75 Temporary Certificate of Occupancy $45 In Ground / Above Ground Swimming Pool Spray Park / Splash Zone Hot Tub or Spa Signage license agreement review Banner Sign Sign Permit Sign Permit $200 $200 $150 0 - 29.99 sq ft = $30 0 - 24,99 sq ft = $30 25 - 49.99 sq ft = $45 50 - 99.99 sq ft = $60 100 - 299.99 sq ft = $125 300 - 399.99 sq ft = $200 400 - sq ft and up = $300 $100 BUILDING PERMITS Electric Permit $10.00 for every $1,000 value ($100 minimum) $50 Fencing/Retaining Wall Permit 1 lot: $50 Electrical Permit Temporary Power Pole/Clean & Show Fence 30 - 48 sq ft - $45 Mechanical Permit Subdivision & Commercial: $50.00 plus $0.25 per linear foot 1 lot: $75 Mechanical Permit $10.00 for every $1,000 value ($100 minimum) Plumbing Permit Annual Backflow Inspection Report Backflow Repair / Replacement Permit New Lawn Sprinkler System & Backflow Test Plumbing Permit $53 per device annually $75 $125 $10.00 for every $1,000 value ($100 minimum) Pool/Spa Permit $100 $20 $100 Contractor License/Registration Residential Plan Review Sign Plan Review Plan Amendment Fee General Contractor**$75 per registration annually **General Contractor shall include, but not to be limited to, the following contractors: commercial, residential, moving, pool, fence, sign, demolition, foundation, remodeling, etc. Retaining Wall Subdivision & Commercial: $50.00 plus $0.25 per linear foot Working without a permit Special Locks MUZ Permit Renewal Permits 50 - 99.99 acres or portion thereof = $1,250 100+ acres = $200 + $12 per acre PD Amendment Site Plan Amendment Review Annexation Notice $20 Zoning Cost ($400 minimum) Annexation Petition Zoning Amendments, Planned Developments, Specific Use Permits, Site Plan $500 0 - 4.99 acres or portion thereof = $375 5 - 9.99 acres or portion thereof = $650 10 - 24.99 acres or portion thereof = $825 25 - 49.99 acres or portion thereof = $1,000 $20 $35 + Mitigation Fees Irrigation Permit Combine MUZ, NSV, and Irrigation 101 devices = $350 +$.75 per device over 100 Narrow Shoreline Variance Permit Fire Panel Replacement Only 1 - 100 sprinkler heads = $175 101 - 200 sprinkler heads = $200 201 - 300 sprinkler heads = $225 301 - 400 sprinkler heads = $250 401 - 500 sprinkler heads = $300over 500 sprinkler heads = $250 + $.25 per sprinkler over 500 $100 $100 $175 $200 $140 Double permit fee $100 Shoreline Mitigation Fees $20 $25 + Mitigation Fees Fire Communicator Replacement Only Fire Plan Review Plan Review Re-submittal ERRCS (Emergency Radio Responder Coverage System) Vent Hood Permit Fire Line Permit Above Ground - $100 Underground - $150 $75 $225 1 - 25 devices = $150 26 - 50 devices = $200 51 - 75 devices = $250 76 - 100 devices = $325 SUP Amendment Special Exception Variance Application $375 $100 $375 $350 $350 Gateway Standards Waiver Zoning Verification Letter Public Hearing Sign Deposit Permit for Sexually Oriented Business $350 $50 per property (within 7 business days) $70 per property (within 3 business days) $35 per sign $500 annual permit $100 - first hood $50 - each additional Mobile Food Truck/Trailer Fire Inspection State Mandated Fire Inspection Group Home - Annual Fire Inspection Fire Re-Inspection Fire Plan Review/Permit $75 $75 $50 $75 for the first $150 for the second Storage Tanks Solar Review & Inspection Fire Sprinkler Permit (Based on the number of sprinkler heads) Fire Alarm Permit Fee (Based on the number of signal initiating devices) Preliminary Plat Final Plat / Amending Plat Platting Single Family / Duplex = $375 + $15 per lot Multi-Family / TH = $250 + $144 per acre or portion thereof All others = $250 + $72 per acre or portion thereof Single Family / Duplex = $375.00 + $15.00 per lot Multi-Family / TH = $250 + $144 per acre or portion thereof All others = $250 + $72 per acre or portion thereof Replat Minor Plat Conveyance Plat Single Family / Duplex = $375 + $15 per lot Multi-Family / TH = $250 + $144 per acre or portion thereof All others = $250 + $72 per acre or portion thereof $300 + $10 per acre or portion thereof Single Family / Duplex = $375 + $15 per lot Multi-Family / TH = $250 + $144 per acre or portion thereof All others = $250 + $72 per acre or portion thereof General Development Plat Street Address Change/Street Name Change Plat Extension Vacating Plat $50 per acre or portion thereof 1 - 5 addresses = $100 6 - 10 addresses = $225 11 + addresses = $400 $100 $250 5/8" Tap & Meter 3/4" Tap & Meter 1" Tap & Meter 1.5" Tap & Meter Water Meter $475 $595 $730 $1,085 2" Tap & Meter 3" Tap Only 4" Tap Only 6" Tap Only 8" Tap Only $1,200 $1,625 $1,895 $2,415 $3,210 10" Tap Only When a paved road must be bored to make tap Tap & Meter fee includes a service connection from main line to meter within (50) feet. Connections greater than fifty (50) feet shall include a "per foot" fee. 4" Sewer Tap $4,270 $500 $20 per foot Sewer/Fire Line Tap $570 6" Sewer Tap 8" Sewer Tap 10" Sewer Tap 4" Fire Line Tap 6" Fire Line Tap $865 $1,410 $2,220 $1,895 $2,415 8" Fire Line Tap 10" Fire Line Tap $3,210 $5,000 METER SIZE WATER IMPACT FEE 5/8" X 3/4" Meter $768 WATER & SEWER IMPACT (Property final platted before September 30, 2007) ENTIRE CITY EXCEPT THE TRIBUTE SUBDIVISION* SEWER IMPACT FEE $990 3/4" Meter $1,152 1" Meter $1,920 1.5" Meter $3,840 $1,089 $1,782 $3,663 2" Compound Meter $6,144 2" Turbine Meter $6,144 3" Compound Meter $12,288 $5,940 $5,940 $11,880 3" Turbine Meter $13,440 4" Compound Meter $19,200 4" Turbine Meter $24,192 $12,969 $18,513 $23,364 6" Compound Meter $38,400 6" Turbine Meter $53,760 8" Compound Meter $61,440 $37,125 $51,975 $59,400 8" Turbine Meter $92,160 10" Compound Meter $88,320 10" Turbine Meter $145,920 $89,100 $85,338 $141,075 METER SIZE WATER IMPACT FEE 5/8" X 3/4" Meter $1,653 3/4" Meter $2,480 * The Tribute Subdivision has a Developer's Agreement authorizing all new fees. NOTE: Turbine meters are for irrigation only. All irrigation meters are only required to pay Water Impact Fees, not Sewer Impact Fees. WATER & SEWER IMPACT (Property final platted after October 1, 2007) SEWER IMPACT FEE $815 $1,223 1" Meter $4,133 1.5" Meter $8,265 2" Compound Meter $13,224 $2,038 $4,075 $6,520 2" Turbine Meter $16,530 3" Compound Meter $26,448 3" Turbine Meter $39,672 $8,150 $13,040 $19,560 4" Compound Meter $41,325 4" Turbine Meter $69,426 6" Compound Meter $82,650 $20,375 $34,230 $40,750 6" Turbine Meter $152,076 8" Compound Meter $132,240 8" Turbine Meter $264,480 $74,980 $65,200 $130,400 10" Turbine Meter $413,250 METER SIZE WATER IMPACT FEE 5/8" PD $518 $203,750 NOTE: Turbine meters are for irrigation only. All irrigation meters are only required to pay Water Impact Fees, not Sewer Impact Fees. WATER & SEWER IMPACT (Property final platted after December 1, 2020) SEWER IMPACT FEE $4,034 3/4" PD $777 1" PD $1,295 1 1/2" PD $2,590 $6,051 $10,085 $20,170 2" PD $4,144 2" Compound Meter $4,144 2" Turbine Meter $5,180 $32,272 $32,272 $40,340 3" Compound Meter $8,288 3" Turbine Meter $12,432 4" Compound Meter $12,950 $64,544 $96,816 $100,850 4" Turbine Meter $21,756 6" Compound Meter $25,900 6" Turbine Meter $47,656 $169,428 $201,700 $371,128 8" Compound Meter $41,440 8" Turbine Meter $82,880 10" Turbine Meter $129,500 $322,720 $645,440 $1,008,500 NOTE: Turbine meters are for irrigation only. All irrigation meters are only required to pay Water Impact Fees, not Sewer Impact Fees. ITE Land Use Code 030 110 120 130 150 151 210 220 230 240 251 252 254 310 320 432 430 495 465 431 445 491 560 565 522 530 540 550 630 610 620 640 2016 FeesLand Use Category Development Veh-Mi Per Unit Dev-Unit ROADWAY IMPACT FEES - Page 1 Industrial Park 1,000 SF GFA 3.40 PORT AND TERMINAL Truck Terminal Acre 26.20 INDUSTRIAL Warehousing 1,000 SF GFA 1.28 Mini-Warehouse 1,000 SF GFA 1.04 RESIDENTIAL Single-Family Detached Housing Dwelling Unit 4.00 Apartment/Multi-family Dwelling Unit 2.48 Residential Condominium/Townhome Dwelling Unit 2.08 Mobile Home Park/Manufactured Housing Dwelling Unit 2.36 Senior Adult Housing-Detached Dwelling Unit 1.08 Senior Adult Housing-Attached Dwelling Unit 1.00 Assisted Living Beds 0.88 LODGING Hotel Room 1.93 Motel / Other Lodging Facilities Room 1.51 RECREATIONAL Golf Driving Range Tee 4.02 Multiplex Movie Theater Screens 43.85 Racquet / Tennis Club Court 10.77 Golf Course Acre 0.96 Recreational Community Center 1,000 SF GFA 8.81 Ice Skating Rink 1,000 SF GFA 7.59 Primary / Middle School (1 - 8)Students 0.34 High School Students 0.27 Junior / Community College Students 0.25 Beds 5.36 6,183$ 916$ 642$ General Light Industrial 1,000 SF GFA 3.88 General Light Industrial 1,000 SF GFA 2.72 802$ 302$ 245$ 944$ 585$ 491$ 557$ 255$ 236$ 208$ 455$ 356$ 949$ 227$ 1,452$ Nursing Home Beds 0.83 1,791$ 250$ 2,061$ 2,542$ 274$ 3,424$ 80$ 64$ INSTITUTIONAL Church 1,000 SF GFA 1.16 Day Care Center 1,000 SF GFA 14.51 Miniature Golf Course Hole 1.06 59$ 85$ 2,694$ 677$ 114$ 1,711$ University / College Students 0.36 MEDICAL Clinic 1,000 SF GFA 19.55 Hospital Animal Hospital / Veterinary Clinic 1,000 SF GFA 12.46 ITE Land Use Code 714 710 720 715 750 942 843 944 945 946 841 941 947 848 934 933 932 931 937 815 817 862 880 881 820 850 864 875 896 911 912 918 Corporate Headquarters Building 1,000 SF GFA 5.64 Land Use Category Development Veh-Mi Per Unit Dev-Unit OFFICE Gasoline / Service Station Vehicle Fueling Position 4.83 Gasoline / Service Station w/ Conv Market Vehicle Fueling Position 3.57 Gasoline / Service Station w/ Conv Market and Car Wash Vehicle Fueling Position 3.66 New Car Sales 1,000 SF GFA 5.87 Quick Lubrication Vehicle Shop Servicing Positions 8.72 Self - Service Car Wash Stall 1.99 Tire Store 1,000 SF GFA 8.37 Dining Fast Food Restaurant w/ Drive-Thru Window 1,000 SF GFA 39.10 Fast Food Restaurant w/out Drive-Thru 1,000 SF GFA 31.31 High Turnover (Sit-Down) Restaurant 1,000 SF GFA 13.45 Quality Restaurant 1,000 SF GFA 10.05 Coffee/Donut Shop w/Drive-Thru Window 1,000 SF GFA 30.75 Other Retail Free-Standing Discount Store 1,000 SF GFA 11.21 Nursery (Garden Center)1,000 SF GFA 15.62 Home Improvement Superstore 1,000 SF GFA 3.90 Pharmacy/Drugstore w/o Drive Thru Window 1,000 SF GFA 12.69 Pharmacy/Drugstore w/Drive Thru Window 1,000 SF GFA 16.25 Shopping Center 1,000 SF GFA 7.87 SERVICES Walk-In Bank 1,000 SF GFA 12.34 Drive-in Bank Drive-in Lanes 29.86 Supermarket 1,000 SF GFA 19.51 1,097$ 2,963$ 1,547$ 552$ 3,012$ 2,912$ 5,662$ 406$ Hair Salon 1,000 SF GLA 1.72 Toy/Children's Superstore 1,000 SF GFA 11.23 Department Store 1,000 SF GFA 4.21 Video Rental Store 1,000 SF GFA 21.86 664$ Rates 772$ ROADWAY IMPACT FEES - Page 2 2016 1,510$ Automobile Related Automobile Care Center 1,000 SF Occ GLA 5.22 Automobile Parts Sales 1,000 SF GFA 9.54 2,050$ 954$ 827$ 898$ Single Tenant Office Building 1,000 SF GFA 6.96 Office Park 1,000 SF GFA 5.92 COMMERCIAL General Office Building 1,000 SF GFA 5.96 Medical - Dental Office Building 1,000 SF GFA 14.28 2,055$ 1,385$ 4,251$ 1,570$ 1,178$ 759$ 1,947$ 1,947$ 486$ 485$ 936$ 1,379$ 274$ 1,604$ 5,716$ 4,315$ 821$ Non-Residential OFFICE CREEK DRAINAGE IMPACT FEES & MAP $231.52/lot $231.52/ERU* Residential *ERU is an equivalent residential unit and is equal to 3,406 square feet of impervious area. TO CALCULATE FEE = MULTIPLY GROSS SQUARE FEET BY $ AMOUNT ABOVE BY PERMIT FEE MULTIPLIER (CURRENTLY 0.0090 FOR NEW CONSTRUCTION, 0.0050 FOR ALTERATION, REMODEL, TFO) Type II-B Retail (Mercantile) with 3,800 sq. ft. of floor space would be calculated as: 3,800 X $125.68 X 0.0090 = $4,298.25