Loading...
HomeMy WebLinkAbout2021 1103Agenda Item No:1.5 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Submitting Department: City Secretary Item Type: Miscellaneous Agenda Section: Subject: Items of Community Interest Suggested Action: Attachments: 4 Agenda Item No:1.6 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Lindsey Stansell Submitting Department: Parks & Recreation Item Type: Announcement Agenda Section: Subject: Receive presentation from Parks and Recreation regarding upcoming events and activities. (Stansell) Suggested Action: Attachments: 5 Agenda Item No:3.1 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Submitting Department: City Secretary Item Type: Miscellaneous Agenda Section: Subject: Council to provide direction to staff regarding future agenda items. (Council) Suggested Action: Attachments: 6 Agenda Item No:4.1 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Submitting Department: City Secretary Item Type: Minutes Agenda Section: Subject: Consider approving City Council Regular Session meeting minutes for October 19, 2021. (Stewart) Suggested Action: Attachments: October 19, 2021 DRAFT Minutes.docx 7 1 These items are strictly public service announcements. Expressions of thanks, congratulations or condolences; information regarding holiday schedules; honorary recognition of city officials, employees or other citizens; reminders about upcoming events sponsored by the City or other entity that are scheduled to be attended by a city official or city employee. No action will be taken and no direction will be given regarding these items. MINUTES OF THE CITY COUNCIL REGULAR SESSION HELD ON OCTOBER 19, 2021 The Regular Session of the City Council of the City of The Colony, Texas, was called to order at 6:31 p.m. on the 19 th day of October 2021, at City Hall, 6800 Main Street, The Colony, Texas, with the following roll call: Joe McCourry, Mayor Kirk Mikulec, Deputy Mayor Pro Tem Richard Boyer, Mayor Pro Tem Brian Wade, Councilmember David Terre, Councilmember Perry Schrag, Councilmember Joel Marks, Councilmember Present Absent (Business) Present Present Present Absent (Business) Present And with 5 council members present a quorum was established and the following items were addressed: 1.0 ROUTINE ANNOUNCEMENTS, RECOGNITIONS and PROCLAMATIONS 1.1 Call to Order Mayor McCourry called the meeting to order at 6:31 p.m. 1.2 Invocation Mayor Pro Tem Boyer delivered the invocation. 1.3 Pledge of Allegiance to the United States Flag The Pledge of Allegiance to the United States Flag was recited. 1.4 Salute to the Texas Flag Salute to the Texas Flag was recited. 1.5 Items of Community Interest 1.5.1 Proclamation: National Chiropractic Health Month. Mayor McCourry proclaimed October 2021 as "National Chiropractic Health" month. Dr. Andrew Oteo with The Colony's Stonebridge Chiropractic and President of the Texas Chiropractic Association, Region 5 accepted the proclamations. Councilmember Marks announced early voting has started for the November 2, 2021 General Election. 2.0 CITIZEN INPUT Robyn Holtz, 7262 Waters Edge Drive, spoke concerning her race for Place 2 on The Colony City Council. 8 City Council – Regular Meeting Agenda October 19 2021 Page| 2 Judy Ensweiler, 7205 Waters Edge Drive, spoke concerning her race for Place 1 on The Colony City Council. Mark Moretto submitted citizen input via email concerning the noise and parking ordinance. 3.0 WORK SESSION 3.1 Council to provide direction to staff regarding future agenda items. None 4.0 CONSENT AGENDA Motion to approve all items from the Consent Agenda- Schrag; second by Mikulec, motion carried with all ayes. 4.1 Consider approving City Council Regular Session meeting minutes for October 6, 2021. **ITEM REMOVED FROM AGENDA FOR SEPARATE CONSIDERATION** 4.2 Consider approving a resolution authorizing the City Manager to execute a Professional Services Contract with Dunkin Sims Stoffels Inc., in the amount of $63,250.00 for Kids Colony Splash Park Phase 2, with funding from the Community Development Corporation. Motion to table this item until the November 3, 2021 meeting- Boyer; second by Marks, motion carried with all ayes. 5.0 REGULAR AGENDA ITEMS 5.1 Conduct a public hearing, discuss and consider an appeal of the Sign Board of Appeals regarding a variance from Chapter 6, Section 6-258, Prohibited signs, to allow an off-premise LED digital sign, “Billboard,” at 3905 SH 121. The subject site is within the Business Park (BP) Zoning District and the Gateway Overlay District. (A request has been made by Applicant to postpone consideration to November 3, 2021). Motion to postpone this item until the November 3, 2021 meeting- Boyer; second by Marks, motion carried with all ayes. 9 City Council – Regular Meeting Agenda October 19 2021 Page| 3 5.2 Conduct a public hearing, discuss and consider an ordinance for a Specific Use Permit (SUP) to allow a thrift store with outdoor donation area known as “Grace Bridge,” and consider relief in accordance with Section 10-906 from (1) that a thrift store be located within two miles of another thrift store (Section 10-2500(1)), and (2) that thrift store shall not be the anchor store in a shopping center, minimum of 25 percent smaller in size than the major tenant (Section 10-2500(2)). The subject site is located at 4711 SH 121, Suite 200, containing a total area of approximately 25,660 square feet, within the Planned Development – 11 (PD-11) Zoning District and the Gateway Overlay District. Senior Planner, Isaac Williams, presented the proposed ordinance specific use permit to Council. Mr. Williams reviewed the land use analysis, site plans, floor plans, parking plans, landscape plan, and elevation plans. The Development Review Committee recommended approval of the Specific Use Permit with conditions to be permitted within two miles of another thrift store and less than a minimum of 25% smaller than the major anchor of the shopping center. On September 28, 2021,the Planning and Zoning Commission voted 4-2to recommend approval of the proposed site plan. The public hearing opened at 6:57 p.m. then Carter Morris, 1336 Tidwell Lane, Celina, spoke in support of the proposed ordinance. Ron Johnson, 9300 Wade Boulevard, Frisco, appeared in support of the proposed ordinance. Three individuals registered in opposition of the proposed ordinance. There being no other speakers the public hearing closed at 7:18 p.m. Council provided discussion on this item and moved to deny this item. Motion to deny- Terre; second by Boyer, motion carried with all ayes. 5.3 Discuss and consider approving a resolution authorizing the City Manager to accept a bid from Sydaptic, Inc., in the amount of $157,259.00 for contract services to install a new Jail Control Integrated System for the Police Department. Assistant Police Chief Chris Chandler provided an overview on this item. Motion to approve- Wade; second by Terre, motion carried with all ayes. RESOLUTION NO. 2021-067 5.4 Discuss and consider approving a resolution authorizing the City Manager to execute the purchase of new police vehicles from Siddons-Martin in the amount of $300,000.00 from the Operations Budget; and $320,000.00 from the Capital Outlay Fund. Police Chief David Coulon provided an overview on this item. 10 City Council – Regular Meeting Agenda October 19 2021 Page| 4 Motion to approve- Boyer; second by Wade, motion carried with all ayes. RESOLUTION NO. 2021-068 Executive Session was convened at 7:35 p.m. 6.0 EXECUTIVE SESSION 6.1.A. Council shall convene into a closed executive session pursuant to Section 551.087 of the Texas Government Code regarding commercial or financial information the city has received from a business prospect(s), and to deliberate the offer of a financial or other incentive to a business prospect(s). Regular Session was reconvened at 8:05 p.m. 7.0 EXECUTIVE SESSION ACTION 7.1 A. Any action as a result of executive session regarding commercial or financial information the city has received from a business prospect(s). No Action ADJOURNMENT With there being no further business to discuss the meeting adjourned at 8:05 p.m. APPROVED: __________________________________ Joe McCourry, Mayor City of The Colony ATTEST: _______________________________ Tina Stewart, TRMC, CMC City Secretary 11 Agenda Item No:4.2 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Tina Stewart Submitting Department: City Secretary Item Type: Expenditures Agenda Section: Subject: Consider approving Council expenditures for the month of September 2021. (Council) Suggested Action: Attachments: Council September Expenditures.pdf 12 13 14 15 16 17 18 19 Agenda Item No:4.3 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Tina Stewart Submitting Department: Parks & Recreation Item Type: Resolution Agenda Section: Subject: Consider approving a resolution authorizing the City Manager to execute a Professional Services Contract with Dunkin Sims Stoffels Inc. in the amount of $63,250.00 for Kids Colony Splash Park Phase 2, with funding from the Community Development Corporation. (Morgan) Suggested Action: Attachments: Kids Colony Splash Park Phase 2 Professional Services Agreement wit Exhibits.pdf Res. 2021-xxx Dunkin Sims Stoffels Professional Services Agreement.doc 20 STATE OF TEXAS § CITY OF THE COLONY, TEXAS § AGREEMENT FOR PROFESSIONAL SERVICES COUNTY OF DENTON § This Agreement for Professional Services (“Agreement”) is made by and between the City of The Colony, Texas, a municipal corporation located in Denton County, Texas (“City”), and DUNKIN SIMS STOFFELS, INC (“Professional”) (individually, each a “Party” and collectively, “Parties”), acting by and through the Parties’ authorized representatives. Recitals: WHEREAS, City desires to engage the services of Professional as an independent contractor and not as an employee in accordance with the terms and conditions set forth in this Agreement; and WHEREAS, Professional desires to render professional services for City for KID’S COLONY SPLASH PARK PHASE II (“Project”) in accordance with the terms and conditions set forth in this Agreement. NOW, THEREFORE, in exchange for the mutual covenants set forth herein and other valuable consideration, the sufficiency and receipt of which is hereby acknowled ged, the Parties agree as follows: Article I Employment of Professional Professional will perform as an independent contractor all services under this Agreement to the prevailing professional standards consistent with the level of care and skill ordinarily exercised by members of Professional’s profession, both public and private, currently practicing in the same locality under similar conditions including but not limited to the exercise of reasonable, informed judgments and prompt, timely action. If Professional is representing this it has special expertise in one or more areas to be utilized in the performance of this Agreement, then Professional agrees to perform those special expertise services to the appropriate local, regional and national professional standards. Article II Term 2.1 The term of this Agreement shall begin on the last date of execution hereof by all parties hereto (the “Effective Date”) and shall continue until completion of the services provided by Professional to City under this Agreement. 2.2 Professional may terminate this Agreement by giving thirty (30) days prior written notice to City. In the event of such termination by Professional, Professional shall be entitled to compensation for services satisfactorily completed in accordance with this Agreement prior to the date of such termination. 21 2.3 City may terminate this Agreement by giving ten (10) days prior written notice to Professional. In the event of such termination by City, Professional shall be entitled to compensation for services satisfactorily completed in accordance with this Agreement prior to the date of such termination. Upon receipt of such notice from City, Professional shall immediately terminate working on, placing orders or entering into contracts for supplies, assistance, facilities or materials in connection with this Agreement and shall proceed to promptly cancel all existing contracts insofar as they are related to this Agreement. Article III Scope of Services 3.1 Professional shall perform the services specifically set forth in Exhibit A, attached hereto and incorporated herein by reference, entitled “Scope of Services”. In case of conflict with the language of Exhibit A and the provisions of this Agreement, the provisions of this Agreement shall control. 3.2 The Parties acknowledge and agree that any and all opinions provided by Professional represent the best judgment of Professional. 3.3 Schematic Design Documents, Design Development Documents, Contract Documents, Drawings, Plans, Specifications and other documents, including those in electronic form, prepared by Professional and its consultants, agents, representatives, and/or employees in connection with the Project (“Project Documents”) are intended for the use and benefit of City. Professional and its consultants, agents, representatives, and/or employees shall be deemed the authors of their respective part of said Project Documents. Notwithstanding the foregoing, City shall own, have, keep and retain all rights, title and interest in and to a ll Project Documents, including all ownership, common law, statutory, and other reserved rights, including copyrights, in and to all such Project Documents, whether in draft form or final form, which are produced at City’s request and in furtherance of this Agreement or for the Project. City shall have full authority to authorize contractor(s), subcontractors, sub-subcontractors, City consultants, and material or equipment suppliers to reproduce applicable portions of the Project Documents to and for use in their execution of the work or for any other purpose. All materials and reports prepared by Professional in connection with this Agreement are “works for hire” and shall be the property of City. Professional shall, upon completion of the services provided under this Agreement, or upon earlier termination of this Agreement, provide City with reproductions of all materials, reports, and exhibits prepared by Professional pursuant to this Agreement, and shall provide same in electronic format if requested by City. Any re-use of the Project Documents by the City on any other project not contemplated or included under this Agreement shall be at the City’s sole risk, without liability to Professional. Article IV Schedule of Work 4.1 Professional agrees to commence services upon written direction from City and to complete the tasks set forth in Exhibit A, Scope of Services, in accordance with a work schedule established by City (the “Work Schedule”), which is attached hereto and incorporated as Exhibit C. 22 4.2 In the event Professional’s performance of this Agreement is delayed or interfered with by acts of City or others, Professional may request an extension of time for the performance of same as hereinafter provided, and City shall determine whether to authorize any increase in fee or price, or to authorize damages or additional compensation as a consequence of such delays, within a reasonable time after receipt of Professional’s request. 4.3 No allowance of any extension of time, for any cause whatsoever, shall be claimed or made by Professional, unless Professional shall have made written request upon City for such extension not later than five (5) business days after the occurrence of the cause serving as the basis for such extension request, and unless City and Professional have agreed in writing upon the allowance of such additional time. Article V Compensation and Method of Payment 5.1 City shall pay Professional for the services specifically as set forth in Exhibit B by payment of a fee not to exceed $63,250.00. 5.2 Each month Professional shall submit to City an invoice supporting the amount for which payment is sought. Each invoice shall also state the percentage of work completed on the Project through the end of the then submitted billing period, the total of the current invoice amount, and a running total balance for the Project to date. 5.3 Within thirty (30) days of receipt of each such monthly invoice, City shall make monthly payments in the amount shown by Professional’s approved monthly invoice and other documentation submitted. 5.4 Professional shall be solely responsible for the payment of all costs and expenses related to the services provided pursuant to this Agreement including, but not limited to, travel, copying and facsimile charges, reproduction charges, and telephone, internet, e-mail, and postage charges, except as set forth in Exhibit A. 5.5 Nothing contained in this Agreement shall require City to pay for any services that is unsatisfactory as determined by City or which is not performed in compliance with the terms of this Agreement, nor shall failure to withhold payment pursuant to the provisions of this section constitute a waiver of any right, at law or in equity, which City may have if Professional is in default, including the right to bring legal action for damages or for specific performance of this Agreement. Waiver of any default under this Agreement shall not be deemed a waiver of any subsequent default. Article VI Devotion of Time, Personnel, and Equipment 6.1 Professional shall devote such time as reasonably necessary for the satisfactory performance of the services under this Agreement. City reserves the right to revise or expand the scope of services after due approval by City as City may deem necessary, but in such event City 23 shall pay Professional compensation for such services at mutually agreed upon charges or rates, and within the time schedule prescribed by City, and without decreasing the effectiveness of the performance of services required under this Agreement. In any event, when Professional is directed to revise or expand the scope of services under this Agreement, Professional shall provide City a written proposal for the entire costs involved in performing such additional services. Prior to Professional undertaking any revised or expanded services as directed by City under this Agreement, City must authorize in writing the nature and scope of the services and accept the method and amount of compensation and the time involved in all phases of the Project. 6.2 It is expressly understood and agreed to by Professional that any compensation not specified in this Agreement may require approval by the City Council of the City of The Colony and may be subject to current budget year limitations. 6.3 To the extent reasonably necessary for Professional to perform the services under this Agreement, Professional shall be authorized to engage the services of any agents, assistants, persons, or corporations that Professional may deem proper to aid or assist in the performance of the services under this Agreement. The cost of such personnel and assistance shall be borne exclusively by Professional. 6.4 Professional shall furnish the facilities, equipment, telephones, facsimile machines, email facilities, and personnel necessary to perform the services required under this Agreement unless otherwise provided herein. Article VII Relationship of Parties 7.1 It is understood and agreed by and between the Parties that in satisfying the conditions and requirements of this Agreement, Professional is acting as an independent contractor, and City assumes no responsibility or liability to any third party in connection with the services provided by Professional under this Agreement. All services to be performed by Professional pursuant to this Agreement shall be in the capacity of an independent contractor, and not as an agent, servant, representative, or employee of City. Professional shall supervise the performance of its services and shall be entitled to control the manner, means and methods by which Professional’s services are to be performed, subject to the terms of this Agreement. As such, City shall not train Professional, require Professional to complete regular oral or written reports, require Professional to devote his full-time services to City, or dictate Professional’s sequence of work or location at which Professional performs Professional’s work, except as may be set forth in Exhibit A. 7.2 Professional shall be responsible for the professional quality, technical accuracy, and the coordination of all designs, drawings, specifications, plans, and other services furnished by Professional under this Agreement. Professional shall, without additional compensation, correct or revise any errors or deficiencies in the Project Documents and other services provided under this Agreement. Neither City’s review, approval, nor acceptance of, nor payment for any of, the services provided under this Agreement, shall be construed to operate as a waiver of any rights under this Agreement, and Professional shall be and remain liable to City in accordance 24 with applicable law for all damages to City caused by Professional’s negligent performance of any of the services furnished under this Agreement. Article VIII Insurance 8.1 Before commencing work, Professional shall, at its own expense, procure, pay for and maintain during the term of this Agreement the following insurance written by companies approved by the state of Texas and acceptable to City. Professional shall furnish to the City Manager certificates of insurance executed by the insurer or its authorized agent stating coverages, limits, expiration dates and compliance with all applicable required provisions. Certificates shall reference the project/contract number and be addressed as follows: City of The Colony, Texas Attention: City Manager 6800 Main Street The Colony, Texas 75056 A. Commercial General Liability insurance, including, but not limited to Premises/Operations, Personal & Advertising Injury, Products/Completed Operations, Independent Contractors and Contractual Liability, with minimum combined single limits of $1,000,000 per occurrence, $1,000,000 Products/Completed Operations Aggregate, and $1,000,000 general aggregate. Coverage must be written on an occurrence form. The General Aggregate shall apply on a per project basis. B. Workers’ Compensation insurance with statutory limits; and Employers’ Liability coverage with minimum limits for bodily injury: 1) by accident, $100,000 each accident, and 2) by disease, $100,000 per employee with a per policy aggregate of $500,000. C. Business Automobile Liability insurance covering owned, hired and non- owned vehicles, with a minimum combined bodily injury and property damage limit of $1,000,000 per occurrence. D. Professional Liability Insurance to provide coverage against any claim which the Professional and all professionals engaged or employed by the Professional become legally obligated to pay as damages arising out of the performance of professional services caused by error, omission or negligent act with minimum limits of $2,000,000 per claim, $2,000,000 annual aggregate. NOTE: If the insurance is written on a claims-made form, coverage shall be continuous (by renewal or extended reporting period) for not less than thirty-six (36) months following completion of this Agreement and acceptance by City. 8.2 With reference to the foregoing required insurance, Professional shall endorse applicable insurance policies as follows: 25 A. A waiver of subrogation in favor of City, its officials, employees, and officers shall be contained in the Workers’ Compensation insurance policy. B. The City, its officials, employees and officers shall be named as additional insureds on the Commercial General Liability po licy, by using endorsement CG2026 or broader . C. All insurance policies shall be endorsed to the effect that City will receive at least thirty (30) days notice prior to cancellation, non-renewal, termination, or material change of the policies. 8.3 All insurance shall be purchased from an insurance company that meets a financial rating of B+VI or better as assigned by A.M. Best Company or equivalent. Article IX Right to Inspect Records 9.1 Professional agrees that City shall have access to and the right to examine any directly pertinent books, documents, papers and records of Professional involving transactions relating to this Agreement. Professional agrees that City shall have access during normal working hours to all necessary Professional facilities and shall be provided adequate and appropriate work space in order to conduct audits in compliance with the provisions of this section. City shall give Professional reasonable advance notice of intended audits. 9.2 Professional further agrees to include in subcontract(s), if any, a provision that any subcontractor agrees that City shall have access to and the right to examine any directly pertinent books, documents, papers and records of such subcontractor involving transactions related to the subcontract, and further, that City shall have access during normal working hours to all such subcontractor facilities and shall be provided adequate and appropriate work space, in order to conduct audits in compliance with the provisions of this section. City shall give any such subcontractor reasonable advance notice of intended audits. Article X Miscellaneous 10.1 Entire Agreement. This Agreement and any and all Exhibits attached hereto constitutes the sole and only agreement between the Parties and supersedes any prior or contemporaneous understandings, written agreements or oral agreements between the Parties with respect to the subject matter of this Agreement. 10.2 Authorization. Each Party represents that it has full capacity and authority to grant all rights and assume all obligations granted and assumed under this Agreement. 10.3 Assignment. Professional may not assign this Agreement in whole or in part without the prior written consent of City. In the event of an assignment by Professional to w hich 26 the City has consented, the assignee shall agree in writing with the City to personally assume, perform, and be bound by all the covenants and obligations contained in this Agreement. 10.4 Successors and Assigns. Subject to the provisions regarding assignment, this Agreement shall be binding on and inure to the benefit of the Parties and their respective heirs, executors, administrators, legal representatives, successors and assigns. 10.5 Governing Law and Exclusive Venue. The laws of the State of Texas shall govern this Agreement, and exclusive venue for any legal action concerning this Agreement shall be in a District Court with appropriate jurisdiction in Denton County, Texas. The Parties agree to submit to the personal and subject matter jurisdiction of said court. 10.6 Amendments. This Agreement may be amended only by the mutual written agreement of the Parties. 10.7 Severability. In the event any one or more of the provisions contained in this Agreement shall for any reason be held to be invalid, illegal, or unenforceable in any respect by a court of competent jurisdiction, such invalidity, illegality or unenforceability shall not affect any other provision in this Agreement, and this Agreement shall be construed as if such invalid, illegal, or unenforceable provision had never been contained in this Agreement. 10.8 Survival of Covenants and Terms. Any of the representations, warranties, covenants, and obligations of the Parties, as well as any rights and benefits of the Parties, pertaining to a period of time following the termination of this Agreement shall survive termination, including, but not limited to, Section 3.3, Article X, and, in particular, Sections 10.13 and 10.14. 10.9 Recitals. The recitals to this Agreement are incorporated herein. 10.10 Notice. Any notice required or permitted to be delivered hereunder may be sent by first class mail, overnight courier or by confirmed telefax or facsimile to the address specified below, or to such other Party or address as either Party may designate in writing, and shall be deemed received three (3) days after delivery set forth herein: If intended for City: With Copy to: Troy C. Powell Pam Nelson City Manager Community Services Director City of The Colony City of The Colony 6800 Main Street 5151 N. Colony The Colony, Texas 75056 The Colony, Texas 75056 If intended for Professional: Bob Stoffels, RLA Dunkin Sims Stoffels, Inc. 622 West State Street Garland, Texas 75040 27 10.11 Counterparts. This Agreement may be executed by the Parties hereto in separate counterparts, each of which when so executed and delivered shall be deemed an original, but all such counterparts shall together constitute one and the same instrument. Each counterpart may consist of any number of copies hereof each signed by less than all, but together signed by all of, the Parties hereto. 10.12 Exhibits. The exhibits attached hereto are incorporated herein and made a part hereof for all purposes. 10.13 Professional’s Liability. Acceptance of the Project Documents by City shall not constitute nor be deemed a release of the responsibility and liability of Professional, its employees, associates, agents or subcontractors for the accuracy and competency of their designs, working drawings, specifications or other documents and work; nor shall such acceptance be deemed an assumption of responsibility by City for any defect in the Project Documents or other documents and work prepared by Professional, its employees, associates, agents or sub-consultants. 10.14 Indemnification. PROFESSIONAL AGREES TO DEFEND, INDEMNIFY AND HOLD HARMLESS CITY FROM AND AGAINST ANY AND ALL LIABILITIES, DAMAGES, CLAIMS, SUITS, COSTS (INCLUDING COURT COSTS, ATTORNEY’S FEES AND COSTS OF INVESTIGATION) AND ACTIONS BY REASON OF INJURY TO OR DEATH OF ANY PERSON OR DAMAGE TO OR LOSS OF PROPERTY TO THE EXTENT CAUSED BY PROFESSIONAL’S PERFORMANCE OF SERVICES UNDER THIS AGREEMENT OR BY REASON OF ANY ACT OR OMISSION ON THE PART OF PROFESSIONAL, ITS OFFICERS, DIRECTORS, SERVANTS, AGENTS, EMPLOYEES, REPRESENTATIVES, CONTRACTORS, SUBCONTRACTORS, LICENSEES, SUCCESSORS OR PERMITTED ASSIGNS (EXCEPT WHEN SUCH LIABILITY, CLAIMS, SUITS, COSTS, INJURIES, DEATHS OR DAMAGES ARISE FROM OR ARE ATTRIBUTED TO THE SOLE NEGLIGENCE OF THE CITY). IF ANY ACTION OR PROCEEDING SHALL BE BROUGHT BY OR AGAINST CITY IN CONNECTION WITH ANY SUCH LIABILITY OR CLAIM, THE PROFESSIONAL, ON NOTICE FROM CITY, SHALL DEFEND SUCH ACTION OR PROCEEDINGS AT PROFESSIONAL’S EXPENSE, BY OR THROUGH ATTORNEYS REASONABLY SATISFACTORY TO CITY. PROFESSIONAL’S OBLIGATIONS UNDER THIS SECTION SHALL NOT BE LIMITED TO THE LIMITS OF COVERAGE OF INSURANCE MAINTAINED OR REQUIRED TO BE MAINTAINED BY PROFESSIONAL UNDER THIS AGREEMENT. IF THIS AGREEMENT IS A CONTRACT FOR ENGINEERING OR ARCHITECTURAL SERVICES, THEN THIS SECTION IS LIMITED BY, AND TO BE READ AS BEING IN COMPLIANCE WITH, THE INDEMNITY SPECIFIED IN § 271.904 OF THE TEXAS LOCAL GOVERNMENT CODE, AS AMENDED. THIS SECTION SHALL SURVIVE TERMINATION OF THIS AGREEMENT 10.15 Conflicts of Interests. Professional represents that no official or employee of City has any direct or indirect pecuniary interest in this Agreement. Any misrepresentation by 28 Professional under this section shall be grounds for termination of this Agreement and shall be grounds for recovery of any loss, cost, expense or damage incurred by City as a result of such misrepresentation. 10.16 Default. If at any time during the term of this Agreement, Professional shall fail to commence the services in accordance with the provisions of this Agreement or fail to diligently provide services in an efficient, timely and careful manner and in strict accordance with the provisions of this Agreement or fail to use an adequate number or quality of personnel to complete the services or fail to perform any of Professional’s obligations under this Agreement, then City shall have the right, if Professional shall not cure any such default after thirty (30) days written notice thereof, to terminate this Agreement. Any such act by City shall not be deemed a waiver of any other right or remedy of City. If after exercising any such remedy due to Professional’s nonperformance under this Agreement, the cost to City to complete the services to be performed under this Agreement is in excess of that part of the contract sum which as not theretofore been paid to Professional hereunder, Professional shall be liable for and shall reimburse City for such excess costs. 10.17 Confidential Information. Professional hereby acknowledges and agrees that its representatives may have access to or otherwise receive information during the furtherance of Professional’s obligations in accordance with this Agreement, which is of a confidential, non - public or proprietary nature. Professional shall treat any such information received in full confidence and will not disclose or appropriate such Confidential Information for Professional’s own use or the use of any third party at any time during or subsequent to this Agreement. As used herein, “Confidential Information” means all oral and written information concerning the City, its affiliates and subsidiaries, and all oral and written information concerning City or its activities, that is of a non-public, proprietary or confidential nature including, without limitation, information pertaining to customer lists, services, methods, processes and operating procedures, together with all analyses, compilations, studies or other documents, whether prepared by Professional or others, which contain or otherwise reflect such information. The term “Confidential Information” shall not include such information that is or becomes generally available to the public other than as a result of disclosure to Professional, or is required to be disclosed by a governmental authority under applicable law. 10.18 Remedies. No right or remedy granted or reserved to the Parties is exclusive of any other right or remedy herein by law or equity provided or permitted; but each right or remedy shall be cumulative of every other right or remedy given hereunder. No covenant or condition of this Agreement may be waived without written consent of the Parties. Forbearance or indulgence by either Party shall not constitute a waiver of any covenant or condition to be performed pursuant to this Agreement. 10.19 No Third Party Beneficiary. For purposes of this Agreement, including the intended operation and effect of this Agreement, the Parties specifically agree and contract that: (1) this Agreement only affects matters between the Parties to this Agreement, and is in no way intended by the Parties to benefit or otherwise affect any third person or entity notwithstanding the fact that such third person or entity may be in contractual relationship with City or Professional or both; and (2) the terms of this Agreement are not intended to release, either by 29 contract or operation of law, any third person or entity from obligations owing by them to either City or Professional. EXECUTED this _______ day of _____________________, 20___. City of The Colony, Texas By: City Manager Attest: City Secretary EXECUTED this _______ day of _____________________, 20___. Professional By: Name: ____________________________________ Title: ____________________________________ Attest: Corporate Secretary 30 1 622 West State Street Garland, Texas 75040 (214) 553-5778 DUNKIN SIMS STOFFELS Inc. September 16, 2021 Eve Morgan Park Development Manager City of The Colony 5151 North Colony Blvd The Colony, Texas 75056 Dear Ms. Morgan: We appreciate the opportunity to submit this scope of services for the Kid’s Colony Splash Park – Phase II. Dunkin Sims Stoffels (DSS), working with the City of The Colony, will develop design and construction documents for the Kid’s Colony Splash Park – Phase II. PROJECT SCOPE A schematic master plan for the Kid’s Colony Playground was prepared in 2009. Phases I and II were completed in 2011 and 2014, respectively. Kids Colony Splash Park – Phase I is currently under construction. Kid’s Colony Splash Park – Phase II is the continued construction of the City’s premier community playground. Facilities included in Kids Colony Splash Park – Phase II development include the enhanced spray features in the splash park, fitness area, parking lot expansion, restroom building, shade canopies and associated site pavement and utilities. Schematic Design DSS, with input from City Staff and the manufacturer’s representatives of the splash park features, restroom building and fitness equipment will refine the Kids Colony Splash Park – Phase II site plan. An opinion of probable cost (OPC) will be prepared for construction of the Kids Colony Splash Park – Phase II features. DSS will submit the schematic design and OPC to City Staff for their review and comment. Design Development DSS will further analyze the Kids Colony Splash Park – Phase II and propose refined design recommendations and solutions for additional review and comment by City Staff. The OPC will be refined and updated to reflect design modifications proposed within the design development phase. 31 2 Construction Documents and Specifications Construction documents and specifications will be prepared for the Kids Colony Splash Park – Phase II components outlined within the project scope. Dunkin Sims Stoffels, Inc. will perform the following tasks in this section of the project:  Grading plan  Erosion Control plan  Layout Plan(s) locating the park features, shade canopies, parking lot expansion, concrete pavement, restroom building, fitness equipment, utilities, etc.  Construction Details providing plans, sections, and/or elevations of the individual elements of the project.  Assist with preparation of forms for BuyBoard Proposals.  Prepare the project specification manual.  Prepare the final opinion of probable cost. BuyBoard Proposals The Consultant will assist City Staff in procuring BuyBoard proposals from the various manufacturers for the construction of Phase II of the Kids Colony Splash Park. Construction Observation The Consultant will perform the following professional services during construction of Kids Colony Splash Park – Phase II:  Consultation and provide advice to the City.  Preparation of elementary and supplementary sketches required to resolve field conditions.  Approval of submittals and shop drawings submitted by contractor for conformance with the design concept.  The Consultant shall make periodic site visits to determine if the project is proceeding in accordance with the contract documents. The Consultant shall not be responsible or liable for the Contractor's failure to perform the construction work in accordance with the contract documents. DSS has included seven (7) site visits within our construction observation scope; based upon an anticipated construction length of three months.  Review and approval of all certificates for payment submitted by the Contractor.  Prepare Change Orders for the City's approval and execution.  Coordinate final site walk through with the City at the conclusion of the construction and provide a punch list to Contractor to complete the project. Following substantial completion and/or final acceptance, the Consultant will prepare one set of record drawings. The record drawings will be based on written record of observations by the City’s Inspectors and information provided by the Contractor through written records and construction mark-ups made to the project record drawings and specifications. If desired the Consultant will provide AutoCAD, version 2018 drawing files of the record drawings. This AutoCAD file will be one drawing file with all of the information encompassed within it and paper space delineation of each individual sheet. There will not be a separate AutoCAD drawing file for each sheet within the drawing set. 32 3 Additional Services Project Meetings - The Consultant has allowed for a total of two (2) meetings within the schematic design, design development and construction document phases. Additional meetings or public hearings with City Boards or other governmental bodies will be considered additional services and billed at the hourly rates outlined within this agreement. Design Changes/Increased Scope - Any substantial design changes following preparation of design development documents and/or commencement of construction documents, as well as, increased project scope will be considered an additional service and the Consultant may invoice for the resultant changes to the construction documents and increased services at the hourly rates outlined within this agreement. Preparation of Alternates – Should the City request design alternates be prepared for bidding that increase the project scope or exceed the current construction budget the Consultant may invoice the City, in addition to the original contract amount, for the hours expended in preparing the alternates; at the hourly rates outlined within this agreement. COMPENSATION The Consultant’s professional fee for the scope of services, exclusive of the subsidiary services and reimbursable expenses delineated within this proposal, is $59,000.00*, this fee shall not be exceeded without written authorization. The professional fees for the services outlined within the separate phases of work delineated within the proposal are as follows: Schematic Design $ 2,950.00 Design Development $ 5,900.00 Construction Documents $ 29,500.00 BuyBoard Proposals $ 5,900.00 Construction Observation $ 14,750.00 Total Professional Fee: * $ 59,000.00 * Exclusive of reimbursable expenses 33 4 For billing purposes and additional services, the following hourly rates shall be used: DSS Principal $150.00 per hour Landscape Architect $110.00 per hour Project Manager – C.E. $140.00 per hour Civil Engineer $130.00 per hour Electrical Engineer $130.00 per hour LiDAR Scanning (Survey) $250.00 per hour Survey Field Crew (3 man) $140.00 per hour Survey Field Crew (2 man) $120.00 per hour GPS Field Crew (1 man) $100.00 per hour Surveyor (RPLS) $100.00 per hour Surveyor in Training (SIT) $ 80.00 per hour Survey Technician $ 70.00 per hour CAD Technician $ 90.00 per hour Technical Support $ 75.00 per hour Administrative $ 50.00 per hour Reimbursable Expenses: Reimbursable items may include delivery charges, postage, CAD Plots, commercial printing/reproduction charges, preparation of presentation boards. The cost for the reimbursable items represents an ‘out-of-pocket’ expense to the consultant and shall be billed at the consultant’s direct incurred cost. Another reimbursable cost is the fee for submittal of the plans and specifications to a third party Registered Accessibility Specialist (RAS) for the required Texas Department of Licensing and Regulation’s (TDLR) Architectural Barriers plan review and post-construction inspection. There is also a TDLR project registration fee. Any cost associated with certification of ADA compliance, if applicable, will be considered a reimbursable expense. The following list delineates anticipated costs for reimbursable expenses, as defined within this proposal. Reimbursable Expenses – Budgetary $ 2,500.00 TAS Registration, Plan Review & Post Construction Inspection $ 1,750.00 Total: $ 4,250.00 Consultant Invoices will be submitted monthly as the professional services are completed. Invoices will be based on percentage of work completed per identifiable unit of work. The City agrees to make prompt payments for all approved invoices. 34 5 INDEMNIFICATION The Consultant shall indemnify and does hereby hold harmless, the City, its agents and employees from and against all claims, damages, losses and expenses, including attorney’s fees, arising out of or resulting from the negligent performance of the services on this project performed by the Consultant, its employees, sub-contractors, agents and representatives and others from whom the Consultant is legally liable. TERMINATION This Agreement may be terminated without cause at any time prior to completion of the Consultant’s services, by the City or by the Consultant with cause, upon seven days written notice to the City at the address of record. Termination shall release each party from all obligations of this Agreement. Upon notice of termination, the Consultant shall prepare and submit to City a final invoice within thirty (30) days. AUTHORIZATION DSS is prepared to initiate work on this project upon receipt of a signed copy of this agreement or upon execution of a professional services agreement with the City of The Colony. We look forward to working with The Colony’s Park and Recreation Department on Kid’s Colony Splash Park – Phase II. Sincerely, Dunkin Sims Stoffels, Inc. ACCEPTED AND APPROVED BY: ____________________________ Bob Stoffels, RLA (Signature) ____________________________ (Typed Name) ____________________________ (Title) AUTHORIZED TO EXECUTE AGREEMENTS FOR: ____________________________ 35 6 ATTACHMENT ‘A’ PROFESSIONAL FEE SCHEDULE Kid’s Colony Splash Park – Phase II The Colony, Texas PROFESSIONAL DESIGN SERVICES Schematic Design $ 2,950.00 Design Development $ 5,900.00 Construction Documents $ 29,500.00 BuyBoard Proposals $ 5,900.00 Construction Observation $ 14,750.00 Professional Design Services Total: $ 59,000.00 Reimbursable Expenses: $ 2,500.00 TAS Registration, Plan Review & Post Construction Inspection: $ 1,750.00 TOTAL: $ 63,250.00 36 Sept. 29, 2021Oct. 27, 2021Nov. 24, 2021Dec. 22, 2021Jan. 19, 2022Feb. 16, 2022March 16, 2022March 13, 20221st Week2nd Week3rd Week4th Week5th Week6th Week7th Week8th Week9th Week10th Week11th Week12th Week13th Week14th Week15th Week16th Week17th Week18th Week19th Week20th Week21st Week22nd Week23rd Week24th Week25th Week26th Week27th Week28th Week29th WeekSchematic Design Design Development Construction Documents Construction Document Review BuyBoard Proposal Building Permit Process Construction Meeting with City Staff Construction Contract Approval Project Timeline KIDS' COLONY PHASE III The Colony, Texas September 16, 2021 Construction * *   Three to Five Months * * 37 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - _______ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT FOR PROFESSIONAL SERVICES TO DUNKIN SIMS STOFFELS, INC., FOR THE KIDS COLONY SPLASH PARK PHASE 2; PROVIDING AN EFFECTIVE DATE NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: Section 1.That the City Council of the City of The Colony, Texas, has duly reviewed and considered the agreement for the Kids Colony Splash Park Phase 2 by and between the City of The Colony and Dunkin Sims Stoffels, Inc., with funding from the Community Development Corporation. Section 2. That this agreement is found to be acceptable and in the best interest of the City and its citizens, and the City Manager is hereby authorized to execute the agreement on behalf of the City of The Colony, Texas, with the terms and conditions as stated therein. Section 3. That with this agreement the City of The Colony is agreeing to pay the sum not to exceed the estimated amount of $63,250.00 for such work. Section 4.That this resolution shall take effect immediately from and after its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THIS 3RD DAY OF NOVEMBER 2021. __________________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: __________________________________ Tina Stewart, TRMC, CMC City Secretary APPROVED AS TO FORM: __________________________________ Jeff Moore, City Attorney 38 Agenda Item No:4.4 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Shannon Stephens Submitting Department: Fire Item Type: Resolution Agenda Section: Subject: Consider approving a resolution authorizing the City Manager to execute a seven-year lease agreement with Stryker Sales, LLC for the provision of City of the Colony Facility automatic external defibrillators (AEDS), The Colony Police Department AEDS, and The Colony Fire Department monitor/defibrillators, Lucas chest compression systems, and emergency patient transport devices in the amount of $159,649.90. (Thompson) Suggested Action: This is a component of the planned 21/22 capital improvement project list. Attached are the required lease agreements, public organization rider, insurance verification coordinated through COTC Finance, and review confirmation from Jeff Moore. Attachments: Lease Agreement.pdf Public Org Rider.pdf Insurance Verification.pdf Counsel Opinion.pdf Res. 2021-xxx Stryker Sales LLC Lease Agreement.docx 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - ________ A RESOLUTION OF THE CITY OF THE COLONY, TEXAS AUTHORIZING THE CITY MANAGER TO APPROVE A SEVEN-YEAR LEASE AGREEMENT WITH THE STRYKER SALES, LLC; PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: Section 1. That the City Council of the City of The Colony, Texas hereby authorizes the City Manager to approve a sever-year lease agreement with Stryker Sales, LLC for the provision of City of The Colony Facility automatic external defibrillators (AEDS), The Colony Police Department (AEDS), and The Colony Fire Department monitor/defibrillators, Lucas chest compression systems, and emergency patient transport devices in the amount of $159,649.90. Section 2. That the City Manager or his designee is authorized to approve the interlocal agreements. Section 3. That this resolution shall take effect immediately from and after its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY O9F THE COLONY, TEXAS THIS 3RD DAY OF NOVEMBER 2021. ______________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: ____________________________________ Tina Stewart, TRMC, CMC, City Secretary APPROVED AS TO FORM: ___________________________________ Jeff Moore, City Attorney 54 Agenda Item No:4.5 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Shannon Stephens Submitting Department: Fire Item Type: Resolution Agenda Section: Subject: Consider approving a resolution authorizing the City Manager to issue a purchase order to Frazier Ambulance in the amount of $278,732.00 for the purchase of a new ambulance to replace Medic 12 assigned to Fire Station #2 (Thompson) Suggested Action: This purchase request is an approved and planned budget item from this fiscal year's CIP list. Attachments: 2022 Frazier Ambulance.pdf Res. 2021-xxx Frazier Ambulance - Fire Department Purchase Order.docx 55 56 57 58 59 60 61 62 63 64 65 66 67 68 69 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - _________ A RESOLUTION OF THE CITY OF THE COLONY, TEXAS AUTHORIZING THE CITY MANAGER TO ISSUE A PURCHASE ORDER TO FRAZIER AMBULANCE, FOR THE PURCHASE OF A NEW AMBULANCE TO REPLACE MEDIC 12 ASSIGNED TO FIRE STATION NO. 2; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: Section 1. That the City Council of the City of The Colony, Texas hereby authorizes the City Manager to issue a purchase order to Frazier Ambulancein theamount of $278,732.00 for the purchase of a new ambulance to replace Medic 12 assigned to Fire Station No. 2. Section 2. That the City Manager or his designee authorized to issue said purchase order. Section 3. That this resolution shall take effect immediately from and after its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THIS 3RD DAY OF NOVEMBER 2021. _____________________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: __________________________________ Tina Stewart, TRMC, CMC, City Secretary APPROVED AS TO FORM: __________________________________ Jeff Moore, City Attorney 70 Agenda Item No:4.6 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Robert Kotasek Submitting Department: Engineering Item Type: Resolution Agenda Section: Subject: Consider approving a resolution authorizing the City Manager to execute an Engineering Services Contract in the amount of $67,780.00 with Birkhoff, Hendricks & Carter, L.L.P. to prepare construction plans and specifications for the Squires Drive 8-inch Waterline Replacement and Vaden Street 8-inch Waterline Extension Project. (Hartline) Suggested Action: Summary of Request: Consider approval of a resolution authorizing the City Manager to sign an Engineering Services Contract in the amount of $ 67,780.00 with Birkhoff, Hendricks & Carter, L.L.P. to prepare construction plans and specifications for the Squires Drive 8-inch Waterline Replacement and Vaden Street 8-inch Waterline Extension. City Council approved funding for these projects in the 2021/2022 CIP budget. This design project will include the replacement of approximately 3,000 linear feet of 8-inch ductile iron water line along Squires Drive to Underwood Drive. The existing waterline has experienced significant corrosion and numerous water leaks have been repaired on this section of pipe over the last couple of years. This project will also include extending the Vaden Street 8-inch dead-end water line to Taylor Street to provide a looped connection to assist in providing better water quality in this area. The water lines will be installed within existing right-of-way. The design contract includes topographic survey, utility locates, preparing construction plans and specifications, bidding assistance and construction management services. The total cost of the contract with Birkhoff, Hendricks & Carter, L.L.P is $ 67,780.00. With approval, the project is anticipated to start construction in June 2022 with an estimated completion in October 2022. Recommendation: Staff recommends approval of the contract with Birkhoff, Hendricks & Carter, L.L.P. for the design of the Squires Drive 8-inch Waterline Replacement and Vaden Street 8-inch Waterline Extension project. Suggested Motion: I move to recommend approval of a resolution authorizing the City Manager to sign an Engineering Services Contract in the amount of $ 67,780.00 with Birkhoff, Hendricks & Carter, L.L.P. to prepare construction plans and specifications for the Squires Drive 8-inch Waterline Replacement and Vaden Street 8-inch Waterline Extension. 71 Attachments: Location Map Engineering Design Contract Agreement Scope of Services Financial Summary Res. 2021-xxx Engineering Servics Contract - Birkhoff, Hendricks and Carter LLP.doc 72 BakerFoxNorth Colony Ragan Tu r ne r S q u i r e s Nash Slay TaylorPaigeReed Rice Gates MillerTrego Tr uit t PruittPerrin CarrollLongo AdamsWilcox Gibson Treese Roberts Pearce NorthpointeShermanPhelps Te r ry Russell Powers Bedford Crawfor d Walker Ashlock SampleSagers Blair OaksRutledge Wagner Ramsey KingAl l enDoo le y Young Yager Poole John YatesScottPettitMadison Mc a f ee V a d e n Wheeler Dunn Thompson Watkins T y l e rWard Kisor Morning StarNation Shannon BlalockUnderwood Mages T w i t t y Woodruff Paint er T u c k e r IndependenceWatson V a n c e Overland Bog ard Dee ColeRearn Wampler Pilgrim STARLI NGMatsonU s h e r Bentley Vanguard HIDALGO FosterA L C O V E KENNEDY C olu m bus JenningsM ayflo w er W oodlandsGarrettBradford TusconLoving PaigeµLocation MapSquires Drive 8-inch Waterline Replacement and Vaden Street 8-inch Waterline Extension. Squires Drive 8-inch Waterline Replacement Existing City Park Vaden Street 8-inch Waterline Extension 73 74 75 76 77 78 79 80 81 82 83 84 FINANCIAL SUMMARY: Are budgeted funds available: Yes Amount budgeted/available: $ 600,000.00 (Squires Drive 8-inch Waterline Replacement) $ 50,000.00 (Vaden Street 8-inch Waterline Extension) Fund(s) (Name and number): Squires Drive 8-inch Waterline Replacement: Fund: 895-669-6422 Project number: 2276 Vaden Street 8-inch Waterline Extension: Fund: 865-661-6660 Project Number 2277 Source of Funds: 2021-2022 Capital Outlay Bond Proceeds Cost of recommended contract award: $ 67,780.00 Total estimated project cost: $ 67,780.00 Engineering Already authorized Yes  No $ 67,780.00 Total estimated costs 85 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - ______ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING AN ENGINEERING SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND BIRKHOFF, HENDRICKS AND CARTER, L.L.P.,FOR CONSTRUCTION PLANS AND SPECIFICATIONS FOR THE SQUIRES DRIVE 8-INCH WATERLINE REPLACMENT AND THE VADEN STREET 8-INCH WATERLINE EXTENSION PROJECT; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City and Consultant have entered into an Engineering Services Contract that includes surveying, preparing construction plans, specifications and drawings, estimates and construction management for the Squires Drive 8-inch Waterline Replacement and the Vaden Street 8-inch Waterline Extension Project; and WHEREAS, the City has determined that it is in the best interest of the City to enter into the Contract with Birkhoff, Hendricks and Carter, L.L.P., which is attached hereto and incorporated herein by reference as Exhibit “A”under the terms and conditions provided therein; and WHEREAS, with this Contract the City of The Colony is agreeing to the services no to exceed the amount of $67,780.00 for such work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THAT: Section 1.The Engineering Services Contract, which is attached hereto and incorporated herein as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved. Section 2. The City Manager is hereby authorized to execute the Contract on behalf of the City of The Colony, Texas. Section 3.This Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THIS 3RD DAY OF NOVEMBER 2021. _____________________________ Joe McCourry, Mayor City of The Colony, Texas 86 ATTEST: _______ Tina Stewart, TRMC, CMC, City Secretary APPROVED AS TO FORM: Jeff Moore, City Attorney 87 Agenda Item No:4.7 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Robert Kotasek Submitting Department: Engineering Item Type: Resolution Agenda Section: Subject: Consider approving a resolution authorizing the City Manager to execute an Engineering Services Contract in the amount of $66,000.00 with Teague, Nall & Perkins, Inc. to prepare construction plans and specifications for pavement resurfacing of Elm Street, Witt Road and East Lake Highlands. (Hartline) Suggested Action: Summary of Request: Consider approval of a resolution authorizing the City Manager to sign an Engineering Services Contract in the amount of $ 66,000.00 with Teague, Nall & Perkins, Inc. to prepare construction plans and specifications for pavement resurfacing of Elm Street, Witt Road and East Lake Highlands. City Council approved funding for these projects in the 2021/2022 CIP budget. This design project will include the resurfacing of Elm Street and Witt Drive with asphalt pavement. This project also includes the reconstruction of East Lake Highlands Drive and converting it from an asphalt street to a concrete roadway. The design contract includes topographic and boundary surveys, geotechnical investigation, utility locates, preparing construction plans and specifications, bidding assistance and construction management services. No drainage or utility work will be performed during this project; only subgrade repairs, the installation of water and sewer services to vacant lots and repaving/resurfacing are included. Recommendation: Staff recommends approval of the contract with Teague, Nall & Perkins, Inc. for plans and specifications for pavement resurfacing of Elm Street, Witt Road and East Lake Highlands. Suggested Motion: I move to recommend approval of a resolution authorizing the City Manager to sign an Engineering Services Contract in the amount of $ 66,000.00 with Teague, Nall & Perkins, Inc. to prepare construction plans and specifications for the pavement resurfacing of Elm Street, Witt Road and East Lake Highlands. 88 Attachments: Location Map Professional Services Agreement Scope of Services Financial Summary Res. 2021-xxx Engineering Servics Contract - Teague, Nall and Perkins, Inc..doc 89 MainNor th ColonyElm ReedCurryLarner Nervin Hale PruittRagan WilcoxShore Carr Jenkins August aKnightAshlock Wagner ElliotChapman Walker Wheeler Lake Highlands ShermanAl l enWoodruff FryerWitt Watkins Lakecrest Ward YoungerAndersonWaters Edge JoyWatsonLake ParkHorseshoe G a r v i nLakelandOak WamplerForestOverlake L a k e vie w I o l a H a m i l t o n G r a h a m Blair OaksMillerSu ns e t Haven HillsJohn Yates Bevily M a l o n e GarrettD r i s c o l l Chowning M i m o s a W illo wLaurel Harris Plaza MainWaters EdgeMainµLocation MapPavement Resurfacing of Elm Street, Witt Road and East Lake Highlands. Elm Street Asphalt Resurfacing Existing City Park Witt Road Asphalt Resurfacing East Lake Highlands ConcretePavement Reconstruction 90 Exhibit A Scope of Services SCOPE OF BASIC SERVICES: In general, the scope of Basic Services will be to provide professional engineering and surveying services for preparation of construction plans and bid documents for The Colony CIP Asphalt and Concrete Streets project (Total length 2,160 LF). Attachment ‘A’ exhibit reflects the project limits. The streets that will be part of this project are: Concrete Street: E Lake Highlands (330 LF) Asphalt Streets: Elm Street (E Lake Highlands to Witt Road) (1,425 LF) Witt Road (405 LF) The scope of work is more specifically outlined below. Design Survey Professional shall provide the following professional surveying services: •Topographic Design Survey for approximately 420 linear feet of street improvements along a portion of East Lake Highlands Drive. The survey limits will extend to the approximate right-of-way on each side of the street. The Survey will identify topography (one-foot contours), visible features and above ground improvements including pavement, curbs, structures, fences, sidewalks, utilities, valves, manholes, hydrants and other pertinent features within the project area as necessary for engineering design. A minimum of 2 (two) benchmarks will be provided at strategic locations within or near the project area for future reference. •Cross-sections will be provided for approximately 2100 linear feet of street improvements along Elm Street and a portion of Witt Drive. The sections will be taken at intervals of approximately 50 feet and will extend to the outer ditch bank on each side of the street. A minimum of 3 (three) benchmarks will be provided at strategic locations within or near the project area for future reference. Boundary surveys, right-of-way surveys, tree locates and underground utility information, including invert measurements, are not included in the scope of services proposed herein. Texas811 will be notified to coordinate marking of underground utilities. However, lacking excavation, the exact location of underground utilities and features cannot be accurately, completely, and reliably depicted. In some jurisdictions, 811 or other similar utility locate requests from surveyors may be ignored or result in an incomplete response. Where additional or more detailed information is required, the CITY is advised that excavation may be necessary. All survey information provided by the Professional will be referenced to Grid North of the Texas Coordinate System of 1983 {North Central Zone No. 4202; NAD83(2011) Epoch 2010} as derived locally from Allterra Central’s continuously operating reference stations via real time kinematic survey methods. Elevations will be referenced to NAVD88 datum as derived from RTK observations. Orthometric heights will be calculated by applying the Geoid 12B model to ellipsoid heights. 91 Professional shall perform all surveying services in accordance with the General Rules and Procedures of Practice, and the Professional and Technical Standards established by the Texas Board of Professional Engineers and Land Surveyors. Geotechnical Investigation The Professional will contract with a Geotechnical firm (Sub-consultant) to provide geotechnical investigation and provide a report of the findings and recommendations. Borings will be taken as needed to verify thickness of existing materials and to identify subgrade soils and strata to support subgrade recommendations at the various sites. A total of five borings are assumed to a depth of five feet using a truck-mounted drilling rig. Samples will be collected and tested, and the holes backfilled. Tests will include the following: Moisture content Atterberg limits Percent passing No. 200 sieve Soluble Sulfates Lime Series An engineering report will be prepared outlining the results of the tests, along with pavement and subgrade recommendations. The boring locations will be as identified by the Sub-consultant and will be sampled on all the streets identified in this scope of work at one time. Construction Plans & Bid Documents The Professional will evaluate the geotechnical and survey data and include typical section based on the geotechnical pavement recommendations and City requirements. The Professional will develop construction plans for the streets based on the survey and geotechnical data and applicable City requirements. The design intent for Elm and Witt will be full depth asphalt pavement replacement with the addition of concrete ribbon curbs and roadway embankment grading as required. Existing bar ditches will not be changed, and street grades will remain unchanged except as necessary to ensure an adequate crown is maintained for proper drainage. The proposed streets will match all existing concrete driveways and will include an asphalt apron for each existing asphalt or gravel driveway. The design intent for East Lake Highlands is to replace the existing asphalt bar-ditch with a concrete curb-and-gutter section. No utility work or drainage work is anticipated on any of the streets except installation of water and sewer services to all vacant, platted lots. The scope is based on the understanding that East Lake Highlands Drive will be paved as a concrete curb and gutter section in order to match up with the curbed sections on either end. This design effort will deviate from the rest of the project in that this will include plan, profile, and sections to design for the elevation change. Elm Street and Witt Drive will be pavement reconstruction only, therefore will not include profiles or cross sections, however typical sections will be provided for all streets including pavement and base thicknesses and pavement dimensions. Deliverables: Deliverables for the project will include sets of 22”x34” construction plans, sets of 11”x17” construction plans, copies of the project manual (defined in the construction documents section below), copies of the Opinion of Probable Construction Cost (OPCC), and an electronic (PDF) version of all the documents delivered via electronic file share. Each submittal package will include the items more specifically listed below: 92 Preliminary Plans (60%) o 4 sets of 11”x17” construction plans o 2 copies of the Project Manual o 4 copies of the OPCC o Electronic versions of each document Final Plans (90%) o 4 sets of 11”x17” construction plans o 2 copies of the Project Manual o 4 copies of the OPCC o Electronic versions of each document Bid Documents (100%) o 5 sets of sealed 22”x34” construction plans o 5 copies of the Project Manual o 5 copies of the OPCC o Electronic versions of each document Conformed documents for construction (after bidding and incorporating all addenda): o 2 sets of 22”x34” construction plans o 10 sets of 11”x17” construction plans o 3 copies of the Project Manual o Electronic versions of each document Specific items to be included with the construction plans and the project manual are listed below The construction plans will include: Cover Sheet General Notes and Typical Sections o General Project notes o City standard notes relative to paving construction o Traffic control notes o Asphalt typical sections o Concrete typical section Asphalt Street Plans (Elm Street and Witt Drive): o Pavement alignment and reconstruction limits (no profiles or cross sections) o Typical pavement sections o Driveway connections o Water and sewer services to be replaced o New water and sewer services o Call out utilities to be adjusted as needed Concrete Street Plans (East Lake Highlands Drive): o Pavement alignment and reconstruction limits with design profiles o Proposed cross sections o Typical pavement section o Driveway connections o Call out utilities to be adjusted as needed o Water and sewer services to be replaced o New water and sewer services Detail Sheets Special construction details Applicable City standard details TxDOT Traffic Control Details 93 The Project Manual will include: City standard Contract Provisions Notice to bidders Special instructions to bidders Pay item list / bid form City insurance requirements Bonds Project technical specifications Geotechnical boring logs TxDOT Permitting The Professional will provide plans for maintenance permit applications to TxDOT for improvements within the ROW of FM 423 if required. Bid Support The Professional will provide up to 10 hard copy sets and an electronic version of the bid documents for use in bidding, award of contracts and construction. The City will be responsible for advertisement for bids and for dispersing all plans and specifications to prospective bidders. The Professional will provide technical support to the City during the bidding and contract award phase by responding to questions, reviewing the bids, preparing a bid tabulation, and making a recommendation of award to the City. This task will be billed at hourly rates. Construction Phase Services The Professional will provide construction support services as requested by the City staff. The likely services are as follows: The Professional will attend and participate in a preconstruction meeting with the Contractor and City staff to identify points of contact and clarify any construction issues. The Professional will visit the site on an irregular basis as necessary, up to 6 visits are assumed. The Professional will consult and advise the City, prepare routine change orders as required, review shop drawings submittals and materials testing reports, make monthly pay recommendations based on contractor pay requests, address questions during construction, and coordinate with the field inspector. This task will be billed at hourly rates. Project Close Out The Professional will create record plans based on construction changes and contractor markups and will provide one hard copy of the record plans and electronic copies in PDF, TIFF, and CAD formats. ASSUMPTIONS AND EXCLUSIONS 1.The fees shown are for the scope of work as indicated above. Changes in the scope of work will require a reconsideration of the fees shown or may be completed as Additional Services. 2.No boundary surveying is included in the scope of this agreement. 3.The scope of this agreement does not include construction staking, construction inspection or materials testing. However, all these services can be provided upon request. 4.No subsurface utility designating or locating will be completed as part of the scope of this agreement. 5.It is assumed that project specific traffic control and project sequencing will be the responsibility of 94 the contractor, therefore no project specific traffic control plans will be prepared as part of the scope of this agreement. The Professional will provide criteria (allowable lane closures, etc.) and standard details (i.e., TxDOT) for the contractor to use in preparing project specific traffic control plans. 6.It is understood that the roadside ditches may or may not have the capacity to convey any specific design storm. It is assumed that ditch modifications will not be made, therefore no roadside ditch capacity calculations will be performed. 7.All the streets listed above will be bid as one complete project. 8.No Public meetings or presentations were included in the scope of this agreement. 95 Exhibit B Compensation COMPENSATION to be on a basis of the following: BASIC SERVICES FEE: The CITY agrees to pay the Professional the following fees for BASIC SERVICES as outlined below (Time and material not to effect). BASIC SERVICES shall be in accordance with payment terms. Design Survey Fixed Fee $ 8,500 Geotechnical Investigation Fixed Fee $ 7,000 Construction Plans Fixed Fee $ 35,000 TxDOT Permitting Fixed Fee $ 2,000 Bid Support Hourly Not to Exceed $ 4,500 Construction Phase Services Hourly Not to Exceed $ 5,000 Project Closeout Hourly Not to Exceed $ 2,000 Direct Expenses ~3%$ 2,000 Total $ 66,000 The Professional will not exceed the total fee of $66,000 without written authorization from the CITY 1.BASIC SERVICES FIXED FEE: The CITY agrees to pay the Professional the fees shown above for the tasks identified above as Fixed Fee tasks. BASIC SERVICES shall be in accordance with payment terms. 2.BASIC SERVICES HOURLY: The Professional shall be compensated on an hourly basis for those tasks identified above as Hourly tasks. Payment will be at Professional’s standard hourly rates for personnel working on the project. A schedule of Professional’s hourly rates is provided as Attachment ‘B’. Services shall be billed monthly based on actual time spent working on the project by Professional’s staff. The fees shown above for hourly services are estimates only. The Professional makes no guarantee that the fees will not exceed the amounts shown. The Professional will not exceed the fees without written authorization CITY prior to exceeding the estimated fees shown. 3.ADDITIONAL SERVICES: ADDITIONAL SERVICES shall be any service provided by the Professional which is not specifically included in BASIC SERVICES as defined above. ADDITIONAL SERVICES shall be considered additional work and shall be reimbursed at standard TNP hourly rates or TNP standard rates for items provided in-house, or direct expenses times a multiplier of 1.10 for non-labor, subcontract or mileage items. 4.PAYMENT TERMS: Per the Provisions identified in Attachment ‘C’, the CITY shall be billed monthly for services rendered and pay promptly upon receipt of invoice. Billings for fixed fee services shall be based on the percentage of work complete. Delays of payment in excess of 30 days from invoice date may result in cessation of services until payment is received. Additionally, Professional may withhold all work products and documents until payment is received in full. Time shall be added to the project schedule for any work stoppages resulting from CITY’s failure to 96 render timely payment. 5.Agreement by CITY to this contract acknowledges available funding for the proposed services provided by the Professional. Payment for services shall not be contingent upon the CITY’s available project specific funds or anticipated future funding. 97 Exhibit C Schedule SCHEDULE: The project will proceed generally as follows: The design survey and geotechnical investigation will be conducted concurrently. Construction Plans and Bid Documents Design Survey:Will begin within ten working days of written authorization Preliminary Plans and Project Manual (60%):12 weeks from written authorization Final Plans and Project Manual (90%):6 weeks from receipt of preliminary comments Bid Documents and Project Manual (100%):4 weeks after receipt of final comments 98 Exhibit D Project Map 99 The Colony Streets Man hour projections TNP No. 250 230 175 160 125 110 140 175 Labor Round to Basic Services Survey 3 18 30 8,460$ 8,500$ Geotechnical (incl traffic ctrl)7,000$ 7,000$ Construction Plans 5 14 49 26 86 64 34,995$ 35,000$ TxDOT Permit Assistance 8 6 2,060$ 2,000$ Bid Support Services 8 16 4,640$ 4,500$ Construction Support 6 15 6 4,965$ 5,000$ Project Closeout 4 6 5 2,000$ 2,000$ 3% Direct Expenses 1,924$ 2,000$ SUBTOTAL 5 31 88 32 86 70 18 30 66,044$ 66,000$ Total October 20, 2021 Field Crew Principal Team Leader Project Manager Project Engineer Engineer I/II CAD Technicia Sr .Survey Technicia 100 FINANCIAL SUMMARY: Are budgeted funds available: Yes Amount budgeted/available: $ 70,000.00 Fund(s) (Name and number): Fund: 895-669-6420 Project number: 2261 Source of Funds: 2021-2022 Capital Outlay Bond Proceeds Cost of recommended contract award: $ 66,000.00 Total estimated project cost: $ 66,000.00 Engineering Already authorized Yes  No $ 66,000.00 Total estimated costs 101 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - ______ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING AN ENGINEERING SERVICES CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND TEAGUE, NALL AND PERKINS, INC., FOR CONSTRUCTION PLANS AND SPECIFICATIONS FOR THE PAVEMENT RESURFACING OF ELM STREET, WITT ROAD AND EAST LAKE HIGHLANDS PROJECT; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City and Consultant have entered into an Engineering Services Contract that includes surveying, preparing construction plans, specifications and drawings, estimates and construction management for the pavement resurfacing of Elm Street, Witt Road and East Lake Highlands Project; and WHEREAS, the City has determined that it is in the best interest of the City to enter into the Contract with Teague, Nall and Perkins, Inc., which is attached hereto and incorporated herein by reference as Exhibit “A”under the terms and conditions provided therein; and WHEREAS, with this Contract the City of The Colony is agreeing to the services no to exceed the amount of $66,000.00 for such work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THAT: Section 1.The Engineering Services Contract, which is attached hereto and incorporated herein as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved. Section 2. The City Manager is hereby authorized to execute the Contract on behalf of the City of The Colony, Texas. Section 3.This Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THIS 3RD DAY OF NOVEMBER 2021. _____________________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: 102 _______ Tina Stewart, TRMC, CMC, City Secretary APPROVED AS TO FORM: Jeff Moore, City Attorney 103 Agenda Item No:4.8 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Tina Stewart Submitting Department: Police Item Type: Resolution Agenda Section: Subject: Consider approving a resolution authorizing the City Manager to accept a bid from Next Gen Construction in the amount of $210,400.00 for the Police Department Roof Recover Project. (Shallenburger) Suggested Action: Attachments: Next Gen Construction Bid.pdf Res. 2021-xxx Next Gen Construction Bid.docx 104 105 106 107 108 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 – ________ A RESOLUTION OF THE CITY OF THE COLONY, TEXAS AUTHORIZING THE CITY MANAGER TO ACCEPT THE BID FROM NEXT GEN CONSTRUCTION FOR THE POLICE DEPARTMENT ROOF RECOVER PROJECT; PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: Section 1. That the City Council of the City of The Colony, Texas hereby authorizes the City Manager to accept a bid from Next Gen Construction, in the amount of $210,400.00 for construction services in the Police Department for the roof recover project. Section 2. That the City Manager or his designee is authorized to accept the bid. Section 3. That this resolution shall take effect immediately from and after its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THIS THE 3RD DAY OF NOVEMBER 2021. _____________________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: ___________________________________ Tina Stewart, TRMC, CMC, City Secretary APPROVED AS TO FORM: ___________________________________ Jeff Moore, City Attorney 109 Agenda Item No:5.1 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Isaac Williams Submitting Department: Engineering Item Type: Discussion Agenda Section: Subject: Conduct a public hearing, discuss and consider an appeal of the Sign Board of Appeals regarding a variance from Chapter 6, Section 6-258 [Prohibited signs] to allow an off-premise LED digital sign [“Billboard”] at 3905 SH 121. The subject site is within the Business Park (BP) zoning district and the Gateway Overlay District. (Williams) Suggested Action: Please see the attached staff report, drawings, maps and associated documents for land use, site layout, recommendations Attachments: SBA21-0003 - SBOA Staff Report (CC appeal final 11-03-21).pdf SBA21-0003.pdf Attorney appeal letter (response letter and detail of proposed sign final).pdf SBA21-0003 3905 SH 121 Var (exhibit updated location final).pdf Electronic Billboard Study Deliverable (final).pdf Expert Report_Signage The Colony.pdf Site Photos (final).pdf SBOA AGENDA 09-15-21 Certified.pdf 110 1 CITY COUNCIL APPEALS MEMO AGENDA DATE: November 3, 2021 DEPARTMENT: Development Services Department SUBJECT: SBA21-0003 - 3905 SH 121 Variance Off-Premise LED Digital Sign Conduct a public hearing, discuss and consider a n appeal of the Sign Board of Appeals regarding a variance from Chapter 6, Section 6-258 [Prohibited signs] to allow an off- premise LED digital sign [“Billboard”] at 3905 SH 121. The subject site is within the Business Park (BP) zoning district and the Gateway Overlay District. APPELLANT/ OWNER/APPLICANT Appellant: Mark T. Samples et. al Frisco, TX Prime Healthcare Properties, LLC Masterplan Dallas, TX Owner: Eric and Heather Turner Wolfpack Property Group, LLC The Colony, TX Applicant: James Ramsey Media Eyes, LLC Colleyville, TX ADJACENT ZONING AND LAND USES North Business Park (BP) - Office South SH-121 East Business Park (BP) - Office Retail West Business Park (BP) - Retail BACKGROUND: May 3, 2021 the applicant submitted to the city a sign permit application at 3905 State SH 121. Review of the provided application reflected the intent to erect a new “Digital LED Billboard” sign. As this particular sign type is considered pro hibited, processing of the application paused to allow the applicant to present to the Sign Board of Appeals either an appeal of the determination that the proposed sign type is prohibited or a request for a variance to Section 6-258 [Prohibited Signs]. To this point the sign permit application process is ongoing until the conclusion of this variance request. Section 6-258 lists the billboard and off-premises signs as prohibited sign types; as amended by ordinance 2021-2437, Section 6-263 defines these sign types as the following:  Billboard: a large freestanding sign, general supported by a metal frame, and generally consisting of two (2) parallel sign faces which are oriented in opposite directions, used for the display of posters, printed, digital, or pa inted advertisements. The term “billboard” excludes other signs further defined in this Article.” 111 2 Upon notification of the sign application status, t he applicant subsequently provided a variance request to the Sign Board of Appeal s to allow the placement of the proposed sign at 3905 SH 121. The applicants request was considered at the June 16, 2021 Sign Board of Appeals meeting. The Board voted (3-0) to table consideration and leave the public hearing open to the July 21, 2021 Sign Board of Appeals meet ing. At the July 21, 2021 meeting, the Sign Board of Appeals, after hearing testimony from the adjacent property owners and the applicant, determined additional information was needed to further evaluate the request. Testimony from the adjacent property o wners suggested, the proposed sign would cause adverse economic impacts on the vacant tract immediately adjacent to the north, and to the developed medical office further to the north. The Board instructed the applicant to commission a study to determine t he potential impact placement of the proposed sign would have on the adjacent property. Findings of the SH 121 Electronic Billboard Economic Impact Report were provided at the September 15, 2021 Sign Board of Appeals meeting. The Board considered the testimony of the previous meetings and the findings of the report provided by the applicant. The Board voted (3-0) to approve the variance from Chapter 6, Section 6-258 [Prohibited signs] to allow an off-premise LED digital sign [“Billboard”]. [The City Council packet contains the SH 121 Electronic Billboard Economic Impact Report provided by the applicant.] In accordance with section Sec. 6-256 (see below) the adjacent property owners group (now appellant) represented by Mark T. Samples of Prime HealthCare P roperties, LLC and also Masterplan submitted an appeal of the SBOA decision; appeals of the SBOA are considered by the City Council. [The City Council packet contains the “Expert Report” prepared by Masterplan for City Council consideration]. Appeals to sign ordinance (f) Appeal from sign board of appeals to city council. Any person aggrieved by the decision of the sign board of appeals may appeal the board's decision to city council. Such appeals shall be made in writing within ten business days from the date of the board's decision and shall be submitted to the city manager, or his designee. The director of planning or three voting members of city council may likewise appeal the board's decision following the same appeal process. The city council's decis ion is final. The appeal was submitted on September 28th. The item was noticed to be heard by the City Council on October 19th. On October 8th the appellants requested consideration to postpone the appeal to the November 3rd City Council meeting. 112 3 Variance Criteria: A variance shall not be granted to relieve a self -imposed or personal hardship, nor shall it be based solely on economic gain or loss. In order to make a finding of hardship and to grant a variance from this article, the board must determi ne that: 1) The requested variance does not violate the intent of the article. 2) The requested variance will not adversely affect surrounding properties. 3) The requested variance will not adversely affect public safety. 4) Special conditions exist which are unique to the applicant or property. 5) The requested variance is not self-imposed or granted to relieve a personal hardship. 6) The requested variance is not based solely on economic gain or loss. The Sign Board of Appeals considered the following regarding variance to the Sign Ordinance: Criterion 1. The proposed sign does not violate the intent of the ordinance The purpose of the Sign Ordinance is to regulate the location, size, construction, duration, use, and maintenance of all signs within the corporate city limits and the extraterritorial jurisdiction of the city on a content-neutral basis. In addition, the purpose of the Sign Ordinance is to promote the health, safety, and welfare of the public, to achieve the efficient transfer of information to the public, and to preserve and enhance the appearance and economic value of the built environment. The approved sign types which fit within the stated intent of the Sign Ordinance are listed in Section 6-261 (Temporary signs) and 6-262 (Permanent Signs); any other sign not referenced in, defined by or governed by Article XI is prohibited. Section 6-258 specifically prohibits billboard. Criterion 2. The proposed sign does not adversely affect the surrounding property owners The Sign Ordinance does not provide development regulations for prohibited signs, however similar freestanding sign types [pylon signs] must maintain a minimum separation distance of 150 feet per premises. The appropriate signage spacing contributes to the goals of environmental preservation and aest hetics. The subject site has an existing freestanding sign adjacent to the SH 121 frontage and approximately 175 feet from the proposed location. There is no evidence the proposed sign will adversely affect the surrounding property owners. Criterion 3. The proposed sign does not adversely affect public safety Staff does not anticipate an adverse effect to public safety. The proposed sign type is consistent with signage found along major thoroughfare s. Further, similar signage exists both north and south of SH 121 within the city limits. Criterion 4. Special conditions exist which are unique to the applicant or property Review of the request and a site visit, reflect no unique conditions to the applicant or property. The subject site’s location and configuration is congruent with the majority of properties along SH 121. Criterion 5. The requested variance is not self-imposed or granted to relieve a personal hardship. 113 4 Staff finds the requested variance does not represent a self -imposed hardship. Criterion 6. The requested variance is not based solely on economic gain or loss. Staff finds the requested variance is not based solely on economic gain or loss. Although the Sign Ordinance provides a clear list of signage types that are considered prohibited , the applicant has expressed that the prohibition of the proposed sign is contrary to the allowance of similar signage already within the city. The request in part seeks equity to provide public messaging consistent with this existing allowance. Further the applicant documents established state and federal court decisions which support the elimination of message based assessment of signage types. The applicant suggests that this manner of evaluation is erroneous and that notwithstanding the characteristics deemed prohibited, the signage is appropriate for the subject site. An amendment to Section 6-253 by Ordinance 2021-2437 addresses the aforementioned message based assessment of this and similar sign types. The definition of billboards as mentioned above only requires an assessment of typical sign characteristics to categorize the sign. ATTACHMENTS: 1. Location Map 2. Response letter and detail of proposed sign (Sign Applicant) 3. Updated location (Sign applicant) 4. SH 121 Electronic Billboard Economic Impact Report (Sign Applicant) 5. Expert Report- Masterplan (Appellant) 6. Photographs of Site 7. Uncertified minutes of the September 15, 2021 SBOA meeting 114 STANDRIDGE DRSTANDRIDGE DRSH 121SH 121SSHH112211UU--TTUURRNNSAM RAYBURN TOLLW AYSAM RAYBURN TOLLW AY3700 3901 3905 3909 40 01 STANDRIDGE DRSTANDRIDGE DRSH 121SH 121SSHH112211UU--TTUURRNNSAM RAYBURN TOLLW AYSAM RAYBURN TOLLW AY3700 3901 3905 3909 4001 This ma p was genera ted by GIS d ata provided by Th e Colony GIS Departmen t. The City of T he Colony does not guar antee th e co rrectness oraccuracy of any fea tures o n this map. These digital products are for llustration purpose s only a nd are no t suitable for site -specific decision making. /Project No. SBA21-0003 - Project N ame: 3905 S H121 LED D igit al Sign Subject Area Sub ject Area Agricultu ral Business Park Business Park/I ndustrial Duplex Dwelling Gene ral Retail Heavy Comm ercial Industrial Light Commercial Mobile Hom e Neighb orh ood Service Office District 1 Planned Development Shopping Center Single Family Dwel ling Townhome 115 ROTHFELDER FALICK L.L.P. ATTORNEYS AT LAW CHRISTOPHER W. ROTHFELDER 1201 LOUISIANA TELEPHONE: 713-220-2288 crothfelder@rothfelderfalick.com SUITE 550 FACSIMILE: 713-658-8211 HOUSTON, TEXAS 77002 WWW.ROTHFELDERFALICK.COM May 5, 2021 The Colony Sign Board of Appeals Via Email: iwilliams@thecolonytx.gov Development Services Department and FedEx, Airbill No. 8160 1240 1024 6800 Main Street The Colony, Texas 75056 RE: Appeal and Alternative Variance Request of Media Eyes, LLC; Our File No. 0492-4. Dear Sign Board of Appeals: The law firm of Rothfelder & Falick, LLP represents Media Eyes, LLC (“Media Eyes”). As such, we are submitting this letter in support of Media Eyes’ appeal of the decision of the Senior Planner to deny Media Eyes’ Sign Permit Application, and alternative variance request. A copy of Media Eyes’ application is attached as Exhibit 1, and a copy of the Senior Planner’s denial of the application is attached as Exhibit 2. Please consider the following explanation and analysis in support of Media Eyes’ appeal, as well as a supplement to Media Eyes’ variance application, which was submitted on May 5, 2021. By way of background, on May 3, 2021, Media Eyes submitted its Sign Permit Application to seek the City’s permission to construct “a new 14’hx48’w (672) sqft double faced electronic sign structure oriented to Sam Rayburn Tollway (SH 121).” Media Eyes’ application indicated that the proposed sign would be used for the display of both commercial and non- commercial messages, as well on-premise and off-premise content. The sign would advertise for the flooring business located on the property where the sign is located (Good Guys) as well as other individuals and groups intending to disseminate messages on behalf of businesses, churches, community groups, civic organizations, governmental entities, and political organizations. The proposed signage is consistent with the character and use of the surrounding properties. The immediate area is commercially zoned and hosts several businesses, including Fast Fuels Gas Station, The Rifle Gear and high ceiling warehousing. Media Eyes’ sign is similar to several other recently permitted and constructed digital signs located in the immediate area. The proposed sign would be located on the west side of the Colony’s corporate limits, such that it would attract travelers to the Colony’s local businesses. Media Eyes has already secured a long-term lease with the property owner. Considering the income the property owner will receive from the lease and the benefits the sign will provide to local businesses that will use the sign to advertise to passing motorists, the sign will provide substantial economic benefits for many individuals and businesses in the Colony. 116 The Colony Sign Board of Appeals May 5, 2021 Page 2 Following receipt of Media Eyes’ application, the Colony’s Senior Planner emailed Media Eyes’ representative on May 3, 2021, stating, “it appears that you have submitted a sign application, however because this sign type is considered a “prohibited sign” the process as discussed will be to get consideration for a sign variance from the Sign Board of Appeals (SBOA) prior to sign application submittal.” Section 6-258(a)(3) of the Colony’s Code of Ordinances specifically prohibits “off-premises sign[s]” in the Colony’s corporate limits and extraterritorial jurisdiction. The term, “off-premises sign,” is defined under Section 6-263 of the Code of Ordinances as “A sign that advertises, promotes, or pertains to a business, person, organization, activity, event, place, service, product, etc. at a location other than where the sign is located.” Media Eyes disagrees with and hereby appeals the decision of the Senior Planner pursuant to Section 6-256(e)(1) of the Colony’s Code of Ordinances. The official’s decision was made in error because the Code’s prohibition of off-premise signs violates Media Eyes’ constitutional rights. On August 25, 2020, the United States Court of Appeals for the Fifth Circuit issued an opinion in Reagan Nat'l Advert. of Austin, Inc. v. City of Austin, No. 19-50354, 2020 WL 5015455 (5th Cir. Aug. 25, 2020) (“Reagan”), which followed a line of precedent holding that regulatory distinctions based on the content of a message on a sign are subject to a strict scrutiny analysis, and ultimately unconstitutional. In Reagan, two outdoor advertising billboard companies, Reagan National Advertising of Austin, Inc. (“Reagan”) and Lamar Advantage Outdoor Company, L.P. (“Lamar”), challenged the constitutionality of the City of Austin’s sign ordinance after the City denied Reagan and Lamar’s applications to digitize existing billboards. Reagan at *1. Similar to the Colony’s sign ordinance, the City of Austin’s sign ordinance distinguished between on-premise and off-premise signage. Id. In particular, automatic changing digital displays were allowed for on-premise signs, while this technology was prohibited for off-premise signs. Id. In reversing and remanding the judgment of the trial court, the Fifth Circuit held, “The Sign Code’s on-premises/off-premises distinction is content based and therefore subject to strict scrutiny.” Id. In 2017, Reagan and Lamar submitted a number of applications to convert their existing static off-premise signs to digital displays. Id. The City denied the applications based on the prohibition on off-premise digital displays in its sign code. Id. Reagan originally sued the City in state court, but the City removed the case to federal court, where Lamar then intervened. Id. at 1– 2. After a bench trial, the United States District Court for the Western District of Texas denied Reagan and Lamar’s requests for declaratory judgment, and held the Austin Sign Code was content neutral and satisfied intermediate scrutiny, thereby entering judgment for the City. Id. On Reagan and Lamar’s appeal, the Fifth Circuit relied heavily on the United States Supreme Court’s opinion in Reed v. Town of Gilbert, 576 U.S. 155, 135 S.Ct. 2218, 192 L.Ed.2d 236 (2015), and it even “abrogated” some of its previous inconsistent holdings, in finding that Austin’s on-premise/off-premise distinction is content-based. Id. at 3–5. Importantly, the Court then determined that the Austin Sign Code regulated both commercial and noncommercial speech—even if billboards might only display noncommercial messages “intermittently,” “for 117 The Colony Sign Board of Appeals May 5, 2021 Page 3 ten minutes or ten years”—and as a result, a strict scrutiny constitutional analysis would apply. Id. at 9–10. Finally, under this analysis, “the Government [must] prove that the restriction furthers a compelling interest and is narrowly tailored to achieve that interest,” which the Court acknowledged is a “hard standard to meet,” and could not be met by the City of Austin in Reagan. Id. at *10. The Fifth Circuit, therefore, held “the on-premise/off-premise distinction is content based and fails under strict scrutiny. It thus runs afoul of the First Amendment.” And, as such, the District Court’s decision to the contrary was reversed, and the case was r emanded “for further proceedings consistent with [the] opinion.” Id. at *11. The Fifth Circuit’s holding is an addition to the growing list of opinions issued in state and federal courts across the country that have held unconstitutional the on- versus off-premise distinction found in the Colony’s sign ordinance. See Thomas v. Bright, 937 F.3d 721, 733 (6th Cir. 2019); Auspro Enterprises, L.P. v. Texas Department of Transportation, 506 S.W.3d 688 (Tex. App.—Austin 2016, pet. granted, judgm't vacated w.r.m.); Reagan National Advertising of Austin, Inc. v. City of Cedar Park, No. AU-17- CA-00717-SS, 2019 WL 3845455, at *5 (W.D. Tex. Aug. 15, 2019); L.D. Mgmt. Co. v. Thomas, No. 3:18-CV-722-JRW, 2020 WL 1978387, at *2 (W.D. Ky. Apr. 24, 2020). On April 24, 2020, the United State District Court for the Western District of Kentucky issued its opinion in L.D. Mgmt. Co. v. Thomas, holding that the on- versus off-premise distinction in Kentucky’s billboard statute was content-based, subject to “heightened judicial scrutiny,” and therefore “unconstitutional in its entirety.” No. 3:18-CV-722-JRW, 2020 WL 1978387, at *3 (W.D. Ky. Apr. 24, 2020). On September 4, 2020, the United States Court of Appeals for the Sixth Circuit issued its opinion in Int'l Outdoor, Inc. v. City of Troy, Michigan, once again following the line of cases applying a strict scrutiny analysis to content-based regulations of speech, and rejecting the attempts of the government to draw distinctions based on commercial and non-commercial speech. No. 19-1151, 2020 WL 5269822, at *11 (6th Cir. Sept. 4, 2020). Similarly, the Colony’s sign regulations are unconstitutional and unenforceable because they regulate speech based on the content of the message of a sign and cannot pass a strict scrutiny analysis, and as a result, unconstitutionally infringe on Media Eyes’ right to free speech. Under Section 6-258(a)(3) of the Colony’s Code of Ordinances, the Colony completely prohibits the construction and operation of an “off-premises sign,” which is defined under the Code as “A sign that advertises, promotes, or pertains to a business, person, organization, activity, event, place, service, product, etc. at a location other than where the sign is located.” However, the Code exempts several categories of signage listed under Section 6-259, and allows with a permit other types of signs specified under Sections 6-261 and 6-262. For example, the Code exempts menu boards, residential holiday signs, and school affiliation signs. The Code also allows with a permit various other on-premise signs, including monument signs and pylon signs. The distinction between the types of signs that are permitted, prohibited, or exempt in the Colony can only be made by examining whether the proposed signage displays an on-premise or off-premise message. In other words, one has to consider the content of the sign’s message to determine what regulations, if any, apply to an application. Such distinctions based on the content of speech are 118 The Colony Sign Board of Appeals May 5, 2021 Page 4 “presumptively unconstitutional,” have repeatedly failed a strict scrutiny analysis, and are therefore unenforceable. Auspro Enterprises, L.P., 506 S.W.3d at 692 (quoting Reed, 576 U.S. at 155). The City’s blanket prohibition of off-premises signs would infringe on Media Eyes’ right to convey any form of speech, and is therefore unenforceable. Because the Colony’s sign regulations, including the prohibition of off-premise signage, are unconstitutional, the Colony’s official erred in denying Media Eyes’ application. As such, Media Eyes respectfully requests that the Sign Board of Appeals reverse the decision of the Senior Planner and issue the requested permit. In the alternative, and for the reasons set out herein, as well in the materials Media Eyes has already submitted, Media Eyes requests that the Sign Board of Appeals issue the requested variance and allow Media Eyes to move forward with the construction and operation of the proposed sign. Thank you for your consideration of the foregoing. Please feel free to contact me following your receipt of this letter to discuss any additional information you may need or if I can be of further assistance. Very truly yours, /s/ Christopher W. Rothfelder Christopher W. Rothfelder CWR:mr Enclosures Cc: Tina Stewart Via Email: cs@thecolonytx.gov City Secretary 6800 Main Street The Colony, Texas 75056 119 EXHIBIT 1 120 121 122 Proposed Off-Premise Commercial Sign Use •Address:3905 SH 121 @ Standridge Rd –The Colony,Tx –the western edge of the citylimit.Located in Business Park zoning. •Proposed Use:Erection of a new 14’hx48’w (672)sqft double faced electronic signstructureorientedtoSamRayburnTollway(SH 121).This sign will be used for commercialandnon-commercial messages. •Purpose:To allow the onsite flooring center to utilize the digital technology on the sign tochangetheirmarketingmessageshelpingtopromotetheirproductsandservices;additionally,by having the off-premise commercial component,this will allow otherbusinessesinthecommunitytoutilizethesigntopromotetheirproductsandservicestoo. •Benefits:The past year has been a struggle for all retail businesses.The use of this sign’selectronicfeaturetocommunicatetothetravellingpublicisessentialandwillbeverybeneficialtomarkettothetravellingpublic.Over 181,000 vehicles pass by the proposedlocationondailybasis. •Similar Use:As recent as May 2020,the City Council approved an off-premise commercialsign,located approximately 2.4 miles northeast of the proposed location at the followingaddress:5733 SH 121 @ (Village @ 121 Shopping Center)on the north side of Hwy 121.Since the sign’s construction,there has not been a single complaint regarding this alloweduse.And a few years ago,NFM installed two similar structures,amply separated,on thesouthsideofHwy121. •Summary:The proposed location is at the farthest west city limit line adjacent to the CityofLewisvillecitylimitline.The area is surrounded by commercial and industrial zoning.The proposed sign use is conducive to the immediate area and would be welcoming forthosebusinessesthatseektoimprovetheirexposuretotheheavilytravelledhighwayandultimatelytoimprovetheeconomicwelfareoftheselocalbusinesses. 123 124 125 Spacing: 2.43 miles Between Off-Premise Commercial Advertising Signs 126 127 128 129 Up to 70’ 14’H 48’w Elevated Highway Facing Southwest 130 131 132 133 134 135 EXHIBIT 2 136 5/4/2021 Mail - info outdooradvertiser.com - Outlook https://outlook.office.com/mail/deeplink?popoutv2=1&version=20210426004.07 1/1 RE: SBOA - Application Attached / 3905 State Highway 121 Isaac Williams <iwilliams@thecolonytx.gov> Tue 5/4/2021 915 AM To: info outdooradvertiser.com <info@outdooradvertiser.com> James, it appears that you have submitted a sign application, however because this sign type is considered a “prohibited sign” the process as discussed will be to get consideration for a sign variance from the Sign Board of Appeals (SBOA) prior to sign application submittal. There is a SBOA checklist that directs what documents are to be submitted with the SBOA request. A link to this checklist is below.   https://www.thecolonytx.gov/DocumentCenter/View/5796/SBOA-Variance-Checklist   Please complete this checklist and submit to staff with the $350 application fee asap.   Let me know if you have any questions.   Best,     Isaac Williams Senior Planner, Development Services 6800 Main Street The Colony, Texas 75056 Office: 972-624-3164 Email: iwilliams@thecolonytx.gov thecolonytx.gov facebook.com/thecolonytexas twitter.com/thecolonytexas         From: Isaac Williams Sent: Monday, May 3, 2021 4:49 PM To: info outdooradvertiser.com <info@outdooradvertiser.com> Subject: RE: SBOA - Application Attached / 3905 State Highway 121 James, yes the physical SBOA submittal still needs to be provided along with the fee.   From: info outdooradvertiser.com <info@outdooradvertiser.com> Sent: Monday, May 3, 2021 2:51 PM To: Isaac Williams <iwilliams@thecolonytx.gov> Cc: heather@ehtfirm.com; eric@ehtfirm.com Subject: Re: SBOA - Application Attached / 3905 State Highway 121 Mimecast Attachment Protection has deemed this file to be safe, but always exercise caution when opening files. Isaac, Just following up, I have attached the Development Services Application to this email as well.  Earlier today I had dropped off the Permit Application and paid the fee. Let me know if there is anything else that I need to do on my end. Thanks,   James Ramsey media eyes llc (214) 536-2633 direct info@outdooradvertiser.com www.outdooradvertiser.com   From: info outdooradvertiser.com <info@outdooradvertiser.com> Sent: Monday, May 3, 2021 9:28 AM To: Isaac Williams <iwilliams@thecolonytx.gov> Cc: heather@ehtfirm.com <heather@ehtfirm.com>; eric@ehtfirm.com <eric@ehtfirm.com> Subject: SBOA - Application Attached / 3905 State Highway 121 Good morning Isaac- I hope this email finds you well. Following up on our conversation about the sign application submittal, per your instructions I have attached to this email the application and provided a link to the application details. https://www.dropbox.com/sh/c48bv1fgmsjfn17/AABpeQZ1wGS3SH-qSUwYCDs8a?dl=0 If you have any questions, please feel free to give me a call or email. Please confirm receipt. Thanks, -James   James Ramsey media eyes llc (214) 536-2633 direct info@outdooradvertiser.com www.outdooradvertiser.com   137 138 139 140 141 142 143 144 145 146 147 148 149 150 151 152 153 154 155 156 157 158 159 160 161 162 163 164 165 166 167 168 SBA21-0003 3905 SH 121 Looking east at proposed location from subject site. Looking north at proposed location from SH 121. Looking south at proposed location from subject site. Looking west at proposed location from adjacent site. 169 170 171 Agenda Item No:5.2 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Tina Stewart Submitting Department: Police Item Type: Resolution Agenda Section: Subject: Discuss and consider approving a resolution authorizing the City Manager to issue a purchase order to Axon Enterprise, Inc. in the amount of $231,139.85 for the purchase of Taser upgrade in the Police Department. (Brown) Suggested Action: We are purchasing (85) Taser’s – model 7 (the newest CQ Taser available) • The funds will be drawn from two accounts due to the increase in pricing. •The total cost is $231,139.85 •The CIP account # 895-675-6594 Project # 2222 amount is $190,000.00. •The remainder will be taken from the TCPD forfeiture account # 752-675-6594 in the amount of $41,139.85. •This is a bundle package that includes an extended warranty for a period of 60 months. •The purchase is being made from Axon Enterprise, INC who is the parent company of Taser – they are a sole source provider. Attachments: Res. 2021-xxx Axon Enterprise Inc - Police Department Purchase Order.docx 172 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - _________ A RESOLUTION OF THE CITY OF THE COLONY, TEXAS AUTHORIZING THE CITY MANAGER TO ISSUE A PURCHASE ORDER TO AXON ENTERPRISE, INCL, FOR THE PURCHASE OF A TASER UPGRADE FOR THE POLICE DEPARTMENT; AND PROVIDING AN EFFECTIVE DATE. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS: Section 1. That the City Council of the City of The Colony, Texas hereby authorizes the City Manager to issue a purchase order to Axon Enterprise, Incl., in the amount of $231,139.85 for the purchase of a Taser upgrade for the police department. Section 2. That the City Manager or his designee authorized to issue said purchase order. Section 3. That this resolution shall take effect immediately from and after its passage. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THIS 3RD DAY OF NOVEMBER 2021. _____________________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: __________________________________ Tina Stewart, TRMC, CMC, City Secretary APPROVED AS TO FORM: __________________________________ Jeff Moore, City Attorney 173 Agenda Item No:5.3 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Robert Kotasek Submitting Department: Engineering Item Type: Resolution Agenda Section: Subject: Discuss and consider approving a resolution authorizing the City Manager to execute an Engineering Services Contract in the amount of $222,490.00 with Halff Associates, Inc. to prepare construction plans and specifications for the Phase 12 Residential Street Reconstruction Project. (Hartline) Suggested Action: Summary of Request: Consider approval of a resolution authorizing the City Manager to sign an Engineering Services Contract in the amount of $ 222,490.00 with Halff Associates, Inc. to prepare construction plans and specifications for the Phase 12 Residential Street Reconstruction project. City Council approved funding for the design of these streets in the 2021/2022 CIP budget. The streets to be designed during this project are listed below. Concrete Streets: Ballard Trail – 75 feet north of Driscoll Drive to Galloway Court Runyon Drive – Clover Valley Drive to Paige Road Alta Oaks Court – Western cul-de-sac to Alta Oaks Lane The concrete streets will be reconstructed to the same width as existing with reinforced concrete pavement. Sidewalk and driveway returns within right-of-ways will also be reconstructed. Storm drains, water/wastewater mains and street lights will also be replaced, as needed. The design contract includes surveying, preparing construction plans and specifications, bidding assistance and construction management services. The total cost of the contract with Halff Associates, Inc. is $ 222,490.00. With approval, the project is anticipated to start construction in June 2022 with an estimated completion in July 2023. Recommendation: Staff recommends approval of the contract with Halff Associates, Inc. for the design of the Phase 12 Residential Street Reconstruction project. Suggested Motion: I move to recommend approval of a resolution authorizing the City Manager to sign an Engineering Services Contract in the amount of $ 222,490.00 with Halff Associates, Inc. to prepare construction plans and specifications for the Phase 12 Residential Street Reconstruction project. Attachments: 174 Location Map Engineering Services Contract Scope of Services Financial Summary Res. 2021-xxx Engineering Servics Contract - Halff Associates, Inc.xps.doc 175 MainPaigeNor th Colony NashFryer Blair OaksBaker MemorialSouth ColonyKeys Norris Aztec Slay Strickland SH 121Morning StarRoberts AveryArbor GlenEthridge Worley GatesNewton M a l o n e Big River Larner GlenviewJoyCrawford Alpha Hale Perrin Pemberton Adams C a l d w e l l Gibson Kno x D r is c o llIreland John YatesCurryPearce I o l a AshlockElliotWagner C l a r y Phelps Clover Valley Stanley Brandenburg Hetherington FoxPowers Bedford S t ew a r t KnightShannon Walker Whe e le r Augusta Sagers BartlettRaganBuc k s k in Ramsey MillerKing Young A listerLakeshoreYager ApachePettitJe n nin g s DurangoD ur bi n GriffinMapl eWitt Overland Rock Canyon Rockwood Green Hollow T a y l o r DarbyThompson Watkins QueenYoungerRolling HillArcher Kisor WexleyMatsonAlta Oaks Cole Phoenix Marsh Sam Rayburn TollwayTeal CoveMayesSH 121 O n Ram pAm hurstSutton Freeman BranchwoodDay SpringAndersonOxfordHawse Hendrix Paint er LibertyCheyenneMountain Valley RidgecrestLookoutBear RunCook Wi l shi reG a r d n e r FisherSandhill Lakeside Kean Westwood Sarasota FoxfireLandmarkOakmont Blue GlenAsh Glen UsherTrailvie w Lake Ridge Beach Club H o w a r d High CliffBiscayneFosterEvansSparks Branch HollowG r a h a m Acacia Harbor M i d d l e t o n MerrellNorth Park Heron CoveH a c k n e y Gilliam GoodmanOhareWestportMel r oyNia g ara Marks Crutchberry Willowbend Santa FeBoca RatonAtterbury HedgecoxeJamesIndianola Overton KellerHanna Che s a pe a k e Latimer Chowning Holden Monterrey SparksMainMa y e s PaigeM e m o r i a l µPhase 12 Residential Street Reconstruction Location Map Alta Oaks Court Ballard Trail Runyon Drive 176 A-1 I:\43000s\43594\Prospect\001\Admin\Contracts\EXHIBIT A – Phase 12 Streets EXHIBIT “A” SCOPE OF SERVICES for Construction Plans, Specifications and Estimates Phase 12 Street Reconstruction in THE COLONY 1. Description: The project will involve the reconstruction of three (3) concrete streets. They are as follows: Ballard Trail – 75’ North of Driscoll Drive to Galloway Court (1,250 LF) Runyon Drive – Clover Valley Drive to Paige Road (1,250 LF) Alta Oaks Court – Western cul-de-sac to Alta Oaks Lane (572 LF) Streets will be reconstructed to the same width as existing and with 6 -inch or 7-inch thick reinforced concrete paving sections in accordance with each street's classification. Sidewalks, alley and driveway approaches within street rights-of-way will be reconstructed as well. Ballard Trail shall include drainage improvements and water line within street right-of-way. Runyon Drive shall include water and sanitary sewer lines within the street right -of- way. Alta Oaks Court shall include drainage improvements, water, and sanitary sewer lines within the street right-of-way. No drainage improvements shall be included on Runyon Drive, and no sanitary sewer line improvements shall be included on Ballard Trail. 2. Assumptions: Professional services shall include only services that are normal and customary and are not represente d as including special services or those requiring expertise that is greater than that provided by other service providers. 3. Work Plan: A. Surveying: The Professional shall provide surveying services, which, in general, may be defined as normal services applicable to a project of this type. The following particulars will also apply. (1) Vertical benchmarks shall be established such that all points of construction shall be within 500 feet of a benchmark. Benchmarks should not be subject to loss during construction. Fire hydrants and similar appurtenances are not to be used for benchmarks. The surveyor shall establish temporary benchmarks throughout the length of the project. 177 178 179 180 181 182 183 184 City of The Colony 10/15/2021 Phase 12 Street Reconstruction Halff Associates AVO P43594.001 (1)(2) Task Director Team Leader QA/QC Manager Project Manager EIT Surveyor, RPLS Survey Crew, PC Survey Crew, IM Survey Technician GIS Specialist CADD Clerical Total Total Fees, Materials & Supplies Subtotal Total Special Services Design Surveys 0.5 2.0 4.0 10.0 16.0 48.0 48.0 32.0 1.0 32.0 2.0 195.5 $20,348.55 $600.00 $20,948.55 $21,000.00 Geotechnical Investigaton (CMJ)$12,292.00 $1,229.20 $13,521.20 $13,520.00 TDLR Review and Inspection Fees 1.0 6.0 7.0 $856.36 $1,010.00 $1,866.36 $1,870.00 Printing and Delivery Costs 8.0 8.0 $772.80 $1,200.00 $1,972.80 $2,000.00 SUBTOTAL - Special Services 0.5 2.0 5.0 16.0 16.0 48.0 48.0 32.0 1.0 32.0 10.0 210.5 $34,269.71 $4,039.20 $38,308.91 $38,390.00 Basic Fee Services Construction Plans (Approx. # of Sheets) Cover Sheet (1)0.25 0.5 0.5 1.0 2.3 $299.48 $299.48 $300.00 Sheet Index and Legend (1)0.25 0.5 2.0 1.0 3.8 $477.34 $477.34 $500.00 General Notes (2)0.50 2.0 1.0 1.0 4.5 $619.65 $619.65 $600.00 Typical Paving Sections (1)4.0 8.0 2.0 14.0 $1,776.61 $1,776.61 $1,800.00 Modified and Standard Details 0.25 0.5 2.0 5.0 7.8 $974.14 $974.14 $1,000.00 Ballard Trail Project Layout Sheets (2)0.25 4.0 8.0 4.0 16.3 $2,068.55 $2,068.55 $2,100.00 Demolition Plans (2)0.50 8.0 16.0 8.0 32.5 $4,137.10 $4,137.10 $4,100.00 Paving Plan and Profile Sheets (3)0.50 1.00 36.0 48.0 12.0 97.5 $12,702.00 $12,702.00 $12,700.00 Sidestreet and Alley Profiles (1)0.50 6.0 12.0 2.0 20.5 $2,627.80 $2,627.80 $2,600.00 Driveway Profiles (2)0.50 4.0 12.0 8.0 24.5 $3,083.20 $3,083.20 $3,100.00 Drainage Area Maps (1)0.25 0.50 4.0 8.0 2.0 14.8 $1,928.38 $1,928.38 $1,900.00 Hydraulic Grade Line and Inlet Calculations (2) 0.50 0.50 4.0 8.0 2.0 15.0 $1,993.07 $1,993.07 $2,000.00 Drainage Plan and Profile Sheet (1)0.50 0.50 4.0 8.0 2.0 15.0 $1,993.07 $1,993.07 $2,000.00 Water Line Plan Sheets (2)0.50 8.0 32.0 8.0 48.5 $6,034.33 $6,034.33 $6,000.00 Erosion Control Plans (1)0.50 2.0 8.0 2.0 12.5 $1,573.89 $1,573.89 $1,600.00 Traffic Control and Sequencing Plans (1)0.50 4.0 8.0 2.0 14.5 $1,863.69 $1,863.69 $1,900.00 Pavement Markings, Light and Signage Plans (1)2.0 4.0 2.0 8.0 $1,012.51 $1,012.51 $1,000.00 Roadway Cross Sections (5) 1.00 16.0 36.0 6.0 59.0 $7,506.51 $7,506.51 $7,500.00 Runyon Drive Project Layout Sheets (1)0.25 4.0 8.0 2.0 14.3 $1,820.15 $1,820.15 $1,800.00 Demolition Plans (2)0.50 8.0 16.0 8.0 32.5 $4,137.10 $4,137.10 $4,100.00 Paving Plan and Profile Sheets (3)0.50 1.00 36.0 48.0 12.0 97.5 $12,702.00 $12,702.00 $12,700.00 Driveway Profiles (5)0.50 10.0 30.0 20.0 60.5 $7,577.37 $7,577.37 $7,600.00 Water Line Plan Sheets (2)0.50 8.0 32.0 8.0 48.5 $6,034.33 $6,034.33 $6,000.00 Sanitary Sewer Plan and Profile Sheets (3)0.50 8.0 32.0 8.0 48.5 $6,034.33 $6,034.33 $6,000.00 Erosion Control Plans (1)0.50 2.0 8.0 2.0 12.5 $1,573.89 $1,573.89 $1,600.00 Traffic Control and Sequencing Plans (1)0.50 4.0 8.0 2.0 14.5 $1,863.69 $1,863.69 $1,900.00 Pavement Markings, Light and Signage Plans (1)2.0 4.0 2.0 8.0 $1,012.51 $1,012.51 $1,000.00 Roadway Cross Sections (5) 1.00 16.0 36.0 6.0 59.0 $7,506.51 $7,506.51 $7,500.00 Alta Oaks Court Project Layout Sheets (1)0.25 2.0 4.0 2.0 8.3 $1,056.05 $1,056.05 $1,100.00 Demolition Plans (1)0.50 4.0 8.0 4.0 16.5 $2,112.09 $2,112.09 $2,100.00 Paving Plan and Profile Sheets (2)0.50 2.00 24.0 32.0 8.0 66.5 $8,743.34 $8,743.34 $8,700.00 Alley Profiles (1)0.50 2.0 4.0 1.0 7.5 $975.38 $975.38 $1,000.00 Drainage Area Maps (1)0.25 0.50 4.0 8.0 2.0 14.8 $1,928.38 $1,928.38 $1,900.00 Hydraulic Grade Line and Inlet Calculations (1) 0.50 0.50 2.0 4.0 1.0 8.0 $1,104.76 $1,104.76 $1,100.00 Drainage Plan and Profile Sheet (1)0.50 0.50 4.0 8.0 2.0 15.0 $1,993.07 $1,993.07 $2,000.00 Water Line Plan Sheets (1)0.50 4.0 12.0 4.0 20.5 $2,586.40 $2,586.40 $2,600.00 Sanitary Sewer Plan and Profile Sheets (1)0.50 4.0 12.0 4.0 20.5 $2,586.40 $2,586.40 $2,600.00 Erosion Control Plans (1)0.50 2.0 8.0 2.0 12.5 $1,573.89 $1,573.89 $1,600.00 Traffic Control and Sequencing Plans (1)0.50 4.0 8.0 2.0 14.5 $1,863.69 $1,863.69 $1,900.00 Pavement Markings, Light and Signage Plans (1)1.0 2.0 2.0 5.0 $630.45 $630.45 $600.00 Roadway Cross Sections (2) 1.00 4.0 12.0 4.0 21.0 $2,673.47 $2,673.47 $2,700.00 Quantities and Cost Estimates 2.00 16.0 16.0 34.0 $4,563.94 $4,563.94 $4,600.00 Specifications / Project Manual 2.00 12.0 16.0 4.0 34.0 $4,370.74 $4,370.74 $4,400.00 Utility Coordination 8.0 8.0 16.0 $2,107.81 $2,107.81 $2,100.00 Meetings (1)2.0 2.0 4.0 $526.95 $526.95 $500.00 Internal Q/C 4.00 4.00 12.0 20.0 $4,836.62 $4,836.62 $4,800.00 Construction Phase Services Pre-Bid Meeting 0.25 6.0 6.0 12.3 $1,624.40 $1,624.40 $1,600.00 Bidding / Addenda 0.50 6.0 4.0 10.5 $1,184.94 $1,184.94 $1,200.00 Contracts / Agreements / Recommendation Letter / Bid Tab 0.50 6.0 4.0 10.5 $1,184.94 $1,184.94 $1,200.00 Pre-Construction Meeting 0.50 6.0 6.0 12.5 $1,667.94 $1,667.94 $1,700.00 Submittals / Pay Requests / Schedules / Change Orders 1.00 24.0 40.0 65.0 $8,394.82 $8,394.82 $8,400.00 Monthly Construction Meetings & Site Visits 60.0 60.0 120.0 $15,808.59 $15,808.59 $15,800.00 Final Inspection and Punchlist 0.50 6.0 8.0 14.5 $1,905.09 $1,905.09 $1,900.00 Record Drawings 0.50 2.0 6.0 16.0 24.5 $3,075.54 $3,075.54 $3,100.00 SUBTOTAL - Basic Fee Services 8.0 32.8 12.0 410.5 745.5 194.0 12.0 1414.8 $184,012.84 $184,012.84 $184,100.00 TOTAL PROJECT 8.5 34.8 12.0 415.5 761.5 16.0 48.0 48.0 32.0 1.0 226.0 22.0 1625.3 $218,282.55 $4,039.20 $222,321.75 $222,490.00 185 186 187 188 189 190 191 FINANCIAL SUMMARY: Are budgeted funds available: Yes Amount budgeted/available: $ 310,000.00 (Design) Fund(s) (Name and number): 895-669-6670-2259 Project number: 2259 Source of Funds: 2021-2022 Capital Outlay Bond Proceeds Cost of recommended contract award: $ 222,490.00 Total estimated project cost: $ 222,490.00 Engineering Already authorized Yes  No $ 222,490.00 Total estimated costs 192 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2021 - _____ A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING AN ENGINEERING SERVICES CONTRACT AMENDMENT BY AND BETWEEN THE CITY OF THE COLONY AND HALFF ASSOCIATES, INC. FOR CONSTRUCTION PLANS AND SPECIFICATIONS FOR THE PHASE 12 RESIDENTIAL STREET RECONSTRUCTION PROJECT; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE. WHEREAS, the City and Consultant have entered into an Engineering Services Contract Amendment that includes surveying, preparing construction plans, specifications and drawings, estimates and construction management for the Phase 12 Residential Street Reconstruction Project; and WHEREAS, the City has determined that it is in the best interest of the City to enter into the Contract with Halff Associates, Inc. which is attached hereto and incorporated herein by reference as Exhibit “A”under the terms and conditions provided therein; and WHEREAS, with this Contract the City of The Colony is agreeing to the services no to exceed the amount of $222,490.00 for such work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THAT: Section 1.The Engineering Services Contract, which is attached hereto and incorporated herein as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved. Section 2. The City Manager is hereby authorized to execute the Contract on behalf of the City of The Colony, Texas. Section 3.This Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED AND APPROVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THIS 3RD DAY OF NOVEMBER 2021. _____________________________ Joe McCourry, Mayor City of The Colony, Texas ATTEST: _______ Tina Stewart, TRMC, CMC, City Secretary 193 APPROVED AS TO FORM: Jeff Moore, City Attorney 194 Agenda Item No:6.1 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Tina Stewart Submitting Department: City Secretary Item Type: Discussion Agenda Section: Subject: A. Council shall convene into a closed executive session pursuant to Section 551.072 of the Texas Government Code to deliberate the purchase, exchange, lease, or value of real property. Suggested Action: Attachments: 195 Agenda Item No:7.1 CITY COUNCIL Agenda Item Report Meeting Date: November 3, 2021 Submitted by: Tina Stewart Submitting Department: City Secretary Item Type: Discussion Agenda Section: Subject: A. Any action as a result of executive session regarding the deliberation of real property. Suggested Action: Attachments: 196