HomeMy WebLinkAboutResolution No. 2016-004CITY OF THE COLONY, TEXAS
RESOLUTION NO. 2016-0 O i.}
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF A
CONSTRUCTION SERVICES CONTRACT AMENDMENT BY AND
BETWEEN THE CITY OF THE COLONY AND MARIO SINACOLA &
SONS EXCAVATING, INC. FOR CONSTRUCTION OF PHASE 2 OF
THE SOUTH COLONY BOULEVARD GRADE SEPARATION AT THE
SAM RAYBURN TOLLWAY/S.H. 121, WHICH IS ATTACHED HERETO
AND INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING
THE CITY MANAGER TO EXECUTE THE CONTRACT; AND
PROVIDING AN EFFECTIVE DATE
WHEREAS, the City and Contractor have entered into an agreement such that the
Contractor is to provide the following services: CONSTRUCTION OF PHASE 2 OF THE
SOUTH COLONY BOULEVARD GRADE SEPARATION AT THE SAM RAYBURN
TOLLWAY/S.11. 121, SPECIFICALLY RAMPS TO FROM SOUTH COLONY BOULEVARD
TO THE BRIDGE OVERPASS; and
WHEREAS, the City has determined that it is in the best interest of the City to enter into
Contract Amendment No. 1 with MARIO SINACOLA & SONS EXCAVATING, INC., which is
attached hereto and incorporated herein by reference as Exhibit "A," under the terms and
conditions provided therein.
WHEREAS, with this Contract Amendment the City of The Colony is agreeing to pay
the sum not to exceed $71,032.79 for such work with primary funding provided by Denton
County Regional Toll Revenues (RTR).
THEREFORE, BE IT RESOLVED BY THE CITY CODICIL OF THE CITY OF
THE COLONY, TEXAS THAT:
Section 1. The Contract Amendment No. 1, which is attached and incorporated herein as
Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found
to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all
things approved in the amount of $71,032.79 and the City Manager is hereby authorized to execute
the Contract on behalf of the City of The Colony, Texas.
Section 2. That this Resolution shall take effect immediately from and after its adoption
and it is so resolved.
PASSED, APPROVED and EFFECTIVE this 191h da of January, 2016.
G
oe McCo , May/exas
City of The Colony,
t
LAA-4,TA-X- PJA
Wilson, City Secretary
eff Moore, Cit Attorney
,-It
CHANGE ORDER 01
CITE' OF THE COLONY
DENTON COUNI Y, TEXAS
ENGINEERING DEPARTMENT
Prnpo,edState High«a% Impio%ctr:em.11
Phase2 S. C olom F31xt!
Cilyofilii c ololl
CONTRACT AMENDMFNT - E.X111611"A"
DATE- December 4, 2015
Contract Atrmerdment No. 1 to the Contract Dated February 3, 2015 between the City of _1 lie
Colony (10%%ner) and Mario Sinacola & Sons Excavating, Inc (Contractor) as shown below
Pursuant to the provisions of Texas, Qgxi mi nt of Transportation SLanda_d 4peclf ic_iti,mti fear
Collsilltctloll alld 1lailltell Ince of I 111gT]Mt IVB tilreell, a1td BrldL;Cs 2004, ltetn a, 5peC1d1 PruylSion
56-4 611 1r°ticle 1 1, this Supplemental Agreement, when fully executed, shall constitute the
authority to change the work of the project as follows, including quantities and total dollars
Contract Amendment Explanation:
• To add the revised waterline "B" plan sheet to add South Colony Boulevard stationing.
e To add items for relocating an existing fire hydrant that was in conflict with the proposed
driveway.
• The add items and revised plan sheet to complete the new tie-in of the proposed sanitary
sewer line The line's diameter increased in order to meet the required gradient design
criteria for the actual field tie-in conditions. Also, a drop sanitary sewer manhole was
added to connect the set -vice tine of the adjacent west property's row construction.
s To add 48 inch RCP and a 6' by 6' junction box to allow the connection of the proposed
storm sewer lines and construction of the intersection connecting the developer's parking
lots on both sides (east and west ROW) The junction box was not in place by others
during the beginning of construction This added work was necessary to order to pi event
delays to the intersection construction and opening.
Q To revise the storm sewer pipe and inlets as required for the retaining wall construction.
The twenty foot long inlets were change to two ten foot inlets and the storm sewer pipe
alignment was adjusted to take it out of the retaining wall's reinforced zone.
Q To add revised bridge layout, es.urated quantities and bridge elevation sheets in order to
correct the drill shaft quantities
• To add 7 CP sheets to show the grade level intersection joining the east and west adjacent
properties to South Colony Boulevard This was necessary because the City requested
before awarding the contract for the intersection to be construction immediately and open
to traffic
o To pothole the existing CoSery gas line in conflict with the drill shaft construction. The
drill shaft for Bent #7 Column A was drilled by hand digging and setting a steel casing
(about 10' lona) to protect the gas line during the drilling operations This added work
prevented delays to the bridge construction. CoSery will relocate the line to the correct
location into the gas easement.
w
o To compensate the contractor for the force account work required in providing and
installing geo-textile and aeo-grid underneath the improved subgrade for the retaining
wall and surrounding Abutment 0 drill shafts This woik was installed according to the
geotechnical engineer's direction This direction also required to adjust the excavation,
embankment C4 and cemented treatment items for the retaining wall improved subgrade.
The geotechnical engineer evaluated the unproved subgrade area during excavation by
the abutment and determined the existing soils would provide the necessary bearing for
the retaining wall
o To adjust the west driveway concrete item due to the City requesting stamped stained
areas to be added in order to match the adjacent east concrete roadway built by others.
o To add tiie baseline control sheets to the contract.
o To add revise the proposed signal layout sheets and signal chart sheets. Some of the
revisions were to account for the changes made on Phase 1.
• This change order adds 79 calendar days to the contract to allow completion of work
items added by this Change Order Also, the days are added due to the non -historical
amount of rainfall that prevented the start of utility work items. Also, days are added due
to the time required to evaluate the construction of the retaining wall. This allowed
further evaluation of the existing geotechnical assumptions made during design and also
allowed further evaluation of the improved subgrade based on soil bores taken before
construction and comparing the to the cores taken two years ago. It has been agreed upon
between the City and contractor that no additional compensation will be provided for
adding these additional days. They were no project overhead delays or monetary costs to
the contractor or to any of the subcontractors during this time.
Attachment #1 describes the adjusted and added pay items attributed to this Change Order
Attachmeni 92 describes the added and revised plant sheets attributed to this Change Order. The
described sheets within this attachment will be added to the existing contract set of plans.
i
TOTAL CONTRACT AMENDMENT NO. 1: S 71,032 79
Original Amount of Contract $ 4,815,421.55
Contract Amount after Amendment No. 1 S 4,886,454.34
Requested Additional Number of Calendar Hays to Be Considered Prior to the Final Payment:
79 Calendar Days The Contract Start Time and Notice to Proceed for this project is March 16,
2€}15. With approval of Contract Amendment No I, 79 Calendar Days will be added to the
original contract time of 255 Calendar Days. The total revised Contract Time with approval of
Amendment No. 1 shall now be (255 +79) 334 Calendar Days.
Please sign and return the Contract Amendment to the Engineering Department as soon as
possible so future payments, if any, may be processed
Thank you.
City of The Colony's offer of proposed change:
By� --- —
Printed N t_ G•®�yZ�
Title•_ �4U 1T
Date. I -o illi _ '
Contiactor: MARIO SIN OLA & SONS EXCAVATION, INC.
By.—
Printed Na1e: Michael acola bate: 12/04/15
Title: Vice President
Engineer:: VRX, Inc.
Printed Name: PIA)(, �-Date: - ,/Z
Tale'_ _� ,� � �c A141f�n_r
ICA PCE ORDE4111, ATTACHMEWT P-1,
SH 221 @ S. Colony Boulevard Improvement Ph-cise 2
PREVIOUS
ITEM No. CO OR
CONTRACT
QUANTITY
—0
46 5 2D11__
DiI - - -- -0-
-4D 2 i621
464 2003
464 2005
NCrCOG
702
465 2027
4�
G- --
11 20CI
NCTCOG
507
ADI)MONAL R. -MED I U141T
QUANTITY QUANTITY
E
- - — --I
- ---
754 1 72
826 LF
463
89
—552-
646
25
2
exco�isn,,n, emt)eci,,,o —d
1bq
00
ooi 0 67,
9000-0M 0 1
5843'2005 —c-- I
Lr
DESCRiPTION AND PRfCE IN UNITt PRICE
WORDS I
Fvmlsih & I,stat) 6' C)r,
$85000
$1,675.00
low, o
1,ts-
exco�isn,,n, emt)eci,,,o —d
1bq
00
h'i —orh t0V kero— d to -.,wake m
Se. (10111 )R 261 17" UR25 PC 16-, $4500
($14,265 00)
ii0l. orain
$1000
("i (f bW Ic k err— I
L
Is,, cqzs rc16s pvc sC7,`e,—tI-,.,d1, all, $8000
$390000
$55.001
($7,80000)
"A Ir
101ace fol 01*
ois-f:i
n1l,
If 91", 1, , (,ii.ys any r,0' anti w 11',
—S,
12 t IWI$
ADDITIONAL Revised
COST Quantity sl?v
I Plan Sheet
$85000
$72000
$4,89500
IF"24RemForced Cmweto S' torm
$1,675.00
low, o
1,ts-
exco�isn,,n, emt)eci,,,o —d
1bq
h'i —orh t0V kero— d to -.,wake m
Se. (10111 )R 261 17" UR25 PC 16-, $4500
($14,265 00)
p — fa rh:r s— 0wt., L"N
.1 ucj, id's msn, no
L
Is,, cqzs rc16s pvc sC7,`e,—tI-,.,d1, all, $8000
$390000
($7,80000)
coft,p lt. , pl"- tt-
101ace fol 01*
L—" P.,
n1l,
—S,
EA
I fli^--� f $16,75000
$16,75000
c A icuIia, T1* if V f"),sh
$4,72500
$18,90000
pod -,'s, 9. "Or, i," N- p,�,
ip 11 h - z 11, Z,(: 0 1 C,ta
"'we to; tte orfory
eall,
EA
11,16
$2,750.00
IF 18" CL It' PCP f,1,15b 00 0—
SJCi7l" 517500 $2,80006
low, o
1,ts-
LF
Se. (10111 )R 261 17" UR25 PC 16-, $4500
($14,265 00)
.1 ucj, id's msn, no
L
Is,, cqzs rc16s pvc sC7,`e,—tI-,.,d1, all, $8000
$18,88000
MA41 — 0 Vir ae,f— u'd
101ace fol 01*
L—" P.,
—S,
EA
I fli^--� f $16,75000
$16,75000
11.1 "It ail J, f, 1,, p' CQ""Iete
F' sPF , "r , ' "I'te., thous in j
ip 11 h - z 11, Z,(: 0 1 C,ta
eall,
EA
$2,75000
$2,750.00
Page
1 of 2
ANNE ORDFR III, ATTI ACHMENT #1
12/41Z015
ISH 121 @ S. Colony Boulevard 5rnprovement Phase 2
PPEVIOUS
CO OP ADDITIONAL REVISED DESCRIPTION AND PRICE IN ADDITIONAL ftFuised
FITEMM NIT COUTRACT QUANTITY QUANTITY UWORDS UP41T PRICE COST Qtji')ntdV see
QUANT)TY Plan Sleet 9
f 9000 0 —,'111111 ?4111 (eeati,4111$6,944 71 $6,944 71
airfo —1, P1,1 Iv 'b'l -I,
$10,076 72 -c'T
9 0 C) 00 4 7�77
3.i I A b1l", I:0"n' ompk
tv't
$11,35136 $11,35136
ucdii'� and n) thirry ,I' C."Is per Iump
1102004
5837 CV
&�O ($KO72 00)
759 5078
Qc' 1, j id
132 3252# 7,9 2493 t CY (0 -,,ns Co rI',j (TV C:) IV jh
$2000 1$15,180 or))
pe --""d
o"
,a C P,- wbw V ;Fd
275 1295 45 1340 Sy Z i-0 to 36 -rch Thick C—o't$2500 $1,12500
cam, tate
'p pl'w 4of thr 5-1 or ,h""
2 J5'i0_'i 74 3 9 ' 49 TON ;-01 C --t Nb" eial 115.00 $2,954-35
r.'rf (--wd co-pIvre "'^ 0--c 00
rf' L)o' a=5 1121 n0 1
530 459 51 :11 I 40689'y Cont
an"'e, 0"), .'4 I -d $6000 ($ 3.066.60)--
W",
A, c-
-- —,75-0-0 $8,944 25
s3kcA 0 51 ii Si 11 SY (an'.6r1w(V) —$-1
!"o'? tjOy perio'13ec. Set Or
I thl 5 - rr Ile
d no C-jr-;a Pe' so" -"a "IrIJI
TOTAL =j
Page 2 of 2
CHANGE ORDER 41 Aitachment 42, SH 121 @ S. Colony Boulevard improvement,
Updated 1012012015
THIS CHANGE ORDER REVISES AND ADDS THE FOLLOWING PLAN SHEETS
Sheet Sealed Date Rev/Add Description Comments
88 4/27/2015 Added Sheet Traffic Control Plan 4 Added Detour for SCB
89 4/27/2015 Added Sheet Traffic Control Plan Added interim TCP for SCB
145A 3/2/2015 Added Sheet- Baseline Control
153A 3/2/2015 Added Sheet Horizontal Control Layout
________._____. -L - - - — -- ' - ____ —, -_ --- --...._-
176_
---
176A 3/23/2015 1 Driveway Layout Revised Driveway 4
275A 7/14/2015 Inlet Computations Split Inlets I and 3 into 10 -foot each
278A 7/14/2015 i 1 Storm Sewer Computations Split Inlets I and 3 into 10 -foot each
287A 7/14/2015 1 Drainage Pian/Profile Split Inlets 1 and 3 into 10 -foot each
2946 7/14/2015 1 Drainage Profiles Renamed Laterals
294C 7/14/201-5 1 Drainage Profiles Renamed Laterals
295H 7/14/2015 1 I CI(2)-02(DAL) Added Inlet Standards
2951 7/14/2015 CI(2)•02(DAL) Added Inlet Standards
3100 31312015 Water Imprcvements Revised Waterline Location
10D
-3 F4/2812015 I Sanitary Sewer Improvements Revised alignment and size
314A 3/24/2015 4 Estimated Quantities Qty Adjustments and rail type change
315A I 3/24/2015 1 Bridge Layout Drift Shaft Qty Adjustments
316A 3/24/2035 1 Bridge Elevation Drill Shaft City Adjustments
474-A 6/30/2015 3 Proposed Si.griall.ayout Updated Phase 1 revisions to crosswalk
and pole P-2 to P-5 Location
474B 10/1512014 2 Y Proposed Signal I ayout Revisions to ground box, updated
phasing, etc.
474C Added e d phasing -- -- diagram, updated
10/15/2014 2 Proposed Signal Charts
. , — I -q_ street termination chart. changed stre nam
Page 1 of 2
CHANE ORDER 61 Attachment #2, SH 121 @ S. Colony Boulevard dWrovOment,
Updated 1012012015
THIS CHANGE ORDER REVISES AND ADDS THE FOLLOWING TAN SHEETS
Sheet Sealed Date Revl�r#d
No. _ -- -
4741) 6/30/70115 3
Description
Comments
Proposed Signa! Charts I Updated corduit lengths
Page 2 of 2