HomeMy WebLinkAboutResolution No. 2015-088 CITY OF THE COLONY, TEXAS
RESOLUTION NO. 2015- p
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE
COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF
CONTRACT AMENDMENT NO. 8 BY AND BETWEEN THE CITY OF
THE COLONY AND AUSTIN BRIDGE & ROAD, L.P. FOR REVISION
AND ADDITION OF ROADSIDE AND OVERHEAD SIGNAGE, AND
OTHER ADDITIONAL WORK FOR PHASE 1 OF THE SOUTH COLONY
BOULEVARD GRADE SEPARATION AT S.H. 121, INCORPORATED
HEREIN AS EXHIBIT "A"; RATIFYING A CONTRACT INCENTIVE
FOR EARLY COMPLETION; AUTHORIZING THE CITY MANAGER
TO EXECUTE THE CONTRACT AMENDMENT; PROVIDING AN
EFFECTIVE DATE
WHEREAS, the City and Contractor have entered into an agreement such that the
Consultant is to provide the following services: revision and addition of roadside and overhead
signage and other additional work; and
WHEREAS, the original Construction Contract authorized an early opening incentive to
Contractor in the amount of$506,000.00 if the deadline of March 2, 2015 was met, which was
met; and
WHEREAS,the City has determined that it is in the best interest of the City to enter into
the Contract Amendment No. 8 with AUSTIN BRIDGE & ROAD, L.P. which is attached
hereto and incorporated herein by reference as Exhibit "A," under the terms and conditions
provided therein, and agrees to fund the early opening incentive; and
WHEREAS, with this Contract Amendment the City of The Colony is agreeing to pay
the sum not to exceed $319,604.04 for such work as described on Amendment No. 8, plus the
early opening incentive of $506,000.00 with funding available through TIRZ No. 1,
NCTCOG/RTR, and city right-of-way acquisition.
THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF
THE COLONY,TEXAS THAT:
Section 1. The Contract Amendment, which is attached and incorporated hereto as Exhibit
"A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be
acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all
things approved in the amount of$319,604.04; plus the early opening incentive in the amount of
$506,000.00 for a total of $825,604.04; the City Manager is hereby authorized to execute the
Contract Amendment on behalf of the City of The Colony, Texas.
Section 2. That this Resolution shall take effect immediately from and after its adoption
and it is so resolved.
63918
PASSED, APPROVED and EFFECTIVE this 17th day of NOVEMBER,2015.
.1, - Mc ou , Mayor
ity of The Colony, Tex,
ATTEST:
Is 'AL
..... ...... 6\
Christie Wilson, City Secretary CY..• .<' '..
i Lii! ••0 A
APPROVED AS TO FORM:
411k.a1g4e1,k i SEAL-.,... S 4....A....L
i .•• ...:•
•:.1 i-,
Nlz
x AS
Jef oore, Cit Attorney
63918
CITY OF THE COLONY
DENTON COUNTY, TEXAS
ENGINEERING DEPARTMENT
SH 121 Improvement at S. Colony Boulevard
TxDOT CSJ: 0364-03-095
Change Order #8
Revision and addition of small, large roadside
and overhead signage. Force Account work
requested by the City and for other items
necessary for the added CO #8 signage items.
All applicable new and revised plan sheets are
under this change order.
CITY OF THE COLONY
DENTON COUNTY, TEXAS
ENGINEERING DEPARTMENT
SH 121 Improvement at S. Colony Boulevard
TxDOT CSJ: 0364-03-095
Change Order#8
Revision and addition of small, large roadside and overhead signage. Force
Account work requested by the City and for other items necessary for the
added CO#8 signage items. All applicable new and revised plan sheets are
under this change order.
Change Order Package Index
1. Change Order
1.1 Change Order#8 Description and Signatures
1.2 Attachment#1- Revised and Adjusted Pay Items
1.3 Attachment#2—Revised and Added Plan Sheets
2. Change Order Pricing Documentation
2.1 Items 416-6018, 416-6022, 416-6023, 650-2025,650-2031
2.2 Force Accounts#11 thru #22
2.3 Credit Items
1 .1 - Change Order #8 - Description and
Signatures
CHANGE ORDER#8
CITY OF THE COLONY
DENTON COUNTY,TEXAS
ENGINEERING DEPARTMENT
Proposed State Highway Improvement at
S.Colony Blvd,
City of the Colony
TxDOT CSJ 0364-03-095
CONTRACT AMENDMENT—EXHIBIT"A"
DATE:October 18,2015
Contract Amendment No.8 to the Contract Dated June 46`,2013 between the City of The
Colony(Owner)and Austin Bridge&Road,LP(Contractor)as shown below.
Pursuant to the provisions of Texas Department of Transportation Standard Specifications for
Construction and Maintenance of Highways,Streets,and Bridges 2004,Item 4,Special Provision
004-017,Article 4,4,this Supplemental Agreement,when fully executed,shall constitute the
authority to change the work of the project as follows,including quantities and total dollars:
Contract Amendment Explanation:
• To replace four of the existing balance tee overhead sign structures in the median of the
SRT(SH 121). This includes removing existing signage and constructing new drill
shafts,tower,truss and replacing the sign panels to identify the new overpass constructed
under this contract. New and revised plan sheets have been issued under this change
order that detail this work. Changes to the roadside large signs and small signs are also
included within the new and revised plan sheets.
• To delete the 65 feet bridge span overhead sign structure along the SBFR. The drill
shafts for the vertical support along the ROW could not be constructed due to the
abundance of existing utilities. Pot holing was performed which determined the bridge
span would have to be replaced with a COSS structure. This change order includes the
new and revised sheets that show this work.
• To add a pay item for Force Account#11 —Rail and deck repair damaged by the
traveling public.
• To add a pay item for Force Account#12—Extra I-beams on existing COSS structures to
support new sign panels according to the design standard sheets.
• To add a pay item for Force Account#13—Concrete traffic rail foundation. These
foundations were not shown in the plans for the two runs of rail along the outside
shoulder of both NB and SB SRT. The rail protects the new bents adjacent to the SRT
for the South Colony Boulevard(SCB)bridge structure.
a To add a pay item for Force Account#14—54"drill shaft for large signs. This shaft was
needed for the new COSS#4 added by this change order.
• To add a pay item for Force Account#15—90 linear feet temporary concrete traffic
barrier. This run of barrier was requested by the City to protect the newly constructed
SSTR rail and signage on the SCB bridge structure. The City is now the owner of these
three pieces of barrier.
• To add a pay item for Force Account#16—Potholing for large roadside signs and two
roadway illumination pole foundations. This work was required in order to determine the
exact location of the existing utilities. Minor adjustment was made to these foundations
after determining the exact location of the utilities. The two roadway illumination
foundations had to be dug using the vac truck due to the close proximity of existing
utilities. One of the roadway illumination poles was moved across the SBFR in order to
find a place without utility conflict. This was approved by the electrical design engineer
with the concurrence of the City and NTTA.
• To add a pay item for Force Account#17—Raising existing sanitary sewer manhole.
This work was required in order to raise the MH ring and cover about 5 feet to make it
flush with the new finished grade.
• To add a pay item for Force Account#18—LDS Panels. This work was added in order to
delineate the temporary traffic barrier and permanent barrier for traffic using the SBFR to
SCB ramp.
• To add a pay item for Force Account#19—Video RCP lines. This work was required to
determine the condition of the RCP lines before the City turns this over to the NTTA for
maintenance. The plans did not show this work except for the retaining wall underdrain
pipe.
• To add a pay item for Force Account#20—35'COSS. This COSS was added to replace
the 65 feet bridge span OH structure described in the second contract amendment
explanation paragraph.
• To add a pay item for Force Account#21—Temporary sign for SBFR to SCB ramp.
This sign was required in order to designate this new ramp prior to opening to traffic in
early March 2015. The permanent sign was not ready during opening to traffic day.
• To add a pay item for Force Account#22—Additional bracket and sign on SBFR to SCB
ramp. This work was added to provide additional advisory signage to the traveling
public.
• To add a credit item for not stamping the concrete raised median on SCB bridge as shown
in the plans. The City requested not to stamp the concrete.
• To add a credit item for not conventionally drilling two eight foot deep roadway
illumination foundations. This credit was required because these two foundations were
drilled by the vac truck previously described in this change order.
• This change order adds 163 calendar days to the contract to allow completion of work
items that could not be completed due to unavailability of block sod in May through
September 2015. It has been mutually agreed between all parties of this contract that no
Contractor overhead costs will accrue or be charged to the owner for the addition of these
calendar days. Contractor and Construction Manager's office were de-mobilized June
2015. These additional days also allowed completion of all contract bid items and added
work as stipulated in Change Order#5 and added under this Change Order.
Attachment#1 describes the adjusted and added pay items attributed to this Change Order.
Attachment#2 describes the added and revised plan sheets attributed to this Change Order. The
described sheets within this attachment will be added to the existing contract set of plans.
TOTAL CONTRACT AMENDMENT NO.8: $ 319,604.040
Original Amount of Contract $ 19,999,737.45
Contract Amount after Amendment No. 7 $ 21,010,064.50
Total Amount after Amendment No. 8 $ 21,329,668.54
Requested Additional Number of Calendar Days to Be Considered Prior to the Final Payment:
163 Calendar Days.The Contract Start Time and Notice to Proceed for this project is November
7,2013. With approval of Contract Amendment No.8, 163 Calendar Days will be added to the
revised contract time project schedule of 548 days. The original contract time was 435 Calendar
Days. Amendment No.2,Amendment No.4 and Amendment No.7 added 113 Calendar Days
Total to the contract. The total revised Contract Time with approval of Amendment No. 8 shall
now be(548+163)711 Calendar Days.
Please sign and return the Contract Amendment to the Engineering Department as soon as
possible so future payments, if any, may be processed.
Thank you.
City of The Colony's offer of r .•sed change:
...111111
By:
,r.. 1
Pri s�ame: 7Vo p9Wt I / Date: /(-/7'LC
Title: e.; kJ �v
Contractor: AUSTIN BRIDGE&ROAD,LP
By:
Itt,64144D,
Printed Name: 14 k -9 • !' -riA'‘ Date: kof) W'15
'title: 51. V.P
Engineer: VRX, Inc.
t
By: ori � ., ,
Printed Name: Kik,'.J/S L-14tP2tt Date: /O/27/ .4
Title: 64c7,,00,-.1i ei Mai?71"