HomeMy WebLinkAboutResolution No. 2014-063 RESOLUTION NO. 2014- Olo3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING THE TERMS AND CONDITIONS OF A CONTRACT AMENDMENT BY AND BETWEEN THE CITY OF THE COLONY AND AUSTIN BRIDGE & ROAD, L.P. FOR RESTRUCTURING THE EARLY COMPLETION INCENTIVE FOR THE SOUTH COLONY BOULEVARD GRADE SEPARATION AT S.H. 121 AS INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT; AND PROVIDING AN EFFECTIVE DATE WHEREAS, the City and Consultant have entered into a Contract Amendment#6 for the purpose of restructuring the early completion incentive; and WHEREAS, the City has determined that it is in the best interest of the City to enter into the Contract Amendment with AUSTIN BRIDGE & ROAD, L.P. which is attached hereto and incorporated herein by reference as Exhibit "A," under the terms and conditions provided therein. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS THAT: Section 1. The Contract Amendment, which is attached and incorporated hereto as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved and the City Manager is hereby authorized to execute the Contract Amendment on behalf of the City of The Colony, Texas. Section 2. That this Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED, APPROVED and EFFECTIVE this 30th day of SEPTEMBER, 2014. • I , .T: - Joe McCo rry, Mayor -Ai Lk./ yN City of The Colony, Tex kikA Christie Wilson, City Secretary (__APPROVED AS _P_►A ; Je f oor= City Attorney e to, p SEAL ; : - c TEX P qN Nt�,,,/l ,� 63918 CHANGE ORDER#5 CITY OF THE COLONY DENTON COUNTY,TEXAS ENGINEERING DEPARTMENT Proposed State Highway Improvement at S.Colony Blvd, City of the Colony TxDOT CSJ 0364-03-095 CONTRACT AMENDMENT—EXHIBIT"A" DATE: September 25,2014 Contract Amendment No.5 to the Contract Dated June 4th„.2013 between the City of The Colony (Owner)and Austin Bridge&Road,LP(Contractor) as shown below. Pursuant to the provisions of Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways. Streets, and Bridges 2004,Item 4, Special.Provision 004- 017, Article 4.4,this Supplemental Agreement, when fully executed, shall constitute the authority to change the work of the project as follows, including quantities and total dollars: Contract Amendment Explanation: • This Change Order replaces the current incentive bonus specified in the contract and modified under Change Order#4. • The schedule shall be revised according to Special Provision 008-097 based on a Traffic Control Plan(TCP)Change. The TCP change includes the closing of Spring Creek southbound entrance ramp beginning September 25, 2014. This change allows for an early start date SBER-E construction scheduled for Phase 3. This work will begin and progress in conjunction with the ending of SBFR Phase 2 work. Ramp S8 shall continue for late November 2014 opening. The revised schedule shall be reviewed and approved by the City before this Change Order is executed. No additional compensation shall be provide to the Contractor for acceleration of the work and project schedule other than what is stated and provided under this Change Order. • As part of the partnering effort under this contract,the current request for additional days under Communication Record#44 shall not be granted. It is understood by both parties the TCP change will allow the Contractor to gain the impacted delay days requested. No additional calendar work days or Contractor overhead compensation shall be provided. • The current finish date of March 23,2015 (498 calendar days)will remain unchanged. Any future impacts,added work or unexpected delays encountered during construction caused by either party shall be rectified by the Contractor by providing additional resources. This includes, but not limited to, providing additional work shifts necessary to overcome the delay. These delays shall include impacts from weather, work activity inefficiencies and material procurement scheduling. Liquidated damages will be accessed according to the contract after the current 498 calendar days have expired. Cost of any additional work shall be compensated according to the pertinent bid items or by Change Order. • The modified incentive bonus shall be modified as follows: 1. The opening to traffic date shall be set as a Milestone. The Milestone shall be March 1,2015. Opening to traffic shall include the installation of small signs, large roadway signs, concrete traffic railing, MBGF,crash attenuators and pavement markings installed according the pertinent standard specifications. The roadway, and all bridges and ramps shall be open and provide a safe passage for all motorists and vehicles. 2. If the Contractor opens all of the project's ramps, roadway,and bridges as described above by or on March 1,2015,the bonus payment incentive amount paid by the City shall be$506,000.00(five hundred six thousand dollars). This is the maximum amount allowed and stipulated during the original bidding of the project. 3. For every day past the March 1,2015 Milestone and until March 8th, 2015, the bonus amount shall diminish by$5,500.00(five thousand five hundred dollars) per calendar day. 4. If the Contractor opens all of the project's ramps, roadway,and bridges as described above on March 9, 2015,the bonus payment incentive amount paid by the City shall be$250,000.00(Two hundred and fifty thousand dollars). 5. For every day past the March 9, 2015 until March 16,2015,the bonus amount shall diminish by$5,500.00(five thousand five hundred dollars)per calendar day. 6. The Milestone incentive completely diminishes to $0(zero dollars)on March 17, 2015 through the current finish date of March 23,2015. • For any minor finish work and punch list items necessary to finish the project after the road is open to traffic, no additional compensation will be paid for extra Traffic Control or manpower/equipment that may be necessary to work in areas where traffic is now present. At least one lane of each roadway, ramp and on SCB shall remain open to traffic during adjacent businesses' retail hours if remaining incidental work or punch list work is needed at this time. Lane closure request and approval will continue to be required during this period. If it is determined that any daytime lane closure after opening severely impacts traffic within the project, the remaining work requiring lane closures shall be performed during nighttime hours and during hours that adjacent businesses are closed for public retail sales. • Incentive bonus described above met by the Contractor shall be paid on next estimate after March 1, 2015. TOTAL CONTRACT AMFNDMENT NO. 5: $ 0.00 Original Amount of Contract $ 19,999,737.45 Contract Amount after Amendment No.4 $ 20,497,253.44 Total Amount after Amendment No. 5 $ 20,497,253.44 Requested Additional Number of Calendar Days to Be Considered Prior to the Final Payment: 0 Calendar Days. The Contract Start Time and Notice to Proceed for this project is November 7, 2013. With approval of Contract Amendment No. 5, 0 Calendar Days will be added to the revised contract time project schedule of 498 days. The original contract time was 435 Calendar Days. Amendment No. 2 and Amendment No. 4 added 63 Calendar Days Total to the contract. The total revised Contract Time with approval of Amendment No. 5 shall remain at 498 Calendar Days. Please sign and return the Contract Amendment to the Engineering Department as soon as possible so future payments, if any, may be processed. Thank you. City of The Colony's offer of proposed change: B.:40/11(le#:-L'- ii_1111.< Printed '7ame: Troy vv €11 Date: _IC/act h Title: /V) di el Contractor: AUSTIN 1.1i .DGE&ROAD. LP By: Printed Name: John H. Shine, RE. Date: i41 14 V.P. — Operations Title: Engineer: VRX, Inc. _Adir By: Printed Name: g-'4x c 61;5 6a r.z.,e2 PL, Date: Title: Ca/15VL "r7 earl 11 er a -7e r 2. 1 Revised and Approved Schedule Project ID:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish Total 2014 2015 Duration Float Sep Oct Nov Dec Jan I Feb Mar Apr May Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 Administration A1010 NTP 0 07-Nov-13A A1890 Contract Time(456 Cal Days) 498 07-Nov-13A 23-Mar-15 0 A1900 Mobilization/Signing/SW3P 6 08-Nov-13A 15-Nov-13A A2000 ATT&Verizon Rdoc ate @NBFR 70 08-Nov-13A 21-Mar-14A A2010 Overhead Power Line Relocate @ NBFR 0 08-Nov-13A 08-Nov-13A A2020 ATT Relocate @ SBFR 39 08-Nov-13A 12-Feb-14 A A2030 Overhead Power Line Relocate @ SBFR 39 08-Nov-13A 21-Jan-14A • A1020 Substantial Completion (Expires 2-5-15)(Rev.3-1-15) 0 01-Mar-15* 0 _ •Substantial Completion (Expires 2-5-15)(Rev. A1030 Punchlist 15 02-Mar-15 23-Mar-15 0 ` S A1040 Final Completion(3-23-15) 0 23-Mar-15' 0 •Final Completion(3-28-15) Submittals .AIIIMIIIIIIIIW A21280 MSE Walls 45 07-Nov-13A 19-Dec-13A . A21290 Slider Plates 60 18-Nov-13A 03-Dec-13A Utility Relocates .-_.,.--- -----111111111"7-7'' Utilities A20930 Water Line Boring(UTILITY RELOCATE) 20 02-Dec-13A 20-Dec-13 A A21260 Fiber Relocation(UTILITY RELOCATE) 40 23-Dec-13A 05-Mar-14A A20930-1 Water Line Boring(UTILITY RELOCATE)-Split 1 7 13-Feb-14A 30-Apr-14A Detour SBFR Temp Paving @ St 538+60 to 544+96 A18540 Prep ROW @ SBFR Temp Paving St 538+60 to 544+96 (DET 2 07-Nov-13 A 07-Nov-13 A A18550 Demo @ SBFR Temp Paving St 538+60 to 544+96(DETOUR 3 07-Nov-13 A 12-Nov-13 A A18560 Exc @ SBFR Temp Paving St 538+60 to 544+96(DETOUR) 2 12-Nov-13A 15-Nov-13A - A21270 RCP@ SBFR Temp Paving St 555+99(Temp Drainage) (DE1 1 12-Nov-13A 14-Nov-13A A18610 Emb @ SBFR Temp Paving St 538+60 to 544+96(DETOUR) 2 15-Nov-13 A 18-Nov-13A A18580 HMAC Base @ SBFR Temp Paving St 538+60 to 544+96 (DE 1 19-Nov-13 A 19-Nov-13A NBFR Temp Paving @ St 540+65 to 547+63 • A18620 Prep ROW @ NBFR Temp Paving St 540+65 to 547+63(DE1 2 11-Nov-13 A 12-Nov-13A A18630 Demo @ NBFR Temp Paving St 540+65 to 547+63(DETOUF 2 12-Nov-13 A 20-Nov-13 A A18640 Exc @ NBFR Temp Paving St 540+65 to 547+63(DETOUR) 2 18-Nov-13A 20-Nov-13A A18650 Emb @ NBFR Temp Paving St 540+65 to 547+63(DETOUR) 2 19-Nov-13A 02-Dec-13A • A18660 HMAC Base @ NBFR Temp Paving St 540+65 to 547+63(DE 1 03-Dec-13 A 03-Dec-13 A • ' Traffic Switches A7290 Detour to P1 Stripe/Traffic Switch SB 5 19-Nov-13A 26-Nov-13A A7280 Detour to P1 Stripe/Traffic Switch NB 4 04-Dec-13 A 05-Dec-13 A PHASE 1 SBFR @ St 532+00 to 562+00 • A16670 Prep ROW @ SBFR St 532+00 to 562+00(P1) 5 27-Nov-13A 03-Dec-13 A A18680 Demo @ SBFR St 532+00 to 562+00(P1) 10 04-Dec-13A 30-Dec-13A A18920 IMP Mill @ SBFR St 532+00 to 562+00(P1)-IMPACT 2 30-Dec-13 A 16-Jan-14 A A18920 Mill @ SBFR St 532+00 to 562+00(P1) 2 16-Jan-14A 16-Jan-14A A18690 IMP Exc @ SBFR St 532+00 to 562+00(P1)-IMPACT 9 16-Jan-14 A 12-Feb-14 A A18700 RCP @ SBFR St 532+00 to 562+00(P1) 25 13-Feb-14 A 21-Mar-14 A A18690 Exc @ SBFR St 532+00 to 562+00(P1) 7 24-Mar-14 A 31-Mar-14 A A18730 Flexbase @ SBFR St 532+00 to 562+00(P1) 12 01-Apr-14A 19-Apr-14 A r_ Remaining Level of Effort MkeeEB Remaining Work • •Milestone Page 1 of 9 TASK filter:All Activities M Actual Work Mill Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc Project ID:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name ' Original Start Finish ' Total 2014 2015 Duration Float I Sep J Oct I Nov I Dec Jan I Feb I Mar I Apr May A18940 4"HMAC @ SBFR St 532+00 to 562+00(P1) 3 22-Apr-14 A 23-Apr-14 A A18710 Conc Pvmt @ SBFR St 532+00 to 562+00(P1) 14 29-Apr-14A 16-May-14 A E A18720 Cure Conc.Pvmt @ SBFR St 532+00 to 562+00(P1) 7 09-May-14 A 16-May-14 A A20970 Curb Inlets @SBFR St 532+00 to 562+00(P1) 7 13-May-14 A 21-May-14 A NBFR @ St 540+00 to 563+00 A18750 Prep ROW @ NBFR St 540+00 to 563+00(P1) 2 11-Dec-13 A 13-Dec-13 A A18760 Demo @ NBFR St 540+00 to 563+00(P1) 7 11-Dec-13 A 15-Jan-14A A18910 Mill @ NBFR St540+00 to 563+00(P1) 2 17-Jan-14A 17-Jan-14A I A18780 IMP RCP @ NBFR St 540+00 to 563+00(P1)-IMPACT 21 21-Mar-14 A 21-Apr-14 A ' A18780 RCP @ NBFR St 540+00 to 563+00(P1) 21 22-Apr-14 A 03-May-14 A • A18770 Exc @ NBFR St 540+00 to 563+00(P1) 10 03-May-14A 21-May-14A I A18820 Flexbase @ NBFR St 540+00 to 563+00(P1) 14 22-May-14 A 13-Jun-14 A A20960 4"HMAC @ NBFR St 540+00 to 563+50(P1) 3 14-Jun-14A 14-Jun-14A A18790 Conc Pvmt @ NBFR St 540+00 to 563+00(P1) 12 27-Jun-14A 10-Jul-14A A18800 Cure Conc.Pvmt @ NBFR St 540+00 to 563+00(P1) 7 07-Jul-14 A 14-Jul-14 A I A18950 Curb Inlets @ NBFR St 540+00 to 563+00(P1) 4 10-Jul-14A 15-Jul-14A I Retaining Wall A19550 IA Footing @ Retaining Wall NBFR-SCB (P1)-IMPACT 14 07-Mar-14A 04-Jun-14 A A19550 Footing @ Retaining Wall NBFR-SCB (P1) 2 05-Jun-14A 07-Jun-14 A • A19560 Panels @ Retaining Wall NBFR-SCB (P1) 4 07-Jun-14A 14-Jun-14A • A19570 Coping @ Retaining Wall NBFR-SCB(P1) 2 18-Sep-14 19-Sep-14 98 1 Colony Blvd Bridge Bents 1 thru 2 A5000 Drilled Shafts(Int.Columns)@132 Colony Blvd Brdg(P1) 5 21-Jan-14A 30-Jan-14A • • A5005 Drilled Shafts(Abuts)@ Al Colony Blvd Brdg(P1) 6 20-Feb-14A 24-Feb-14 A Columns A5010 Columns @ B2 Colony Blvd Brdg(P1) 15 12-Feb-14 A 19-Mar-14 A A5070 DS Extensions(Abutment)@A1 Colony Blvd Brdg(P1) 8 27-Feb-14A 07-Mar-14A I Caps IIA5015 Caps @ B2 Colony Blvd Brdg(P1) 18 13-Mar-14 A 03-May-14 A { A5020 Abuts @A1 Colony Blvd Brdg(P1) 8 12-May-14A 31-May-14A I I I A5025 Beams @ Colony Blvd Brdg Span 1(P1) 3 03-Jun-14A 04-Jun-14A Deck A5035 PMD @ Colony Blvd Brdg Span 1(P1) 8 14-Jun-14A 11-Jul-14 A A5030 Overhangs @ Colony Blvd Brdg Span 1(P1) 2 07-Jul-14 A 17-Jul-14 A A5040 Rebar&Prep Deck @ Colony Blvd Brdg Span 1(P1) 5 18-Sep-14 23-Sep-14 0 O I' •i A5045 Grade&Dry Run @ Colony Blvd Brdg Span 1(P1) 4 25-Sep-14 29-Sep-14 0 NI I iii A5050 Pour Deck @ Colony BNd Brdg Span 1(P1) 2 02-Oct-14 03-Oct-14 0 i t A5055 Cure Deck @ Colony Blvd Brdg Span 1(P1) 15 04-Oct-14 18-Oct-14 93 F A5060 Approach Slab @ Colony Blvd Brdg Span 1(P1) 8 20-Oct-14 29-Oct-14 63 O Rail A5065 Rail @ Colony Blvd Brdg Span 1(P1) 2 20-Dec-14 22-Dec-14 27 ❑ Retaining Wall A20980 Excavate,Temp Shore&Embank @ SCB(P1) 7 16-Jan-14 A 18-Feb-14 A Remaining Level of Effort Remaining Work • •Milestone Page 2 of 9 TASK filter.All Activities f� Actual Work 1::}={!! Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc Project ID:613005 CO5 Review Printout 1 - 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish Total 2014 2015 Duration Float Sep I Oct I Nov I Dec Jan I Feb J Mar I Apr ] May I._ ; A20900 Footing @ Retaining Wall SCB (P1) 2 19-Mar-14A 21-Mar-14A I, A20910 Panels @ Retaining Wan SCB(P1) 5 14-Apr-14A 16-May-14A A20920 Coping @ Retaining Wall SCB(P1) 1 07-May-14 A 07-May-14A I I A20920 SI Coping @ Retaining Wall SCB(P1) 1 18-Sep-14 18-Sep-14 84 Colony Blvd Bridge Bent 4 Substructure } Foundations I • A20570 Drilled Shafts(Int.Columns)@ Colony Blvd Brdg(P1) 3 31-Jan-14A 01-Feb-14A 1 Columns A20610 Columns @ Colony Blvd Brdg(P1) 10 03-Apr-14A 30-Apr-14A ' Caps A.20590 Caps @ Colony Blvd Brdg(P1) 5 05-May-14A 29-May-14 A Traffic Switches A8920 P1 to P2 Stripe/Traffic Switch SB 3 22-May-14A 22-May-14 A A8930 P1 to P2 Stripe/fra>Fc Switch NB 3 18-Jul-14A 18-Jul-14A PHASE 2 SCB-SBFR&Ramp SE @ St 533+61 to 557+52 A18830 Prep ROW @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+5 2 22-May-14 A 23-May-14 A A18840 Demo @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+52(P 6 27-May-14 A 04-Jun-14 A A18930 Mill @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+52(P2) 3 05-Jun-14A 07-Jun-14A A18850 Exc @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+52(P2) 5 09-Jun-14A 08-Jul-14A A18860 RCP @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+52(P2) 7 09-Jul-14 A 19-Sep-14 45 A18900 Flexbase @ SCB-SBFR inc(Ramp S8) St 533+61 to 557+52. 15 26-Sep-14 18-Oct-14 39 h A18960 HMAC @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+52(P; 3 18-Oct-14 23-Oct-14 39 p A21000 Flexbase @ Under Bridge(P2) 3 18-Oct-14 23-Oct-14 47 p A18870 Conc Pvmt @ SCB-SBFR inc(Ramp S8)St 533+61 to 557+5 9 23-Oct-14 03-Nov-14 39 A21010 HMAC @ Under Brige(P2) 1 23-Oct-14 24-Oct-14 47 5 A18880 Cure Conc.Pvmt @ SCB-SBFR inc(Ramp S8)St 533+61 to 7 03-Nov-14 10-Nov-14 69 p A21020 Conc Pvmt @ Under Bridge(P2) 7 03-Nov-14 13-Nov-14 39 O A21030 Cure Conc.Pvmt @ Under Bridge(P2) 7 13-Nov-14 20-Nov-14 59 O Retaining Wall A19830 Excavate,Temp Shore&Embank @ SBFR-W Brdg(P2) 10 03-Jun-14A 11-Jul-14 A A19830 IN Excavate,Temp Shore&Embank @ SBFR-W Brdg(P2)-IMF 10 11-Jul-14 A 28-Jul-14 A A19830 Al Excavate,Temp Shore&Embank 0 SBFR-W Brdg(P2)-AF1 5 29-Jul-14A 30-Jul-14A • A19830 if Excavate,Temp Shore&Embank 0 SBFR-W Brdg(P2)-IMF 8 30-Jul-14A 07-Aug-14A A19830 Al Excavate,Temp Shore&Embank 0 SBFR-W Brdg(P2)-AF1 5 07-Aug-14 A 19-Aug-14 A A19580 Footing @ Retaining Wall Ramp S7&SCB-SBFR (P2) 9 20-Aug-14 A 18-Sep-14 39. • A19590 Panels 0 Retaining Wall Ramp S7&SCB-SBFR (P2) 17 25-Aug-14A 26-Sep-14 39 A19600 Coping @ Retaining Wall Ramp S7&SCB-SBFR (P2) 9 26-Sep-14 10-Oct-14 64 7E= Colony Blvd Bridge Bents 5 thru 6 A20150 Drilled Shafts(Int.Columns)@ B5&B6 Colony Blvd Brdg(P2) 9 19-May-14A 17-Jun-14 A Columns A20190 Columns @ B5&96 Colony Blvd Brdg(P2) 15 19-Jun-14 A 08-Aug-14 A Caps A20170 Caps @ 85&B6 Colony Blvd Brdg(P2) 30 15-Jul-14 A 10-Sep-14 A iiii.• Remaining Level of Effort ' Remaining Work • •Milestone Page 3 of 9 TASK filter:All Activities M-i Actual Work lii-iil Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc. Project 10:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish Total 2014 2015 Duration Float exp Oct I Nov Dec Jan I Feb I Mar I Apr I May Superstructure Beams A20130 Beams @ Colony Blvd Brdg Span 5(P2) 2 26-Sep-14 29-Sep-14 22 El Deck A20060 PMD @ Colony Blvd Brdg(P2) 9 29-Sep-14 13-Oct-14 22 A20070 Overhangs @ Colony Blvd Brdg(P2) 2 13-Nov-14 14-Nov-14 0 fi A20080 Rebar&Prep Deck©Colony Blvd Brdg(P2) 7 15-Nov-14 24-Nov-14 0 I_ A20090 Grade&Dry Run @ Colony Blvd Brdg(P2) 4 25-Nov-14 01-Dec-14 0 10 • A20100 Pour Deck @ Colony Blvd Brdg(P2) 2 02-Dec-14 04-Dec-14 0 ■ A20110 Cure Deck @ Colony Blvd Brdg(P2) 15 05-Dec-14 19-Dec-14 30 I 1 A20140 Rail @ Colony Blvd Brdg(P2) 2 10-Feb-15 14-Feb-15 0 ❑ SBFR-E Bridge Bents 1 thru 2 Substructure Foundations A20290 Drilled Shafts(Int.Columns)@ SBFR-E Brdg(P2) 2 15-Jul-14A 21-Jul-14A Footings A21060 Footings @ SBFR-E Brdg(P2) 4 23-Jul-14A 25-Jul-14 A Columns A21120 Columns Cross Bent @ SBFR-E Brdg(P2) 4 06-Aug-14A 08-Aug-14A A20330 Columns @ SBFR-E Brdg(P2) 6 18-Aug-14A 12-Sep-14A MUNI I Caps A20310 Caps @ SBFR-E Brdg(P2) 7 18-Sep-14 26-Sep-14 59 dram A21130 Caps Cross Bent @ SBFR-E Brdg(P2) 5 27-Sep-14 04-Oct-14 59 j Superstructure I Beams A20270 Beams @ SBFR-E Brdg Span 1(P2) 1 23-Dec-14 23-Dec-14 3 1 i Deck ! A20200 PMD @ SBFR-E Brdg(P2) 3 26-Dec-14 29-Dec-14 3 0 A20210 Overhangs @ SBFR-E Brdg(P2) 2 30-Dec-14 02-Jan-15 3 0 A20220 Rebar&Prep Deck @ SBFR-E Brdg(P2) 3 03-Jan-15 06-Jan-15 3 0 A20230 Grade&Dry Run @ SBFR-E Brdg(P2) 4 08-Jan-15 12-Jan-15 3 0 A20240 Pour Deck @ SBFR-E Brdg(P2) 2 13-Jan-15 16-Jan-15 6 ❑ A20250 Cure Deck @ SBFR-E Brdg(P2) 15 17-Jan-15 31-Jan-15 14 I A20260 Approach Slab @ SBFR-E Brdg(P2) 8 17-Jan-15 27-Jan-15 6 I=0 A20280 Rail @ SBFR-E Brdg(P2) 2 05-Feb-15 07-Feb-15 0 ❑ SBFR-W Bridge A20430 Drilled Shafts(Int.Columns)@ SBFR-W Brdg(P2) 5 08-Jul-14A 21-Jul-14A A20440 Drilled Shafts(Abuts)@ SBFR-W Brdg(P2) 2 11-Aug-14 A 13-Aug-14A • Footings A21050 Footings @ SBFR-W Brdg(P2) 20 10-Jul-14A 22-Jul-14A Columns A20470 Columns©SBFR-W Brdg(P2) 8 29-Jul-14A 16-Aug-14A A21150 Columns Cross Bent @ SBFR-W Brdg(P2) 2 06-Aug-14A 08-Aug-14A A20540 DS Extensions(Abutment)@ SBFR-W Brdg(P2) 2 18-Aug-14A 21-Aug-14A Remaining Level of Effort Its iEl Remaining Work • •Milestone Page 4 of 9 TASK filter:All Activities N Actual Work M Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc Project ID:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish Total 2014 2015 Duration Float Sep Oct Nov Dec Jan Feb Mar Apr May , Caps A20450 Caps @ SBFR-W Brdg(P2) 23 20-Aug-14 A 26-Sep-14 22 ion A20460 Abuts @ SBFR-W Brdg(P2) 8 11-Sep-14 A 19-Sep-14 46 113 A21160 Caps Cross Bent @ SBFR-W Brdg(P2) 7 18-Sep-14 26-Sep-14 41 Superstructure Beams A20410 Beams @ SBFR-W Brdg(P2) 4 27-Sep-14 03-Oct-14 41 O Deck A20340 Panels @ SBFR-W Brdg(P2) 3 04-Oct-14 07-Oct-14 41 p A20350 Overhangs @ SBFR-W Brdg(P2) 8 05-Dec-14 15-Dec-14 0 ll A20360 Rebar&Prep Deck @ SBFR-W Brdg(P2) 6 16-Dec-14 23-Dec-14 0 A20370 Grade&Dry Run @ SBFR-W Brdg(P2) 4 26-Dec-14 30-Dec-14 0 =� ""-- A20380 Pour Deck @ SBFR-W Brdg(P2) 2 02-Jan-15 03-Jan-15 0 i A20390 Cure Deck @ SBFR-W Brdg(P2) 15 04-Jan-15 18-Jan-15 0 iliMil A20400 Approach Slab @ SBFR-W Brdg(P2) 8 05-Jan-15 16-Jan-15 16 MEM i. A20420 Rail @ SBFR-W Brdg(P2) 2 07-Feb-15 10-Feb-15 0 iiii Colony Blvd Bridge Bent 3 A19760 Drilled Shafts(Int.Columns)@ B3 Colony Blvd Brdg(P2) 4 05-May-14A 09-May-14A l A19800 Columns @ B3 Colony Blvd Brdg(P2) 12 22-May-14 A 18-Jun-14 A Caps A19780 Caps @ B3 Colony Blvd Brdg(P2) 15 14-Jun-14 A 14-Jul-14 A Superstructure Beams A19740 Beams @ Colony Blvd Brdg Span 2(P2) 2 25-Jul-14A 25-Jul-14A Deck A19670 PMD@ Colony Blvd Brdg(P2) 8 16-Aug-14A 02-Sep-14A NI A19680 Overhangs @ Colony Blvd Brdg(P2) 2 04-Oct-14 06-Oct-14 0 ■ A19690 Rebar&Prep Deck @ Colony Blvd Brdg(P2) 4 07-Oct-14 11-Oct-14 0 I. A19700 Grade&Dry Run @ Colony Blvd Brdg(P2) 4 13-Oct-14 17-Oct-14 0 MI A19710 Pour Deck @ Colony Blvd Brdg(P2) 2 1B-Oct-14 20-Oct-14 0 ■ A19720 Cure Deck @ Colony Blvd Brdg(P2) 15 21-Oct-14 04-Nov-14 103 A19750 Rail @ Colony Blvd Brdg(P2) 2 14-Feb-15 17-Feb-15 0 Colony Blvd Bridge Bent 4 Superstructure Beams • A20550 Beams @ Colony Blvd Brdg Span 3(P2) 1 26-Jul-14A 27-Jul-14 A A20550 t Beams @ Colony Blvd Brdg Span 4(P2) 1 22-Aug-14A 23-Aug-14 A • Deck A20480 PMD @ Colony Blvd Brdg(P2) 14 03-Sep-14 A 20-Sep-14 20 A20490 Overhangs @ Colony Blvd Brdg(P2) 4 21-Oct-14 25-Oct-14 0 MI A20500 Rebar&Prep Deck @ Colony Blvd Brdg(P2) 7 27-Oct-14 03-Nov-14 0 MN A20510 Grade&Dry Run @ Colony Blvd Brdg(P2) 4 04-Nov-14 08-Nov-14 0 IN A20520 Pour Deck @ Colony Blvd Brdg(P2) 2 10-Nov-14 11-Nov-14 0 Ill r- Remaining Level of Effort 1==ii==1 Remaining Work • •Milestone Page 5 of 9 TASK filter:All Activities --tom Actual Work Lam)-fl Criti al Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc Project ID:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish - Total 2014 2015 Duration I Float Sep I Oct I Nov I Dec Jan I Feb l Mar Apr May y A20530 Cure Deck @ Colony Blvd Brdg(P2) 15 12-Nov-14 26-Nov-14 53 I I Rail A20560 Rail @ Colony Blvd Brdg(P2) 2 17-Feb-15 20-Feb-15 0 ❑ • Ramp 148 @ St 540+23 to 562+85 ________._____._ A18990 Prep ROW @ Ramp N8 St 540+23 to 562+85(P2) 2 05-Aug-14A 05-Aug-14A A19000 Demo @ Ramp N8 St 540+23 to 562+85(P2) 3 06-Aug-14 A 07-Aug-14 A I. A19010 Exc @ Ramp N8 St 540+23 to 562+85(P2) 8 07-Aug-14 A 14-Aug-14 A A19020 RCP @ Ramp N8 St 540+23 to 562+85(P2) 3 14-Aug-14 A 27-Aug-14 A A19060 Flexbase @Ramp N8 St 540+23 to 562+85(P2) 12 19-Aug-14 A 03-Sep-14 A I. A19180 HMAC @ Ramp N8 St 540+23 to 562+85(P2) 2 04-Sep-14 A 05-Sep-14 A 1 A19030 Conc Pvmt @ Ramp N8 St 540+23 to 562+85(P2) 6 18-Sep-14A 23-Sep-14 0 J A19040 Cure Conc.Pvmt @ Ramp N8 St 540+23 to 562+85(P2) 7 23-Sep-14 30-Sep-14 6 NBFR @ St 540+00 to 546+00 A19070 Prep ROW @ NBFR St 540+00 to 546+00(P2) 2 05-Aug-14A 05-Aug-14A A19080 Demo @ NBFR St 540+00 to 546+00(P2) 3 06-Aug-14 A 07-Aug-14 A A19090 Exc @ NBFR St 540+00 to 546+00(P2) 3 07-Aug-14A 19-Aug-14A A19100 RCP @ NBFR St 540+00 to 546+00(P2) 3 14-Aug-14A 27-Aug-14A A19140 Flexbase @ NBFR St 540+00 to 546+00(P2) 6 19-Aug-14 A 03-Sep-14 A N A19170 HMAC @ NBFR St 540+00 to 546+00(P2) 1 04-Sep-14A 05-Sep-14A 1 A19110 Conc Pvmt @ NBFR St 540+00 to 546+00(P2) 4 23-Sep-14 29-Sep-14 0 RE A19120 Cure Conc.Pvmt @ NBFR St 540+00 to 546+00(P2) 7 29-Sep-14 06-Oct-14 0 OM iNBFR @ St 540+39 to 543+06 A19150 Prep ROW @ NBFR St 540+39 to 543+06(P2) 1 05-Aug-14A 05-Aug-14A A19160 Demo @ NBFR St 540+39 to 543+06(P2) 1 06-Aug-14 A 07-Aug-14 A A19220 Flexbase NBFR St 540+39 to 543+06(P2) 1 19-Aug-14 A 03-Sep-14 A • ' A19190 HES Conc Pvmt @ NBFR St 540+39 to 543+06(P2) 1 17-Sep-14 A 18-Sep-14 12 A19200 Cure Conc.Pvmt @ NBFR St 540+39 to 543+06(P2) 1 18-Sep-14 19-Sep-14 18 i NBFR-E Bridge Bents 1 thru 2 i A20010 Drilled Shafts(Int.Columns)@ NBFR-E Brdg(P2) 2 29-Jul-14A 30-Jul-14A Footings . _ '' - A21040 Footings @ NBFR-E Brdg(P2) 4 13-Aug-14 A 15-Aug-14A Colu A21090 Columns Cross Bent @NBFR-E Brdg(P2) 2 18-Aug-14A 21-Aug-14A A20050 Columns @ NBFR-E Brdg(P2) 4 18-Sep-14 22-Sep-14 69 ja Caps • A21100 Caps Cross Bent @NBFR-E Brdg(P2) 5 OS-Sep-14A 19-Sep-14 11 • A20030 Caps @ NBFR-E Brdg(P2) 7 23-Sep-14 03-Oct-14 69 I 1 •A19990 Beams @ NBFR-E Brdg Span 1(P2) 1 10-Jan-15 12-Jan-15 0 0 Deck A19920 PMD @ NBFR-E Brdg(P2) 3 12-Jan-15 17-Jan-15 0 O • A19930 Overhangs @ NBFR-E Brdg(P2) 2 17-Jan-15 20-Jan-15 0 12 Page A19940 Rebar&Prep Deck @ NBFR-E Brdg(P2) I3 20-Jan-15 24-Jan-15 0 ID 1 A19950 Grade&Dry Run @ NBFR-E Brdg(P2) 4 24-Jan-15 30-Jan-15 0 O me...... Remaining Level of Effort F Remaining Work ♦ ♦Milestone Page 6 of 9 TASK filter:All Activities M Actual Work M—IIIIII Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc Project 10:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish Total 2014 2015 Duration Float I Sep Oct I Nov I Dec Jan I Feb Mar I Apr May A19960 Pour Deck @ NBFR-E Brdg(P2) 2 30-Jan-15 02-Feb-15 0 0 ' A19970 Cure Deck @ NBFR-E Brdg(P2) 15 02-Feb-15 17-Feb-15 3 I I Rail A20000 Rail @ NBFR-E Brdg(P2) 2 02-Feb-15 05-Feb-15 0 0 NBFR-W Bridge Bent 7 j, A19890 Drilled Shafts(Int.Columns)@ NBFR-W Brdg(P2) 2 31-Jul-14A 01-Aug-14A ' Columns A19910 Columns Cross Bent @ NBFR-W Brdg(P2) 6 15-Aug-14A 19-Aug-14A A19900 Caps Cross Bent @ NBFR-W Brdg(P2) 7 20-Aug-14A 05-Sep-14A Traffic Switches A9780 P2 to P3 Stripe/Traffic Switch NB 2 06-Oct-14 09-Oct-14 0 18 A9740 P2 to P3 Stripe/Traffic Switch SB 2 19-Jan-15 20-Jan-15 0 PHASE 3 Ramp S7 @ St 530+50 to 534+00 A19230 Prep ROW @ Ramp S7 St 530+50 to 534+00(P3) 2 22-Jan-15 23-Jan-15 0 A19240 Demo @ Ramp S7 St 530+50 to 534+00(P3) 3 24-Jan-15 27-Jan-15 0 III A19790 Mill @ Ramp S7 St 530+50 to 534+00(P3) 1 29-Jan-15 29-Jan-15 0 I , A19250 Exc @ Ramp S7 St 530+50 to 534+00(P3) 2 30-Jan-15 31-Jan-15 0 g A19260 RCP @ Ramp S7 St 530+50 to 534+00(P3) 2 02-Feb-15 03-Feb-15 0 TI A19300 Flexbase @ Ramp S7 St 530+50 to 534+00(P3) 4 05-Feb-15 09-Feb-15 0 M A19730 HMAC @ Ramp S7 St 530+50 to 534+00(P3) 1 10-Feb-15 10-Feb-15 0 1 A19270 Conc Pvmt @ Ramp S7 St 530+50 to 534+00(P3) 3 13-Feb-15 16-Feb-15 0 IN A19280 Cure Conc.Pvmt @ Ramp S7 St 530+50 to 534+00(P3) 7 17-Feb-15 23-Feb-15 0 NM SBFR-SCB©St 553+00 to 562+00 A19470 Prep ROW @ SBFR-SCB St 553+00 to 562+00(P3) 1 02-Oct-14` 02-Oct-14 0 A19480 Demo @ SBFR-SCB St 553+00 to 562+00(P3) 4 03-Oct-14 07-Oct-14 3 O A19840 Mill @ SBFR-SCB St 553+00 to 562+00(P3) 3 09-Oct-14 11-Oct-14 3 ❑ A19490 Exc @ SBFR-SCB St 553+00 to 562+00(P3) 7 13-Oct-14 21-Oct-14 49 O A19500 RCP @ SBFR-SCB St 553+00 to 562+00(P3) 2 23-Oct-14 24-Oct-14 49 0 A19540 Flexbase @ SBFR-SCB St 553+00 to 562+00(P3) 14 25-Oct-14 11-Nov-14 49 I- •I A19770 HMAC @ SBFR-SCB St 553+00 to 562+00(P3) 1 13-Nov-14 13-Nov-14 49 I A19510 Conc Pvmt @ SBFR-SCB St 553+00 to 562+00(P3) 6 29-Jan-15 05-Feb-15 7 p A19520 Cure Conc.Pvmt @ SBFR-SCB St 553+00 to 562+00(P3) 7 06-Feb-15 12-Feb-15 11 p I Retaining Wall i A19820 Excavate,Temp Shore&Embank @ SBFR-E Brdg(P3) 19 13-Oct-14 O6-Nov-14 3 I I 1 I A19640 Footing @ Retaining Wall SBFR-SCB(P3) 5 13-Nov-14 18-Nov-14 3 O A19650 Panels @ Retaining Wall SBFR-SCB(P3) 15 20-Nov-14 11-Dec-14 3 I 1 A19660 Coping @ Retaining Wall SBFR-SCB(P3) 6 12-Dec-14 19-Dec-14 32 O SBFR-E Bridge Bents 3 thru 4 Substructure Foundations A20850 Drilled Shafts(Int.Columns)@ SBFR-E Brdg(P3) 2 15-Jul-14A 21-Jul-14 A A20860 Drilled Shafts(Abuts)@ SBFR-E Brdg(P3) 2 07-Nov-14 08-Nov-14 3 0 Footings _ .-. .. s�s Remaining Level of Effort Remaining Work • •Milestone Page 7 of 9 TASK firer:All Activities ss = Actual Work Cry Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc Project ID:613005 CO5 Review Printout 1 - 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish —Total 2014 2015 Duration Float Sep Oct Nov Dec Jan Feb Mar Apr May 1' A21070 Footings @ SBFR-E Brdg(P3) 4 23-Jul-14A 25-Jul-14A Columns j A20890 Columns @ SBFR-E Brdg(P3) 6 09-Sep-14A 15-Sep-14A iiii A20990 DS Extensions(Abutment)@ SBFR-E Brdg(P3) 2 10-Nov-14 11-Nov-14 3 Caps A20870 Caps @ SBFR-E Brdg(P3) 5 18-Sep-14 23-Sep-14 72 NI A20880 Abuts @ SBFR-E Brdg(P3) 8 12-Dec-14 22-Dec-14 3 MEM Superstructure Beams A20830 Beams @ SBFR-E Brdg Spans 2&3(P3) 1 23-Dec-14 23-Dec-14 9 I -- Deck P20760 Panels @ SBFR-E Brdg(P3) 2 26-Dec-14 27-Dec-14 9 El A20770 Overhangs @ SBFR-E Brdg(P3) 2 29-Dec-14 30-Dec-14 9 A20780 Rebar&Prep Deck @ SBFR-E Brdg(P3) 2 02-Jan-15 03-Jan-15 9 B A20790 Grade&Dry Run @ SBFR-E Brdg(P3) 4 05-Jan-15 09-Jan-15 9 0103 A20800 Pour Deck @ SBFR-E Brdg(P3) 2 13-Jan-15 16-Jan-15 7 is A20810 Cure Deck @ SBFR-E Brdg(P3) 14 17-Jan-15 30-Jan-15 14 MIMI A20820 Approach Slab @ SBFR-E Brdg(P3) 8 17-Jan-15 27-Jan-15 7 MN A20840 Rail @ SBFR-E Brdg(P3) 2 23-Feb-15 27-Feb-15 0 ®r SCB-NBFR @ St 552+00 to 563+00 A19390 Prep ROW @ SCB-NBFR St 552+00 to 563+00(P3) 2 09-Oct-14 11-Oct-14 0 8 A19400 Demo @ SCB-NBFR St 552+00 to 563+00(P3) 4 11-Oct-14 17-Oct-14 0 RERI A19410 Exc @ SCB-NBFR St 552+00 to 563+00(P3) 4 23-Oct-14 27-Oct-14 64 in , A19420 RCP @ SCB-NBFR St 552+00 to 563+00(P3) 2 28-Oct-14 29-Oct-14 64 p w A19450 Emb @ SCB-NBFR St 552+00 to 563+00(P3) 4 30-Oct-14 03-Nov-14 64 En A19460 HMAC @ SCB-NBFR St 552+00 to 563+00(P3) 2 04-Nov-14 06-Nov-14 64 0 A19430 Cone Pvmt @ SCB-NBFR St 552+00 to 563+00(P3) 4 12-Jan-15 19-Jan-15 19 0 A19440 Cure Conc.Pvmt @ SCB-NBFR St 552+00 to 563+00(P3) 7 19-Jan-15 26-Jan-15 28 p i. Retaining Wall L A19850 Excavate,Temp Shore&Embank @ NBFR-E Brdg(P3) 21 17-Oct-14 14-Nov-14 0 f -1 A19610 Footing @ Retaining Wall SCB-NBFR (P3) 9 20-Nov-14 04-Dec-14 0 l I A19620 Panels @ Retaining Wall SCB-NBFR(P3) 18 02-Dec-14 29-Dec-14 0 I 1 A19630 Coping @ Retaining Wall SCB-NBFR (P3) 9 29-Dec-14 12-Jan-15 19 I I NBFR-E Bridge Bent 3 I Substructure Foundations A20720 Drilled Shafts(Abuts)@ NBFR-E Brdg(P3) 2 14-Nov-14 17-Nov-14 0 ❑ Columns A20750 DS Extensions(Abutment)@ NBFR-E Brdg(P3) 2 17-Nov-14 20-Nov-14 0 0 Caps A20740 Abuts @ NBFR-E Brdg(P3) 8 29-Dec-14 10-Jan-15 0 . Superstructure { Beams A20690 Beams @ NBFR-E Brdg Span 2(P3) 1 10-Jan-15 12-Jan-15 3 0 Deck A20630 Overhangs @ NBFR-E Brdg(P3) 2 12-Jan-15 16-Jan-15 3 IN Remaining Level of Effort Remaining Work • •Milestone Page 8 of 9 TASK filter:All Activities Mil Actual Work C----ED Critical Remaining Work (c)Primavera Systems,Inc Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 Project 0:613005 C05 Review Printout_1 24-Oct-14 17:49 Activity ID Activity Name Original Start Finish Total 2014 2015 Duration Float I Sep I Oct I Nov I Dec Jan I Feb I Mar I Apr I May I A20620 PMD©NBFR-E Brdg(P3) 3 16-Jan-15 20-Jan-15 3 I ❑ A20640 Rebar&Prep Deck @ NBFR-E Brdg(P3) 2 20-Jan-15 23-Jan-15 3 0 • • A20650 Grade&Dry Run @ NBFR-E Brdg(P3) 4 23-Jan-15 29-Jan-15 3 p A20660 Pour Deck @ NBFR-E Brdg(P3) 2 30-Jan-15 02-Feb-15 2 [] A20670 Cure Deck©NBFR-E Brdg(P3) 15 02-Feb-15 17-Feb-15 3 I I ' A20680 Approach Slab©NBFR-E Brdg(P3) 8 02-Feb-15 14-Feb-15 4 I I Rail • A20700 Rail @ NBFR-E Brdg(P3) 2 20-Feb-15 23-Feb-15 0 0 Traffic Switches A20950 P3 S2 to P4 Stripe/Traffic Switch NB 2 14-Feb-15 17-Feb-15 6 0 A9760 P3 S2 to P4 Stripe/Traffic Switch SB 2 24-Feb-15 27-Feb-15 0 • Traffic Switches-1 A9770 Final Stripe/Traffic Switch 2 28-Feb-15 01-Mar-15 0 •• Y Electrical A2820 Electrical Work(P4) 15 07-Feb-15 01-Mar-15 0 Signing • A2830 Signing I ITS Work(P4) 15 07-Feb-15 01-Mar-15 0 Milli Landscaping iA21080 Pour Bridge Median @ Colony Blvd Brdg(P4) 25 20-Dec-14 27-Jan-15 22 I 1 A2840 Backfill Slopes(P4) 10 17-Jan-15 30-Jan-15 9 t I A2850 Sod&Seed(P4) 11 31-Jan-15 16-Feb-15 9 I I Remaining Level of Effort == Remaining Work • •Milestone Page 9 of 9 TASK filter.All Activities Mi1. Actual Work M Critical Remaining Work Colony Blvd over SH 121-Alternate TCP 2-Revised According to CO#5 (c)Primavera Systems,Inc