Loading...
HomeMy WebLinkAboutResolution No. 2014-070 RESOLUTION NO. 2014- O A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, APPROVING A SPECIAL SERVICES REQUEST NO. 3 FOR COROLLO ENGINEERS, INC. FOR ELECTRICAL DESIGN SERVICES FOR NEW UTILITY POWER CONNECTIONS AND ADDITIONAL BACKUP GENERATOR CAPACITY AT THE STEWART CREEK WASTEWATER TREATMENT PLANT, INCORPORATED HEREIN AS EXHIBIT "A"; AUTHORIZING THE CITY MANAGER TO EXECUTE THE CONTRACT AMENDMENT; PROVIDING AN EFFECTIVE DATE WHEREAS, the City and Consultant have entered into an agreement such that the Consultant is to provide the following services: ELECTRICAL DESIGN SERVICES FOR NEW UTILITY POWER CONNECTIONS AND ADDITIONAL BACKUP GENERATOR CAPACITY AT THE STEWART CREEK WASTEWATER TREATMENT PLANT; and WHEREAS,the City has determined that it is in the best interest of the City to enter into the Contract Amendment with COROLLO ENGINEERS, INC. which is attached hereto and incorporated herein by reference as Exhibit "A," under the terms and conditions provided therein. WHEREAS, with this Contract Amendment the City of The Colony is agreeing to pay the sum not to exceed $76,520 for such work. THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY,TEXAS THAT: Section 1. The Contract Amendment, which is attached and incorporated hereto as Exhibit "A", having been reviewed by the City Council of the City of The Colony, Texas, and found to be acceptable and in the best interest of the City and its citizens, be, and the same is hereby, in all things approved in the amount of$76,520 and the City Manager is hereby authorized to execute the Contract Amendment or Purchase Order on behalf of the City of The Colony,Texas. Section 2. That this Resolution shall take effect immediately from and after its adoption and it is so resolved. PASSED,APPROVED and EFFECTIVE this 7th day of OCTOBER,2014. T: J%e McCou y, Mayor I ity of The Colony, Tefl- :s istie Wilson, City Secretary r"---• ° " D AS TO FORM: V .0 Jeff M.ore City Attorney • TE'X • P►g,,,oi 63918 C Ca1.40." Ya Engineers...Working Wonders With Water® August 21, 2014 Mr. Evan Groeschel The Colony #1 Harris Plaza The Colony, TX 75056 Subject: Special Services Request No. 3-- Utility and Backup Power Dear Mr. Groeschel: This letter serves as Special Service Request No. 3 for additional engineering design related to new utility power connections and additional backup generator capacity at the Stewart Creek Wastewater Treatment Plant (WWTP). As discussed in our August 5, 2014 meeting, it has been determined that the existing utility service and backup generation capacity is not adequate to serve the planned plant improvements. New utility service and additional backup generation capacity will be designed to accommodate Phase 1 and Phase 2 improvements. This effort will also include coordination with Oncor in requesting the new service connections As you recall, modifications to the existing utility power supply and backup generators were not included as part of our scope under Basic Services. This effort was included as a Special Service Task due to the many unknowns about existing capacity and future power requirements. The scope of work for this special service request will include upgrading the existing electrical feed to the plant along with the addition of two new electrical feeds. Backup generators will be provided for each of the three plant feeds. Additionally, it is our understanding the existing PLC based automatic throwover switch (ATO) for the existing generator serving the main switchboard is not functional. As part of this work, the existing ATO will be demolished and replaced with a new automatic transfer switch (ATS), to match what is proposed for the two new plant electrical feeds. We request that $76,520 of the total budgeted amount of$90,000 for this special service task be authorized. This amount includes $71,520 for Mbroh Engineering (Mbroh) for electrical design services and $5,000 for Carollo for management, design coordination, and review. A breakdown of Mbroh's cost is attached to this letter. Please let me know if you have any questions or need additional information. I can be reached at 817-882-0528 or jgallovich@carollo.com. Sincerely, CAROLLO ENGINEERS, INC. ''''7:: —.,, m Gallovich JG:jsg cc: Scott Hoff, Carollo File i Special Services Request No.3 Special Services Additional Electrical Upgrade Aug 21,2014 Labor Hours I Rate: $200 $165 $185 $150 $120 PM Project Sr PLC Prgr Sr EE EE l&C l&C CAD Total Labor Task Description Hours Fee 100 , Coordination with Power Company $28,320 11011 Telephone calls to discuss procedures and 4 4 $800 Forms with Oncor Electrical load calculations for 3 Forms 120 required by Oncor and preparing forms for 8 24 32 $5,560 Oncor 1301 Descriptions for different options for providing 4 16 20 $3,440 power to Plant by Oncor Design of three independent electrical one line 140 diagrams for 3 services from Oncor and 4 24 25 53 $7,760 generators Design of layouts and plans for three Oncor 150 transformers and primary power feeders to 4 24 30 58 $8,360 Main Switchboard,new MCC-E and MCC-W 160, Three Coordination field trips and meetings 12 12 $2,400 with Oncor Subtotal 36 88 0 0 55 179 $28,320 200 Design for three Generators $43,200 210 Electrical load calculations for sizing of each of three generators Main Switchboard 2 6 8 $1,390 New MCC-E 2 6 8 $1,390 New MCC-W 2 6 8 $1,390 I 2201 Design of layouts and plans for enclosures for 2 8 16 26 $3,640 I three generators and three ATS's 8/21/2014 Page 1/2 The Colony-Stewart Creek WWTP Special Services I(rev3)xls Special Services Additional Electrical Upgrade Aug 21,2014 Labor Hours Rate: $200 $165 $185 $150 $120 PM Project Sr PLC Prgr Sr EE EE I&C l&C CAD Total Labor Task Description Hours Fee Design of three independent electrical one line 230 diagrams for 3 services from Oncor and 8 30 20 58 $8,950 associated generators and ATS's Design of layouts and plans for three Oncor 240 transformers and primary power feeders to 5 46 40 91 $13,390 Main Switchboard,new MCC-E and MCC-W and three generators and associated ATS's 250 Power and Control diagrams for each 2 10 16 28 $3,970 generator and ATS 260 Three coordination field trips and meetings 4 16 20 $3,440 with Generator and ATS manufacturer 270 Three MEI field trips associated with design of 2 8 10 $1,720 new generators and ATS's 280 Three coordination field trips and meetings 2 8 10 $1,720 with Generator and ATS manufacturer 290 Design of three new grounding systems 2 8 4 14 $2,200 Subtotal 33 152 0 0 96 281 $43,200 Project Total $71,520 8/21/2014 Page 2/2 The Colony-Stewart Creek VVWTP Special Services l(rev3).xls