Loading...
HomeMy WebLinkAboutResolution No. 2012-048 CITY OF THE COLONY, TEXAS RESOLUTION NO. 2012- C ll A RESOLUTION OF THE CITY OF THE COLONY, TEXAS, AWARDING A BID AND APPROVING A CONTRACT BY AND BETWEEN THE CITY OF THE COLONY AND WEISINGER INCORPORATED, FOR REPAIR OF THE TRINITY WELL AT WELL SITE 1, AUTHORIZING THE CITY MANAGER TO EXECUTE SAID CONTRACT; PROVIDING AN EFFECTIVE DATE WHEREAS, the City Council has determined that it is in the best interest of the citizens to award a bid to Weisinger Incorporated, and execute a contract for repair of the Trinity Well at Well Site 1; and WHEREAS, the City of The Colony agrees to pay the sum of $152,969.00 for such work. NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF THE COLONY, TEXAS, THAT: Section 1. The City Council of the City of The Colony, Texas hereby awards a bid to Weisinger Incorporated, and authorizes the City Manager to execute a contract for repair of the Trinity Well at Well Site 1 for a total amount of $152,969.00. Section 2. This resolution shall take effect immediately from and after its passage. PASSED AND APPROVED by the City Council of the City of The Colony, Texas, this 5th day of June, 2012. 'e McCourrv Mayor ity of The C&ny, Texas AT'it'ESIT. 1 ` Christie Wilson, City Secretary tzr.ro;.„ APPROVED AS TO FORM: Jeff Moore city Attorney I TRINITY WELL 41 PUMP AND CASING REPAIRS Weisinger Inc. Lane Christensen Co. Alsay Inc. BID TABULATION FOR MOBILIZATION BID ITEM # 1 ITEM # QTY DESCRIPTION Unit $ Total Cost $ Unit $ Total Cost $ Unit $ Total Cost $ 1 1 MOBILIZATION INCLUDES: TRANSPORTING METERIALS, 6,480.00 6,480.00 19,900.00 19,990.00 78,500.00 78,500.00 TOOLS AND EQUIPMENT TO WORK SITE. SUCH AS PUMP SERVICE RIG, CRAINS AND CREW, DRILL PIPE, SETTING TOOL RENTAL AND INSTALATION SUPPLIES, CAMERA SERVEY CREW AND EQUIPMENT. BID TABULATION FOR BID ITEM # 1 ITEM # QTY DESCRIPTION Unit $ Total Cost $ Unit $ Total Cost $ Unit $ Total Cost $ 1 1 8" LINER / PACKER ASSEMBLY INSTALLED COMPLETE. 46,200.00 46,200.00 175,700.00 175,700.00 78,000.00 78,000.00 2 1 LABOR FOR DIPPING BOTTOM TO REMOVE SEDIMENTS FROM 2,475.00 2,475.00 3,900.00 3,900.00 45,000.00 45,000.00 WELL AFTER REPAIRS 3 1 PROVIDE VIDEO RECORDING OF CAMERA SERVEY AND 1,500.00 1,500.00 1,400.00 1,400.00 2,500.00 2,500.00 INSPECTION (IN DVD FORAMAT). BID TABULATION FOR MOBILIZATION BID ITEMS # 2 ITEM # QTY DESCRIPTION Unit $ Total Cost $ Unit $ Total Cost $ Unit $ Total Cost $ 1 TRANSPORTING METERIALS FROM WEISINGER'S YARD TO 24,180.00 24,180.00 21,660.00 21,660.00 70,000.00 70,000.00 CONTRACTORS LOCATION, TRANSPORTING METERIALS TO WORK SITE. SANITIZING WELL AND COLUMN PIPE ASSEMBLING PUMP, MOTOR AND EQUIPMENTS. BID TABULATION FOR BID ITEM # 2 ITEM # QTY DESCRIPTION OF PARTS TO BE REPLACED Unit $ Total Cost $ Unit $ Total Cost $ Unit $ Total Cost $ 1 1 1.93" x 5' motor drive shaft 792.00 792.00 430.00 430.00 780.00 780.00 2 1 2.5" x 1.69" tension bearing 647.00 647.00 510.00 510.00 900.00 900.00 3 1 8" x 2.5" x 1.69" x 10' top column assembly 1,134.00 1,134.00 1,580.00 1,580.00 1,280.00 1,280.00 4 31 8" x 20' Thread & Coupled column pipe, sch. 40 833.00 25,823.00 800.00 24,800.00 1,490.00 46,190.00 5 1 8" x 10' Thread & Coupled column pipe, sch. 40 480.00 480.00 440.00 440.00 750.00 750.00 6 101 2.5" x 5' oil tubes 58.00 5,858.00 58.00 5,858.00 160.00 16,160.00 7 170 2.5" x 1.69" line shaft bearings 83.00 14,110.00 70.00 11,900.00 100.00 17,000.00 8 15 1.69" x 20' line shaft 330.00 4,950.00 326.00 4,890.00 600.00 9,000.00 9 1 1.69" x 10' line shaft 190.00 190.00 163.00 163.00 286.00 286.00 10 45 1.69" shaft couplings 23.00 1,035.00 4100 1,935.00 46.00 2,070.00 11 865 FT. 114" SS airline 3.00 2,595.00 2.25 1,946.25 0.00 0.00 Page 1 of 2 TRINITY WELL #1 PUMP AND CASING REPAIRS Weisinger Inc. Lane Christensen Co. Alsay Inc. ITEM # QTY DESCRIPTION: PUMP AND MOTOR OVERHAUL Unit $ Total Cost $ Unit $ Total Cost $ Unit $ Total Cost $ 1 1 OVERHAUL PEERLESS 12LD-10 STAGE BOWL ASSEMBLY 7,180.00 7,180.00 5,290.00 5,290.00 18,600.00 18,600.00 FURNISHING WEAR RINGS, BEARINGS, SHAFT AND TRIMMING IMPELLERS SKIRTS. SAND BLASTING AND PAINTING WELL VJ3 1 1 RECONDITIONING MOTOR, REPLACING BEARING, SEAL AND, 7,340.00 7,340.00 14,400.00 14,400.00 28,000.00 28,000.00 CLEANING, DIPPING AND BAKING WINDINGS REPLACE HEATERS. PAINTING MOTOR TOTAL ALL ITEMS 152,969.00 296,792.25 415,016.00 CITY OF THE COLONY - WELL PUMP REPAIR Hourly Rate 275.00 250.00 425.00 Call out Fee 300.00 1,500.00 2,000.00 Page 2 of 2